This document is a Statement of Work (SOW) for the construction of a Crime Scene Forensics Office in Belize. The SOW provides detailed specifications for the construction of a single-story concrete building that will serve as a forensics laboratory and office space for the National Forensic Science Service, Scenes of Crime Unit.
The key requirements include constructing the building with a lab/office, kitchen, storage, and main area, using a steel reinforced concrete frame, plycem walls, and a gabled metal roof. The contractor must provide all construction services, materials, and equipment necessary to complete the project. Specific requirements are provided for the electrical system, plumbing, HVAC, cabinetry, and other building components. The contractor must also provide testing, an operations and maintenance manual, and 5% attic stock of finish materials. The overall intent is to provide a workspace that meets the conditions for ISO certification of the Scenes of Crime Unit. The period of performance is 270 calendar days after the notice to proceed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 19AQMM24R0054 00003.pdf | ||
| 19AQMM24R0054 002.pdf | ||
| 19AQMM24R0054 QA.xlsx | XLSX spreadsheet | |
| Attachment 3 Drawings 0001.zip | ZIP file | |
| Attachment 1 - SOW 0001 (Track Changes).pdf | ||
| 19AQMM24R0054 B-M 0001.pdf | ||
| Attachment 3a PUC Submission 0001.zip | ZIP file | |
| 19AQMM24R0054 0001.pdf | ||
| 23R0054-Belize-Forensic Lab-Pre-Proposal Conference.pdf | ||
| Attachment 2 - Bid Chart.xlsx | XLSX spreadsheet | |
| Attachment 5 - Past Performance Questionnaire (PPQ).docx | DOCX document | |
| Attachment 3a PUC Submission.zip | ZIP file | |
| 19AQMM24R0054 B-M.pdf | ||
| Attachment 4 - Firm and Project Information.pdf | ||
| 19AQMM24R0054.pdf | ||
| Attachment 3 Drawings.zip | ZIP file | |
| Attachment 1 - SOW.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INTERNATIONAL NARCOTICS
& LAW ENFORCEMENT
BELIZE
STATEMENT OF WORK REVISED
CONSTRUCTION OF
CRIME SCENE FORENSICS OFFICES
BELIZE
STATEMENT OF WORK Page 2 of 20
STATEMENT OF WORK
CONSTRUCTION OF
ONE LABORATORY BUILDING
FOR THE NATIONAL FORENSIC SCIENCE SERVICE
SCENES OF CRIME UNIT
BELIZE, CA
PREFACE
The USA Embassy in Belize, through the International Narcotics and Law Enforcement (INL)
Affairs Office, is planning to provide one Forensics Laboratory for the National Forensic Science
Service, Scenes of Crime Unit (hereafter referred to as the Client). The lab will be a single-story traditional concrete-frame building constructed on a lot in the Stann Creek District (Dangriga
Town). Equipping this facility with loose furniture and equipment will not be required under this scope of work.
The overall intent of the project is to provide a workspace that will meet the conditions required for ISO certification of the Scenes of Crime Unit. This will be done by providing the ability to process and securely store exhibits on a temporary basis before handing over to the forensic laboratory for analysis. This space will provide a dedicated separate work area to produce scenes and autopsy reports. An expanded office space will allow the separation of visitors to safeguard exhibits/evidence. In addition, surveillance and adequate security system will improve security of staff and storage of evidence. This proposed office space will improve personnel growth (see attached Future SOC Organogram) and provide adequate space for supervision. In addition to evidence security, information such as reports, data and crime scenes pictures can be properly worked on and safely secured.
The project shall be conducted in accordance with the plans and specifications detailed in this document. The contractor shall provide services for the one (1) site in the Stann Creek District.
C.1 SPECIFIC TASK
The purpose of this statement of work (SOW) is to establish the requirements for the construction of the one (1) Forensic Lab. The work includes but is not limited to the following: Construction
Services, labor, supervision, independent testing services, tools, materials, and equipment necessary to perform the construction of the new Forensic Lab.
The US Government is seeking qualified, experienced sources capable of delivering this project based on design parameters provided by INL under Attachment “A”. Candidates must provide construction contracting and management services and must be experienced in the coordination of design and construction efforts in all aspects of new construction. The selected firm is encouraged to hire local labor and contractors and use local materials to complete the work.
• The Contractor shall examine all the documents and visit the site to fully inform themselves of all the conditions and limitations applied to the work and submit a firm fixed price cost
STATEMENT OF WORK Page 3 of 20 proposal for all the work. No subsequent cost allowance will be made to the Contractor for neglect of the existing conditions.
• The Contractor shall provide the following with their cost proposal:
o A Bill of Quantity and product literature indicating quantity and values of standard materials and equipment required.
o A schedule that indicates construction activities, milestones, and timelines.
o A statement that the Contractor’s company and all personnel are experienced in
Civil Construction like the type and scope required for this work.
o A list of projects that indicate the Contractor’s experience in this type of work.
o A Quality Control Schedule [QCS] and Project Safety Plan [PSP] to address the project.
o The QCS and PSP are intended to document the entire project from beginning to end.
