The file's text, extracted by GovTribe without its formatting.
SECTION M
EVALUATION FACTORS FOR AWARD
Supplies/Services.
This is a Multiple Award Indefinite Delivery Indefinite Quantity (IDIQ) contract with firm fixed-price Delivery Orders to furnish and deliver packaged generators sets, associated transfer switches, and ancillary devices, including a 2,000-hour supply of spare parts, to the U.S. Department of State, in accordance with the specifications and terms and condition set forth herein. A firm fixed-price Delivery Order will be issued for each required delivery throughout the contractual period.
This contract is for New Equipment ONLY; NO remanufactured or "gray market" items. All items must be covered by a labor and materials manufacturer's warranty for a period of one year starting from the date the equipment is installed and commissioned on the work site. No partial shipments are permitted unless specifically authorized at the time of Delivery Order award.
The Government may also request the Contractor furnish and deliver packaged generator sets and components not currently listed under Section B.2.
The period of performance is one (1) year as of the date of the Contracting Officer's signature for the base contract year, with four (4) one-year options to be exercised at the sole discretion of the Government.
Schedule of Prices.
The unit prices listed below shall be the maximum ceiling price and shall include all labor, materials, testing, crating, overhead, and profit for ready-to-ship packaged generator sets. The described ratings listed for each generator set is established based on standby operations. At their choosing, the Contractor may provide lower prices within each Delivery Order request. The quantity values identified for each CLIN in the schedule are provided only for purposes of identifying past annual procurement trends and do not reflect the Government’s future procurement obligations. Pricing needs to be provided for each CLIN identified in the schedules.
Firm fixed prices shall be provided for transportation to three US Department of State facilities. See Section B.4 for location addresses. The contractor, at their discretion, may use other Department of State despatch locations for purposes of shipping generators and transfer switches if deemed to be a more cost-effective alternative for a specific delivery order.
All prices are in US Dollars. The Contractor will be paid in full after the Government accepts the equipment at the delivery site stipulated on the Delivery Order.
Description
| QTY |
| Unit Price |
| Delivery Antwerp, Belgium |
| Delivery Miami, Florida |
| Delivery Hagerstown, Maryland |
| FOB Vendor Dock |
| 0001 |
| 25 kva, 220V, 3 Phase, 50 Hz |
| 0 |
| 0002 |
| 25 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 4 |
| 0003 |
| 37.5 kva, 220V, 3 Phase, 50 Hz |
| 1 |
| 0004 |
| 37.5 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 106 |
| 0005 |
| 50 kva, 220V, 3 Phase, 50 Hz |
| 1 |
| 0006 |
| 50 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 33 |
| 0007 |
| 75 kva, 220V, 3 Phase, 50 Hz |
| 1 |
| 0008 |
| 75 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 6 |
| 0009 |
| 100 kva, 220V, 3 Phase, 50 Hz |
| 0 |
| 0010 |
| 100 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 6 |
| 0011 |
| 125 kva, 220V, 3 Phase, 50 Hz |
| 0 |
| 0012 |
| 125 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 2 |
| 0013 |
| 156 kva, 220V, 3 Phase, 50 Hz |
| 1 |
| 0014 |
| 156 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 0015 |
| 188 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 2 |
| 0016 |
| 219 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 6 |
| 0017 |
| 250 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 0 |
| 0018 |
| 288 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 0019 |
| 313 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 0020 |
| 344 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 0021 |
| 375 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 0022 |
| 438 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 0023 |
| 500 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 3 |
| 0024 |
| 750 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 0 |
| 0025 |
| 1000 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 0 |
| 0026 |
| 25 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 0027 |
| 25 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 0028 |
| 37.5 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 0029 |
| 37.5 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 0030 |
| 50 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 0031 |
| 50 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 0032 |
| 75 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 0033 |
| 75 kva, 220V, 3 Phase, 60 Hz |
| 1 |
| 0034 |
| 100 kva, 208V, 3 Phase, 60 Hz |
| 1 |
| 0035 |
| 100 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 0036 |
| 125 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 0037 |
| 125 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 0038 |
| 156 kva, 208V, 3 Phase, 60 Hz |
| 1 |
| 0039 |
| 156 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 0040 |
| 219 kva, 208V, 3 Phase, 60 Hz |
| 1 |
| 0041 |
| 250 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 0042 |
| 25 kva, 230V, 1 Phase, 50 Hz |
| 1 |
| 0043 |
| 37.5 kva, 230V, 1 Phase, 50 Hz |
| 0 |
| 0044 |
| 50 kva, 230V, 1 Phase, 50 Hz |
| 2 |
| 0045 |
| 12.5 kva, 230V/115V, 1 Phase, 60 Hz |
| 1 |
| 0046 |
| 25 kva, 230V/115V, 1 Phase, 60 Hz |
| 0 |
| 0047 |
| 37.5 kva, 230V/115V, 1 Phase, 60 Hz |
| 0 |
| 0048 |
| 50 kva, 230V/115V, 1 Phase, 60 Hz |
| 3 |
| 0049 |
| 75 kva, 230V/115V, 1 Phase, 60 Hz |
| 1 |
| 0050 |
| 100 kva, 230V/115V, 1 Phase, 60 Hz |
| 0 |
| 0051 |
| 125 kva, 230V/115V, 1 Phase, 60 Hz |
| 1 |
| 0052 |
| 156 kva, 230V/115V, 1 Phase, 60 Hz |
| 0 |
| 0053 |
| ATS 100 Amps, 600V, 3-Pole |
| 0 |
| 0054 |
