This solicitation is for apartment renovation services at a U.S. government-owned residential compound in Libreville, Gabon. The scope of work includes kitchen and bathroom remodeling, finish replacement and updates, fixture replacement, stair modification, and window/door replacement across six apartment units. Required products and services include new cabinetry, countertops, flooring, plumbing fixtures, lighting, doors, windows, and appliances. The contractor must provide design and construction services, purchase all materials and equipment, and arrange transportation. The response deadline is September 19, 2022. The contract will be a firm fixed-price award. The contractor must complete all work within 240 calendar days of the notice to proceed, and liquidated damages of $200 per day will be assessed for delays. The contractor must also submit various plans, schedules, and reports on a weekly, monthly, and milestone basis throughout the project period.

View the file

Other files

File Type Posted
22R0100 Q and A Volume I.pdf PDF
19GE5022R0100 Q and A Volume I.pdf PDF
19GE5022R0118_Q and A Volume I.pdf PDF
J.1.8 Design Legend.docx DOCX document
J.2.2 Sample ILC - Payment Guaranty.pdf PDF
J.1.10 Sliding Glass Window Example.docx DOCX document
J.2.1 Sample ILC - Performance Guaranty.pdf PDF
J.2.3 COR Questionnaire for TCNs.pdf PDF
J.1.1 Appendix of Houses.docx DOCX document
19GE5022R0100_RFP Cover letter.pdf PDF
J.1.9 Design Examples_Preferences.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

19GE5022R0100

SOLICITATION,OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

19GE5022R0100 SEALED BID (IFB)

X NEGOTIATED (RFP)

2. TYPE OF SOLICITATION 3. DATE ISSUED

08/19/2022

RATING

IMPORTANT -The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

CODE FRANK

AMERICAN CONSULATE GENERAL FRANKFURT

GIESSENER STRASSE 30

ATTN: RPSO

60435, FRANKFURT, GERMANY

7. ISSUED BY 8. ADDRESS OFFER TO

9. FOR INFORMATION

CALL:

a. NAME

Jamie M. Fleischhacker

b. TELEPHONE NO. (Include area code)(NO COLLECT CALLS) c. EMAIL

FleischhackerJM@state.gov

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Section A - Solicitation, Offer, and Award Section B - Supplies or Services and Price/Costs Section C - Description/Specifications/Statement of Work Section D - Packing and Marking Section E - Inspection and Acceptance Section F - Deliverables and Performance Section G - Contract Administration Data Section H - Special Contract Requirements Section I - Contract Clauses Section J - List of Attachments Section K - Representations, Certifications and other Statements of Offerors Section L - Instructions, Conditions, and Notices to Offerors Section M - Evaluation factors for Award

11. The Contractor shall begin performance calendar days and complete it within calendar days after receiving15 F.1

Section F.1award, X notice to proceed. This performance period is X mandatory negotiable. (See __________________________.)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If "YES," indicate within how many calendar days after award in Item 12b).

X YES NO

12b. CALENDAR DAYS

Sealed offers in original and copies to perform the work required are due at the place specified in item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

1 13:00 Europe/Amsterdama.

09/19/2022

b. An offer guarantee is, X is not required.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.c.

90d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

13. ADDITIONAL SOLICITATION REQUIREMENTS:

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

CGFS // CGFS

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

CONTACT: UEI:

CODE FACILITY CODE

The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ___________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

17.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

G.4.2

ITEM

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY OPEAQM

RPSO Frankfurt OPE/AQM/IP/RPSO Frankfurt Office of Acquisition (AQM) Frankfurt

AMERICAN EMBASSY LIBREVILLE

BP 4000

ATTN: FMC

LIBRE, GABON

27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return __________ copies to issuing office) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a.NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

Nicolas Wilhelm

31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

08/19/2022

31c. DATE

STANDARD FORM 1442 (REV. 4-85)BACK

Table of Contents

Section Description Page Number

B Supplies or Services and Prices/Costs

B.1 SERVICES

B.2 TYPE OF CONTRACT

B.3 CONTRACT PRICE

B.4 LOCAL TAXES

B.5 DEFENSE BASE ACT (DBA) INSURANCE

B.6 PRICE PROPOSAL BREAKDOWN (PPB)

B.7 ABBREVIATIONS

C Descriptions/Specifications/Statement of Work

C.1 PROJECT NAME & LOCATION

C.2 SCOPE OF WORK

C.3 PROJECT SPECIFICATIONS

C.4 PROJECT DRAWINGS

652.242-70 CONTRACTING OFFICER'S REPRESENTATIVE (COR) (AUG 1999)

D Packaging and Marking

D.1 DUTY-FREE CLEARANCE

D.2 PACKAGING REQUIREMENTS FOR MAIL AND COURIER SHIPMENT OF DOCUMENTS

AND DRAWINGS

D.3. SAFEGUARDING AND RELEASE OF SENSITIVE BUT UNCLASSIFIED

INFORMATION

652.229-70 EXCISE TAX EXEMPTION STATEMENT FOR CONTRACTORS WITHIN THE

UNITED STATES (JUL 1988)

E Inspection and Acceptance

E.1 INSPECTION OF CONSTRUCTION

E.2 SUBSTANTIAL COMPLETION

E.3 USE OF EQUIPMENT BY THE GOVERNMENT

E.4 FINAL COMPLETION AND ACCEPTANCE

E.5 QUALITY ASSURANCE AND CONTROL

52.246-12 Inspection of Construction (Aug 1996)

F Deliveries or Performance

F.1 COMMENCEMENT, PROSECUTION & COMPLETION OF WORK (FAR 52.211-10 APR

1984)

F.2 LIQUIDATED DAMAGES (FAR 52.211-12 SEP 2000)

F.3 CONTRACTOR'S SUBMISSION OF CONSTRUCTION SCHEDULES

F.4 DELIVERABLES

F.5 ACCEPTANCE OF SCHEDULE

F.6 NOTICE OF DELAY

F.7 MONTHLY PROGRESS REPORT

F.8 NOTICE TO PROCEED

F.9 WORKING HOURS

F.10 EXCUSABLE DELAYS

FAR 52.242-14 SUSPENSION OF WORK (APRIL 1984)

FAR 52.242-15 STOP-WORK ORDER (AUG 1989)

