19AQMM22R0002 - Amendment 0001.pdf

PDF 912 KB Posted

Attached to
EO/IR VIDEO SURVEILLANCE SYSTEM FOR THE BELL UH-1HII/UH-1ST and SIKORSKY UH-60 HELICOPTER
Solicitation number
19AQMM22R0002
Issued by

About this file

This solicitation seeks proposals for an electro-optical/infrared (EO/IR) video surveillance system for Bell UH-1HII/UH-1ST and Sikorsky UH-60 helicopters operated by the Department of State's Bureau of International Narcotics and Law Enforcement Affairs (INL/A) in Central and South America. Offerors should provide solutions for a prototype installation as well as production quantities. The system must provide day/night surveillance capabilities with zoom optics and stabilization. It must integrate with existing aircraft interfaces and be interchangeable between airframes. Proposals are due by May 2, 2022 and will result in an indefinite-delivery/indefinite-quantity contract with both firm-fixed-price and cost-reimbursable line items. The contract has a minimum value of $10,000 and maximum of $30 million over multiple option years. Training and support services are also required.

View the file

Other files

File Type Posted
19AQMM22R0002 - Amendment 0002.pdf PDF
QA Set Three Final.xlsx XLSX spreadsheet
QA Set two 4-15-22.xlsx XLSX spreadsheet
Attachment 1 - Pricing Spreadsheet.xlsx XLSX spreadsheet
19AQMM22R0002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

19AQMM22R0002

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE RATING

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

04/15/2022

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

AOPE_CODE

OFC OF PROCUREMENT EXECUTIVE (A/OPE)

PO BOX 9115, ROSSLYN STATION

A/OPE/AQM/IP

ARLINGTON, VA 22209

Patrick J Murphy

NAME

TEL.

murphypj@state.gov

EMAIL

6. ISSUED BY OPEAQMCODE

INL Support

OPE/AQM/IP/INL

Office of Acquisition (AQM) 1200 Wilson Blvd (SA-06B) Arlington, VA 22209

7. ADMINISTERED BY (If other than Item 6)

9A. AMENDMENT OF SOLICITATION NO.

19AQMM22R0002

CONTACT: UEI:

CODE FACILITY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, state and ZIP Code) (X)

X 9B. DATED (SEE ITEM 11)

03/28/2022

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning __1__copies of the amendment;(b)By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.X

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

1. This amendment adds a Training CLIN series (X020) to Section B.

2. This amendment adds Attachment 1, Pricing Spreadsheet, which is referenced on page 46 under Volume III Price Proposal.

3. This amendment also provides responses to offeror's questions, which are as Attachment 2, "QA Set 2".

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

John R. Menard

(Signature of person authorized to sign)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

By (Signature of Contracting Officer)

16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

03/28/2022

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

CGFS // CGFS

Table of Contents

Section Description Page Number

B Supplies or Services and Prices/Costs C Descriptions/Specifications/Statement of Work

C.001 EO/IR VIDEO SURVEILLANCE SYSTEM FOR THE BELL UH-1HII/UH-1ST and

SIKORSKY UH/HH-60 A/L HELICOPTERS STATEMENT OF WORK

J List of Attachments J.1 Section J - List of Attachments

Line Item Summary

Solicitation Number:

19AQMM22R0002

Contract Number: Title: EO/IR VIDEO SURVEILLANCE

SYSTEM

Date of Solicitation:

04/15/2022

Line Item No.