| ATS 100 Amps, 600V, 4-Pole |
| 0 |
| 0055 |
| ATS 125 Amps, 600V, 3-Pole |
| 0 |
| 0056 |
| ATS 125 Amps, 600V, 4-Pole |
| 52 |
| 0057 |
| ATS 150 Amps, 600V, 3-Pole |
| 4 |
| 0058 |
| ATS 150 Amps, 600V, 4-Pole |
| 2 |
| 0059 |
| ATS 225 Amps, 600V, 3-Pole |
| 1 |
| 0060 |
| ATS 225 Amps, 600V, 4-Pole |
| 0 |
| 0061 |
| ATS 260 Amps, 600V, 4-Pole |
| 0 |
| 0062 |
| ATS 300 Amps, 600V, 4-Pole |
| 0 |
| 0063 |
| ATS 400 Amps, 600V, 4-Pole |
| 0 |
| 0064 |
| ATS 600 Amps, 600V, 4-Pole |
| 0 |
| 0065 |
| ATS 800 Amps, 600V, 4-Pole |
| 0 |
| 0066 |
| ATS 1000 Amps, 600V, 4-Pole |
| 0 |
| 0067 |
| ATS 1200 Amps, 600V, 4-Pole |
| 0 |
| 0068 |
| ATS 1600 Amps, 600V, 4-Pole |
| 0 |
Description
| QTY |
| Unit Price |
| Delivery Antwerp, Belgium |
| Delivery Miami, Florida |
| Delivery Hagerstown, Maryland |
| FOB Vendor Dock |
| 1001 |
| 25 kva, 220V, 3 Phase, 50 Hz |
| 0 |
| 1002 |
| 25 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 4 |
| 1003 |
| 37.5 kva, 220V, 3 Phase, 50 Hz |
| 1 |
| 1004 |
| 37.5 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 106 |
| 1005 |
| 50 kva, 220V, 3 Phase, 50 Hz |
| 1 |
| 1006 |
| 50 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 33 |
| 1007 |
| 75 kva, 220V, 3 Phase, 50 Hz |
| 1 |
| 1008 |
| 75 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 6 |
| 1009 |
| 100 kva, 220V, 3 Phase, 50 Hz |
| 0 |
| 1010 |
| 100 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 6 |
| 1011 |
| 125 kva, 220V, 3 Phase, 50 Hz |
| 0 |
| 1012 |
| 125 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 2 |
| 1013 |
| 156 kva, 220V, 3 Phase, 50 Hz |
| 1 |
| 1014 |
| 156 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 1015 |
| 188 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 2 |
| 1016 |
| 219 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 6 |
| 1017 |
| 250 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 0 |
| 1018 |
| 288 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 1019 |
| 313 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 1020 |
| 344 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 1021 |
| 375 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 1022 |
| 438 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 1023 |
| 500 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 3 |
| 1024 |
| 750 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 0 |
| 1025 |
| 1000 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 0 |
| 1026 |
| 25 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 1027 |
| 25 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 1028 |
| 37.5 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 1029 |
| 37.5 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 1030 |
| 50 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 1031 |
| 50 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 1032 |
| 75 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 1033 |
| 75 kva, 220V, 3 Phase, 60 Hz |
| 1 |
| 1034 |
| 100 kva, 208V, 3 Phase, 60 Hz |
| 1 |
| 1035 |
| 100 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 1036 |
| 125 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 1037 |
| 125 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 1038 |
| 156 kva, 208V, 3 Phase, 60 Hz |
| 1 |
| 1039 |
| 156 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 1040 |
| 219 kva, 208V, 3 Phase, 60 Hz |
| 1 |
| 1041 |
| 250 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 1042 |
| 25 kva, 230V, 1 Phase, 50 Hz |
| 1 |
| 1043 |
| 37.5 kva, 230V, 1 Phase, 50 Hz |
| 0 |
| 1044 |
| 50 kva, 230V, 1 Phase, 50 Hz |
| 2 |
| 1045 |
| 12.5 kva, 230V/115V, 1 Phase, 60 Hz |
| 1 |
| 1046 |
| 25 kva, 230V/115V, 1 Phase, 60 Hz |
| 0 |
| 1047 |
| 37.5 kva, 230V/115V, 1 Phase, 60 Hz |
| 0 |
| 1048 |
| 50 kva, 230V/115V, 1 Phase, 60 Hz |
| 3 |
| 1049 |
| 75 kva, 230V/115V, 1 Phase, 60 Hz |
| 1 |
| 1050 |
| 100 kva, 230V/115V, 1 Phase, 60 Hz |
| 0 |
| 1051 |
| 125 kva, 230V/115V, 1 Phase, 60 Hz |
| 1 |
| 1052 |
| 156 kva, 230V/115V, 1 Phase, 60 Hz |
| 0 |
| 1053 |
| ATS 100 Amps, 600V, 3-Pole |
| 0 |
| 1054 |
| ATS 100 Amps, 600V, 4-Pole |
| 0 |
| 1055 |
| ATS 125 Amps, 600V, 3-Pole |
| 0 |
| 1056 |
| ATS 125 Amps, 600V, 4-Pole |
| 52 |
| 1057 |
| ATS 150 Amps, 600V, 3-Pole |
| 4 |
| 1058 |
| ATS 150 Amps, 600V, 4-Pole |
| 2 |
| 1059 |
| ATS 225 Amps, 600V, 3-Pole |
| 1 |
| 1060 |
| ATS 225 Amps, 600V, 4-Pole |
| 0 |
| 1061 |
| ATS 260 Amps, 600V, 4-Pole |
| 0 |
| 1062 |
| ATS 300 Amps, 600V, 4-Pole |
| 0 |
| 1063 |
| ATS 400 Amps, 600V, 4-Pole |
| 0 |
| 1064 |
| ATS 600 Amps, 600V, 4-Pole |
| 0 |
| 1065 |
| ATS 800 Amps, 600V, 4-Pole |
| 0 |
| 1066 |
| ATS 1000 Amps, 600V, 4-Pole |
| 0 |
| 1067 |
| ATS 1200 Amps, 600V, 4-Pole |
| 0 |
| 1068 |
| ATS 1600 Amps, 600V, 4-Pole |
| 0 |
Description
| QTY |
| Unit Price |
| Delivery Antwerp, Belgium |
| Delivery Miami, Florida |
| Delivery Hagerstown, Maryland |
| FOB Vendor Dock |
| 2001 |
| 25 kva, 220V, 3 Phase, 50 Hz |
| 0 |
| 2002 |
| 25 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 4 |
| 2003 |
| 37.5 kva, 220V, 3 Phase, 50 Hz |
| 1 |
| 2004 |
| 37.5 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 106 |
| 2005 |
| 50 kva, 220V, 3 Phase, 50 Hz |
| 1 |
| 2006 |
| 50 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 33 |
| 2007 |
| 75 kva, 220V, 3 Phase, 50 Hz |
| 1 |
| 2008 |
| 75 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 6 |
| 2009 |
| 100 kva, 220V, 3 Phase, 50 Hz |
| 0 |
| 2010 |
| 100 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 6 |
| 2011 |
| 125 kva, 220V, 3 Phase, 50 Hz |
| 0 |
| 2012 |
| 125 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 2 |
| 2013 |
| 156 kva, 220V, 3 Phase, 50 Hz |
| 1 |
| 2014 |
| 156 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 2015 |
| 188 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 2 |
| 2016 |
| 219 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 6 |
| 2017 |
| 250 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 0 |