• Upon award of the contract the Contractor shall provide:
o Materials List, product data, and samples (where applicable) of products to be used in the project. The Materials List shall list the equipment and materials in enough detail that all components of the facilities can be approved by INL without further elaboration or specifications. These documents will be used by INL to approve the manufacturers, model/product numbers, and colors of all materials.
o A copy of a Contractor’s Installation Guarantee covering the work, labor and equipment for a period of 0NE [1] year at no cost to the Embassy signed by the
Contractor.
• Special Scope of Work Notes:
o The supply and installation of loose furniture, kitchen appliances, air conditioners, and lab equipment will be provided by others. The Contractor is to provide all electrical and plumbing connections for this equipment.
o Belize municipality (Belize Electricity Limited (B.E.L.) will be responsible for providing and installing all electric meters and transformers. The Contractor is responsible for connecting the building to the meter.
o The GOB will provide municipal water source and water meter to within 20’ of each building. The Contractor is responsible for connecting the building to the water meter.
o All roadway and parking lot work will be provided by others.
o The Government of Belize (GOB) will provide initial pre-construction site levelling at the site to within 2”. The Contractor is responsible for final site grading that will provide natural rainwater drainage away from the building.
o The Contractor is responsible for hiring 3rd party testing services for soils, concrete, electrical, plumbing, and any other discipline that requires testing.
C.1.1 CONSTRUCTION OF FORENSIC LAB
The scope of services includes, but is not limited to, the work required to fulfill the objectives of this contract. All deviation from the criteria contained herein must be approved by the Contracting
Officers Representative (COR) before proceeding. The contract has the following phases:
Phase 1 - Project Start (Kick off meeting and site visit).
Phase 2 – Product Submittal and Review
Phase 3 - Construction of Lab Building
Phase 4- Substantial Completion & Final Acceptance.
STATEMENT OF WORK Page 4 of 20
Coordination will be in accordance with the requirements outlined in this Contract. All contractual agreements or changes affecting the SOW or delivery of services must be approved by the COR prior to implementation.
Schedule for Deliverables:
Complete all work within time specified below. The following schedule of intermediate deliverable dates may be adjusted only by the COR to accommodate unforeseen events during the work.
Deliverable Item Due Date
Phase 1 -Project Start (Kick off meeting and site visit)
TBD
Phase 2 – Product Submittal and Review Period of Performance of 45 calendar days after Notice to Proceed.
Phase 3 – Construction Period of Performance of 270 calendar Days after Notice to Proceed.
Phase 4 - Substantial Completion & Final
Acceptance; As-Built Drawings; O&M
Manuals; Attic stock
Period of Performance of 30 calendar days after Contractor requests substantial completion
The Contractor shall provide and construct Forensics Office at the below location according to the pre-design established in the attached drawings and specifications detailed in section C.3.6 in this document. The following is the facility that the Contractor must construct at the location:
• Office #1 - Dangriga: Construct a Crime Scene Forensics Office for Dangriga. This includes outdoor deck, eating/kitchen area, bathroom, storage area, mini-lab, office, stairs and wheelchair accessible concrete ramp, gabled roof, windows and doorways with security grills, electrical connections to main power supply, and connections to existing municipal sewer and water systems. The facilities will require built-in utility sink, bathroom sink (and accessories), shower stall, kitchen cabinets, office cabinets, and water heater. Air conditioners and loose equipment/furniture will be provided and installed by others. Contractor responsible for providing all electrical and plumbing required for equipment provided by others.
• others.
The design, and construction, shall be according to the preliminary drawings and specifications detailed in this document.
C.1.2 CONSTRUCTION REQUIREMENTS
The Contractor shall construct in its entirety one (1) new Forensic Lab in Dangriga. The proposed buildings dimensions shall be approximately 50’ x 16’. The facility will have a
Lab/Office, Kitchen, Storage, and Main Area. The structure shall be built on concrete foundation per IBC regulation, and supported by steel reinforced column beam structure, suspended ceiling, metal-framed roof, and concrete block and plycem walls. The proposed building shall be a commercial design. All mechanical, electrical, and plumbing (MEP) systems shall be installed
STATEMENT OF WORK Page 5 of 20 within the walls, floors, shafts, and/or above finished ceilings. Exposed surface mounted plumbing and electrical components will only be approved on a case-by-case basis. Walls shall be plastered per commercial industry standards and cured before applying surface coatings.
Contractor shall not deviate from the design approved by INL and the Client without their prior approval.
Demolition Requirements: The Contractor shall not be responsible for the demolition of any existing buildings/facilities. Any buildings or other structures that will interfere with the new construction will be removed by others. Dust Control Measures: Contractor must make all reasonable efforts to prevent or control blowing dust and debris. Contractor shall be responsible for maintaining the site in such a manner that dust and other wind-borne debris transported to adjacent properties are kept to reasonable minimal levels during demolition and earthwork.