Description Quantity Unit Unit Price Total Cost

EO/IR VIDEO SURVEILLANCE SYSTEM

020 Training Type of Contract Pricing: FFP

Doc Ref No:

Delivery Date FOB:

0.00 0.00 0.00

LT

1020 Training Type of Contract Pricing: FFP

Doc Ref No:

Delivery Date FOB:

0.00 0.00 0.00

LT

2020 Training Type of Contract Pricing: FFP

Doc Ref No:

Delivery Date FOB:

0.00 0.00 0.00

LT

3020 Training Type of Contract Pricing: FFP

Doc Ref No:

Delivery Date FOB:

0.00 0.00 0.00

LT

4020 Training Type of Contract Pricing: FFP

Doc Ref No:

Delivery Date FOB:

0.00 0.00 0.00

LT

EO/IR VIDEO SURVEILLANCE SYSTEM

Section C - Descriptions/Specifications/Statement of Work

C.001 - EO/IR VIDEO SURVEILLANCE SYSTEM FOR THE BELL UH-1HII/UH-1ST and SIKORSKY UH/HH-60 A/L

HELICOPTERS STATEMENT OF WORK

1. BACKGROUND

1. Currently INL/A has no capability for providing on scene video of any critical situation to decision makers either in the RSO or DoS Air Wing Tactical Operations Center (TOC). An EO/IR video surveillance system with data link capability can fulfill this critical shortfall in capability. INL/A has an urgent requirement for UH-1HII/UH-1ST and UH/HH-60 A/L aircraft to be modified for EO/IR sensors (A kits), and sensor packages (B Kits) for deployment to provide real time data/imagery to fixed and mobile ground stations in Central and South America.

2. INL/A rotary wing aircraft perform a variety of security and counternarcotic related missions.

I. Intelligence, Surveillance and Reconnaissance (ISR). In support of nighttime air and sea interdiction operations, the flight crew will have the capability to locate, identify, and classify illicit transport operations from a safe distance.

During airborne operation, threat/target locations can be observed and relayed to support ground and maritime interdiction forces.

II. Overland Operations. Troop transport in support of interdiction operations is one of the primary mission areas of INL supported aircraft. Conducting insertions and extraction operations in a nighttime low light environment will greatly enhance the operational effectiveness and increase the element of surprise. An EO/IR UH-1HII/UH-1ST and UH/HH-60 A/L aircraft will be able to locate any possible threats, identify smuggling routes and sanitize the immediate environment around the LZ.

Surveillance and recording of activities can be conducted from 500 meters and beyond per current host nation agreements.

III. Embassy Support. INL/A UH-1HII/UH-1ST and UH/HH-60 A/L aircraft may be used for support to Embassy operations to provide surveillance and reconnaissance that provides critical details of attack/threat situations in real time.

1. Secondary missions.

I. Search and Rescue (SAR). EO-IR equipped UH-1HII/UH-1ST and UH/HH-60 A/L aircraft could be used for opportune search and rescue, providing a significant increase over current capabilities.

2. SCOPE

The scope of this project is to provide an EO/IR capability for INL/A UH-1HII/UH-1ST and UH/HH-60 A/L aircraft currently operating in Central and South America. The contractor will perform all actions to accomplish this task. Additional contractor effort will include but not be limited to aircraft capability and system analysis, system development, design, procurement, aircraft modification, testing and evaluation, airworthiness certification, operator and maintenance technician training, continued airworthiness plan, production of a technical data package and follow-on logistics support, technical assistance, and maintenance support as required.

3. OBJECTIVES

At the completion of this effort, the USG in Central and South America will have the capability to view real-time, all-weather, day or night, EO/IR HD/SDI surveillance video from INL/A rotary wing aircraft.

4. REQUIREMENTS

1. The contractor will provide project management support for the design, development, integration, testing, and installation of the aircraft kits, sensor packages and associated systems. The contractor shall complete first article installation and testing at the INL/A facility in Melbourne FL. The contractor will complete the EOIR installation of the remaining aircraft to in Central and South America.

2. The contractor will manage government property in accordance with appropriate FAR clauses.

3. Written progress reports will be provided at least monthly, delivered within 5 business days of the first day of the month.

Progress may be reported weekly via telecom or email until first article testing and installation are complete.

4. Written progress reports will be provided at least monthly, delivered within 5 business days of the first day of the month on all warranty work.