| 2018 |
| 288 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 2019 |
| 313 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 2020 |
| 344 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 2021 |
| 375 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 2022 |
| 438 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 2023 |
| 500 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 3 |
| 2024 |
| 750 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 0 |
| 2025 |
| 1000 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 0 |
| 2026 |
| 25 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 2027 |
| 25 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 2028 |
| 37.5 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 2029 |
| 37.5 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 2030 |
| 50 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 2031 |
| 50 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 2032 |
| 75 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 2033 |
| 75 kva, 220V, 3 Phase, 60 Hz |
| 1 |
| 2034 |
| 100 kva, 208V, 3 Phase, 60 Hz |
| 1 |
| 2035 |
| 100 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 2036 |
| 125 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 2037 |
| 125 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 2038 |
| 156 kva, 208V, 3 Phase, 60 Hz |
| 1 |
| 2039 |
| 156 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 2040 |
| 219 kva, 208V, 3 Phase, 60 Hz |
| 1 |
| 2041 |
| 250 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 2042 |
| 25 kva, 230V, 1 Phase, 50 Hz |
| 1 |
| 2043 |
| 37.5 kva, 230V, 1 Phase, 50 Hz |
| 0 |
| 2044 |
| 50 kva, 230V, 1 Phase, 50 Hz |
| 2 |
| 2045 |
| 12.5 kva, 230V/115V, 1 Phase, 60 Hz |
| 1 |
| 2046 |
| 25 kva, 230V/115V, 1 Phase, 60 Hz |
| 0 |
| 2047 |
| 37.5 kva, 230V/115V, 1 Phase, 60 Hz |
| 0 |
| 2048 |
| 50 kva, 230V/115V, 1 Phase, 60 Hz |
| 3 |
| 2049 |
| 75 kva, 230V/115V, 1 Phase, 60 Hz |
| 1 |
| 2050 |
| 100 kva, 230V/115V, 1 Phase, 60 Hz |
| 0 |
| 2051 |
| 125 kva, 230V/115V, 1 Phase, 60 Hz |
| 1 |
| 2052 |
| 156 kva, 230V/115V, 1 Phase, 60 Hz |
| 0 |
| 2053 |
| ATS 100 Amps, 600V, 3-Pole |
| 0 |
| 2054 |
| ATS 100 Amps, 600V, 4-Pole |
| 0 |
| 2055 |
| ATS 125 Amps, 600V, 3-Pole |
| 0 |
| 2056 |
| ATS 125 Amps, 600V, 4-Pole |
| 52 |
| 2057 |
| ATS 150 Amps, 600V, 3-Pole |
| 4 |
| 2058 |
| ATS 150 Amps, 600V, 4-Pole |
| 2 |
| 2059 |
| ATS 225 Amps, 600V, 3-Pole |
| 1 |
| 2060 |
| ATS 225 Amps, 600V, 4-Pole |
| 0 |
| 2061 |
| ATS 260 Amps, 600V, 4-Pole |
| 0 |
| 2062 |
| ATS 300 Amps, 600V, 4-Pole |
| 0 |
| 2063 |
| ATS 400 Amps, 600V, 4-Pole |
| 0 |
| 2064 |
| ATS 600 Amps, 600V, 4-Pole |
| 0 |
| 2065 |
| ATS 800 Amps, 600V, 4-Pole |
| 0 |
| 2066 |
| ATS 1000 Amps, 600V, 4-Pole |
| 0 |
| 2067 |
| ATS 1200 Amps, 600V, 4-Pole |
| 0 |
| 2068 |
| ATS 1600 Amps, 600V, 4-Pole |
| 0 |
Description
| QTY |
| Unit Price |
| Delivery Antwerp, Belgium |
| Delivery Miami, Florida |
| Delivery Hagerstown, Maryland |
| FOB Vendor Dock |
| 3001 |
| 25 kva, 220V, 3 Phase, 50 Hz |
| 0 |
| 3002 |
| 25 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 4 |
| 3003 |
| 37.5 kva, 220V, 3 Phase, 50 Hz |
| 1 |
| 3004 |
| 37.5 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 106 |
| 3005 |
| 50 kva, 220V, 3 Phase, 50 Hz |
| 1 |
| 3006 |
| 50 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 33 |
| 3007 |
| 75 kva, 220V, 3 Phase, 50 Hz |
| 1 |
| 3008 |
| 75 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 6 |
| 3009 |
| 100 kva, 220V, 3 Phase, 50 Hz |
| 0 |
| 3010 |
| 100 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 6 |
| 3011 |
| 125 kva, 220V, 3 Phase, 50 Hz |
| 0 |
| 3012 |
| 125 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 2 |
| 3013 |
| 156 kva, 220V, 3 Phase, 50 Hz |
| 1 |
| 3014 |
| 156 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 3015 |
| 188 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 2 |
| 3016 |
| 219 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 6 |
| 3017 |
| 250 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 0 |
| 3018 |
| 288 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 3019 |
| 313 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 3020 |
| 344 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 3021 |
| 375 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 3022 |
| 438 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 3023 |
| 500 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 3 |
| 3024 |
| 750 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 0 |
| 3025 |
| 1000 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 0 |
| 3026 |
| 25 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 3027 |
| 25 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 3028 |
| 37.5 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 3029 |
| 37.5 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 3030 |
| 50 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 3031 |
| 50 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 3032 |
| 75 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 3033 |
| 75 kva, 220V, 3 Phase, 60 Hz |
| 1 |
| 3034 |
| 100 kva, 208V, 3 Phase, 60 Hz |
| 1 |
| 3035 |
| 100 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 3036 |
| 125 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 3037 |
| 125 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 3038 |
| 156 kva, 208V, 3 Phase, 60 Hz |
| 1 |
| 3039 |
| 156 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 3040 |
| 219 kva, 208V, 3 Phase, 60 Hz |
| 1 |
| 3041 |
| 250 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 3042 |
| 25 kva, 230V, 1 Phase, 50 Hz |
| 1 |
| 3043 |
| 37.5 kva, 230V, 1 Phase, 50 Hz |
| 0 |
| 3044 |
| 50 kva, 230V, 1 Phase, 50 Hz |
| 2 |
| 3045 |
| 12.5 kva, 230V/115V, 1 Phase, 60 Hz |
| 1 |
| 3046 |
| 25 kva, 230V/115V, 1 Phase, 60 Hz |
| 0 |
| 3047 |
| 37.5 kva, 230V/115V, 1 Phase, 60 Hz |