Historical Artifacts: Careful attention should be made to recover historical artifacts that may be uncovered during the construction phase. The Contractor shall provide a written plan that describes the method of protecting and handing over such artifacts. All artifacts shall only be handed over to person(s) identified by the Client.
C.1.3 SHIPPING & DELIVERY
The packing, shipping, and delivery of the construction materials from origin to the project site will be the sole responsibility of the Contractor. The Contractor shall be responsible for paying all shipping costs, to include duties, taxes, demurrages, and any other related costs. These costs must be included in the Contractor’s proposal. INL nor the U.S. Embassy will assist in the shipping in any manner.
C.1.4 INL INSPECTIONS
INL and the Client reserves the right to inspect the facilities at any time during the construction phase. Prior to shipping the constructed facilities, INL will inspect the facilities to confirm that all construction work has been completed per the contract. The absence of INL inspections does not relieve the Contractor of providing a finished product that meets INL’s standard of quality.
C.2 GENERAL SPECIFICATIONS
All work shall be carried out in strict compliance with all contract clauses and these technical specifications. If the Contractor discovers discrepancies contained in the various design/technical documents, Contractor must immediately notify the Contracting Officer Representative (COR) before taking any other action.
C.2.1 QUANTITIES
This contract is based on a fixed firm priced solicitation. Any quantities indicated in the specifications and drawings are for reference only and the Contractor is responsible for providing quantities needed to complete the work, without any price adjustment after award.
C.2.2 WORK EXECUTION
STATEMENT OF WORK Page 6 of 20
The different items of the construction program shall be carried out in a gradual and progressive manner, without initiating work that could later be affected by other items that have not been concluded or that lack an adequate support or safety, taking care that work that has been finished is not affected by weather or other elements.
Contractor shall be responsible for maintaining quality of work by following proper operation procedures in construction.
Contractor is responsible for all testing of materials (i.e. soil, concrete) and installed systems (i.e.
roofing, plumbing, electric).
Prior to the start of construction work, Contractor shall obtain approval from INL for all products that will be used to construct the facilities. Before receiving approval to continue through various stages of work, INL may request the review of samples of completed work to verify the quality of the work and adherence to the design requirements.
The Contractor shall provide a construction schedule in which all the works shall be detailed with the date of performance and delivery.
C.2.3 COST OF THE PROJECT
The Contractor should include all the costs of the materials, materials testing, labor, transportation, construction equipment, and any other personnel or supplies that will be needed to complete the project and comply with all the specifications stated in this document.
C.3 SPECIFICATIONS FOR MATERIALS & CONSTRUCTION ACTIVITIES
C.3.1 LAYING OUT, LEVELING, & INSTALLATION
Preliminary rough grading of site shall be the responsibility of the Government of Belize. Site leveling tolerance shall be +/- 2 in. The COR shall inspect the work to ensure compliance with standards. The contractor should inspect the site and report any deficiency noticed prior to starting work on site. Final grading will be the responsibility of the contractor. Contractor shall be responsible for providing sloped grades around the perimeter of the buildings for proper drainage of rainwater from downspouts.
C.3.2 WARNING SIGNALS:
The Contractor shall provide all the necessary jobsite and safety signs and announcements to prevent accidents according to the safety plan, which shall have the approval of the COR. Signs shall be made of acrylic or galvanized sheets painted with a yellow background and with red or black letters.
C.3.3 TEMPORARY STRUCTURES: SANITARY FACILITIES & WAREHOUSES
The Contractor will implement their own temporary structures on the construction site for the
Contractor’s personnel to include all workers and subcontractors. It is the Contractor’s
STATEMENT OF WORK Page 7 of 20 responsibility to implement offices, warehouses, provisional bathrooms, and the guardhouses required for their own use.
The Contractor will implement provisional sanitary facilities for the personnel, and a guardhouse with a temporary connection to a potable water and sewage system prior to commencing construction. One sanitary facility shall be implemented for every 10 workers. The Contractor will be responsible for cleaning and maintaining these structures.
The materials to be used for these provisional facilities can be of metal, concrete, or wood, as long as they are secure and provide a private area. The Contractor is allowed to rent office space if located near the project site and approved by INL. The COR can demand changes or improvement of the provisional facilities at any time if he determines that the Contractor is not providing a clean area with sufficient privacy and safety. All temporary structures must be removed by the Contractor prior to INL’s final acceptance of the project.
C.3.4 EARTHWORK, EXCAVATION AND BACKFILLING
Preliminary general excavation and backfilling, as well as carrying, piling up and removing excavation material will be the responsibility of the Government of Belize. The Contractor shall be responsible for soils testing, especially in areas of backfill, and verifying that the rough grades are accurate. The Contractor must notify the COR immediately if any discrepancies are found and must cease all earthwork until the COR provides further guidance. If the contractor does not verify the soils and/or rough grade elevations prior to construction, the Contractor shall be responsible for making any corrections necessary to bring the earthwork within design and IBC guidelines.
