This document is a set of Questions and Answers (Q&A) related to Solicitation Number 19AU9024Q0006 for a facade renovation project at a U.S. Embassy residence.

The key details are:

  • The contract requires scaffolding delivery and installation, facade repairs, and facade painting.
  • The estimated size of the project is between $25,000 and $100,000.
  • The government will not provide access to the in-house bathroom facilities for contractor personnel. The contractor must provide their own bathroom facilities.
  • No additional pictures or plans beyond what is included in the Statement of Work will be provided.
  • The government does not intend to change the scope of work. If the contractor identifies additional necessary repairs, they must notify the Contracting Officer's Representative.
  • The government has not found evidence of water leakage into the plaster or masonry of the balconies and terraces.
  • The government does not require 3D scanning or photographic mapping services at this time.
  • Contractor shall provide material specifications and color codes per the Statement of Work.
  • Work hours are Monday through Friday, 7am to 7pm. Other hours must be approved by the government.
  • The contractor shall state the percentage discount off the material list price for items provided.

View the file

Other files

File Type Posted
19AU9024Q0006_A0001_Amendment_SF30.pdf PDF
19AU9024Q0006QA.docx DOCX document
19AU9024Q0006_SF1442_Facade_Renovation.docx DOCX document
19AU9024Q0006_CoverLetter.pdf PDF
19AU9024Q0006_Solicitation_Doc.docx DOCX document
19AU9024Q0006_SOW.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SBU ‐ CONTRACTING AND ACQUISITIONS

Ques ons & Answers 19AU9024Q0006

Q1) Are the bathroom facili es inside the house available for use during work?

A 1) No, the in‐house bathroom facili es are not accessible to any external personnel that are involved in the construc on project. The awarded contractor will need to provide bathroom facili es for its on‐site personnel.

Q2) Could we please have more detailed pictures of the facade, par cularly focusing on the front part of the balcony area?"

A2) The statement of work contains all relevant informa on necessary for the bidder to produce a full offer. The site visit provided an addi onal way to understand the construc on project and no addi onal pictures will be provided.

Q3) Can we obtain a more detailed plan focusing par cularly on the exterior features of the building?

A3) No addi onal plans will be provided during the solicita on process. All necessary informa on is included in the Statement of Work, which is part of the solicita on documents.

Q4) What is the investor's idea of the scope of work based on recommenda ons above?

The U.S. Embassy Vienna received the above ques on (Q4) from one of the poten al offerors in connec on with a list of recommenda ons and poten al solu ons.

The U.S. Embassy Vienna has no inten on to change the scope of work.

If the contractor discovers that addi onal necessary repair work is required during the renova on, they must point this out in wri ng to the responsible U.S. Embassy Contrac ng Officer’s Representa ve (COR).

Q5) What is the condi on of the balconies and terraces? Is the water leaking onto the plaster or masonry?

A5) The condi on of the balconies and terraces observed during the site visit supports the effort to renovate the outside façade. Despite the presence of obvious cracks and chips in the façade, the U.S.

Embassy Vienna has not found any evidence of water leaking into the plaster or masonry.

Q6) In order to prepare detailed price repair offer, we would like to offer you laser 3D scanning of facades, or the crea on of a "photographic map" of facades from the drone photos. Would it be possible a er agreement? A 3D scan and Photomap can serve you to preserve the current appearance and detailed data on the exact dimensions of the facades during repairs in the following years.

A6) The U.S. Embassy Vienna currently does not require this service for this property.

Q7) Would you kindly provide specifica ons for the paint and repair works products?

A7) Refer to point ‘Technical Comments Construc on Work’ in document ‘19AU9024Q0006_SOW” (page

7). The contractor shall provide details, including material specifica ons and color codes, necessary for the comple on of all work in accordance with Austrian Standards.

SBU ‐ CONTRACTING AND ACQUISITIONS

Q8) Could you please supply any specifica ons concerning safety measure post‐award, such as the installa on of safety barriers around the construc on site?

A8) Refer to the standard highlighted in document ‘19AU9024Q0006_SOW” (page 7). The services shall be performed in compliance with all relevant Austrian standards including but not limited to

Occupa onal Health and Safety Regula on for Construc on Workers.

Q9) Would you kindly specify working hours in weekdays? Would the contractor start the work earlier and finish later then the specified working hours? Would it be possible to work on weekends?

A9) Refer to point F.8 (page 13) in document ‘19AU9024Q0006_Solicita on_Doc’. Work shall be performed Monday thru Friday 7a.m. – 7p.m.. Other hours must be approved by the Embassies

Contrac ng Officer’s Representa ve.

Q10) Could you please clarify in more details or examples for the item 2.3 Provision of materials of all kinds which is in SOW?

A10) Contractor shall state the percentage deduc on off the material list price. Example: Material list price façade paint €1000 – discount 20% = Total = €800