This document is an Excel bid chart for a federal contract opportunity related to the construction of a dining facility, warehouse, and training sheds in Lusaka, Zambia. The bid chart is divided into three tasks - Task A for the dining facility, Task B for the warehouse, and Task C for the training sheds. Each task provides a breakdown of the various cost elements, including material, equipment, and labor costs, for the construction activities. The related federal contract opportunity is Solicitation Number 19AQMM24R0139, issued by the Department of State Office of Acquisition Management, for the Zambia Dining Facility and Warehouse Construction project. The solicitation was posted on 06/18/24.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Task A - Dining Facility
| BID Chart - Task A - Dining Facility |
| ZDF Multifunctional Warehouse |
| Lusaka, Zambia |
| DATE: |
BASE BID
| ITEM | DESCRIPTION | MATERIAL COST | EQUIPMENT COST | LABOR COST | TOTAL COST |
| CLIN 0001 Pre-Construction Activities | |||||
| Site Survey and Design Revisions |
| CLIN 0002 DINING FACILITY (ZAMBIA) | |
| Initial Site Survey (Soil, Perclation, Density Test) |
Earthworks
Concrete & Concrete Accesssories
Masonry
Carpentry
Plumbing (latrine and septic system hook ups)
Structural Welding
Electrical Works (includes hookup to solar panel array)
Miscelaneous Metal Fabrications
Fabricated Roof Panels Assemblies
Flashing and Sheet Metal
Aluminium Doors and Frames
Windows
Door Hardware
Exterior Finishes (glazing, stucco, plaster, painting)
Interior Signage
Toilet Accessories
Fire Extinguishers
Basic Mechanical Materials and Methods
Basic Electrical Materials and Methods
Lighting
Water Distribution
Sanitary Sewer
Miscelleanous Materials (Water Tower, Tents, Welding Materials, etc.)
Furnishings
Solar PV System
Labor
| D | TOTAL DIRECT COST PHYSICAL ADECUATION WORKS (BASE BID) | $ 0.00 |
| D | Administration | $ 0.00 |
| D | Unforenseens | $ 0.00 |
| D | Profit | $ 0.00 |
| D | DBA Insurance | $ 0.00 |
| T | TOTAL COSTS (BASE BID) $ | $ 0.00 |
Task B - Warehouse
| BID CHART - Task B - Warehouse (OPTIONAL) |
| ZDF Multifunctional Warehouse |
| Lusaka, Zambia |
| DATE: |
BASE BID
| ITEM | DESCRIPTION | MATERIAL COST | EQUIPMENT COST | LABOR COST | TOTAL COST |
| CLIN 0003 Pre-Construction Activities | $ 0.00 | ||||
| Site Survey and Design Revisions |
| CLIN 0004 WAREHOUSE (ZAMBIA) | $ 0.00 | |
| Initial Site Survey (Soil, Perclation, Density Test) |
Earthworks
Concrete & Concrete Accesssories
Masonry
Carpentry
Plumbing (latrine and septic system)
Structural Welding
Electrical Works
Miscelaneous Metal Fabrications
Fabricated Roof Panels Assemblies
Flashing and Sheet Metal
Aluminium Doors and Frames
Windows
Door Hardware
Exterior Finishes (glazing, stucco, plaster, painting)
Interior Signage
Toilet Accessories
Fire Extinguishers
Basic Mechanical Materials and Methods
Basic Electrical Materials and Methods
Lighting
Water Distribution
Sanitary Sewer
Miscelleanous Materials (Water Tower, Tents, Welding Materials, etc.)
Furnishings/Equipment
Solar PV System
Labor
| D | TOTAL DIRECT COST PHYSICAL ADECUATION WORKS (BASE BID) | $ 0.00 |
| D | Administration | $ 0.00 |
| D | Unforenseens | $ 0.00 |
| D | Profit | $ 0.00 |
| D | DBA Insurance | $ 0.00 |
| T | TOTAL COSTS (BASE BID) $ | $ 0.00 |
Task C -Training Sheds
| BID CHART - Task C - Training Sheds (OPTIONAL) |
| ZDF Multifunctional Training Sheds |
| Lusaka, Zambia |
| DATE: |
BASE BID
| ITEM | DESCRIPTION | MATERIAL COST | EQUIPMENT COST | LABOR COST | TOTAL COST |
| CLIN 0005 Pre-Construction Activities | |||||
| Site Survey and Design Revisions |
| CLIN 0006 TRAINING SHEDS (ZAMBIA) | $ 0.00 | |
| Initial Site Survey (Soil, Perclation, Density Test) |
Earthworks
Concrete & Concrete Accesssories
Masonry
Carpentry
Plumbing (latrine and septic system)
Structural Welding
Electrical Works
Miscelaneous Metal Fabrications
Fabricated Roof Panels Assemblies
Flashing and Sheet Metal
Aluminium Doors and Frames
Windows
Door Hardware
Exterior Finishes (glazing, stucco, plaster, painting)
Interior Signage
Toilet Accessories
Fire Extinguishers
Basic Mechanical Materials and Methods
Basic Electrical Materials and Methods
Lighting
Water Distribution
Sanitary Sewer
Miscelleanous Materials (Water Tower, Tents, Welding Materials, etc.)
Furnishings
Labor
| D | TOTAL DIRECT COST PHYSICAL ADECUATION WORKS (BASE BID) | $ 0.00 |
| D | Administration | $ 0.00 |
| D | Unforenseens | $ 0.00 |
| D | Profit | $ 0.00 |
| D | DBA Insurance | $ 0.00 |
| T | TOTAL COSTS (BASE BID) $ | $ 0.00 |