C.3.4.8 REMOVAL OF WASTE AND/OR EXCAVATED MATERIAL
Waste removal is defined as the method of transportation of the materials produced by excavation, which should have a specifically determined place for disposal approved by the local authority.
When there is an excess of excavated material during the Contractor’s work (concrete footings, sewer system, etc.), the Contractor shall remove it and place it outside the area of construction in a location designated by the COR, where such material will not obstruct watercourses or cause detriment to the neighboring areas.
Excess or waste material shall not be located in properties adjacent to the construction site unless the Contractor receives written authorization from the owners of such properties, evidence of which shall be provided to the COR upon request.
The material produced by excavation that will not be used for the construction of the project shall be removed from the site using heavy mechanical equipment in good condition, without causing vehicle transit interruption or neighbors’ annoyance. All construction debris and excess waste must be removed from the site prior to INL’s final acceptance of the project.
C.3.5 CONSTRUCTION DETAILS
CONCRETE STRUCTURES: The Contractor shall build all concrete structures according to IBC and local codes. All rebar and concrete testing must be performed by reputable independent testing company and must be submitted to the INL/COR for concurrence.
STATEMENT OF WORK Page 8 of 20
CEILING AND WALL INSULATION: All Plycem walls and ceilings must be insulated with sound batts. Insulation can be 4” rock-wool (40kg/m3/ Class A nonflammable) or other insulation product that guarantees the same conditions that rock-wool provides
GABLED ROOF: A gabled roof shall be constructed for each office using welded galvanized hollow structural sections (HSS per ASTM500) and galvanized metal roof panels (minimum 24-gauge thickness). The Contractor shall provide engineered drawings that indicates size and gauge of structural members, fastening methods, and welding requirements. Shop drawings must be stamped by licensed engineer. All metal components shall be hot dipped galvanized from the factory. All field welds shall be coated with two coats of inorganic 93% zinc rich coating.
INTERIOR PAINTING: Interior walls shall be painted with high-durability paint with washable finish. No flat finish will be acceptable. The minimum paint thickness will be 4.5 mils (Approximately one coat of primer and two coats of semi-gloss paint). The first coat will be a wash primer (or other type of paint/primer which guarantees adhesion to the galvanized sheet), after which two coats of high-quality, minimum 10-year Warranty, semi-gloss interior quality paint, shall be applied. Color will be “Arcade white” or similar.
If walls are constructed with plastic sheets, the sheets must be manufactured with an INL-approved color.
EXTERIOR PAINTING: The exterior painting requires three (3) coats of high-quality exterior weather resistant acrylic paint (color selected by the COR) (sapolin or similar mark) with a 25-year minimum guarantee. Paint should be applied according to the manufacturer's recommendation with adherence to application specifications for an anticorrosive primer.
ELECTRICAL SYSTEM: All electrical work must be performed under
ANSI/EIA/IEEE77-80, and Belize NEC codes. The contractor shall supply and install a three-phase board with door and space for 12-circuit totalizer with 225A Bar-Neutral Bar-
Earth Bar-Plastic Sheet. This panel will be located inside the building at a height of at least
1.50 meters from the floor to the back of the panel. It shall include a breaker for the interior of the building, which shall be calculated to support the installation of internal lighting
(110v), outputs (110v), and additional 20% capacity inside the panel. The panel shall be properly labeled and shall contain an electrical diagram and a charging directory. All electrical conduits shall be installed within the internal wall cavity. Under no circumstance shall any electrical conduit be surface mounted. The Contractor shall be responsible for connecting the building electrical system to the municipal electrical service provided by the Government of Belize. The Contractor is responsible for final testing of the entire electrical system. The testing reports must be submitted to the INL COR for concurrence.
• Channeling: All wiring and installation shall be of the appropriate caliber and specification of the Belize Electrical Code IAW (RETIE) and shall be executed within a conduit channeled through the interior of the insulation layer of the building. The pipe shall be metal EMT conduit and wall boxes.
• 110V electrical outlet: The contractor shall supply and install 110 V industrial outlets, with adequate grounding, properly labeled with a non-removable or embossed low-relief plastic or metal label. The outputs shall be in sequence throughout the circuit. The outputs will be distributed according to drawings attached. The installation height of these outputs is 0.30 meter for standard use and workstations, 1.8 meters for TV points.
STATEMENT OF WORK Page 9 of 20
• 110V electrical outlet for TV point: The contractor shall supply and install 110V outlet electrical outlets, for TV points, with proper ground, properly labeled with a non-removable plastic or metal low-relief or embossed label. The outlets shall be in sequence throughout the circuit. The installation height of these outlets is 70 inches.