FAR 52.242-17 GOVERNMENT DELAY OF WORK (APRIL 1984)

FAR 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APRIL 1984)

G Contract Administration Data

G.1 AUTHORITY OF CONTRACTING OFFICER

G.2 CONTRACT ADMINISTRATION DATA

G.3 SUPERINTENDENCE BY THE CONTRACTOR (FAR 52.236-6 APR 1984)

G.4 PAYMENT FOR CONSTRUCTION SERVICES

G.5 ADVANCE PAYMENT

H Special Contract Requirements

H.1 BOND REQUIREMENTS

H.2 INSURANCE

H.3 DEFINITIONS

H.4 OWNERSHIP AND USE OF DOCUMENTS

H.5 SECURITY

H.6 GOVERNING LAW

H.7 LANGUAGE PROFICIENCY

H.8 LAWS AND REGULATIONS

H.9 RESPONSIBILITY OF CONTRACTOR

H.10 CONSTRUCTION OPERATIONS

H.11 TEMPORARY FACILITIES AND SERVICES

H.12 SAFETY

H.13 SUBCONTRACTORS AND SUPPLIERS

H.14 CONSTRUCTION PERSONNEL

H.15 MATERIALS AND EQUIPMENT

H.16 IMPORTED MATERIALS, EQUIPMENT, AND PERSONNEL

H.17 SPECIAL WARRANTIES

H.18 EQUITABLE ADJUSTMENTS

H.19 NONCOMPLIANCE WITH CONTRACT REQUIREMENTS

H.20 ZONING APPROVALS & BUILDING PERMITS

H.21 ASSIGNMENT

H.22 AVAILABILITY OF FUNDS

H.23 ASBESTOS-CONTAINING MATERIALS RESTRICTION

H.24 PERFORMANCE OF WORK BY THE CONTRACTOR (FAR 52.236-1 APR 1984)

H.25 CONTRACTOR RECRUITMENT OF THIRD-COUNTRY NATIONALS

I Contract Clauses 52.222-19 Child Labor--Cooperation with Authorities and Remedies (Jan 2022) 52.249-10 Default (Fixed-Price Construction) (Apr 1984)

652.243-70 NOTICES (AUG 1999)

I.1 CONTRACTOR IDENTIFICATION (JUL 2008)

52.229-12 Tax on Certain Foreign Procurements (Feb 2021) 52.228-14 Irrevocable Letter of Credit (Nov 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) 52.204-13 System for Award Management Maintenance (Oct 2018) 52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Nov 2021) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) 52.222-50 Combating Trafficking in Persons (Nov 2021) 52.222-56 Certification Regarding Trafficking in Persons Compliance Plan (Oct 2020) 52.225-13 Restrictions on Certain Foreign Purchases (Feb 2021) 52.228-3 Workers' Compensation Insurance (Defense Base Act) (July 2014) 52.228-4 Workers' Compensation and War-Hazard Insurance Overseas (Apr 1984) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Nov 2021) 52.236-15 Schedules for Construction Contracts (Apr 1984)

652.204-70 DEPARTMENT OF STATE PERSONAL IDENTIFICATION CARD POLICY AND

PROCEDURES (FEB 2015)

652.225-71 SECTION 8(a) OF THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED

(AUG 1999)

652.242-73 AUTHORIZATION AND PERFORMANCE (AUG 1999)

652.229-71 PERSONAL PROPERTY DISPOSITION AT POSTS ABROAD (AUG 1999)

J List of Attachments

J.1 PROJECT REFERENCE DOCUMENTS

J.2 ADMINISTRATIVE DOCUMENTS

K Representations, Certifications, and Other Statements of Offerors or Respondents 52.209-2 Prohibition on Contracting with Inverted Domestic Corporations--Representation (Nov 2015) 52.209-5 Certification Regarding Responsibility Matters (Aug 2020) 52.209-7 Information Regarding Responsibility Matters (Oct 2018) 52.225-18 Place of Manufacture (Aug 2018) 52.225-20 Prohibition on Conducting Restricted Business Operations in Sudan - Certification (Aug 2009)

652.225-70 ARAB LEAGUE BOYCOTT OF ISRAEL (AUG 1999)

K.1 AUTHORIZED CONTRACT ADMINISTRATOR

K.2 CONTRACTOR RECRUITMENT OF THIRD COUNTRY NATIONALS (TCNs)

K.3 CERTIFICATION

52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law (Feb 2016) 52.229-11 Tax on Certain Foreign Procurements--Notice and Representation (Jun 2020) 52.203-2 Certificate Of Independent Price Determination (Apr 1985) 52.203-11 Certification And Disclosure Regarding Payments To Influence Certain Federal Transactions (Sept 2007) 52.204-3 Taxpayer Identification (Oct 1998) 52.204-8 Annual Representations and Certifications (Jan 2020)

L Instructions, Conditions, and Notices to Offerors and Respondents 52.214-34 Submission of Offers in the English Language (Apr 1991) 52.215-1 Instructions to Offerors-Competitive Acquisition (Nov 2021) 52.232-38 Submission of Electronic Funds Transfer Information with Offer (Jul 2013) 52.236-28 Preparation of Proposals-Construction (September 2019) 52.204-7 System for Award Management (Oct 2018) 52.216-1 Type of Contract (Apr 1984) 52.233-2 Service of Protest (Sept 2006)

652.206-70 ADVOCATE FOR COMPETITION/OMBUDSMAN (FEB 2015)

L.1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE

L.2 SOLICITATION PROVISIONS IN FULL TEXT

L.3 MAGNITUDE OF CONSTRUCTION PROJECT

L.4 REVIEW OF DOCUMENTS

L.5 SUBMISSION OF OFFERS

L.5.4 SUMMARY OF PROPOSAL INSTRUCTIONS

L.5.5 DETAILED INSTRUCTIONS

L.6 PROPOSAL DUE DATE

M Evaluation Factors for Award

M.1 EVALUATION OF PROPOSALS

M.2 AWARD WITHOUT DISCUSSIONS

M.3 CONTRACT AWARD

52.225-17 Evaluation of Foreign Currency Offers (Feb 2000)

Line Item Summary

Solicitation Number:

19GE5022R0100

Contract Number: Title: Gabon Residential Housing Renovations

Date of Solicitation:

08/19/2022

Line Item No.