5. The Contractor shall provide a copy of the project schedule and updates as they happen, monthly at a minimum. If the contractor uses MS Project, the update should include the .mpp file.

6. Existing wiring and controls should be used to the maximum extent possible, but if newer technology could result in better performance/reliability or lower life cycle cost then other options will be considered.

7. The contractor will propose solutions for line of sight (primary) as well as beyond line-of-sight communications capability (via satellite or commercial cell tower IP network).

8. Development, Engineering, Modification, Installation, Test and Evaluation, Training will be proposed by the contractor.

9. Cockpit video interface will be included.

10. Operator Station / Control Panel is expected to reside aft of the cockpit with an operator seated behind the pilots. Any operator station or console should consider crash survivability requirements per aircraft manufacturer specifications.

11. System shall be compatible with the existing aircraft hard points, data interfaces, aircraft weight and balance limitations, and use currently available on#board power sources.

12. The EO/IR video surveillance system (B Kit) and any associated sensor operator equipment shall be easily installed and interchangeable between all R/W aircraft within 2 hours for changing mission requirements, even at night, utilizing flashlights, simple tools and on the ramp (not in a hangar).

13. The vendor provided EO/IR system controls and display shall be Day / Night Unaided capable and night vision goggle compatible.

14. The EO/IR video surveillance system must integrate with the R/W aircraft to minimize mission impacts associated with stability, aerodynamics and drag, airframe and aircraft performance limitations, center of gravity, increased weight reducing payload and range, aircraft and surveillance system vibration, ground clearance, and cabin and occupant space.

15. The proposed system must be designed for helicopter operations in extreme temperature changes and unprepared landing zones per MIL-STD 810G requirements.

5. PLACE OF PERFORMANCE

1. First article testing will be conducted at Department of State INL/A facility in Melbourne, FL.

2. Fleet modifications will be in Central and South America or other locations as noted in individual task orders.

6. TECHNICAL SPECIFICATIONS

1. Recommended Installed equipment and systems include, but are not limited to:

1. EO/IR single Line Replaceable Unit (LRU) sensor

1. Full High-Definition Thermal Imager

2. Full High-Definition Color and Low light camera

3. Continuous Zoom HD Optics

4. Wide-Area Secondary / HD Color Camera

5. Short wave IR camera

6. Universal Hand Control unit (UHCU)

1. Operable by the Sensor Operator (UH-1) or Pilot (HH-60L)

1. Crew station control panel should be mobile and operated from the cargo compartment. Needs to be NVG compatible. Easily transferrable between aircraft.

2. The contractor will provide a solution to ensure the video signal can be received and distributed to all required users.

7. WARRANTY AND REPAIR

1. The contractor shall propose their best standard warranty periods. Please address if the warranty includes repair capability in country and replacement units while a system is unavailable for warranty service.

2. The vendor will provide information on proposed maintenance concept and service and support capabilities in country and provide 18-month historical supply data for a similar geographical/mission fleet. Provide estimated availability of repair parts, approved sources of supply, turnaround time for repairs, and availability of 24/7 online/call center support.

3. The vendor needs to provide major-end-item repair/OH lead times with OEM or approved sources of supply.

8. ENGINEERING, DESIGN, INSPECTION AND ACCEPTANCE

1. Prototype Project.

1. Before INL/A proceeds with the complete purchase/shipment of EO/IR systems, the selected vendor will conduct a prototype trial installation with one EO/IR sensor kit and Data downlink system to be installed in one UH-1HII/UH-1ST and UH/HH-60 A/L aircraft to be located at the Department of State INL/A facility located in Melbourne, FL. The selected vendor will supply the necessary equipment, spare parts, and technical assistance to proceed with the installation and testing.

2. The prototype project will include non-recurring engineering (NRE) for the new equipment installations, wire routing and all the associated technical analysis and first article testing.

