19GE5022R0069_ Q and A Volume II.pdf
PDF 100 KB Posted
- Attached to
- Dubai Storage Annex Roof Repairs
- Solicitation number
- 19GE5022R0069
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 19GE5022R0069_Additional SOW Info.pdf | ||
| 19GE5022R0069_P0003.pdf | ||
| 19GE5022R0069 Q and A Volume III.pdf | ||
| 22R0069_Attachment J.1.E Specification Information.pdf | ||
| 19GE5022R0069_P00001.pdf | ||
| 19GE5022R0069_Q and A Volume I.pdf | ||
| 19GE5022R0069_P00002.pdf | ||
| IRS Form W-14.pdf | ||
| 22R0069_Attachment J.1.D_Product Specifications.pdf | ||
| 22R0069_Attachment J.1.C_Photos of Roof.docx | DOCX document | |
| Performance Guarantee Bond.doc | DOC document | |
| 19GE5022R0069.pdf | ||
| W-14 Instructions.pdf | ||
| 22R0069_Attachment J.1.C-Coating Details.docx | DOCX document | |
| 22R0069-Attachment J.1.A_Roof Plan.docx | DOCX document | |
| Payment Bond.doc | DOC document | |
| SAM Information Guide.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
19GE5022R0069 Question and Answers Volume 2
1. On the existing roof, the loose hex head screws needed to be replaced, could you please provide product specification.
Answer: See attached document (J.1.E)
2. At this point we are unable Identify how many Corrugated sheets are damaged below the existing water proofing system, on the scope of work its mentioned to replace corroded and damaged sheets, please clarify.
Answer: A site survey has been arranged for August 2, 2022, at 0800 local time. Interested participants must email FleischhackerJM@state.gov NLT July 28, 2022 @ with attendees’ information to request access through the Consulate security office.
3. If multiple sheets are found to be unacceptable due to damages, what is the method of requesting additional funds for the replacement since we are being asked for a fix price quote.
Answer: This is fixed price contract; a site survey can be arranged to assess corrugated sheets condition. Furthermore, access can be provided to view the bottom of the sheets from inside of the building (J.1.E)
4. To replaced corrugated sheets required product specification. Could you please assist?
5. Could you please provide the specification for the Fiber mesh reinforcement at joints?
6. Length of Specified Product Warranty to be clarified. Could you please assist in proving this information? Longevity and material quality affects cost. We will provide 12-months from completion of the Project and acceptance by the Client (US Government).
Answer: A 12-month installation/performance warranty is required. Furthermore, the installation / application of roofing system shall be by a manufacturer approved / trained contractor, which ensures an additional manufacturer warranty.
7. Does the Buy American Act apply in this solicitation, or can material be procured locally?
Answer: The materials can be procured locally.