Description Quantity Unit Unit Price Total Cost

001 Construction Services: Remodeling of Apartments for the U.S. Embassy in Libreville, Gabon Including all labor, materials, equipment, overhead, other indirect costs, cost for the General Liability Insurance, Irrevocable Line of Credits, and profit Type of Contract Pricing: FFP

Doc Ref No:

Delivery Date FOB:

1.00 LS

002 Defense Base Act Insurance Type of Contract Pricing: FFP

Doc Ref No:

Delivery Date FOB:

1.00 LS

003 Value Added Tax (if applicable) Type of Contract Pricing: FFP

Doc Ref No:

Delivery Date FOB:

1.00 LS

B.1 - SERVICES

The Contractor shall perform Construction Services for the U.S. Embassy in Libreville, Gabon All work shall be performed in accordance with the specifications and statement of work contained in this solicitation and provided as an attachment as listed in Section J, List of Attachments, and all other documents incorporated into this contract. The Contractor is to perform the services in accordance with the terms and conditions of this contract/solicitation, and in strict conformance with the contract clauses and any special conditions contained herein.

B.2 - TYPE OF CONTRACT

This is a firm fixed-price contract payable entirely in the currency indicated by the Contractor in Sub-Section B.3. No additional sums will be payable on account of any escalation in the cost of materials, equipment or labor, or because of the Contractor's failure to properly estimate or accurately predict the cost or difficulty of achieving the results required by this contract.

Nor will the contract price be adjusted on account of fluctuations in the currency exchange rates. Changes in the contract price or time to complete will be made only due to changes made by the Government in the work to be performed, or by delays caused by the Government (see Sub-Section F.10, Excusable Delays), as determined and approved by the Contracting Officer.

B.3 - CONTRACT PRICE

The Contractor shall complete all work (including furnishing all labor, material, equipment, and services) required under this contract for the following firm fixed-price and within the time specified herein. This price shall include all labor, services, materials, equipment, overhead, costs for insurance, costs of obtaining Irrevocable Letters of Credit, profit, travel, DBA Insurance, and any other costs required to perform and complete all construction services, in accordance with the Project Specifications, Statement of Work and all other contract terms and conditions stated within the contract.

The cost of any materials or equipment required in conjunction with the services rendered herein shall be included in the proposed firm fixed-price.

If applicable, insurance required by FAR 52.228-3, Workers’ Compensation and War-Hazard Insurance, shall be part of the firm fixed-price. Any costs not priced will be included in overhead and other indirect costs.

B.3.1 Total Contract Price BASIC REQUIREMENT The Offeror shall insert their total price proposal costs as follows:

CLIN Description Price

001 CONSTRUCTION SERVICES FOR

APARTMENT RENOVATIONS

(LIBREVILLE, GABON)

Including all labor, materials, equipment, overhead, other indirect costs, costs for General Liability insurance, Irrevocable Letter of Credits, and profit

002 Defense Base Act Insurance (DBA) 003 VAT (If Appicable) Grand Total: CLIN 001 through CLIN 003

State Currency: __________________________________________ The offeror shall clearly identify and state the currency for all costs in their price proposal. After award, the Contractor shall invoice in and payment will be made according to the currency identified in the offerror's proposal, unless otherwise specified by the Contracting Officer.

B.4 - LOCAL TAXES

The Government will not reimburse the Contractor for VAT under this contract. The Contractor shall not include a line for VAT on Invoices as the U.S. Embassy has a tax exemption certificate with the host government.

B.5 - DEFENSE BASE ACT (DBA) INSURANCE

B.5.1 DBA insurance is required for all United States citizens or residents and individuals hired in the United States, regardless of citizenship for any construction and services for U. S. overseas contracts over US$10,000.00. DBA insurance is also required for all Host Country Nationals (HCNs) and Third Country Nationals (TCNs) working overseas unless waved by the Department of Labor (DOL). Only the countries listed currently on the DOL’s Active DBA Waivers are not required to have DBA insurance for Host Country Nationals (HCNs) and Third Country Nationals (TCNs). See website for country waivers: https://www.dol.gov/owcp/ dlhwc/dbawaivers/dbawaivers.htm). The waiver is only valid if alternative worker’s compensation benefits are provided to the waived employees pursuant to applicable local law. If there are no local worker’s compensation laws, the waiver has no effect and HCN and TCN (if applicable by local law) working under a U. S. contract shall be included and covered under the DBA.

B.5.2 The DBA insurance may be obtained from any authorized DBA insurance broker, see Sub-Section I.14, FAR 52.228-3 WORKER’S COMPENSATION INSURANCE (DEFENSE BASE ACT) (APR 1984). New DBA insurances policies can be purchased directly from any DOL approved insurance carrier. A list of DOL approved carriers may be found at http://www.dol.gov/ owcp/dlhwc/lscarrier.htm.

B.5.3 The Contractor will be reimbursed for DBA only to the extent the contractor provides documentary proof that DBA has been paid and only to the extent quoted in the Pricing Schedule.

NOTE: Gabon is currently not listed on the DOL Active DBA Waiver list and therefore DBA insurance for all personnel (US Citizens, Host Country Nationals (HCNs) and Third Country Nationals (TCNs)) working under this contract is required.

B.6 - PRICE PROPOSAL BREAKDOWN (PPB)

The Price Proposal Breakdown is provided under Section J – List of Attachments The contract resulting from this solicitation shall be a Firm Fixed-Price contract and not a Bill of Quantities (BOQ) type contract providing for unit pricing of items and for payment based on quantity surveys. The total price will therefore not be adjusted upwards or downward to reflect work performed as determined by quantity surveys performed. It is a requirement for offerors to provide a breakdown of proposal by completing the PPB. The PPB shall be adjusted as desired to correspond with this Firm Fixed Price.

