QA Set Three Final.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
EO/IR VIDEO SURVEILLANCE SYSTEM FOR THE BELL UH-1HII/UH-1ST and SIKORSKY UH-60 HELICOPTER
Solicitation number
19AQMM22R0002
Issued by

About this file

This document contains questions and answers related to a solicitation for an EO/IR video surveillance system for Bell UH-1HII/UH-1ST and Sikorsky UH-60 helicopters. Key details include that the solicitation number is 19AQMM22R0002, with proposals due by May 2, 2022. The agency is the Department of State Office of Acquisition Management. Questions cover areas such as airworthiness certification requirements, available government furnished information and equipment, environmental testing standards, training requirements, and communications systems already installed on the aircraft. Responses provide clarification but also indicate contractors are expected to propose their own specific technical solutions that meet the requirements.

View the file

Other files

File Type Posted
19AQMM22R0002 - Amendment 0002.pdf PDF
QA Set two 4-15-22.xlsx XLSX spreadsheet
19AQMM22R0002 - Amendment 0001.pdf PDF
Attachment 1 - Pricing Spreadsheet.xlsx XLSX spreadsheet
19AQMM22R0002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Column1QuestionResponse
1Support for airworthiness is mentioned in the SOW (Section C of Solicitation). Is there a CDRL associated with supporting airworthiness approval by AED and UHPO? e.g. MIL-HDBK-516C Modification Airworthiness Certification Criteria (MACC) worksheet Certification Basis/Compliance Report inputs?There is no CDRL requirement for the supporting Airworthiness approval. DoS INL/A will expect the certification criteria to be within the guidelines of industry standard for FAA certificated aircraft under 14 CFR Part 21 Certification Procedures for products and articles, and will be reviewed and approved by the INL/A airworthiness authority prior to acceptance.
2What GFI will be available for the current aircraft configuration? e.g., SSHA, ELA, W&B, Stress&Loads. It is implied in some locations (e.g. SOW states, "Current Electrical Loads Analysis updated..."), however the extent of GFI and specific item availability is unclear.Given the number of airframes in the fleet and the expansive data they collectively represent, it is neither practicle for the USG, nor helpful to offerors at this point. Once the contract is awarded, USG will coordinate with the contracted vendor to select specific aircraft to be modified. At that point all requisite technical data for the selected airframes will be made avaliable as requested/required.
3Are special tooling or fixtures in the form of ground support equipment expected to be needed to facilitate relocating B Kit equipment between aircraft within the 2 hours window? If so, how many GSE instances will be required as part of the contract?The tools and equipment will be determined by the needs of the proposed system provided by the vendor. USG posseses all requisite GSE on sites to operate and maintainn each aircraft for normal flight line operations. This GSE will be available at work sites in support of this project. Any specialized tools or equipment unique to the EO-IR system proposed by vendors should be identified and discussed in the proposal.
4Please quantify allowable limits to impacts for items listed in SOW paragraph 4.14Impact requirements will mirror aircraft specifications as outlined in aircraft technical manuals. The vendor should provide the requirements that the system has been tested/qualified to meet.
5Please define exact requirements for extreme temperature changes and unprepared landing zones in terms of specific MIL-STD-810G requirements (specific applicable METHODS and parameters) or equivalent applicable standards (SOW paragraph 4.15.)Environmental requirements will mirror aircraft specifications as outlined in aircraft technical manuals. The vendor should provide the requirements that the system has been tested/qualified to meet.
6When the B Kit is not installed on the aircraft, will permanent stowage provisions for the A Kit be required to allow for Partially Mission Capable flight?When the B-Kit is not installed on the aircraft, the design should provide provisions for the aircraft to fly missions with no impact on aircraft performance, or potential damage or water/dust intrusion into to installed A-kit equipment.

Generally it is expected that removable equipment will be provided in a protective case by the vendor to allow for storage in an enviromentally controlled facillity such as a toolroom when not in use. The vendor will propose appropriate stowage for A-Kit and B-Kit equipment.

7Please remove non-descript or non-binding words like "recommend", "recommended", "consider", or "will" and ensure each contractor requirement uses "shall" and provides specific requirements and specific deliverables (e.g., CDRLs); and replace conditional words like "options" or "optional" unless intending to provide Section L and M criteria that gives credit for providing features beyond threshold requirements. Additionally, please replace most instances of "propose" and "proposed" with specific requirements that must be met (Threshold) or are desired (Objective).The term "recommended" is used in the SOW 6.1 Technical Specifications is used as a recommended installed equipment and system listing, however, the contractor shall propose their complete technical solution. The term "will" used throughout the SOW is an imperative statement. The term "options" used in the SOW Section 4.6 allows the contractor to propose other technical solutions instead of using existing wiring and controls. The terms "propose" and "proposed" used throughout the SOW refer to the contractor's proposed techical solution and as such will provide the specific requirements that shall be met and the desired objective in fullfilling the requirements of the SOW.
8Will an aircraft survey be performed by the contractor on each aircraft variant? 4, 3, 2, or just 1? Requirements state "initial survey" implying more than 1 (SOW paragraph 8.1.3. and the '1.' paragraph following 8.1.3)No site surveys are scheduled at this time.
9Consider including a CLIN for publications that has a POP consistent with the warranty period to provide a contractual vehicle for publication updates.publications should be part of the A and B Kit pricing.
10Will the training of pilots be done as a part of the training for maintenance and avionics technicians or will these be separate training events for the two groups?Separate training sessions would be anticipated based on the trainees interaction with the system. Maintenance and Avionics will need to know how to install/troubleshoot/repair/uninstall the system and Pilots will need training on how to operate the systems.
11What are communications, radar and RF transmission systems are already onboard the aircraft?MODELP/NDESCRIPTIONQTY Installed
KX165A VHF COM/NAV069-01 033-020 1-NVGVHF Com/Nav Transceiver2 EA
KTR909 UHF Com050-03146-0010UHF Transceiver1
ADF Receiver066-01 072-0004-NVGADF Receiver Control1
KT76C Transponder Control066-01156-01 01-NVGTransponder Transceiver1
KRA405B Radar Altimeter066-01153-0101Radar Altimeter Transceiver1
KLN900 GPS066-04034-01 04-NVG KLN900 GPS Receiver, NVG Modified1
C-406-2HM453-5001-366Emergency Locator Transmitter ELT Unit1
Controller, NAT301A ICSNAT301-065ICS Controller6 EA
121270-2-91-AZZ-P91649TDFM 9100-P91649NV TiL RadioFM Transceiver1

19AQMM22R0002 QA SET THREE

&1#&"Times New Roman,Regular"&10&K000000SBU - CONTRACTING AND ACQUISITIONS &P of &N

File details come from the government source that posted it. Updated .