| 0 |
| 3048 |
| 50 kva, 230V/115V, 1 Phase, 60 Hz |
| 3 |
| 3049 |
| 75 kva, 230V/115V, 1 Phase, 60 Hz |
| 1 |
| 3050 |
| 100 kva, 230V/115V, 1 Phase, 60 Hz |
| 0 |
| 3051 |
| 125 kva, 230V/115V, 1 Phase, 60 Hz |
| 1 |
| 3052 |
| 156 kva, 230V/115V, 1 Phase, 60 Hz |
| 0 |
| 3053 |
| ATS 100 Amps, 600V, 3-Pole |
| 0 |
| 3054 |
| ATS 100 Amps, 600V, 4-Pole |
| 0 |
| 3055 |
| ATS 125 Amps, 600V, 3-Pole |
| 0 |
| 3056 |
| ATS 125 Amps, 600V, 4-Pole |
| 52 |
| 3057 |
| ATS 150 Amps, 600V, 3-Pole |
| 4 |
| 3058 |
| ATS 150 Amps, 600V, 4-Pole |
| 2 |
| 3059 |
| ATS 225 Amps, 600V, 3-Pole |
| 1 |
| 3060 |
| ATS 225 Amps, 600V, 4-Pole |
| 0 |
| 3061 |
| ATS 260 Amps, 600V, 4-Pole |
| 0 |
| 3062 |
| ATS 300 Amps, 600V, 4-Pole |
| 0 |
| 3063 |
| ATS 400 Amps, 600V, 4-Pole |
| 0 |
| 3064 |
| ATS 600 Amps, 600V, 4-Pole |
| 0 |
| 3065 |
| ATS 800 Amps, 600V, 4-Pole |
| 0 |
| 3066 |
| ATS 1000 Amps, 600V, 4-Pole |
| 0 |
| 3067 |
| ATS 1200 Amps, 600V, 4-Pole |
| 0 |
| 3068 |
| ATS 1600 Amps, 600V, 4-Pole |
| 0 |
Description
| QTY |
| Unit Price |
| Delivery Antwerp, Belgium |
| Delivery Miami, Florida |
| Delivery Hagerstown, Maryland |
| FOB Vendor Dock |
| 4001 |
| 25 kva, 220V, 3 Phase, 50 Hz |
| 0 |
| 4002 |
| 25 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 4 |
| 4003 |
| 37.5 kva, 220V, 3 Phase, 50 Hz |
| 1 |
| 4004 |
| 37.5 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 106 |
| 4005 |
| 50 kva, 220V, 3 Phase, 50 Hz |
| 1 |
| 4006 |
| 50 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 33 |
| 4007 |
| 75 kva, 220V, 3 Phase, 50 Hz |
| 1 |
| 4008 |
| 75 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 6 |
| 4009 |
| 100 kva, 220V, 3 Phase, 50 Hz |
| 0 |
| 4010 |
| 100 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 6 |
| 4011 |
| 125 kva, 220V, 3 Phase, 50 Hz |
| 0 |
| 4012 |
| 125 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 2 |
| 4013 |
| 156 kva, 220V, 3 Phase, 50 Hz |
| 1 |
| 4014 |
| 156 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 4015 |
| 188 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 2 |
| 4016 |
| 219 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 6 |
| 4017 |
| 250 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 0 |
| 4018 |
| 288 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 4019 |
| 313 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 4020 |
| 344 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 4021 |
| 375 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 4022 |
| 438 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 1 |
| 4023 |
| 500 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 3 |
| 4024 |
| 750 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 0 |
| 4025 |
| 1000 kva, 380V/400V/415V, 3 Phase, 50 Hz |
| 0 |
| 4026 |
| 25 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 4027 |
| 25 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 4028 |
| 37.5 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 4029 |
| 37.5 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 4030 |
| 50 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 4031 |
| 50 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 4032 |
| 75 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 4033 |
| 75 kva, 220V, 3 Phase, 60 Hz |
| 1 |
| 4034 |
| 100 kva, 208V, 3 Phase, 60 Hz |
| 1 |
| 4035 |
| 100 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 4036 |
| 125 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 4037 |
| 125 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 4038 |
| 156 kva, 208V, 3 Phase, 60 Hz |
| 1 |
| 4039 |
| 156 kva, 220V, 3 Phase, 60 Hz |
| 0 |
| 4040 |
| 219 kva, 208V, 3 Phase, 60 Hz |
| 1 |
| 4041 |
| 250 kva, 208V, 3 Phase, 60 Hz |
| 0 |
| 4042 |
| 25 kva, 230V, 1 Phase, 50 Hz |
| 1 |
| 4043 |
| 37.5 kva, 230V, 1 Phase, 50 Hz |
| 0 |
| 4044 |
| 50 kva, 230V, 1 Phase, 50 Hz |
| 2 |
| 4045 |
| 12.5 kva, 230V/115V, 1 Phase, 60 Hz |
| 1 |
| 4046 |
| 25 kva, 230V/115V, 1 Phase, 60 Hz |
| 0 |
| 4047 |
| 37.5 kva, 230V/115V, 1 Phase, 60 Hz |
| 0 |
| 4048 |
| 50 kva, 230V/115V, 1 Phase, 60 Hz |
| 3 |
| 4049 |
| 75 kva, 230V/115V, 1 Phase, 60 Hz |
| 1 |
| 4050 |
| 100 kva, 230V/115V, 1 Phase, 60 Hz |
| 0 |
| 4051 |
| 125 kva, 230V/115V, 1 Phase, 60 Hz |
| 1 |
| 4052 |
| 156 kva, 230V/115V, 1 Phase, 60 Hz |
| 0 |
| 4053 |
| ATS 100 Amps, 600V, 3-Pole |
| 0 |
| 4054 |
| ATS 100 Amps, 600V, 4-Pole |
| 0 |
| 4055 |
| ATS 125 Amps, 600V, 3-Pole |
| 0 |
| 4056 |
| ATS 125 Amps, 600V, 4-Pole |
| 52 |
| 4057 |
| ATS 150 Amps, 600V, 3-Pole |
| 4 |
| 4058 |
| ATS 150 Amps, 600V, 4-Pole |
| 2 |
| 4059 |
| ATS 225 Amps, 600V, 3-Pole |
| 1 |
| 4060 |
| ATS 225 Amps, 600V, 4-Pole |
| 0 |
| 4061 |
| ATS 260 Amps, 600V, 4-Pole |
| 0 |
| 4062 |
| ATS 300 Amps, 600V, 4-Pole |
| 0 |
| 4063 |
| ATS 400 Amps, 600V, 4-Pole |
| 0 |
| 4064 |
| ATS 600 Amps, 600V, 4-Pole |
| 0 |
| 4065 |
| ATS 800 Amps, 600V, 4-Pole |
| 0 |
| 4066 |
| ATS 1000 Amps, 600V, 4-Pole |
| 0 |
| 4067 |
| ATS 1200 Amps, 600V, 4-Pole |
| 0 |
| 4068 |
| ATS 1600 Amps, 600V, 4-Pole |
| 0 |
Minimum and Maximum Ordering Quantities.
The Government minimum will be 15 generators. The larger percentage of these generators will likely be in the range of 35-50 kVA (50 Hz models) and shipped to the ELSO Despatch Agency in Antwerp, Belgium The maximum for this contract (if the Government exercises all options) shall be any quantity or combination of equipment equal to $25,000,000.
Delivery Time and Location.
The Contractor shall deliver all ordered equipment no later than the date specified on the Delivery Orders. The Contractor will be given a maximum 120-day delivery schedule.
Each Delivery Order will stipulate the delivery location. The Government has the option to pick-up the equipment at the Contractor’s facility or consign delivery to the US Despatch Agency in Antwerp, Belgium, the US Despatch Agency in Miami Florida, or the US Hagerstown Maryland Storage Facility.