The PPB provided is for reference purposes only. The contractor is required to verify the quantities and dimensions based on the drawings and specifications provided, and information acquired during the Site Visit. The contract price will not be adjusted due to increased quantities required during performance of the contract

B.7 - ABBREVIATIONS

CLIN Contract Line Item Number CO Contracting Officer COR Contracting Officer's Representative DOSAR Department of State Acquisition Regulations FAR Federal Acquisition Regulations ILOC Irrevocable Letter of Credit LNTP Limited Notice to Proceed SOW Statement of Work QTY Quantity DBA Defense Base Act Insurance VAT Value Added Tax

Section C - Descriptions/Specifications/Statement of Work

C.1 - PROJECT NAME & LOCATION

Project Identification:

Sabliere Compound Apartment Renovations Location:

U.S. Embassy Libreville, Gabon

C.2 - SCOPE OF WORK

Introduction/Background The US Embassy is soliciting renovation services at a government owned residences known as SABLIERE COMPOUND. This compound has two sets of buildings, and each set has 3 apartments. The first set, ‘TH1’ is made of (3) apartment units, BLOC 1/2/3 shown in plans, with 3 bedrooms per apartment and the second set, ‘TH2’ is made (3) apartment units, BLOC 4/5/6 shown in plans, with 2 bedrooms per apartment.

This is a residential and community compound and site should be cleaned-up daily and contractor to respect occupants’ privacies, with proper decorum.

This project is to renovate townhouse unit Sabliere Bloc 1, 2, 3, 4, 5, 6 at the US Embassy Libreville Government-owned Residential compound. Renovation works include all 6 apartments and consist of kitchen and bathroom remodeling, finish replacement/update, fixture (plumbing / electrical) replacement, stair finish modification, architectural millwork(cabinet) replacement, and window / door replacement.

Demolition It is the contractor’s responsibility to ensure that appropriate dust control measures are in place. When choosing a method of work, dust control must be considered as well as ensuring that appropriate control measures are in place to prevent damage to other parts of the compound. Particularly important are fall prevention measures when removing and replacing the railings from height. The contractor should consider protecting all existing air conditioners units (A/C) to remain from dust and damage during the project. Any damage to the A/C units due to dust and or accident will be the responsibility of the contractor to replace.

Debris from the worksite must be contained within the designated work area and must be removed from the site as frequently as required to maintain a safe and presentable environment. The contractor shall dispose of all debris in a manner that is acceptable by local authorities and law. Contractor shall not dump any debris within Sabliere compound, the beach, or neighboring property.

Selective demolition shall be performed as required based on the descriptions in Statement of Works (SOW) where new work is required. In such demolition works, care should be taken not to disturb the structural integrity of the structural columns. This may include cutting, bracing, etc. Method of demolition activities shall be approved by the Contractor Officers Representative (COR) before work can commence.

- All existing cabinetry in bathrooms, kitchen, and walk-in closets are to be removed for new cabinetry, unless noted otherwise.

- All interior plumbing and electrical light fixture shall be removed for replacement fixtures, except for existing ceiling fans and rolling shutters to remain.

- All interior existing tiles and flooring shall be removed.

- All existing door and window assemblies including frame shall be removed to receive replacement.

- The contractor shall be responsible for the repairs of adjacent conditions damaged during the selective demolitions required. Renovation conditions shall be look anew, approved by US Embassy.

Materials The contractor is responsible for providing all materials required to complete the work. All materials must be modern, good quality and certified by an independent testing company such as Underwriters Laboratories (UL), Conformite Europeene (CE), or American Society for Testing and Materials (ASTM) or any other organization, approved by the Embassy, with similar standards.

The Contractor must include the following items in the pricing offer

- 1 complete replacement shower head assembly

- 1 spares of all hardware including door handles, towel racks, cabinet hardware, toilet paper dispenser, faucet, etc.

- 10 wall tiles (of each style)

- 10 floor tiles (of each style)

- 2 paint buckets

- 10% of installed/supplied light bulbs

Schedule / Phasing The contractor shall provide a project design/construction schedule for review by US Embassy in its response to Request for Proposal.

The contractor’s construction schedule shall be based on phasing allowing the occupation of (3) apartment units out of (6) in any point in construction period. The phasing scheme requires approval by COR in advance and should minimize disruption to other occupants.

Warranty Contractor's Warranty: Contractor is to provide the U.S. government a written warranty which shall warrant works to be free of defects in materials and workmanship for one year after date of final acceptance by the U.S. Government

Maintenance Manuals Contractor shall provide maintenance manuals for, but not limited to new architectural finishes, assemblies, and equipment during project close-out.

Design Review / Submittals The contractor shall provide drawings and product data for prior to fabrication / purchase /or Contracting Officer Representative (COR) review and acceptance. The submittals shall include;

- Detailed project schedule showing work phasing and proposed daily progress.

- Shop drawings and graphical views/presentation of all specific details

- Finish Plan for Tiles pattern

- Reflected ceiling plans for all rooms with ceiling-mounted fixtures including light fixture locations/layout

- Elevations for Bathrooms, laundry rooms, closet, and kitchen with architectural millworks / cabinets, and appliances

- Schedule for Doors and windows with sizes, material, glazing type (if applicable) and finishes and elevations of door/window types

- Elevation and details for stairs finish upgrades / railing(sidewalls) replacement

- Product data for all finishes including paint and floor/wall tiles

- Product data for all plumbing fixtures and electrical / lighting fixtures

- Product data for door / window system

- Product data for all toilet/bathroom accessories

- Material manufacturer’s product data sheets, accompanied by written approval/acceptance of specified tests for project

- Manufacturer’s warranties that are to be issued upon project completion.

- Samples for proposed material and fixtures, including but not limited to, woods, tiles, windows/doors glass, paint, hard ceiling, lighting fixtures, and plumbing fixtures.

Inspection prior to wall enclosure

Any electrical wiring or plumbing shall be run in the wall prior to wall closure and shall be inspected by the Contracting officer Representative (COR). Light and plumbing fixtures, outlets, and switches will be installed per manufacturer's recommendations and shall be properly set.

Tiles Floor Tiles (LVT-1 and LVT-2): Contractor to provide 12mm thick Luxury Vinyl Tile (plank pattern) laminate flooring with authentic wood appearance and texture with finishes selected by US Embassy. Laminate flooring to be:

- Highly scratch/dent resistant and resists to extreme impact and wear

- Stain resistant

- Sunlight exposure resistant and should not fade.

- Waterproof and antimicrobial

- With underlayment for enhanced sound performance and underfoot comfort

The Contractor shall propose design main tile areas, accent tiles at boundaries, and accessories at transitions to other rooms/spaces or stairs. Stair tread finishes to be coordinated or integrated with floor tiles of living / circulation spaces.