3. An aircraft survey shall be performed to assess and define the following:

- Hardware mounting locations

- Antenna mounting locations

- EO/IR installation interference

- Electrical bussing for system

- Circuit breaker locations/

- Electrical wire routing

- Mounting points

- Weight and balance

1. At the completion of the initial survey, the selected vendor will further define the Preliminary Integration Design Solution. This integration design solution will be reviewed with DoS INL/A staff during a formal design review for concurrence or revision.

2. The selected vendor will develop and submit the Technical Data Package (TDP) once the integration solution is affirmed by Dos INL/A. The TDP will include:

- Master Data List (MDL)

- Installation drawings

- Mechanical

- Electrical

- Assembly drawings

- Detail part drawings

- Wiring diagram

- Substantiation documents

- Mechanical

- Stress

- Electrical

- Electrical load analysis

- Test plans

- Ground test plan

- Electro-magnetic Interference test plan

- Flight test plan

- Flight manual supplement

- Instructions for Continued Airworthiness documents

- Maintenance manual

- Illustrated parts catalog

- Weight and balance

1. The TDP will be corrected using Red Lines during the trial installation. These Red Line corrections will be incorporated into the TDP prior to final release and approval of the drawings. Final documents shall be provided to INL/A within 30 days after completion of the successful Trial installation.

2. Upon successful completion of aircraft modifications, the following documentation shall be delivered to INL/A:

- Current Electrical Load Analysis (ELA) updated to correspond to the load changes created by the new equipment installation.

- Electrical Load Analysis documentation and Certificates of Conformance for all structural equipment fabricated and installed in the aircraft.

- Test plan and results including operational checks of all newly installed equipment as well as disturbed systems caused by the modifications to include repairs required to return the systems to fully operational status (EMI/EMC and FCC checklists)

- Instructions for Continued Airworthiness (ICA)

- Flight Manual Supplements

- Parts Manual Supplements

- Airworthiness Limitations

- Drawings and Schematics

Contractor proposed electrical installations and modifications shall be accomplished in accordance with TM 1-1500-323-24-1, Installation and Repair Practices, Aircraft Electric and Electronic Wiring, Aerospace Standard AS50881, Rev F and FAA AC 21-99. Structural modifications and/or fabrications shall be accomplished in accordance with AC 43-13-2B, Acceptable Methods, Techniques, and Practices - Aircraft Modifications.

1. INL/A will make a final technical assessment and decision about whether to continue with the development of this SOW and proceed with the purchase of EO/IR systems.

2. INL/A will conduct all ground and flight tests to support the inspection, repair, and acceptance of the EO/IR and associated data downlink system.

3. Acceptance of the installation will be by the INL/A designated test pilot and the WASS contractor QC/Maintenance Advisor when the test pilot signs off on the work.

9. TRAINING AND PUBLICATIONS

1. The selected vendor will provide training for up to (10) pilots/system operators and (10) maintenance and avionics technicians and/or third-party contractors on the install, uninstall, configure, repair, use and troubleshooting the EO/IR and Data Downlink system.

2. Provide all up-to-date publications (with updates throughout the warranty period), licenses and manuals for the components of the aircraft and the sensor system.

10. RESPONSIBILITIES

1. Vendor Responsibilities:

1. Provide a qualified avionics and maintenance technician/instructor who can competently inspect and install the EO/IR sensor system, integrate it with other UH-1HII/UH-1ST and UH-60 A/L aircraft systems and train others.

2. Provide a detailed listing of parts, supplies, software, and tools required to install and configure the EO/IR system on the UH-1HII/UH-1ST and UH/HH-60 A/L aircraft.

3. Provide training for up to (10) pilots and (10) maintenance and avionics technicians on the install, uninstall, configure, repair, use and troubleshooting of sensor system in Central and South America.

4. Supply an engineering order with all technical data required before the installation process begins. The vendor will support airworthiness assessment by the Aviation Engineering Directorate and Utility Helicopter Program Office.