US Despatch Agency, European Logistical Support Office (ELSO)
GOVLOG N.V.
Belcrownlaan 23, B-2100 Antwerp, Belgium Tel: +32-3-360-5602 Fax: +32-3-540-2040 Email: Despatch_Agency_ELSO@state.gov
US Despatch Agency, Miami 7789 NW 48th Street Miami, FL 33166 Tel: 305-526-2906 Fax: 305-526-2596 Email: Despatch_Agency_Miami@state.gov
Hagerstown Storage Facility 11841 Newgate Boulevard Hagerstown, MD 21740 Tel: 301.223.1730
FAX: 301.223.1735
Email: HagerstownWHSE@state.gov
IDIQ Type of Contract.
This contract is a Multiple Award Indefinite Delivery, Indefinite Quantity Firm Fixed-Priced contract, payable entirely in US Dollars and within the Delivery Order issued under this contract. No additional sums will be payable because of any escalation in the cost of materials, equipment or labor, or because of the Contractor's failure to properly estimate or accurately predict the cost or difficulty of achieving the results required by this contract. Nor will the contract price be adjusted because of fluctuations in currency exchange rates. Changes in the contract price or time to complete will be made only due to changes made by the Government in the work to be performed, or by delays caused by the Government.
Payments based on quantities and unit prices will be made only to the extent specifically provided in the contract Delivery Order.
The actual amount and type of equipment to be delivered, the time of delivery, and the location of delivery will be determined by the Contracting Officer, who will issue formally executed Delivery Orders to the Contractor. Delivery Orders may be issued orally by the Contracting Officer but will be confirmed in writing within three business days of the date the Delivery Order is placed.
SUPPLIES OR SERVICES AND PRICES/COSTS
19AQMM19R0022
Scope and Background.
Background. The Utilities Management Program (UM) is a program organization under the auspices of the Facilities Management Division within the Department of State’s Bureau of Overseas Building Operation Bureau (OBO). One such program function under UM provides generator and related accessory funding for residences occupied by full-time Foreign Service Officers stationed at a Post, for the Marine Guard house and other agency residences assigned to a Post location. This process is governed by organizational policies which designates UM as the responsible Department of State (DOS) organization for sizing all generators and providing post with the necessary assistance and guidance for the procurement and installation of the generators.
OBO/CFSM/FAC/PS has centralized the procurement of residential generators through qualified contractors who have the ability meet OBO/CFSM/FAC/PS standard product specification and can support delivery and local maintenance on a global scale. In centralizing the procurement and staging an assortment of different size packaged generators sets at three US storage and logistics locations (Antwerp, Belgium, Miami, Florida, and Hagerstown, Maryland), UM has been able to shorten the lead time needed to fulfill the requests for residential back-up power worldwide.
Scope. Qualified contractors shall have the ability to provide generators, transfer switches, and ancillary components that comply with the technical specifications quantified herein. A packaged generator set as defined within this solicitation, is a packaged system consisting of an engine, a generator, fuel storage and delivery elements, controls, starter, cooling system, exhaust and exciter, which are all mounted, assembled, and aligned on a single base. The Contractor will be required to provide certified load testing results for each packaged generator set. The certified load test shall be undertaken before the equipment is released for shipment. Controls shall be part of the tested package generator set and shall be provided with engineered documentation for field wiring and support. Packaged generator sets shall be required to comply with UL, NEMA, ASTM and SAE standards as indicated in the specifications.
In all installations, packaged generator sets are intended to be integrated into the main service of the facility through a transfer switch that can detect loss and restoration of utility/normal power and subsequent switching of the local generator source. The transfer switch will generally be a three-phase, double throw device with switched neutral connections and supplied with the generator equipment based on the ampacity rating of the generator required. Switches shall conform to UL and NFPA standards.
The Contractor is solely responsible for providing complete design, fabrication, crating, and shipping to meet the requirements of this contract within the established schedules and specifications.
Design and Submittals.
The Contractor will be responsible for the final design of the packaged generator sets. The Contractor shall provide assembly drawings and certified load-testing data. The Contractor will also provide electronic installation, operations and maintenance instructions/guide information for all equipment and devices. The Contractor shall remain completely responsible for designing and fabricating the equipment and devices in full compliance with the requirements of this contract.
The resulting materials shall conform to the standards cited below. Design requirements are detailed in the following documents attached to this Statement of Work:
Section J.1.1 Packaged Generator Set Specification Section J.1.2 Automatic Transfer Switch (ATS) Specification Packaging and Crating.
The Contractor shall consolidate and pack in one crate all materials, including the 2,000 hours of use spare parts, for international shipment and in a manner that prevents any deterioration or degradation of quality of the materials for a period of up to one year. All crates shall be individually marked and tagged with the contents of each crate and include the contract Delivery Order Number.
The Contractor shall include all materials to facilitate the complete installation of the provided materials. Specialty tools, if needed to complete assembly and installation at the field site, shall be provided as well.
Warranty and Local Service Support.
The Contractor shall warranty the packaged generator sets for a period of two years from date of manufacture or one year from date of installation whichever occurs first. The warranty shall include labor and materials.
The Contractor shall provide local support that can service needs other than routine maintenance beyond the warranty period for all packaged generator sets furnished through this contract. The Contractor’s supply chain network shall manage a local service group that can respond to operating and maintenance needs within 24 hours of a request for service. Attachment J.1.3 lists the current worldwide locations where the Department of State has facilities that support diplomatic missions.
Schedule.
The Contractor shall manufacture and assemble packaged generator sets of the sizes identified and in the order volumes and time constraints needed by the Government. While many of the orders will constitute the manufacture and assembly of a single packaged generator set there will be requirements to fulfill requests that involve multiple packaged generator sets; possibly ten or more units at a given time. Over the course of a given year, the Government may have requests for as many as 250 packaged generator sets with the median size in the range of 38-50 kVA. Additionally, the Government may have up to 60 requests for individual transfer switches other than those which are supplied with generator purchases.
The Contractor shall provide the packaged engine sets and have them ready for shipment within 16 weeks after receipt of the Delivery Order.
Coordination, Communication and Information Systems Support.
The Contractor shall assign a dedicated account manager with a minimum of 5 years’ experience working with the design and fabrication of packaged generators sets. This manager will serve as the primary point of contact for all Government interactions with the Contractor. This manager must be knowledgeable of a wide range of activities to include but not limited to: the fabrication process, contract administration, invoicing, warranty enforcement, coordination of local servicing, packaging and crating, warehousing, quality control/quality assurance, specifications, information systems support, etc. and have the authority to set production priorities to meet the Government requirements.