Bathroom (PT-1) / Kitchen Tiles (PT-5) / Utility space (PT-3) /Exterior Porch & Balcony (PT-4) Floor tiles Tiles shall be at least ½ cm thick and shall be rated at the Porcelain Enamel Institutes' (PEI) rating of III or equivalent. Additionally, the water absorption ratio must be appropriate for bathroom/wet area or exterior installation and the Coefficient of Friction (COF) shall be above 0.50 foot pounds. Any deviations from this must be approved by the Embassy.

Bathroom Shower Stall Floor Ceramic Mosaic Tile (CT-3) Bathroom Wall tiles Provide porcelain wall tiles (PT-2) on all (3) sides of shower area and a wet wall behind toilet in bathrooms from floor to ceiling.

Provide ceramic accent tile (CT-2) on wall(s) with bathroom lavatory sink between upper and lower cabinet.

Kitchen Wall tiles Provide ‘Subway’ pattern backsplash Ceramic tile (CT-1) at kitchen backsplash, on the wet wall between lower cabinet’s countertops and overheads cabinets, similar to the image shown in the photo following the ‘cabinetry and countertops‘paragraph in SO.

The contractor shall provide finish proposals for US Embassy approval in selecting tiles in coordination with adjacent space tiles and proper tile transition including base tile and thresholds. All materials must be approved by the COR before installation and the contractor shall provide 3 samples of each type of tile for review. If none of the tiles meet the desired style or pattern the COR can request more samples be provided. The contractor shall supply floor, wall, and accent tiles for each restroom. Tiles shall be a minimum 30cm x 40cm or greater for the floors.

Tile Installation All tile cutting shall be done in a manner and location to limit the amount of dust both created and distributed through the house.

Use of a wet cut saw is preferred. All installations shall be completed by qualified technicians and shall meet local codes. Proof shall be given in writing that workers are qualified to work in their respective trades. All holes and cracks in the existing concrete base must be repaired, leveled, smoothed over and dried prior to installing new tile. The forms for the shower shall be inspected prior to tile installation. Any tile terminating in the middle of a wall shall have appropriate cap to avoid sharp edges and appropriate floor transitions will be installed. Any surface that isn't properly graded (shower shall slope¼" per foot towards the drain) or finished will be redone at the contractor's expense.

Paint Unless noted otherwise, the contractor shall provide premium grade latex / acrylic paint (prime, intermediate, and topcoat) with low odor/VOC on all interior wall surfaces with low luster/eggshell sheen and all ceiling surfaces with flat sheen. All base/trim/ molding shall receive off-white paint with semi-gloss finish. All colors of each space shall be reviewed via samples by US Embassy.

Contractor is required to use the best available paint in the local market and to be mildew free, cleanable, and durable. Paint to be applied as per industry standards and manufacturer recommendations including proper walls surface preparation, crack repairs and walls priming.

Finish Schedule for TH1, Bloc 1/2/3 (‘#’ in Room Numbers corresponds to ‘Bloc’ number shown in existing plans.)

Room Number Designation Floor Wall Ceiling Base(B) | Ceiling molding (C) Ground Floor #.00 Entrance Porch PT-4 ETR ETR PT-4 (B) only #.01 Hall LVT-1 PTD PTD WD/PTD (B & C) #.02 Stock PT-3 PTD PTD PT-3 (B) only

#.03 Storage 01 LVT-1 PTD PTD WD/PTD (B) only #.04 Storage 02 LVT-1 PTD PTD WD/PTD (B) only #.05 Sanitary Guests PT-1 PTD PTD WD/PTD (B & C) #.06 Living Room LVT-1 PTD PTD WD/PTD (B & C) #.07 Kitchen PT-5 CT-1/PTD PTD PT-5 (B) | WD/PTD

(C) #.08 Dining Room LVT-1 PTD PTD WD/PTD (B & C) #.09 Loggia PT-4 PTD PTD PT-4 (B) only Level 1 #.11 Corridor LVT-1 PTD PTD WD/PTD (B & C) #.12 Laundry Room PT-3 PTD PTD PT-3 (B) only #.13 Bedroom 02 LVT-2 PTD ETR WD/PTD (B & C) #.14 Bedroom 03 LVT-2 PTD ETR WD/PTD (B & C) #.15 Bathroom PT-1 PT-2/CT-2/PTD PTD PT-1 (B) | WD/

PTD(C)

#.16 Master Bedroom LVT-2 PTD ETR WD/PTD #.17 Dressing LVT-2 PTD PTD WD/PTD #.18 Master Bathroom PT-1/CT-3 PT-2/CT-2/PTD PTD PT-1 (B) | WD/

PTD(C)

#.19 Balcony PT-4 PTD ETR PT-4 (B) only ETR: Existing to remain

Finish schedule for TH2, Bloc 4/5/6 (‘#’ in Room Numbers corresponds to ‘Bloc’ number shown in existing plans.)

Room Number Designation Floor Wall Ceiling Base(B) | Ceiling molding (C) Ground Floor #.00 Entrance Porch PT-4 ETR ETR PT-4 (B) only #.01 Hall LVT-1 PTD PTD WD/PTD (B & C) #.02 Stock PT-3 PTD PTD PT-3 (B) only ST @ entry Storage LVT-1 PTD PTD WD/PTD (B) only #.03 Sanitary Guests PT-1 PTD PTD WD/PTD (B & C) #.06 Living Room LVT-1 PTD PTD WD/PTD (B & C) #.05 Kitchen PT-5 CT-1/PTD PTD PT-5 (B) | WD/PTD

(C) #.04 Dining Room LVT-1 PTD PTD WD/PTD (B & C) Level 1 #.11 Corridor LVT-1 PTD PTD WD/PTD (B & C) #.12 Laundry Room PT-3 PTD PTD PT-3 (B) only #.13 Bedroom 01 LVT-2 PTD ETR WD/PTD (B & C) #.14 Bathroom PT-1 PT-2/CT-2/PTD PTD PT-1 (B) | WD/

PTD(C)

#.15 Master Bedroom LVT-2 PTD ETR WD/PTD (B & C) #.16 Dressing LVT-2 PTD PTD WD/PTD #.17 Master Bathroom PT-1/CT-3 PT-2/CT-2/PTD PTD PT-1 (B) | WD/

PTD(C)

#.18 Balcony PT-4 PTD ETR PT-4 (B) only ETR: Existing to remain

Plumbing Fixtures All interior plumbing fixtures shall be replaced by new plumbing fixtures approved by US Embassy. All new toilets and toilet sinks shall be white porcelain of good quality. All plumbing fixtures (i.e. faucet and shower) and toilet accessories (i.e. mirror, towel bar/ hook and toilet paper holder) throughout each bathroom, kitchen, and laundry shall be of the consistent color and metal finishes.