5. Recommend operational environmentally appropriate spares package(s) and/or OEM maintenance services in Central and South America.

6. Advise and assist INL/A with installing, calibrating, and maintaining the EO/IR and Data downlink systems during testing.

7. Contractor shall provide estimated transportation and lodging costs to support first article test installations in Melbourne, FL, technicians to install the systems in Central and South America. Cost estimates will be provided to complete all installations in Central and South America.

Section J - List of Attachments

Clause J.1 Section J - List of Attachments was added or modified.

J.1 - Section J - List of Attachments

Attachment 1 - "Pricing Spreadsheet" Attachment 2 - "QA Set 2"

Evaluation Factors for Award

19AQMM22R0002 PRICING SPREADSHEET ATTACHMENT 1

Line Item No. Description Quantity Unit Price Total Price 1 UH-1ST Non-Recurring Engineering 1 -$ 2 UH-1ST A-Kit Fabrication 1 -$ 3 UH-1ST B-Kit Fabrication 1 -$ 4 UH-1ST A-Kit Installation 1 -$ 5 UH-1ST B-Kit Installation 1 -$ 6 UH-1ST Service Plan 1 -$ 7 UH-1 II Non-Recurring Engineering 1 -$ 8 UH-1 II A-Kit Fabrication 1 -$ 9 UH-1 II B-Kit Fabrication 1 -$

10 UH-1 II A-Kit Installation 1 -$ 11 UH-1 II B-Kit Installation 1 -$ 12 UH-1 II Service Plan 1 -$ 13 HH-60 Non-Recurring Engineering 1 -$ 14 HH-60 A-Kit Fabrication 1 -$ 15 HH-60 B-Kit Fabrication 1 -$ 16 HH-60 A-Kit Installation 1 -$ 17 HH-60 B-Kit Installation 1 -$ 18 HH-60 Service Plan 1 -$

19 COST REIMBURSABLE TRAVEL 0 -$ -$

20 Training 1

Total Base Year -$

1001 UH-1ST Non-Recurring Engineering 1 -$ 1002 UH-1ST A-Kit Fabrication 1 -$ 1003 UH-1ST B-Kit Fabrication 1 -$ 1004 UH-1ST A-Kit Installation 1 -$ 1005 UH-1ST B-Kit Installation 1 -$ 1006 UH-1ST Service Plan 1 -$ 1007 UH-1 II Non-Recurring Engineering 1 -$ 1008 UH-1 II A-Kit Fabrication 1 -$ 1009 UH-1 II B-Kit Fabrication 1 -$ 1010 UH-1 II A-Kit Installation 1 -$ 1011 UH-1 II B-Kit Installation 1 -$ 1012 UH-1 II Service Plan 1 -$ 1013 HH-60 Non-Recurring Engineering 1 -$ 1014 HH-60 A-Kit Fabrication 1 -$ 1015 HH-60 B-Kit Fabrication 1 -$ 1016 HH-60 A-Kit Installation 1 -$ 1017 HH-60 B-Kit Installation 1 -$ 1018 HH-60 Service Plan 1 -$

1019 COST REIMBURSABLE TRAVEL 0 -$ -$

1020 Training 1

Total Option Year 1 -$

#SBU - CONTRACTING AND ACQUISITIONS

2001 UH-1ST Non-Recurring Engineering 1 -$ 2002 UH-1ST A-Kit Fabrication 1 -$ 2003 UH-1ST B-Kit Fabrication 1 -$ 2004 UH-1ST A-Kit Installation 1 -$ 2005 UH-1ST B-Kit Installation 1 -$ 2006 UH-1ST Service Plan 1 -$ 2007 UH-1 II Non-Recurring Engineering 1 -$ 2008 UH-1 II A-Kit Fabrication 1 -$ 2009 UH-1 II B-Kit Fabrication 1 -$ 2010 UH-1 II A-Kit Installation 1 -$ 2011 UH-1 II B-Kit Installation 1 -$ 2012 UH-1 II Service Plan 1 -$ 2013 HH-60 Non-Recurring Engineering 1 -$ 2014 HH-60 A-Kit Fabrication 1 -$ 2015 HH-60 B-Kit Fabrication 1 -$ 2016 HH-60 A-Kit Installation 1 -$ 2017 HH-60 B-Kit Installation 1 -$ 2018 HH-60 Service Plan 1 -$