The Contractor shall provide a secure/encrypted interface within their information architecture that supports a simple service-oriented connection to procurement and related shipping/delivery status information. This information needs to be open to a properly authenticated external query by the Government’s information resources. At a minimum, the following general information shall be provided as part of this information exchange to validate and acknowledge the package generator set manufacture and delivery process:
Delivery Order Proposal Request (DOPR): (Government issues a request for specific generators, sizes, etc.)
Delivery Order receipt information to Government: (Contractor posts Delivery Order proposal information for Government review) Delivery Order award and acceptance notifications: (Government issues Delivery Order award and acceptance information) Product delivery and status information/tracking: (Contractor maintains and exposes status of manufacturing process and shipping/delivery status after leaving the Contractor’s location) Product information such as model number, serial number, generator rating, and other related information as defined in the JSON specification identified in attachment J.1.4.
SECTION C
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
Marking of Reports.
All reports delivered by the Contractor to the Government under this contract shall be encrypted and sent electronically via email to the Contracting Officer. The Delivery Order Number shall be included in the title of the electronic file. The report shall prominently show on the cover:
| (a) | Name and business address of the Contractor; |
| (b) | Government Contract Number and Delivery Order Number; |
| (c) | Date of report; and |
| (d) | Contract Line Item Number (CLIN), Model and serial numbers of all components addressed in the report. |
Packing of Product.
Product shall be consolidated in one crate and packed for overseas shipment in a manner that will ensure acceptance by common carriers and safe delivery at destination. Containers and closures shall comply with the Interstate Commerce Commission Regulations, Uniform Freight Classification Rules, and regulations of other carriers as applicable to the mode of transportation.
The packing and palletizing must conform to the standards in the International Standards for Phytosanitary Measures Publication No. 15: “Guidelines for Regulating Wood Packaging Material in International Trade” (ISPM 15) and have the appropriate markings indicating that the materials meet this standard. Any deliveries arriving at our indicated delivery address that do not meet these standards will be rejected at the Contractor’s expense. For any additional information concerning these requirements, please refer to the following www.aphis.usda.gov/ppq/wpm/import.html or www.cbp.gov/xp/cgov/import/commercialenforcement/wpm.
Packing List(s).
A packing list or other suitable shipping document shall accompany each shipment and shall include the following information:
| (a) | Name and address of consignor; |
| (b) | Name and address of consignee; |
| (c) | Government Contract number; |
| (d) | Government Delivery Order number; |
| (e) | Description of the items shipped, including Contract Line Item Number (CLIN), model number, serial number, quantity, and package number, if any, and; |
| (f) | Compact Disk (CD) containing Installation, Operation, and Maintenance Instructions. |
Crate and Box Markings.
All shipping crates and packages shall be marked with the following on the outside of each individual container:
| (a) | Name and address of Contractor; |
| (b) | Delivery Order number; |
| (c) | Contract Line Item Number (CLIN); |
| (d) | Quantity, if more than one item included; |
| (e) | Tip-N-Tell devices or the equivalent will be fixed to the exterior of every crate to be used during storage and shipment to identify if any of the crates were mishandled prior to delivery to the designated facility. |
Warranty Notification.
In accordance with FAR 46.706(b)(5), the Contractor shall stamp or mark the product delivered, or otherwise furnish notice with the product, of the existence of a warranty. Enough information shall be presented for Government receiving personnel and end-users to identify warranted product. Warranty information shall include the terms and duration of the warranty and the name and telephone number of the Contracting Officer to be notified if the products are found to be defective.
Packages sent via U.S. Mail, Registered or Certified Mail.
Unclassified and SBU packages sent via U.S. Mail, Registered or Certified Mail shall be addressed as follows:
U.S. Department of State Office of Acquisition Management
A/OPE/AQM/FDCD
Attn: Joy Young P. O. Box 9115, Rosslyn Station Arlington, VA 22219 Packages sent via commercial courrier service.
Unclassified and SBU packages sent via commercial courier service shall be addressed as follows:
U.S. Department of State Office of Acquisition Management
A/OPE/AQM/FDCD
Attn: Joy Young
423F (SA-06A)
1735 North Lynn Street Arlington, VA 22209 Packaging Requirements for Mail and Courier Shipment of Documents and Drawings.
All documents under this contract shall be furnished in digital/electronic media. The prime contractor and any associated subcontractors will package all electronic media, which shall be transported in electronic media packages that contain no other drawings or hard copies of any kind, beyond that of transfer/receipt documentation. No hardcopy (paper) drawing and documents will be accepted.
Double-wrapping and addressing of packages. For all shipping methods, the prime contractor, and any associated subcontractors will ensure that all project documentation, is double-wrapped with both layers addressed properly and labeled with the sender’s address. Document tracking receipts shall be packaged inside the inner wrapping with the materials the receipt describes. No indication of the classification or sensitivity should appear on the outer wrapper. Unclassified and SBU packages addressed to overseas facilities or sites may not have the words “blueprints” or “drawings” displayed on the outer wrapper.
Packaging heavy materials in appropriate containers. In applying the above double-wrapping and addressing procedures, items sent via US mail or commercial carrier weighing more than one (1) pound shall be enclosed within an appropriately sized double-walled box or, for rolled drawings, a manufactured mailing tube. The cardboard box or mailing tube counts as the second layer of wrap.
SECTION D
PACKAGING AND MARKING
52.252-2 Clauses Incorporated by Reference (FEB 1998).
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
| www.arnet.gov/FAR for FAR clauses |
| www.statebuy.state.gov/DOSAR/Dosartoc.htm for DOSAR clauses |
52.246-2 Inspection of Supplies – Fixed-Price (AUG 1996).
52.246-15 Certification of Conformance (APR 1984).
52.246-16 Responsibility for Supplies Clauses (APR 1984).
Inspection and Acceptance – Data (11/08). See Section D for inspection and acceptance data requirements.
Inspection and Acceptance - F.O.B. ORIGIN (11/08). Inspection and acceptance shall be made at the Contractor's facility by an authorized representative.
Inspection and Acceptance – F.O.B. DESTINATION. Inspection and acceptance shall be made at the destination specified in the Delivery Order by an authorized representative.
Coordination and Communication.
Government Role. The Government will support the use of the SSL technology to the Contractor’s network. The Government will assist Contractor’s IT staff with establishing secured/encrypted connections between Government and Contractor’s network. No information requests will be made to a Government network from the Contractor’s network. Specific information as identified in Section C.6.2 will be requested by the Government network through an encrypted connection, which authenticates to the Contractor’s network resource via a web service (JSON/XML) using SAML or other acceptable security standard. The Government will support the Contractor’s implementation of Information Systems Support using a web-based communication module as approved by the Contracting Officer.
Contractor Hardware Requirements. The Contractor shall maintain information resources with acceptable virus protection and on network servers that are not publicly exposed to outside networks.
Business Rules. The Contractor is restricted from transporting unencrypted data electronically across the Internet using email, FTP sites, or commercial web sites.