Please refer to Attachment G for examples of color/finish style.

Replacement Toilet Closet / Sink / Bathtub types: TH1, Bloc 1/2/3 (‘#’ in Room Numbers corresponds to ‘Bloc’ number shown in existing plans.)

Room# Designation Qty New #.05 Toilet Closet 1 Modern/gravity flush horizontal outlet #.05 Lavatory sink 1 Classic Pedestal Wash hand #.07 Kitchen Sink 1 Undermount, Double basin/Bowl pull down sprayer with garbage disposal *

#.12 Laundry Room Sink 1 Wall mounted single basin #.15 Lavatory sink 1 Drop-in * #.15 Toilet Closet 1 Modern/gravity flush horizontal outlet #.15 Bathtub 1 Drop-in ‘whirlpool’ type bathtub

(Bathtub Replacement) * #.18 Lavatory sink 1 Drop-in * #.18 Toilet Closet 1 Modern/gravity flush horizontal outlet * #.18 Bathtub 1 N/A (To be reconfigured into shower stall)

Replacement Toilet closet / Sink / Bathtub Types: TH2, Bloc 4/5/6 (‘#’ in Room Numbers corresponds to ‘Bloc’ number shown in existing plans.)

Room# Designation Qty Wall Ground Floor #.03 Toilet Closet 1 Modern/gravity flush horizontal outlet #.03 Lavatory sink 1 Classic Pedestal Wash hand #.05 Kitchen sink 1 Undermount, Double basin/Bowl pull down sprayer with garbage disposal *

Level 1 #.12 Laundry Room Sink 1 Wall mounted single basin #.14 Lavatory Sink 1 Drop-in * Toilet Closet 1 Modern/gravity flush horizontal outlet Bathtub 1 Drop-in ‘whirlpool’ type bathtub

(Bathtub Replacement) * #.17 Lavatory Sink 1 Drop-in * Toilet Closet 1 Modern/gravity flush horizontal outlet * Bathtub 1 N/A (To be reconfigured into shower stall)

* See pictures in the attachment G for preferred style by US Embassy

Electrical All interior lighting fixtures and and exterior lighting fixtures at entrance porch, patio, and balcony , electrical /telecommunication / audio visual outlets, and lights switches shall be removed and replaced with modern styles and color/finish shall match the rest of the hardware. All light fixtures shall utilize LED bulbs. Electrical outlets and lighting systems shall be of a standard design, water / moisture resistant based on the locations, compliant with local codes and 10mA GFCI rated in the bathroom, kitchen, laundry room, and outdoor areas. Styles shall be approved by the COR.

Bathroom Remodeling The contractor shall provide holistic design services for all bathroom re-modelling components in SOW, including finish and plumbing fixture selections. US Embassy approval will be required prior to contractor’s purchase of materials/fabrication.

Walk-in Shower Reconfiguration The master suite bathrooms (#.18 in TH-1 and #.17 in TH-2, total of 6 master bathrooms) shall be reconfigured into a modern walk-in shower from the existing bathtub configuration, similar to an image shown below with a wall recess, a glass sliding door, and a recessed downlight. The contractor shall provide all associated works including waterproofing membrane/underlayment, application of cement boards or moisture-resistant gypsum boards on surrounding walls and reconfiguration of floor drainage, and stone threshold transition.

The contractor shall provide a custom, modern style base and upper vanity cabinet with built-in mirror at (6) Master bathrooms and (6) bathrooms.

Contractor is to replace all ceiling mounted bathroom ventilation systems. All toilets to be horizontal outlets and gravity flush. All toilets’ fittings to be suitable to existing PVC pipes and water connection lines.

General Requirements

- Sink areas shall receive a full-height ceramic tile backsplash.

- Restrooms shall receive a full-height ceramic tile backsplash on wet walls.

- Restrooms shall receive floor-to-ceiling tile on shower stall walls.

- Casework shall be fabricated with wood veneer or plastic laminate cabinets and premium granite countertops.

- Bathtub walls to be tiled to the ceiling.

Kitchen Remodeling The contractor shall provide holistic design services for all kitchen re-modelling components in SOW, including cabinetry design, finish and plumbing fixture selections, associated ceiling lighting (with downlight) design. US Embassy approval will be required prior to contractor’s purchase of materials/fabrication.

Cabinetry and Countertops All cabinetry wood shall be premium-grade and pre-treated to resist water and pests. The wood shall be properly dried and kept within a conditioned space 2-3 calendar days before being installed. If the cabinetry warps due to improper procedures, the contractor will be responsible for its replacement. The contractor shall design-assist for layout of cabinet in plans and elevations for US Embassy review and all cabinetry designs, materials, and modifications shall be approved by the COR. All kitchen appliances will be furnished by US Embassy for contractor’s design and utility/infrastructure coordination and installation. A proposed layout of cabinetry in kitchens and bathrooms shall utilize existing plumbing connections and their locations to remain or adjusted. Countertops shall be of premium grade Quartz at kitchen, premium grade granite at bathrooms, and solid-surface material at laundry room. Samples shall be provided for approval before installation.

Unless noted otherwise, existing layout / configuration of cabinetry in kitchen and bathrooms shall be similarly replicated, re-designed in a high-end modern style.

A new island with countertop and base cabinet matching main cabinet style shall be provided in all kitchens in TH1(total of 3 kitchens). In case of TH1, Bloc 3, new island shall replace existing island.

Kitchen cabinetry will be upper and lower cabinets with a standalone and modern island with cabinets for Sabliere Bloc 1,2,3. When entering the kitchen, the front left corner should have a floor to ceiling cabinetry installed. Lower cabinetry will be a combination of drawers and doors.

Contractor to provide a well-vented gourmet kitchen hood incorporated with cabinetry design with grease filtering feature in all kitchens(total of 6 kitchens). Contractor to create its associated ducting path as needed and as per manufacturer recommendation.

