AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE RATING

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

06/04/2019

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

FRANKCODE

AMERICAN CONSULATE GENERAL FRANKFURT

GIESSENER STRASSE 30

ATTN: RPSO

FRANKFURT, D60435

David D. Machen

NAME

TEL.

machendd@state.gov

EMAIL

6. ISSUED BY FRANKCODE

AMERICAN CONSULATE GENERAL FRANKFURT

GIESSENER STRASSE 30

ATTN: RPSO

FRANKFURT, D60435

7. ADMINISTERED BY (If other than Item 6)

9A. AMENDMENT OF SOLICITATION NO.

19GE5019R0042

CONTACT DUNS

CODE FACILITY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, state and ZIP Code) (X)

X 9B. DATED (SEE ITEM 11)

04/26/2019

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning __2__copies of the amendment;(b)By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.__2__X

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to provide Questions and Answers (J.1.4. Information for Offerors No. 2).

All other terms and conditions remain unchanged.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Fabiola A. Bellevue

(Signature of person authorized to sign)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

By (Signature of Contracting Officer)

16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

19GE5019R0042

Section J- List of Attachments

Identifier Title Date Number of Pages

Clause J.1 PROJECT SPECIFICATIONS was deleted or updated.

J.1 PROJECT SPECIFICATIONS

J.1.1. SPECIFICATIONS

File: Ge20190410 CMR SPEC.pdf - Specifications Dated April 10, 2019 Specifications: Chief of Mission Residence Roof Replacement Georgetown, Guyana Specifications by Sections:

Division 1 01020 – Summary of Roof Work 01535 – Roof Construction Safety 01700 – Project Close-out

Division 2 02072 – Roof Removals and Renovation Work

Divisions 3 - 5 Not used

Division 6 06120 – Rough Carpentry

Division 7 07410 – Standing Seam Metal Roof Panels 07526 – Modified Bitumen Roofing 07620 – Sheet Metal Flashing 07920 - Sealants

Division 8 Not used

Division 9 09910 – Exterior Painting

Division 10 – 16 Not used

Division 17 17000 – Temporary Electromechanical Disconnects

J.1.2. Ge20190410 Roof DWG.pdf

Drawing No. Drawing title Date CMR A00 Low Roof Plan June 27, 2018 CMR A01 Upper Roof Plan CMR A02 Elevations CMR A03 Elevations CMR A04 Section CMR A05 Roof Details CMR A06 Roof Details CMR A07 Window Well Section

J.1.3. Ge20180702 INFO 1.pdf - Photos dated July 2, 2018

J.1.4. Ge20190603 INFO 2.pdf - Information for Offerors dated June 4, 2019