• LED Lighting: The contractor shall supply and install hermetic LED lamps with a minimum aggregate of 4000 lumens of Bright White Light inside each room of the building. Exterior lighting shall be exterior grade flood light fixtures producing 900-
1200 lumens per lightbulb.
• Emergency lamp: The contractor shall supply and install emergency lamps and exit signs in LED lighting as required by NFPA and local codes.
AIR CONDITIONING: The contractor shall NOT be responsible for the supply and installation of the air conditioners. However, the electrical work should include the provisions for two 4x1 multi split air conditioning units per facility. Each evaporator shall be 12,000 BTU with all accessories. One (1) condenser unit of 48,000 BTUs will be provided per facility. The installation of the electrical system shall include metal supports fixed to the wall, electrical outlets, heavy-duty disconnect switch, and gravity condensation drains. All electrical components must be rated for the amps and voltage of the equipment. The outlets for the evaporator should be adjacent to the units just below the finished ceiling height. The condenser must be located at the top of the exterior wall or on the roof and should be secured in a manner to minimize the chance of theft, using security straps or steel cage to contain the unit. All air conditioning equipment shall be from a well-known brand from United States that can be easily obtained in Belize for maintenance purposes.
HOT WATER HEATER: The Contractor shall provide one “point-of-use” tankless electric hot water heater that will supply hot water to the bathroom, kitchen, and laboratory. Hot water boilers will not be acceptable. Size of hot water heater shall be based on a maximum capacity of 40 gallons. Manufacturer shall be Rheem, AO Smith, Rinnai, or equal.
SEWAGE AND WATER SYSTEM: All plumbing fixtures shall have their own connections for water and sewage systems. Each fixture must have its own p-trap to prevent sewer gasses from entering the facility. All piping shall be permanently joined using PVC primer and PVC cement. All threaded connections must be sealed with teflon plumbing tape. All plumbing penetrations (through walls, ceilings, or floors) must be sealed with foam and silicone sealants and covered with a stainless-steel escutcheon or cover plate. Contractor shall connect water lines to the municipal water system. Contractor must include in the municipal water connections check-valves and any other devices required by local municipality. Dangriga will not be connected to municipal sewer system. Contractor is responsible for constructing a septic tank and soakaway pit per the drawings.
WINDOWS: The contractor shall provide windows of varying dimensions as shown on the bridging documents. Dimensions may have a tolerance of +/- 4” in. depending on the manufacturer standards. The windows shall be double-glazed with sheets of 4mm thick safety glass in aluminum or PVC framing equipped with roller shutters and mosquito net.
DOORS AND HARDWARE: The contractor shall supply and install exterior steel frames and doors 6’-8” high (with an acceptable tolerance of +/- 2”. depending on the manufacturer standards) and varying widths to match the openings shown on the drawings. Interior doors shall be combination of wood, metal, or PVC with foam core and equipped with an industrial grade locking handle. Exterior doors shall be metal reinforced frames with foam cores and galvanized metal skin. The exterior doors will be made of AA 5020 aluminum alloy T5
STATEMENT OF WORK Page 10 of 20 temper, natural grey color. Hardware should include 4 exterior-grade hinges, hydraulic automatic closer, lockable door handle, and deadbolt. The door for the Lab (D2) shall have a biometric lock (reference Strattec Advanced Logic RTS-Z-EX for comparison). Thickness of all doors shall be a minimum of 2”.
KITCHEN AND BATHROOM FIXTURES: The contractor shall include sinks, faucets, toilets, and shower heads/mixing valves according to section C.3.7. Quality to match
American Standard, Toto, or Kohler brands. If Contractor uses standard brands different from these, they must submit their fixtures as a substitution within the proposal. The Contractor shall guarantee correct operations of all units, including drainage operation. The complete connection parts and special parts, which are necessary to connect the washbasin valves to the water system, shall be installed. All the connections shall remain hermetical. All the necessary connections parts and/or special parts (such as siphons, lead tubes, drainages, etc.), shall be completely installed and connected, and shall be hermetically connected to the discharge through the sewerage service. The Contractor shall complete all finish work, including escutcheons, caulking, access panels, etc. for correct installation and all proper appearance.
Sanitary fixtures:
o Bathroom Washbasin: The Contractor shall supply and install a drop-in or under-mounted washbasin with siphon, supply pipes, p-traps, escutcheons, and fountain faucet with two spigots. All of the elements shall be new and include all the necessary materials for proper operation. The washbasins shall be of first quality porcelain and accredited by a manufacturer, similar to those made by the American Standard
(Washbasin Sorrento white with temporized faucet code 24-32-141 at EPA) or others with the same or better characteristics. The Contractor shall obtain the approval of the washbasin from the COR. The washbasin shall be marked with the manufacturer’s identification stamp. The washbasin boxes and necessary accessories shall be prepared in the finishes of the corresponding walls to support it. Before this process, leveling shall be confirmed.
o Toilets: The Contractor shall supply and install the toilet with all the necessary materials for its operation including a self-closing toilet seat with lid. The toilet and seat shall be first quality, by an accredited manufacturer, similar to those made by the American Standard, Kohler, or Toto (or other manufacturer with the same or better characteristics, white color).