Contractor shall maintain and or adjust plumbing lines and electrical outlets as needed for kitchen equipment and appliances.

Kitchen Wall Opening The contractor shall demolish the existing non-load bearing walls near existing door opening between concrete columns and create an arched opening in Bloc 1 and 2 from living room into the kitchen, similar to the existing condition in TH1 Bloc 3.

The contractor shall demolish the existing non-load bearing walls, shutter, counter, and cabinet as required and create a new arched opening from living room into the kitchen in Bloc 4, Bloc 5, and Bloc 6, similar to the existing arched opening condition in TH1 Bloc

3. The existing opening/door frame (single door-sized) between living room and kitchen shall be removed and closed permanently with partition matching adjacent.

The new openings and adjacent partition shall be refinished and painted to match adjacent new finishes.

Cabinetry/Carpentry All cabinetry drawers, doors, and hardware in all kitchens and bathrooms shall be premium grade and working properly at turnover.

Cabinets shall have a protective finish. Countertops and cabinets shall be leveled and properly set. Hinges shall be euro-style and hidden from view. Shelves shall be removable, and drawers shall be soft closing.

General Requirements

- Refrigerator is required to have a minimum clearance of 150 mm (6") on each side.

- Range hood is required to be ducted directly to the exterior with a circular galvanized steel duct.

- Wall located behind the range is required to be finished with a ceramic wall tile from 51 mm (2") below counter height to the bottom of the range hood.

- Ceramic wall tiles are preferred to be laid in a stack bond and carried the full height between the counter and underside of the cabinet above.

- Ceramic wall tiles are to only be used in place of a backsplash.

- Undercabinet light fixtures are required.

- Sink areas shall receive a full-height ceramic tile backsplash.

Walk-in Dresser A new modern style armoire/closet shall be provided by contractor for room #.17 in TH1 and #.16 in TH2, total of (6) master bedroom walk-in closets with shelves, drawers, in-set mirror, and a place to hang clothes the length of the closet on both sides. The material should match the bathroom cabinetry.

Laundry Room The contractor shall provide design services for all laundry re-modelling components in SOW, including cabinetry design, finish and plumbing fixture selections, associated ceiling lighting design. US Embassy approval will be required prior to contractor’s purchase of materials/fabrication. Laundry room cabinetry shall be provided in a modern style for all laundry rooms (total of 6 units). Cabinetry shall be with a solid surface material countertop and upper and lower storage cabinets over the appliance units and another wall in laundry room to maximize storage. The contractor shall change the swing of the door to the room with new door(s) to make room for the cabinets. The contractor may re-arrange the locations of appliances or sink as needed to maximize space use in limited space.

Contractor to create a vent path as needed in each apartment for each drying machine at laundry.

Ceilings All dropped ceilings in the Level 1 bathrooms, laundry rooms and the kitchens in all units and Ground floor Sanitary Guest rooms and Closets in all units shall be replaced with hard ceiling made of plaster (prevalent local method) or equivalent. These ceiling shall have appropriate supporting structure and equipment with an access trap for inspection or any work above ceiling. A support plan should be presented to the COR for approval before ceiling installation.

The contractor shall provide recessed LED downlight fixtures appropriately coordinated and located with new cabinetry layout in all kitchens.

Sliding Glass Doors The contractor shall replace all existing sliding glass door systems in its entirety by new sliding glass door assemblies. The ‘basis of design’ of new sliding glass door system shall be ANTELIO CLEAR STADIP laminated safety glass “STADIP 8/2” and energy efficient. This product or equivalent system will be acceptable upon approval. The doors should contain locks and installation will include new frames and tracks.

The aluminum frame shall be of white color with corrosion resistant. The doors should also include locks and heavy-duty accessories suitable for new doors load.

Sliding Glass door schedule for TH1, Bloc 1/2/3 (‘#’ in Room Numbers and Designations correspond to Sabliere ‘Bloc’ number) (See building elevations for Room # and Designations) Room# Designation Door Size Existing Qty New #.08 SD#-01 2560x2590 To be removed 1 See TH1 Window

Schedule #.08 SD#-02 2560x2590 To be removed 1 TH1-SGDAF1 #.08 SD#-03 2560x2590 To be removed 1 See TH1 Window

Schedule #.16 SD#-10 2560x2560 To be removed 1 See TH1 Window

Schedule #.16 SD#-11 2560x2560 To be removed 1 TH1-SGDAF1

Sliding Glass door schedule for TH2, Bloc 4/5/6 (‘#’ in Room Numbers and Designations correspond to Sabliere ‘Bloc’ number) (See building elevations for Room # and Designations) Room# Designation Door Size*** Existing Qty New #.06 SD#-01 2600x2600 To be removed 1 TH2-SGDAF2 #.06 SD#-02 3850x2600 To be removed 1 See TH2 window schedule W#-03 #.15 SD#-10 3860x2560 To be removed 1 New configuration shall have one sliding glass door and a sliding window ****

#.15 2000x2560 N/A 1 TH2-SGDAF2 *** Provided sizes are for information only. The contractor shall verify the opening and confirm sizes for new sliding door assemblies.

**** After removal of existing sliding glass door SD4-10, SD5-10, and SD6-10, each sliding glass door shall be replaced by combination of a smaller sliding glass door and a window with new concrete masonry unit wall as shown below in Attachment J.1.10.

Glass Windows The contractor will replace all existing window systems in its entirety by new window assemblies except for clerestory windows at the roof / 2nd level. In addition, the contractor shall provide (5) new windows at new openings at the locations and sizes described below in Window Schedule in each unit Bloc 1/2/3/4/5/6. The ‘basis of design’ of new window system shall be ANTELIO CLEAR STADIP laminated safety glass “STADIP 8/2”, lockable, and energy efficient. This product or equivalent system will be acceptable upon approval. The aluminum frame shall be of a white color with corrosion resistant. All windows to have sliding mosquitoes frame/ screen to allow exterior glass cleaning as well as the interior side.