SECTION E
INSPECTION AND ACCEPTANCE
This contract incorporates one of more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
| www.arnet.gov/FAR for FAR clauses |
| www.statebuy.state.gov/DOSAR/Dosartoc.htm for DOSAR clauses |
52.242-15 Stop-Work Order (AUG 1989).
52.242-17 Government Delay of Work (APR 1984).
52.247-29 F.O.B. Origin (FEB 2006).
52.247-34 F.O.B. Destination (NOV 1991) Period of Performance (11/08).
This contract shall be effective on the date of the Contracting Officer's signature and shall remain in effect for twelve (12) months, with four one-year option years, in accordance with FAR 52.217-9.
Place of Performance (11/08).
The principal place of performance for this contract shall be the Contractor’s manufacturing facility and representative offices.
Required Time of Delivery (11/08).
The performance schedule shall be specified in each Delivery Order in accordance with Section C.5 and the Contractor shall initiate and complete each delivery within the time specified.
Performance Requirements (11/08).
The Contractor shall be ISO 9000 and ISO 14000 Certified and shall meet the acceptable quality levels as identified in Attachment J.1.1 and J.1.2.
Deliverables/Submittals (11/08).
The Contractor shall furnish all the shop drawings, reports, and packaged generator set products in accordance with the Performance Requirements and transmitted in accordance with Section D. All the J Attachment specification submittals must be forwarded to the COR within 30 days of contract award. The packing lists and bills of lading must be submitted to the COR within two days of any shipment.
SECTION F
DELIVERIES OR PERFORMANCE
DOSAR 652.242-70 Contracting Officer’s Representative (COR) (AUG 1999).
| (a) | The Contracting Officer may designate in writing one or more Government employees, by name and position title, to act for the Contracting Officer under this contract. Each designee shall be identified as a Contracting Officer’s Representative (COR). Such designation(s) shall specify the scope and limitations of the authority so delegated; provided, that the designee shall not change the terms or conditions of the contract, unless the COR is a warranted Contracting Officer and this authority is delegated in the designation. |
| (b) | The COR for this contract is Mark Lepire. |
Contract Administration Data (11/08).
| Contracting Officer: | Joy Young | | |
| Contract Administrator: | Ryan Peterson | | |
| Telephone Number: | | 703-875-6614 | |
| Fax Number: | | | 703-875-6292 |
| Mailing Address: | | U.S. Department of State | |
Office of Acquisition Management P.O. Box 9115, Rosslyn Station Arlington, Virginia 22219 Hand-delivery/Courier: U.S. Department of State Office of Acquisition Management
423F (SA-06A)
1735 North Lynn Street Arlington, VA 22209 Attn: Ryan Peterson Contracting Officer’s Representative (COR): Mark Lepire
Telephone Number: 571-451-6706 Invoice Requirements (11/08).
The Contractor’s invoice shall be submitted electronically in to the following:
Via FAX: invoices to (703)875-5826 or Via EMAIL: invoices to OBOInvoices@state.gov For Large Invoice packages: ship via courier (FedEX/UPS) U.S. Department of State
OBO/RM/FM, SA-6
Attn: Division Chief, Fiscal Operations 1701 N. Fort Myer Drive Arlington, VA 22219
Phone:(703)875-5182 RM/FM will log in the invoice and give it to the COR who shall determine if the billed items have been received. If it has been determined that the amount billed is incorrect, the COR will approve undisputed portions of the invoice and notify the Contractor in writing.
A proper invoice must include the following information, in accordance with FAR 52.232-25 Prompt Payment in Section I hereof:
| (a) | Name, address, and telephone number of the Contractor. |
| (b) | Invoice date. |
| (c) | Unique vendor Invoice Number. |
| (d) | Contract number; also, modification number, if applicable. |
| (e) | Description, quantity, unit of measure, unit price, and extended price of supplies delivered. |
| (f) | Delivery information. |
| (g) | Accounting and Appropriation Data. |
| (h) | Electronic funds transfer (EFT) banking information. |
CLIN Breakdown Structure.
The Contractor's invoice shall include a breakdown by CLIN, as well as by accounting and appropriation data, as reflected on each Delivery Order.
Ordering Procedures (11/08).
| (a) | In accordance with FAR 52.216-18 "ORDERING", the following individuals and activities are authorized to issue Delivery Orders hereunder: |
| (1) | Department of State Contracting Officer |
| (b) | Orders placed under this contract shall contain the following information: |
| (1) | Date of order; |
| (2) | Contract number and Delivery Order number; |
| (3) | Contract Line Item Number (CLIN) and description, quantity, and unit price; |
| (4) | Delivery or performance date; |
| (5) | Packing and shipping instructions, per terms of the contract; |
| (6) | Accounting and appropriation data; |
| (7) | Security clearance level (s), applicable to the order, if any; and |
| (8) | Any other pertinent information. |
| (c) | Issuance of orders by facsimile is authorized in accordance with FAR 52.216-18 "ORDERING". |
Delivery Orders (11/08).
| (a) | Delivery Order Proposal Requests (DOPR) will be issued in writing to the Contractor by the Contracting Officer and will describe the specific requirement. A Delivery Order Proposal Request is a request for proposal. It is not a Delivery Order and does not authorize performance. |
| (b) | Each Delivery Order Proposal Request will include, at a minimum: |
| (1) | A description of the items to be procured; |
| (2) | Required completion date (as stated in Section C); and |
| (3) | Other deliverable requirements. |
| (c) | The Contractor shall, within five working days of the receipt of a Delivery Order Proposal Request, submit to the Contracting Officer a written detailed price proposal. The price proposal shall include the following: |
| (1) | CLIN and item description; |
| (2) | Quantity; |
| (3) | Unit of measure; |
| (4) | Unit price; |
| (5) | Extended price of supplies; |
| (6) | Total estimated price; and, |
| (7) | Proposed completion or delivery dates (per terms in Section C). |
| (d) | Following successful negotiation of the Contractor's proposal, the Contracting Officer will issue a written Delivery Order to the Contractor providing the necessary funding and authorizing the Contractor to begin work. |
| (e) | The Government will not be obligated to pay the Contractor any amount more than the total Delivery Order amount, and the Contractor shall |
not be obligated to continue performance if to do so would exceed the total Delivery Order amount.
| (f) | All Delivery Orders shall be competed, except when one or more of the following conditions apply: |
| (1) | Majority of existing generator sets at post are by one vendor |
| (2) | Preferred local support is by one vendor |
Performance (11/08).
Following execution of the Delivery Order, technical clarifications may be issued in writing at any time by the COR to amplify or provide additional guidance to the Contractor regarding performance of the Delivery Order. The Contractor shall notify the Contracting Officer of any instructions or guidance the Contractor considers to be a change to the Delivery Order, which will impact the cost, schedule or deliverables content of the baseline work (Section C.5).