2019 COST REIMBURSABLE TRAVEL 0 -$ -$

2020 Training 1

Total Option Year 2 -$

3001 UH-1ST Non-Recurring Engineering 1 -$ 3002 UH-1ST A-Kit Fabrication 1 -$ 3003 UH-1ST B-Kit Fabrication 1 -$ 3004 UH-1ST A-Kit Installation 1 -$ 3005 UH-1ST B-Kit Installation 1 -$ 3006 UH-1ST Service Plan 1 -$ 3007 UH-1 II Non-Recurring Engineering 1 -$ 3008 UH-1 II A-Kit Fabrication 1 -$ 3009 UH-1 II B-Kit Fabrication 1 -$ 3010 UH-1 II A-Kit Installation 1 -$ 3011 UH-1 II B-Kit Installation 1 -$ 3012 UH-1 II Service Plan 1 -$ 3013 HH-60 Non-Recurring Engineering 1 -$ 3014 HH-60 A-Kit Fabrication 1 -$ 3015 HH-60 B-Kit Fabrication 1 -$ 3016 HH-60 A-Kit Installation 1 -$ 3017 HH-60 B-Kit Installation 1 -$ 3018 HH-60 Service Plan 1 -$

3019 COST REIMBURSABLE TRAVEL 0 -$ -$

3020 Training 1

Total Option Year 3 -$

4001 UH-1ST Non-Recurring Engineering 1 -$ 4002 UH-1ST A-Kit Fabrication 1 -$ 4003 UH-1ST B-Kit Fabrication 1 -$ 4004 UH-1ST A-Kit Installation 1 -$ 4005 UH-1ST B-Kit Installation 1 -$ 4006 UH-1ST Service Plan 1 -$ 4007 UH-1 II Non-Recurring Engineering 1 -$ 4008 UH-1 II A-Kit Fabrication 1 -$ 4009 UH-1 II B-Kit Fabrication 1 -$ 4010 UH-1 II A-Kit Installation 1 -$ 4011 UH-1 II B-Kit Installation 1 -$ 4012 UH-1 II Service Plan 1 -$ 4013 HH-60 Non-Recurring Engineering 1 -$ 4014 HH-60 A-Kit Fabrication 1 -$ 4015 HH-60 B-Kit Fabrication 1 -$ 4016 HH-60 A-Kit Installation 1 -$ 4017 HH-60 B-Kit Installation 1 -$ 4018 HH-60 Service Plan 1 -$

4019 COST REIMBURSABLE TRAVEL 0 -$ -$

4020 Training 1

Total Option Year 4 -$

Total Base + Options -$

19AQMM22R0002 ATTACHMENT 2, QSheet1 SET 2

Question Response 1 Can DoS provide any specifications for the mobile and fixed sites the downlink will interface/communicate with?

The proposed ISR network is not operational yet, so specifications are still unknown. However, the project is moving forward. The proposed network will be a combination of fixed radio sites for line of site communications with surface vessels, ground vehicles and aircraft using radio (UHF) and data link communication equipment most likely operating in the S band frequency range. The fixed sites will use an IP network to communicate with a combined operations center and other agencies.

Is it possible for contractors to survey the aircraft prior to submission of proposals in order to understand the electrical and mechanical interfaces?

No, The operational tempo at PACE cannot support numerous contractor visits or an industry day.

3 Can electrical and interface drawings be provided for the UH-60 MFD video interface?

Electrical and interface drawings will be provided after the Vendor selection.

