Attachment 2 - Section B Pricing Spreadsheet (revised).xlsx

XLSX spreadsheet 39 KB Posted

Attached to
DOS Domestic Light Construction Multiple Award IDIQ Requirement
Solicitation number
19AQMM26R0012_Domestic_Light_RFP
Issued by

About this file

This is a pricing spreadsheet template for the Department of State's Domestic Light Construction Multiple Award IDIQ solicitation (19AQMM26R0012_Domestic_Light_RFP). Offerors must select and complete pricing for only one of four geographic zones: Zone 1 (Blackstone, VA), Zone 2 (Charleston, SC), Zone 3 (Denver, CO), or the National Capital Region (Washington, D.C.). All other zone tabs must be left empty. The spreadsheet requires fully burdened labor rates for a base year (2025-2026) and four option years (2026-2027 through 2029-2030).

The labor categories span construction administration, construction trades, quality control/assurance, and engineering disciplines (architecture, mechanical, electrical, fire protection, civil, and structural). Specific certifications and qualifications are required for certain positions, including AWS welding certifications for welders, NICET certification for fire protection installers, EPA refrigeration certification for HVAC mechanics, and licensed professional engineers for senior and lead engineering roles. Offerors must provide escalation rates not exceeding 3.0% between option years. The total evaluated price is calculated by summing all labor category rates across all five contract years and serves as the basis for proposal evaluation. The proposal submission deadline was February 11, 2026 at 4:00 PM ET.

View the file

Other files

File Type Posted
19AQMM26R0012 0003.pdf PDF
QA 3.docx DOCX document
QA 2.docx DOCX document
Attachment 1 - Statement of Work (revised).docx DOCX document
Attachment 2 - Section B Pricing Spreadsheet (revised).xlsx XLSX spreadsheet
19AQMM26R0012 0002.pdf PDF
19AQMM26R0012 00001.pdf PDF
QA 1.docx DOCX document
Attachment 4 - Public Release of Information 20250219.pdf PDF
Attachment 1 - Statement of Work (Working).docx DOCX document
Attachment 3 - DOS Fed Facilities.xlsx XLSX spreadsheet
Attachment 5 - Past Performance Questionnaire.docx DOCX document
19AQMM26R0012.pdf PDF
Attachment 2 - Section B Pricing Spreadsheet.xlsx XLSX spreadsheet
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions Instructions: The offeror shall identify which zone they are submitting their proposal for as part of the proposal submission process. The offeror shall only provide a proposal for one zone. The offeror shall complete fully burdened pricing for every labor category in the applicable tab to be considered for award. For all other zones that the offeror doesn't intend to propose on, the offeror shall leave those tabs empty. *The total evaluated price will be used for evaluation purposes only.

Zone 1

LABOR CATEGORIES & RATES FOR WORLDWIDE PROJECTS
ZONE 1 (Base Rates on Blackstone, VA)

COMPANY NAME:

LABOR CATEGORYBASE YEAROPTION YEAR 1OPTION YEAR 2OPTION YEAR 3OPTION YEAR 4
2025-20262026-20272027-20282028-20292029-2030
CONSTRUCTION ADMINISTRATIONBase + 4 Option Years
Project Manager$ - 0
Department Head$ - 0
Senior Engineer$ - 0
Junior Engineer$ - 0
CONSTRUCTION
Superintendent$ - 0
Project Manager$ - 0
Mechanic Senior$ - 0
Mechanic$ - 0
Steam Fitter/Plumbing Supervisor$ - 0
Steam Fitter/Plumber$ - 0
Pipe Fitter Supervisor$ - 0
Pipe Fitter$ - 0
Welder-Certified Nuclear (AWS-B2.1 or D10.12)$ - 0
HVAC (Hydronic Test & Balance Technician)$ - 0
HVAC (Air Test & Balance Technician)$ - 0
HVAC Mechanic (EPA Refrigeration Certified)$ - 0
Sheet Metal Supervisor, SMACNA$ - 0
Sheet Metal Mechanic SMACNA$ - 0
Sheet Metal Worker$ - 0
Control Tech Senior$ - 0
Control Technician$ - 0
Electrician, Master$ - 0
Electrician, Journeyman$ - 0
High Voltage Lineman$ - 0
Truck Driver$ - 0
Telecommunications/TSS Installers$ - 0
Fire Sprinkler Installer (NICET certified)$ - 0
Fire Alarm Installer (NICET certified)$ - 0
Sprinkler Fitter$ - 0
Carpenter$ - 0
Pipe Insulator$ - 0
Duct Insulator$ - 0
Drywall Installer$ - 0
Drywall Finisher$ - 0
Painter$ - 0
Communication-Systems Installer$ - 0
Communication-Systems Technician$ - 0
Laborer Foreman$ - 0
General Laborer$ - 0
QUALITY CONTROL/QUALITY ASSURANCE
Quality Management Plan Manager (QMPM)$ - 0
Document Security Manager$ - 0
QC Construction$ - 0
QC Design$ - 0
ARCHITECTURE
Department Head$ - 0
Registered Architect$ - 0
Junior Architect$ - 0
Interior Designer$ - 0
CAD Specialist$ - 0
MECHANICAL ENGINEERING
Department Head$ - 0
Senior Mechanical Engineer$ - 0
Mechanical Engineer$ - 0
Junior Mechanical Engineer$ - 0
Plumbing Engineer$ - 0
Engineering Technician$ - 0
Environmental Security Specialist$ - 0
Telecommunication Design Specialist$ - 0
ELECTRICAL ENGINEERING
Department Head$ - 0
Senior Electrical Engineer$ - 0
Electrical Engineer$ - 0
Junior Electrical Engineer$ - 0
Lighting Specialist$ - 0
Lightning & Cathodic Specialist$ - 0
Telecommunications Engineer$ - 0
Engineering Technician$ - 0
FIRE PROTECTION ENGINEERING
Department Head$ - 0
Senior Fire Protection Engineer$ - 0
Fire Protection Engineer$ - 0
Junior Fire Protection Engineer$ - 0
Engineering Technician$ - 0
CIVIL ENGINEERING
Department Head$ - 0
Senior Civil Engineer$ - 0
Civil Engineer$ - 0
Junior Civil Engineer$ - 0
Geotechnical Engineer$ - 0
Seismic Engineering Specialist$ - 0
Engineering Technician$ - 0
STRUCTURAL ENGINEERING
Department Head$ - 0
Senior Structural Engineer$ - 0
Structural Engineer$ - 0
Junior Structural Engineer$ - 0
Geotechnical Engineer$ - 0
Seismic Engineering Specialist$ - 0
Engineering Technician$ - 0
Total Evaluated Price
Total Per Year$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Escalation Rate between Option Years:

savagejm: savagejm:

< 3.0%

Zone 2

LABOR CATEGORIES & RATES FOR WORK
ZONE 2 (Base Rates on Charleston, SC)

COMPANY NAME:

LABOR CATEGORYBASE YEAROPTION YEAR 1OPTION YEAR 2OPTION YEAR 3OPTION YEAR 4
2025-20262026-20272027-20282028-20292029-2030
CONSTRUCTION ADMINISTRATIONBase + 4 Option Years
Project Manager$ - 0
Department Head$ - 0
Senior Engineer$ - 0
Junior Engineer$ - 0
CONSTRUCTION
Superintendent$ - 0
Project Manager$ - 0
Mechanic Senior$ - 0
Mechanic$ - 0
Steam Fitter/Plumbing Supervisor$ - 0
Steam Fitter/Plumber$ - 0
Pipe Fitter Supervisor$ - 0
Pipe Fitter$ - 0
Welder-Certified Nuclear (AWS-B2.1 or D10.12)$ - 0
HVAC (Hydronic Test & Balance Technician)$ - 0
HVAC (Air Test & Balance Technician)$ - 0
HVAC Mechanic (EPA Refrigeration Certified)$ - 0
Sheet Metal Supervisor, SMACNA$ - 0
Sheet Metal Mechanic SMACNA$ - 0
Sheet Metal Worker$ - 0
Control Tech Senior$ - 0
Control Technician$ - 0
Electrician, Master$ - 0
Electrician, Journeyman$ - 0
High Voltage Lineman$ - 0
Truck Driver$ - 0
Telecommunications/TSS Installers$ - 0
Fire Sprinkler Installer (NICET certified)$ - 0
Fire Alarm Installer (NICET certified)$ - 0
Sprinkler Fitter$ - 0
Carpenter$ - 0
Pipe Insulator$ - 0
Duct Insulator$ - 0
Drywall Installer$ - 0
Drywall Finisher$ - 0
Painter$ - 0
Communication-Systems Installer$ - 0
Communication-Systems Technician$ - 0
Laborer Foreman$ - 0
General Laborer$ - 0
QUALITY CONTROL/QUALITY ASSURANCE
Quality Management Plan Manager (QMPM)$ - 0
Document Security Manager$ - 0
QC Construction$ - 0
QC Design$ - 0
ARCHITECTURE
Department Head$ - 0
Registered Architect$ - 0
Junior Architect$ - 0
Interior Designer$ - 0
CAD Specialist$ - 0
MECHANICAL ENGINEERING
Department Head$ - 0
Senior Mechanical Engineer$ - 0
Mechanical Engineer$ - 0
Junior Mechanical Engineer$ - 0
Plumbing Engineer$ - 0
Engineering Technician$ - 0
Environmental Security Specialist$ - 0
Telecommunication Design Specialist$ - 0
ELECTRICAL ENGINEERING
Department Head$ - 0
Senior Electrical Engineer$ - 0
Electrical Engineer$ - 0
Junior Electrical Engineer$ - 0
Lighting Specialist$ - 0
Lightning & Cathodic Specialist$ - 0
Telecommunications Engineer$ - 0
Engineering Technician$ - 0
FIRE PROTECTION ENGINEERING
Department Head$ - 0
Senior Fire Protection Engineer$ - 0
Fire Protection Engineer$ - 0
Junior Fire Protection Engineer$ - 0
Engineering Technician$ - 0
CIVIL ENGINEERING
Department Head$ - 0
Senior Civil Engineer$ - 0
Civil Engineer$ - 0
Junior Civil Engineer$ - 0
Geotechnical Engineer$ - 0
Seismic Engineering Specialist$ - 0
Engineering Technician$ - 0
STRUCTURAL ENGINEERING
Department Head$ - 0
Senior Structural Engineer$ - 0
Structural Engineer$ - 0
Junior Structural Engineer$ - 0
Geotechnical Engineer$ - 0
Seismic Engineering Specialist$ - 0
Engineering Technician$ - 0
Total Evaluated Price
Total Per Year$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Escalation Rate between Option Years:

Zone 3

LABOR CATEGORIES & RATES FOR WORK
ZONE 3 (Base Rates on Denver, CO)

COMPANY NAME:

LABOR CATEGORYBASE YEAROPTION YEAR 1OPTION YEAR 2OPTION YEAR 3OPTION YEAR 4
2025-20262026-20272027-20282028-20292029-2030
CONSTRUCTION ADMINISTRATIONBase + 4 Option Years
Project Manager$ - 0
Department Head$ - 0
Senior Engineer$ - 0
Junior Engineer$ - 0
CONSTRUCTION
Superintendent$ - 0
Project Manager$ - 0
Mechanic Senior$ - 0
Mechanic$ - 0
Steam Fitter/Plumbing Supervisor$ - 0
Steam Fitter/Plumber$ - 0
Pipe Fitter Supervisor$ - 0
Pipe Fitter$ - 0
Welder-Certified Nuclear (AWS-B2.1 or D10.12)$ - 0
HVAC (Hydronic Test & Balance Technician)$ - 0
HVAC (Air Test & Balance Technician)$ - 0
HVAC Mechanic (EPA Refrigeration Certified)$ - 0
Sheet Metal Supervisor, SMACNA$ - 0
Sheet Metal Mechanic SMACNA$ - 0
Sheet Metal Worker$ - 0
Control Tech Senior$ - 0
Control Technician$ - 0
Electrician, Master$ - 0
Electrician, Journeyman$ - 0
High Voltage Lineman$ - 0
Truck Driver$ - 0
Telecommunications/TSS Installers$ - 0
Fire Sprinkler Installer (NICET certified)$ - 0
Fire Alarm Installer (NICET certified)$ - 0
Sprinkler Fitter$ - 0
Carpenter$ - 0
Pipe Insulator$ - 0
Duct Insulator$ - 0
Drywall Installer$ - 0
Drywall Finisher$ - 0
Painter$ - 0
Communication-Systems Installer$ - 0
Communication-Systems Technician$ - 0
Laborer Foreman$ - 0
General Laborer$ - 0
QUALITY CONTROL/QUALITY ASSURANCE
Quality Management Plan Manager (QMPM)$ - 0
Document Security Manager$ - 0
QC Construction$ - 0
QC Design$ - 0
ARCHITECTURE
Department Head$ - 0
Registered Architect$ - 0
Junior Architect$ - 0
Interior Designer$ - 0
CAD Specialist$ - 0
MECHANICAL ENGINEERING
Department Head$ - 0
Senior Mechanical Engineer$ - 0
Mechanical Engineer$ - 0
Junior Mechanical Engineer$ - 0
Plumbing Engineer$ - 0
Engineering Technician$ - 0
Environmental Security Specialist$ - 0
Telecommunication Design Specialist$ - 0
ELECTRICAL ENGINEERING
Department Head$ - 0
Senior Electrical Engineer$ - 0
Electrical Engineer$ - 0
Junior Electrical Engineer$ - 0
Lighting Specialist$ - 0
Lightning & Cathodic Specialist$ - 0
Telecommunications Engineer$ - 0
Engineering Technician$ - 0
FIRE PROTECTION ENGINEERING
Department Head$ - 0
Senior Fire Protection Engineer$ - 0
Fire Protection Engineer$ - 0
Junior Fire Protection Engineer$ - 0
Engineering Technician$ - 0
CIVIL ENGINEERING
Department Head$ - 0
Senior Civil Engineer$ - 0
Civil Engineer$ - 0
Junior Civil Engineer$ - 0
Geotechnical Engineer$ - 0
Seismic Engineering Specialist$ - 0
Engineering Technician$ - 0
STRUCTURAL ENGINEERING
Department Head$ - 0
Senior Structural Engineer$ - 0
Structural Engineer$ - 0
Junior Structural Engineer$ - 0
Geotechnical Engineer$ - 0
Seismic Engineering Specialist$ - 0
Engineering Technician$ - 0
Total Evaluated Price
Total Per Year$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Escalation Rate between Option Years:

NCR

LABOR CATEGORIES & RATES FOR WORK
NATIONAL CAPITOL REGION (Base Rates on Washington D.C.)

COMPANY NAME:

LABOR CATEGORYBASE YEAROPTION YEAR 1OPTION YEAR 2OPTION YEAR 3OPTION YEAR 4
2025-20262026-20272027-20282028-20292029-2030
CONSTRUCTION ADMINISTRATIONBase + 4 Option Years
Department Head$ - 0
Project Manager$ - 0
Senior Engineer$ - 0
Junior Engineer$ - 0
CONSTRUCTION
Superintendent$ - 0
Project Manager$ - 0
Mechanic Senior$ - 0
Mechanic$ - 0
Steam Fitter/Plumbing Supervisor$ - 0
Steam Fitter/Plumber$ - 0
Pipe Fitter Supervisor$ - 0
Pipe Fitter$ - 0
Welder-Certified Nuclear (AWS-B2.1 or D10.12)$ - 0
HVAC (Hydronic Test & Balance Technician)$ - 0
HVAC (Air Test & Balance Technician)$ - 0
HVAC Mechanic (EPA Refrigeration Certified)$ - 0
Sheet Metal Supervisor, SMACNA$ - 0
Sheet Metal Mechanic SMACNA$ - 0
Sheet Metal Worker$ - 0
Control Tech Senior$ - 0
Control Technician$ - 0
Electrician, Master$ - 0
Electrician, Journeyman$ - 0
High Voltage Lineman$ - 0
Truck Driver$ - 0
Telecommunications/TSS Installers$ - 0
Fire Sprinkler Installer (NICET certified)$ - 0
Fire Alarm Installer (NICET certified)$ - 0
Sprinkler Fitter$ - 0
Carpenter$ - 0
Pipe Insulator$ - 0
Duct Insulator$ - 0
Drywall Installer$ - 0
Drywall Finisher$ - 0
Painter$ - 0
Communication-Systems Installer$ - 0
Communication-Systems Technician$ - 0
Laborer Foreman$ - 0
General Laborer$ - 0
QUALITY CONTROL/QUALITY ASSURANCE
Quality Management Plan Manager (QMPM)$ - 0
Document Security Manager$ - 0
QC Construction$ - 0
QC Design$ - 0
ARCHITECTURE
Department Head$ - 0
Registered Architect$ - 0
Junior Architect$ - 0
Interior Designer$ - 0
CAD Specialist$ - 0
MECHANICAL ENGINEERING
Department Head$ - 0
Senior Mechanical Engineer$ - 0
Mechanical Engineer$ - 0
Junior Mechanical Engineer$ - 0
Plumbing Engineer$ - 0
Engineering Technician$ - 0
Environmental Security Specialist$ - 0
Telecommunication Design Specialist$ - 0
ELECTRICAL ENGINEERING
Department Head$ - 0
Senior Electrical Engineer$ - 0
Electrical Engineer$ - 0
Junior Electrical Engineer$ - 0
Lighting Specialist$ - 0
Lightning & Cathodic Specialist$ - 0
Telecommunications Engineer$ - 0
Engineering Technician$ - 0
FIRE PROTECTION ENGINEERING
Department Head$ - 0
Senior Fire Protection Engineer$ - 0
Fire Protection Engineer$ - 0
Junior Fire Protection Engineer$ - 0
Engineering Technician$ - 0
CIVIL ENGINEERING
Department Head$ - 0
Senior Civil Engineer$ - 0
Civil Engineer$ - 0
Junior Civil Engineer$ - 0
Geotechnical Engineer$ - 0
Seismic Engineering Specialist$ - 0
Engineering Technician$ - 0
STRUCTURAL ENGINEERING
Department Head$ - 0
Senior Structural Engineer$ - 0
Structural Engineer$ - 0
Junior Structural Engineer$ - 0
Geotechnical Engineer$ - 0
Seismic Engineering Specialist$ - 0
Engineering Technician$ - 0
Total Evaluated Price
Total Per Year$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Escalation Rate between Option Years:

File details come from the government source that posted it. Updated .