19GE5026Q0119-Att.2 - Price proposal breakdown.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
EXTERIOR UPGRADE, FRANKFURT
Solicitation number
19GE5026Q0119
Issued by

About this file

This is a Price Proposal Breakdown template for a federal contract solicitation addressing exterior upgrades and renovations of residential housing compounds in Frankfurt, Germany. The solicitation (19GE5026Q0119) is issued by the Department of State Office of Acquisition Management's Regional Procurement Support Office in Frankfurt for work on two Siedlung Housing Compound Buildings located at Plieninger Str. 2/4-6/8, Frankfurt am Main.

The scope of work encompasses mobilization, removals and disposal, envelope work including roof and facade upgrades, scaffolding installation (1,800 SQM), window replacement, basement waterproofing (160 M), basement door installation, earthwork, application of cementitious repair plaster, installation of dimpled drainage systems, protection sheeting with filter fleece (320 SQM), perimeter insulation boards (320 SQM), French drain system installation with flushing shafts (160 M), and pump shaft installation (2 units). The contract also includes comprehensive bathroom renovations across three bathroom types: Type 1 (12 units) and Types 2 and 3 (4 and 5 units respectively), each requiring electrical work, mechanical work, floor and wall tiles, painting, bathroom product installation, and new doors. The template requires offerors to provide a detailed breakdown with material costs, labor and equipment costs, and per-unit subtotals, with the final contract price established as Firm Fixed Price. Offerors are responsible for verifying all quantities and dimensions based on drawings, specifications, and site visits, with no price adjustments permitted for quantity variations during contract performance. The pricing template includes line items for VAT, insurance, ILCs (Individually Legitimate Costs), overhead, and profit calculations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price proposal breakdown

ATTACHMENT 2 - PRICE PROPOSAL BREAKDOWN

It is a requirement for offerors to provide a breakdown of proposal by completing the PPB. The PPB shall be adjusted as desired to correspond with his Firm Fixed Price. The PPB provided is for reference purposes only. The contractor is required to verify the quantities and dimensions based on the drawings and specifications provided, and information acquired during the Site Visit. The contract price will not be adjusted due to increased quantities required during performance of the contract.

ITEM OF WORKQUANTITY (estimated)UNITSMATERIAL COSTLABOR AND EQUIPMENT COSTTOTAL
PER UNITSUBTOTALPER UNITSUBTOTAL
Mobilization1LS
Removals & Disposal1LS
Envelope Work
Roof Work1LS
Façade Work1LS
Scaffolding1,800SQM
Windows Work1LS
Basement Waterproofing160M
Basement Door1pcs
Earthwork1LS
Application of cementitious levelling / repair plaster160M
Installation of a dimpled drainage160M
Protection sheet with filter fleece320SQM
Installation of perimeter insulation boards (XPS)320SQM
Installation of a French drain system and flushing shafts DN300160M
Installation of a pump shaft2pcs
Bathroom Type 1
Electrical work (incl. light fixtures, new power lines)12Pcs
Mechanical work12Pcs
Floor and Wall tiles12Pcs
Painting (walls and ceiling)12Pcs
Installation of bathroom products12Pcs
New Door12Pcs
Bathroom Type 2
Electrical work (incl. light fixtures, new power lines)4Pcs
Mechanical work4Pcs
Floor and Wall tiles4Pcs
Painting (walls and ceiling)4Pcs
Installation of bathroom products4Pcs
New Door4Pcs
Bathroom Type 3
Electrical work (incl. light fixtures, new power lines)5Pcs
Mechanical work5Pcs
Floor and Wall tiles5Pcs
Painting (walls and ceiling)5Pcs
Installation of bathroom products5Pcs
New Door5Pcs
Subtotal - Bathroom Labor and Materials
Total Labor and Materials
VAT
Insurance
ILCs
Overhead
Profit