4 What is the technical specification for Full High-Definition cameras/imagers? 720? 1080P?

Both formats are acceptable.

5 For the EO/IR Camera, are stepped zoom optics acceptable, and how many axis of stabilization are required?

Stepped zoom Optics is acceptable. 4-Axis stabilization is acceptable.

6 Do the B Kit systems need to be exportable or will DoS take delivery of the B kits in the U.S. or grant an exemption for contractor shipment to Central/South America?

The intent is for the Vendor to install the system in country. The selected vendor is responsible to do all the appropriate due diligence to meet export compliance requirements. They may not need a license and may have a license exception but it is the responsibility of the vendor to do the appropriate due diligence.

7 On page 46 of the solicitation, under Volume III Price Proposal, “Attachment 1 Pricing Spreadsheet” is listed for offerors to use to submit pricing. A pricing spreadsheet is not included on the solicitation listing on Fed Biz ops.

Amendment 00001 includes the referenced Attachment 1, Pricing Spreadsheet. Offerors shall input their firm fixed price unit pricing for each line item number. The travel CLIN shall not be priced at this time.

8 A CLIN is not provided to quote training. How would DoS like the pricing for training to be presented?

Amendment 00001 added a Training CLIN (X020) for the base year and each option period. All travel expenses related to executing the offeror's proposed training should be included in the travel CLIN (X019) and therefore not priced at this time.

9 Will Block 10 be amended to Unrestricted (removing 8(a) requirement)?

No, this is an 8(a) set aside competitive procurement.

19AQMM22R0002 ATTACHMENT 2, QSheet1 SET 2

10 The February pre-solicitation update read: “(1)The Contractor shall—(i)Provide an end item that a small business has manufactured, processed, or produced in the United States or its outlying areas; for kit assemblers who are nonmanufacturers, see paragraph (c)(2) of this clause instead; (ii)Be primarily engaged in the retail or wholesale trade and normally sell the type of item being supplied; and

(iii) Take ownership or possession of the item(s) with its personnel, equipment, or facilities in a manner consistent with industry practice; for example, providing storage, transportation, or delivery.” Is this requirement still in effect?

Yes, 52.219-33, Nonmanufacturer Rule (Sep 2021) (15 U.S.C. 657s) is applicable to this procurement.

11 It also read: “(2)When the end item being acquired is a kit of supplies, at least 50 percent of the total cost of the components of the kit shall be manufactured, processed, or produced in the United States or its outlying areas by small business concerns.” Is this requirement still in effect?

Yes, 52.219-33, Nonmanufacturer Rule (Sep 2021) (15 U.S.C. 657s) is applicable to this procurement.

12 The 4 February RFI response mentioned a total of 23 A/B kits (5 Costa Rica, 18 Peru). Is this still valid? From what we can tell, only 15 systems are included in the Line Item Description.

These quantities were provided to indicate the anticipated quantity of units that may be procured within the first two years of the contract. The resulting contract will be an indefinate delivery indefinate quantity (IDIQ) contract. Consequently the exact number and types of units to be procured are not know at this time. The IDIQ contract has a minimum order amount of $10,000.00 and a maximum order amount of $30,000,000.00. (See B-004 - MINIMUM AND MAXIMUM CONTRACT AMOUNTS (Indefinite Quantity Contract).

13 What is the anticipated date of delivery of the 1st system to

PACE?

This will depend on when an actual task order is issued against the IDIQ contract. Offerors should include delivery time frames (x days after receipt of task order) in their proposals.

14 For the solicitation in support of the Department of State there is a requirement for compliance to MIL-STD 810.G.

Would you please confirm what methods within 810G must the system be qualified to?

Offeror must meet all requirements in that section of the MIL-STD.

19AQMM22R0002 - Amendment 0001
Attachment 1 - Pricing Spreadsheet
Attachment 2 - QA Set 2