The toilet bowl and tank shall be made of porcelain and possess a high-quality finish.
All elements of the toilet must be new. The toilet shall be placed on the floor over the sewerage system and shall be sealed with wax ring connection and silicone caulking around the base of the fixture. All piping shall be joined using PVC primer and cement.
All connection and special parts, which are necessary to connect the toilet to the water system service, shall be installed. All the connections shall remain hermetical. All the necessary connection parts and/or special parts (such as siphons, lead tubes, drainages, etc.) shall be completely installed and connected, and shall be hermetically connected to discharge through the sewerage system.
STATEMENT OF WORK Page 11 of 20
The Contractor shall provide all the auxiliaries of masonry works, and the necessary plumbing, required to install the parts. The Contractor shall provide the finishes required for the correct installation and all proper appearance. The toilet shall be provided complete, with all accessories (such as: valves, flappers, etc.), and shall be subject to the approval of the COR. The Contractor shall use the manufacturer catalogs to determine proper dimensions for the parts location.
o Stainless Steel Utility Sink: In the laboratory the Contractor shall provide and install a drop-in cabinet-mounted stainless-steel sink approximtely50 x 35 cm in size with continuous stainless-steel surround. The sink shall include the siphon, p-trap, supply pipes, and the fountain faucet. All the elements shall be new and with all the necessary materials for proper operation. The sink shall be of first quality accredited by a manufacturer, similar to “Teka Economico”, with faucet type “Colony” (4175-
500IN.002 Monocont INCESA) or similar with equal or better quality.
The Contractor shall obtain the approval of the sink from the COR, and the sink shall be marked with the manufacturer’s identification stamp. The sink boxes, or necessary accessories, shall be prepared in the finishes of the corresponding walls in order to support it. Before this process, leveling shall be confirmed.
The Contractor shall warranty all correct operations including drainage. The
Contractor shall install all connection and special parts, necessary to connect the sink valves to the water system. All the necessary connections parts and/or special parts
(such as siphons, lead tubes, drainages, etc.), shall be completely installed and connected, and shall be hermetically connected to the discharge through the sewerage service.
o Shower Enclosure Cabin: All bathrooms shall have a shower enclosure with incorporated base. Reference Dreamline DL-6152-01 Prime 31 3/8" by 31 3/8" for basis of design. Similar brands with equal features and quality can be submitted for approval. Shower pan shall be set in a mortar bed to prevent deflection of shower pan when being used. Provide compatible faucet with mixing valve and water-saver type shower head. Each joint should be hermetically sealed, and its parts shall be installed without forcing them.
o Stainless Steel Double Kitchen Sink: Contractor shall provide and install a double stainless-steel sink approximately 100x35 cm with continuous stainless-steel dish drain and countertop in the kitchen. The sink shall include the siphon, p-trap, supply pipes, and the fountain faucet. All of the elements shall be new and with all the necessary materials for proper operation. The sink shall be of first quality accredited by a manufacturer, similar to “Teka Stena 2B 1D”, with faucet type “Colony” (4175-
500IN.002 Monocont INCESA) or similar with equal or better quality.
The Contractor shall obtain the approval of the sink from the COR, and the sink shall be marked with the manufacturer’s identification stamp. The sink boxes, or necessary accessories, shall be prepared in the finishes of the corresponding walls in order to support it. Before this process, leveling shall be confirmed.
The Contractor shall warranty all correct operations including drainage. The
Contractor shall install all connection and special parts, necessary to connect the sink
STATEMENT OF WORK Page 12 of 20 valves to the water system. All the necessary connections parts and/or special parts
(such as siphons, lead tubes, drainages, etc.), shall be completely installed and connected, and shall be hermetically connected to the discharge through the sewerage service. The Contractor shall create all the auxiliaries of masonry works and the necessary plumbing in order to install the parts.
Contractor shall accomplish all work using the detailed basic requirements. The contractor shall include any other accessories or equipment that are needed for the complete and appropriate construction of the facilities, and to guarantee the durability and manipulation for no less than one year of use. All sanitary fixtures shall be sealed with continuous bead of silicone sealant wherever fixture is adjoined to the floor, wall, or any other adjacent surface.
BATHROOM ACCESSORIES: Contractor to provide the following bathroom accessories:
o Liquid soap dispenser with push-button nozzle: Provide and install satin stainless steel soap Ref: B-4112 Bobrick push-type brand or equivalent at the bathroom sinks. Their installation will be according to the manufacturer's instructions, perfectly level and placed under the mirror as indicated on the attached drawing.
o Paper Holder and Bin: Each toilet stall will have one stainless steel toilet paper holder and a stainless-steel paper bin. The toilet paper holder should be firmly fixed to interior toilet stall divider to prevent it from being removed.
o Mirrors: Provide and install a mirror above the bathroom sink. Mirror bottoms to be 2 in. above the sink and reach the ceiling. The mirrors will be 5 mm thick. All mirrors will be attached to the wall according to the manufacturer’s instructions.
