About this file
This is an Amendment of Solicitation (Amendment No. 19AS2026Q0020-A0001) issued by GSO Procurement at the U.S. Embassy in Canberra, Australia, with an effective date of July 23, 2026. The amendment modifies the original solicitation 19AS2026Q0020 dated June 23, 2026, for Purchase Requisition PR16058104. The contracting officer is Malene G. Carr. The amendment does not extend the deadline for offer submission, and offerors must acknowledge receipt of this amendment prior to the original solicitation deadline or risk rejection of their offer.
The primary purpose of this amendment is to add additional work to Section B of the Statement of Work that was not included in the original solicitation. The contractor is required to supply and install approximately 12 linear meters of 50 mm heavy-duty electrical conduit extending from a residence to the front grass area, crossing beneath a driveway while pavement is removed for replacement. The work scope includes site investigation (inspection and utility verification), excavation of trenches on both sides of the driveway (approximately 6 meters on each side), conduit installation with proper bedding material and fittings, trench backfilling and compaction, and full restoration of disturbed areas including turf, garden beds, soil, edges, and existing finishes to match surrounding conditions. The contractor must furnish all labor, supervision, materials, tools, equipment, transportation, permits, and incidentals necessary for completion, with work subject to inspection and approval by the Contracting Officer's Representative.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION 1. CONTRACT ID CODE PAGE OF
PAGES
1 3
2. AMENDMENT/MODIFICATION
NO.
19AS2026Q0020-A0001
3. EFFECTIVE DATE
07/23/2026
4. REQUISITION/PURCHASE REQ. NO.
PR16058104
5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)
CODE
GSO PROCUREMENT, U.S. EMBASSY CANBERRA
21 MOONAH PLACE
YARRALUMLA ACT, 2600
AUSRTRALIA
8. NAME AND ADDRESS OF CONTRACTOR 9a. AMENDMENT OF SOLICITATION NO.
19AS2026Q0020
9b. DATED (SEE ITEM 11)
06/23/2026
10a. MODIFICATION OF CONTRACT/ORDER
NO.
10b. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[ X] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [X] is not extended
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15 and returning_1._copies of the amendment;(b) By acknowledging receipt of this amendment on each copy of the offer submitted; or(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers.
FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) FAR Clause 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
E. IMPORTANT: Contractor [ X ] is not, [ ] is required to sign this document and return __1_ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to add additional work to Section B Statement of Work, specifically the supply and installation of conduit beneath the driveway, as detailed in the attached drawing. This work was not included in the original SOW
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME OF CONTRACTING OFFICER
Malene G. Carr
15B. NAME OF CONTRACTOR/OFFEROR
BY
(Signature of person authorized to sign)
15C.DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C.DATE SIGNED
Continuation Page to Modification 19AS2026Q0020-A0001
Additional Work Added to the SOW:
The objective of this addition is to supply and install approximately 12 linear meters of 50 mm heavy-duty electrical conduit, extending from the residence to the front grass area, crossing beneath the driveway while the pavement is removed for replacement.
The Contractor shall furnish all labor, supervision, materials, tools, equipment, transportation, permits, and incidentals necessary to complete the work.
The work shall include, but not be limited to, the following:
1. Site Investigation Prior to commencing work, the Contractor shall:
• Inspect the work area and confirm existing grades.
• Verify all underground utilities and protect existing services from damage (if applicable).
2. Excavation The Contractor shall excavate trenching from both sides of the driveway, comprising:
• Approximately 6 meters from the residence to the driveway edge; and
• Approximately 6 meters from the driveway edge to the front lawn;
for a total conduit length of approximately 12 meters.
Excavation shall maintain uniform trench width and sufficient depth to comply with Australian Standards.
3. Conduit Installation The Contractor shall supply and install approximately 12 meters of heavy-duty rigid 50 mm electrical conduit, along with all fittings required.
The Contractor shall install suitable bedding material beneath and around the conduit.
Following inspection by the COR, the Contractor shall backfill the trench using approved material, compact in layers, and restore original ground levels.
4. Restoration Upon completion, the Contractor shall restore all disturbed areas, including:
• Turf
• Garden beds
• Soil
• Edges
• Existing finishes
Restoration shall match surrounding conditions.
End of additional work.