TH1 Block 1/2/3 Glass Window Schedule (‘#’ in Room Numbers and Designations correspond to Sabliere ‘Bloc’ number) (See building elevations for Room # and Designations) Room# Designation Window Size*** Existing Qty New #.02 W#-01 2560x500 To be removed 1 TH1-FOGWAF #.02 W#-02 2560x500 To be removed 1 TH1-FOGWAF #.01 W#-03 1320x2520 * To be removed 1 TH1-FWGWF #.08 W#-08 2560x1350 N/A (New opening) 1 TH1-SGWAF1 #.08 W#-09 2560x2560 N/A (New opening) 1 TH1-SGWAF1 #.09 W#-06 2560x2560 To be removed 1 TH1-HFBWAF1 #.09 W#-07 2560x2560 To be removed 1 TH1-HFBWAF1 #.09 W#-05 2560x2800 To be removed 1 TH1-HFBWAF2 #.13 W#-11 1235x1285 To be removed 1 TH1-SGWAF2 #.14 W#-12 1235x1285 To be removed 1 TH1-SGWAF2 #.13 W#-10 2560x1285 To be removed 1 TH1-SGWAF2 #.14 W#-13 2560x1285 To be removed 1 TH1-SGWAF2 #.16 W#-19 2580x1320 N/A (New opening) 1 TH1-SGWAF1 #.17 W#-18 2560x500 To be removed ** 1 N/A #.19 W#-15 2560x2560 To be removed 1 TH1-HFBWAF1 #.19 W#-16 2560x2560 To be removed 1 TH1-HFBWAF1 #.19 W#-17 2560x2560 To be removed 1 TH1-HFBWAF1

TH2 Block 4/5/6 Glass Window Schedule

(See building elevations for Room # and Designations) Room# Designation Window Size*** Existing Qty New #.02 W#-02 3850x500 To be removed 1 TH2-FOGWAF #.01 W#-01 1320x2520 * To be removed 1 TH1-FWGWF #.06 W#-03 3850x1350 N/A (New opening) 1 TH1-SGWAF1

#.13 W#-10 2560x1300 To be removed 1 TH1-SGWAF2 #.13 W#-11 3860x1300 To be removed 1 TH2-SGWAF3 #.15 W#-16 1860x1300 N/A (New opening) 1 TH2-SGWAF1 #.16 W#-15 2560x500 To be removed ** 1 N/A #.18 W#-14 2560x2560 To be removed 1 TH1-HFBWAF1 #.18 W#-13 3860x2560 To be removed 1 TH2-HFBWAF1

* Given size is for the existing single window. new door to be centered and replace existing window with two windows (one on each side of the door).

** Remove existing and fill in / close the opening with masonry bricks *** Provided sizes are for information only. The contractor shall verify the opening and confirm sizes for new windows.

**** After removal of existing sliding glass door, provide concrete masonry unit wall infill with WH-03 at the top

Concrete Masonry Unit Wall In order to install the new windows at new openings, the contractor must build up a wall to support them. The contract shall use concrete masonry blocks the same dimensions and strength as the existing walls. The blocks will be mortared and finished according to normal construction practices. The inside of the wall shall be reinforced with rebar to prevent lateral sway since this is an exterior wall. The wall should be finished and painted to match the existing finishes.

Loggia Enclosure The contractor shall provide new storefronts with the bottom half with fixed aluminum/glazing wall and the upper half with operable with sliding and lockable mosquitoes frame/screen to allow bottom glazing clean-up, similar to existing configuration being replaced.

Where existing configurations has a built-in door, The contractor shall provide the same. The ‘basis of design’ of new patio enclosure system shall be ANTELIO CLEAR STADIP.

Door Assemblies Replace all wooden exterior doors assemblies with modern style wooden doors and frames, similar to existing main entry door to remain at TH1 Bloc 3. The wood shall be properly dried and kept within a conditioned space 2-3 calendar days before being installed, and pre-treated to prevent damage from pests and water. If the doors and frames warps due to improper procedures, the contractor will be responsible for its replacement.

Replace all interior door assemblies or opening with door frame only new modern-style doors assemblies. A door to master bedrooms shall be Solid Core Wood Door. All doors and frames designs, materials, and modifications shall be approved by the COR.

Contractors to coordinate any safety locks or mechanism with the COR and additional features may be required by the Security office.

TH1 Block 1/2/3 Door Schedule

(See building elevations for Room # and Designations) Room# Designation Door Size*** Existing Qty New #.01 D#-01 1165x2035 To be removed 1 FWHDD-2 #.02 D#-02 820x2040 To be removed 1 FWLDD-1 #.04 D#-03 725x2040 To be removed 1 FWLDD-1 #.05 D#-04 720x2050 To be removed 1 FWLDD-1 #.12 D#-12 825x2020 To be removed 1 FWLDD-1 #.13 D#-10 825x2000 To be removed 1 FWLDD-2 #.14 D#-11 825x2005 To be removed 1 FWHDD-2 #.15 D#-13 825x2010 To be removed 1 FWLDD-1 #.16 D#-14 825x2015 To be removed 1 FWLDD-2 #.18 D#-15 830x2025 To be removed 1 FWLDD-1

TH2 Block 4/5/6 Door Schedule (‘#’ in Room Numbers and Designations correspond to Sabliere ‘Bloc’ number) (See building elevations for Room # and Designations) Room# Designation Door Size*** Existing Qty New #.01 D#-01 1163x2030 To be removed 1 FWHDD-2 #.02 D#-02 830x2040 To be removed 1 FWLDD-1 #.03 D#-03 725x2040 To be removed 1 FWLDD-1 #.12 D#-12 825x1920 To be removed 1 FWLDD-1 #.13 D#-10 830x1920 To be removed 1 FWHDD-2 #.14 D#-11 825x1920 To be removed 1 FWLDD-2 #.15 D#-13 820x1940 To be removed 1 FWLDD-2 #.17 D#-14 725x1940 To be removed 1 FWLDD-1 *** Provided sizes are for information only. The contractor shall verify the opening and confirm sizes for all new Doors.

Stairs and Landings The contractor shall replace existing stair finishes (treads/risers/nosing and side stringers) and intermediate landing flooring by hardwood material in coordination with adjacent floor finishes in all (6) units. Also, the contractor shall remove low-side walls / railings along the stair flight and at 1st level corridor, and provide wooden or metal open railing configuration, similar to existing condition shown in Bloc 3. The contractor shall provide railing design options for US Embassy approval and selection. Design shall be in a modern style and in compliance with ASTM standards and POSHO requirements.

Main Entrance Metal Grills Remove…