KITCHEN AND BATHROOM VENTILATION: Provide an 8”x8” 110v wall-mounted variable speed shutter ventilation fan in the kitchen and bathroom. Ventilation should be direct to the outdoor.
FIRE EXTINGUISHERS: The Contractor shall provide class ABC fire extinguishers as shown on the drawings. Extinguishers must be fully charged and tagged by inspector.
BUILT-IN CABINETRY: Contractor shall provide cabinets for kitchen, bathroom, and laboratory. Cabinets shall be factory-made using new kiln-dried wood. Face panels, doors, and boxes shall be fabricated from laminated cabinet-grade plywood or MDF. Doors and drawers shall be partial overlay with European hinges (Blum or equal). Toe kicks shall also be laminated using high-pressure laminate (Formica, Wilsonart, or equal). Exterior laminate to have a minimum thickness of 1 mm. Interior laminate should have a minimum thickness of .5mm. Contractor to provide standard color selection to be selected by INL. Adhesives must be commercial-grade contact cement or equal. Door pulls and handles shall be stainless steel. Contractor to provide standard selection of hardware and laminates from local market to be selected by INL. Countertops in Kitchen and Lab shall be an integral stainless-steel sink and countertop. Countertop in bathroom shall be solid (Corian or equal) minimum 1 ½” thick, with either a drop-in or under-mounted wash basin. Any plumbing penetration shall be covered with an escutcheon or cover plate. Contractor to provide a single cabinet as a sample for INL approval prior to fabrication and installation of the entire set of cabinets. Approved sample may be used for final installation.
STATEMENT OF WORK Page 13 of 20
SEALANTS: All wall penetrations (interior and exterior) must be properly sealed. Exterior wall penetrations must be sealed with foam insulation and exterior silicone sealant and covered with escutcheons. Interior walls to be sealed with insulation and interior latex or silicone sealant. All door and window frame perimeters must be sealed on interior and exterior sides using silicone sealant. All sealant colors to closely match color of adjacent walls. All plumbing fixtures must be sealed with silicone sealant where fixture abuts an adjoining surface.
C.3.6 LOOSE FURNITURE AND EQUIPMENT
All loose equipment and furniture will be provided and installed by the Client. A List of furniture and equipment has been provided in attachment “B” for coordination purposes only.
C.3.7 LICENSING REQUIREMENTS
Contracting company must have a current license recognized by the Government of Belize.
Engineers must be registered and licensed with the Government of Belize. Contractor Project Manager needs to have a university degree in Construction Management, Civil Engineering, or related field.
Waivers for the use of Project Managers and Engineers licensed in countries other than the Government of Belize will be reviewed and approved on a case-by-case basis by the Contracting Officer.
C.3.8 TRAINING AND OPERATIONS/MAINTENANCE MANUALS
At the completion of the project the contractor shall provide an Operations and Maintenance
(O&M) Manual for the owner. This manual shall include product literature, warranties, cleaning and repair information, and vendor information for all products used on the project. The
Contractor shall provide a training session with the end user to review the manual and highlight proper use and maintenance of building components.
C.3.9 ATTIC STOCK
The Contractor must provide the end user with 5% attic stock of finish materials for future maintenance/repairs of flooring, paints, door hardware (not including combination lock for laboratory), ceiling tiles, light bulbs, and any other finish or consumable product. If 5% is less than one unit, provide a minimum of one unit of that product. A list of materials must accompany the attic stock.
C.3.10 AS-BUILTS
The contractor will keep an updated record of all construction documents (drawings, specifications, BOQ), indicating all modifications made during the implementation of the project.
At the conclusion of the job clean copies of these records shall be made and turned over to the
INL COR on site as ‘as built’ plans accurately reflecting the finished site. In this project the drawings and architectural specifications will have the same priority. If discrepancies are found, STATEMENT OF WORK Page 14 of 20 the builder shall advise INL in writing in order to determine a solution with the designer and end user.
C.4 REPORTING
Weekly Updates: Contractor shall provide weekly updates of accomplishments, plans of actions, outstanding tasks, potential and actual delays, problems encountered and solutions, recommendations for process improvements regarding assigned tasks, and future or projected tasks or issues.
Monthly Status Reports. The Contractor shall produce Monthly Status Reports (MSRs) to the
INL POC. Reports shall include at a minimum, an executive summary, identify team personnel, skill levels, schedule tracking, travel conducted, any issues and recommendations and updates/changes. The MSR shall also provide a chart showing the actual work completed versus the planned work completed as noted on the original schedule submitted to the INL
POC for review and approval. The MSR is to provide information on work completed, work in progress and work outstanding, as well as highlighting problems encountered and anticipated.
