Amendment of Solicitation Summary

This is Amendment 19AS2026Q0020-A0002 to solicitation 19AS2026Q0020, issued by GSO Procurement at the U.S. Embassy in Canberra, Australia on July 31, 2026. The amendment clarifies added scope under Section B of the Statement of Work (SOW) regarding the supply and installation of electrical conduit beneath the driveway, which was not included in the original solicitation. Updated drawings with revised legends have been attached to clarify the intended scope. The hour and date for receipt of offers is not extended. Offerors must acknowledge receipt of this amendment prior to the deadline through one of three methods: completing and returning one copy of the amendment, acknowledging receipt on each offer copy, or submitting a separate letter or telegram referencing the solicitation and amendment numbers. All other solicitation terms and conditions remain unchanged and in full force and effect.

The amendment includes Questions and Answers addressing prospective offerors' concerns. Key clarifications include: new kerb lines shall be provided within Embassy property only; existing grass areas identified for removal shall be replaced with asphalt; and electrical conduit quantities shall total approximately 24 linear meters of 50mm conduit (approximately 12 meters on each side of the driveway/property crossing), in accordance with the latest addendum rather than the 35 meters shown on schematic drawings. The electrical drawings are diagrammatic in nature and not intended for scaled measurements; offerors must base pricing on quantities stated in the addendum and verify final installation requirements during construction. The estimated project start date is April–May 2027, with work aligned to other ongoing residence projects.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION 1. CONTRACT ID CODE PAGE OF

PAGES

1 2

2. AMENDMENT/MODIFICATION

NO.

19AS2026Q0020-A0002

3. EFFECTIVE DATE

July 31, 2026

4. REQUISITION/PURCHASE REQ. NO.

PR16058104

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

CODE

GSO PROCUREMENT, U.S. EMBASSY CANBERRA

21 MOONAH PLACE

YARRALUMLA ACT, 2600

AUSRTRALIA

8. NAME AND ADDRESS OF CONTRACTOR 9a. AMENDMENT OF SOLICITATION NO.

19AS2026Q0020

9b. DATED (SEE ITEM 11)

June 23rd, 2026

10a. MODIFICATION OF CONTRACT/ORDER

NO.

10b. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ X] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [X] is not extended

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15 and returning_1._copies of the amendment;(b) By acknowledging receipt of this amendment on each copy of the offer submitted; or(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers.

FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b)

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) FAR Clause 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

E. IMPORTANT: Contractor [ X ] is not, [ ] is required to sign this document and return __1_ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

his amendment addresses questions on the SOW and drawings, clarifying the added scope under Section B (supply and installation of electrical conduit beneath the driveway), as shown on the attached revised drawing. This work was not part of the original SOW.

Updated drawings with revised legends are attached for clarity. All other solicitation terms remain unchanged.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME OF CONTRACTING OFFICER

Marlene G. Carr

15B. NAME OF CONTRACTOR/OFFEROR

BY

(Signature of person authorized to sign)

15C.DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C.DATE SIGNED

Continuation Page to Modification 19AS2026Q0020-A0001

Questions & Answers

Q1: Can you please advise if the asphalt replacement scope extends to the kerb line on Mugga Way? The drawings provided show the scope finishing at the property boundary.

A1: Any new kerb line, where applicable, shall be provided within the Embassy property only.

Q2: Can you please confirm if the "EXISTING GRASS AREA TO BE REMOVED" indicated on the plans is to be replaced with asphalt?

A2: Yes, the existing grass area identified for removal on the drawings shall be replaced with asphalt as part of the project.

Q3: The latest addendum states to allow a total of 12m of electrical conduit; however, the drawings indicate a quantity of 35m. Could you please confirm whether we are to allow as per the addendum or as per the drawing?

A3: Prospective offerors shall allow for approximately 24 linear meters of 50 mm electrical conduit only, comprising approximately 12 meters on each side of the driveway/property crossing, in accordance with the latest addendum.

The electrical system (conduit only) has been prepared as a schematic drawing to illustrate the proposed conduit routing. In accordance with AS/NZS 3000 (Wiring Rules) and standard electrical engineering drafting practices, electrical drawings are diagrammatic in nature and shall not be used for scaled measurements or the determination of exact conduit lengths. The Contractor remains responsible for verifying final routing, dimensions, and site conditions prior to installation.

The quantities identified in the latest addendum shall govern the work and supersede any dimensions that may otherwise be inferred from the schematic drawings. The drawing legends have been updated to further clarify the intended scope. Given the schematic nature of the electrical drawing, prospective offerors shall base their pricing on the quantities stated in the latest addendum and verify final installation requirements during construction.

Please note: The estimated start date for this project is April–May 2027, and work will be aligned with other ongoing works at the residence. Offerors shall confirm awareness of this estimated timeline and adjust their submissions accordingly.