The MSR shall also include progress photos showing work completed during the month.
Draft deliverables for the Monthly Status Report shall be submitted five (5) working days following each month to the INL POC. The INL POC will respond within five (5) working days with comments. The Contractor shall incorporate the comments within five (5) working days. For final deliverables, the INL POC will either accept or reject them within five (5) working days of submission. Final MSRs shall also be provided to the Contracting Office. In the event of rejection, the INL POC will notify the Contractor in writing of the reasons for such rejection. Absence of notification will be construed as an acceptance.
STATEMENT OF WORK Page 15 of 20
Attachment B: Client-Furnished Equipment and Furniture
Item Code Description Example of required model Quantity Unit
1 RT5 Rectangular table with 4 chairs (1.40 x 1.0 m approximately) constructed of hardwood solids and veneers, with durable high pressure laminate work surfaces. Color classic cherry or similar. 4 heavy duty chairs manufactured with steel and synthetic leather.
2 set
2 SF Stainless steel gas stove with 6 burners & 1 ovens from well-known brand from United
States that can be easily obtained in Costa
Rica for maintenance purposes. Similar to
Frigidaire model FFGF3052TS.
1 u
Stainless steel exhaust hood 30" width from well-known brand from United States that can be easily obtained in Costa Rica for maintenance purposes. Similar to Frigidaire model FHWC3050RS.
3 R Stainless steel air of 25 cubic feet capacity, side by side type from well-known brand from United States that can be easily obtained in Costa Rica for maintenance purposes.
Similar to Frigidaire model FFHS2622MS u
4 MS Stainless steel microwave of 1.3 cubic feet capacity from well-known brand from
United States that can be easily obtained in
Costa Rica for maintenance purposes.
Similar to GE Model: JVM6175SKSS.
Coordinate size of microwave with cabinetry.
Similar to GE Model: JVM6175SKSS.
Coordinate size of microwave with cabinetry.
STATEMENT OF WORK Page 16 of 20
Item Code Description Example of required model
5 Provide and Install Fume Hood 72" W X 30"
D X 90" H
6 Drying Cabinet 60" W X 29" D X 27" H.
Polypropylene construction with Metal and
Glass Door. Type Forensic Evidence Drying
Cabinet. Voltage 120V Hertz 60HZ. 1-year
Warranty
7 Camera System
4K Long Range Security Camera, 7-35mm, 8MP Security Camera 7-35mm Lens
H.265, H.264 compatible
7-35mm Motorized Zoom Lens
38° - 11° Angle of View
330ft IR Range
Add-on Mic Capable
Video Analytics
Micro SD up to 128GB
12VDC or PoE
IP67 Weatherproof
Wall/Ceiling/Pole Mount
8 Alarm System. Wireless Home Office
Business Security Alarm System, GSM SIM
Card Burglar Alarm Outdoor Siren, with
Auto Dial, Infrared Detector, Remote Control and More Kits for Complete Security
STATEMENT OF WORK Page 17 of 20
10 Fingerprint Biometric Door Lock, Chrome
Ideal for Main Door
Lever Lock Handle Type
Chrome Finish Type
Fingerprint Identification Methods
Stainless Steel Body Material
10 to 40 deg celsius Operating Temperature
11 set of metal locker (3 division)
Single Tier 36-Inch Wide 6-Feet High 12-
Inch-Deep Standard Metal Locker, Gray
Assembled dimension: 36" W x 78" H x 12"
D
Compartment dimensions: (3) - 12" W x 72"
H x 12" D
Each locker compartment includes an adjustable hat shelf
Units include a lift up handle and recessed hasp and can accommodate key locks and combination or key padlocks
12 Duplex 1200 x 1200 DPI Wireless/USB
Mono Laser MFC Printer
STATEMENT OF WORK Page 18 of 20
13 Temperature control Laboratory refrigerator
21 5/8 x 21 5/8 x 63 inches glass swing door with hinges right
14 60" W x 28" D x 30" H computer desk with cabinet
15 Swivel armchair
STATEMENT OF WORK Page 19 of 20
16 40" dia. Metal working table 2’ x 5'
17 15" office cabinets with 3 drawers
STATEMENT OF WORK Page 20 of 20
Attachment C: Examples of Fixed Cabinetry to be Provided by Contractor
Item Code Description Example of required model
1 Kitchen upper cabinets with doors manufactured with hardwoods and painted with lacquer, with a minimum deep of 40cm, shall include two adjustable shelves along all length and shall be designed and build according to drawings A-03.
2 Kitchen cabinet base with stainless steel countertop. Cabinets shall be manufactured with hardwoods and painted with lacquer, with doors and shall include two adjustable shelves along all length, except for one module that at least will have 3 drawers. The countertop shall be of stainless steel of minimum 60cm deep. Shall be designed and build according to drawings A-03.
3 Kitchen wall cabinet for microwave oven