In cases where technical instructions or other events may dictate a change from the baseline, Delivery Orders may be formally modified in writing by the Contracting Officer to reflect modifications to tasking. The Contractor is responsible for revising the proposal to reflect Delivery Order modifications within five (5) working days following negotiation or issuance of a modification of the Delivery Order.
Delivery Orders may be placed during the period of performance of the contract, as identified in Section F. Any order issued during the period of performance of this contract and not completed within that time shall be governed by the contract terms to the same extent as if the order were completed during the contract's period of performance, including the contract and individual order ceiling price.
SECTION G
CONTRACT ADMINISTRATION DATA
IDIQ Contractor Commitments, Warranties and Representations (11/08).
Any written commitment by the Contractor within the scope of this contract shall be binding upon the Contractor. Failure of the Contractor to fulfill any such commitment shall render the Contractor liable for liquidated or other damages due to the Government under the terms of this contract. For this clause, a written commitment by the Contractor is limited to the proposal submitted by the Contractor, and to specific written modifications to the proposal. Written commitments by the Contractor are further defined as including:
| (a) | any warranty or representation made by the Contractor in a proposal as to hardware or software performance; total systems performance; and other physical, design, or functional characteristics of equipment, software package or system, or installation date; |
| (b) | any warranty or representation made by the Contractor concerning the characteristics or items described in (a) above, made in any publications, drawings, or specifications accompanying or referred to in a proposal; and |
| (c) | any modification of or affirmation or representation as to the above which is made by the Contractor in or during negotiations, whether it is or is not incorporated into a formal amendment to the proposal. |
Nonpayment for Unauthorized Work (11/08).
No payments will be made for any unauthorized supplies or services or for any unauthorized changes to the work specified herein. This includes any services performed by the Contractor of his own volition or at the request of an individual other than a duly appointed Contracting Officer. Only a duly appointed Contracting Officer is authorized to change the specifications, terms, and/or conditions of this contract.
Key Personnel (11/08).
| (a) | The Contractor shall assign to this contract the following key personnel: | |
| LABOR CATEGORY | NAME |
| Account Manager | _______________________ |
| (b) | The Contractor agrees to assign to this contract those key persons who were identified in the proposal necessary to fulfill the requirements of the contract. No substitution shall be made without prior notification to and concurrence of the Contracting Officer. During the first ninety days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. | |
| (c) | All proposed substitutes shall meet or exceed the qualifications of the person to be replaced. The Contracting Officer shall be notified in writing of any proposed substitution at least forty-five days in advance of the proposed substitution. Such notification shall include: | |
| (1) | an explanation of the circumstances necessitating the substitution; | |
| (2) | any other information requested by the Contracting Officer to enable him/her to judge whether the Contractor is maintaining the same high quality of personnel. | |
Technical Direction (11/08).
| (a) | Performance of the work hereunder shall be subject to technical instructions, whether oral or written, issued by the Contracting Officer's Representative specified in Section G of this contract. As used herein, technical instructions are defined to include the following: |
| (1) | Directions to the Contractor that suggest pursuit of certain lines of inquiry, change work emphasis, fill in details or otherwise serve to assist in the Contractor's accomplishment of the Statement of Work. |
| (2) | Guidance to the Contractor that assists in the interpretation of drawings, specifications, or technical portions of work description. |
| (b) | Technical instructions must be within the general Scope of Work stated in the contract. Technical instructions may not be used to: (1) assign additional work under the contract; (2) direct a change as defined in the "Changes" clause of this contract; (3) increase or decrease the contract price or estimated contract amount (including fee), as applicable, the level of effort, or the time required for contract performance; or (4) change any of the terms, conditions or specifications of the contract. |
| (c) | If, in the opinion of the Contractor, any technical instruction calls for effort outside the scope of the contract or is in consistent with this requirement, the Contractor shall notify the Contracting Officer in writing within ten working days after the receipt of any such instruction. The Contractor shall not proceed with the work affected by the technical instruction unless and until the Contractor is notified by the Contracting Officer that the technical instruction is within the scope of this contract. |
| (d) | Nothing in the foregoing paragraph shall be construed to excuse the Contractor from performing that portion of the contractual work statement. |
Organizational Conflict of Interest - General (02/96).
| (a) | The Contractor warrants that, to the best of its knowledge and belief, there are no relevant facts or circumstances which would give rise to an organizational conflict of interest, as defined in FAR Subpart 9.5, or that the Contractor has disclosed all such relevant information. |
| (b) | The Contractor agrees that if an actual or potential organizational conflict of interest is discovered after award, the Contractor will make a full disclosure in writing to the Contracting Officer. This disclosure shall include a description of actions, which the Contractor has taken or proposes to take to avoid or mitigate the actual or potential conflict. |
| (c) | If the Contractor was aware of a potential organizational conflict of interest prior to award or discovered an actual or potential conflict after award and did not disclose or misrepresented relevant information to the Contracting Officer, the Government may terminate the contract for default. |
| (d) | The Contractor shall insert the substance of this clause, including this paragraph (d), in all subcontracts. |
Information Security Transmission of Sensitive But Unclassified (SBU) information via the Internet is prohibited. SBU information can be transmitted via ProjNet, US mail, GSA Schedule 48 commercial carriers or fax, or hand-carried by authorized contractor personnel.
When it is deemed necessary to take personal or contractor-owned laptops, Personal Digital Assistants (PDAs), smart phones (such as BlackBerrys), cell phones, digital cameras or any other electronic processing media overseas to process or store any OBO project information (on or off the site), the following guidelines must be adhered to:
THE ELECTRONIC PROCESSING MEDIA MUST BE ENCRYPTED USING any NIST approved product. (NIST approved products can be found at http://csrc.nist.gov/groups/STM/cmvp/validation.html) An overwrite utility software must be used to remove all previous data in the following manner: A first overwrite pass using the number '1'; A second overwrite pass using the number '0'; and a third overwrite pass using ANY character.
Electronic media which contains OBO project information MUST be hand-carried at all times. This equipment shall NOT be checked with luggage. It must remain in the carrier’s possession at all times. Any loss or compromise of electronic media containing project information must be reported to the COR, RSO and DS/IS/IND immediately.
Downloading OBO project information at the site onto thumb drives, jump drives or other portable storage devices onto which project information can be downloaded, is prohibited unless specifically authorized in writing by the COR and RSO. Requests to utilize these portable storage devices must include certification that a NIST approved product (including the product name and version) will be utilized to encrypt the portable storage device.
PUBLIC RELEASE OF INFORMATION
There shall be no public release of information or images concerning any aspect of the design, construction, or other services relating to this contract, or other documents resulting therefrom, without the written prior approval of the Contracting Officer. The contractor shall include the substance of this provision in all subcontracts hereunder.
REMOVAL FOR CAUSE
Misconduct or unsuitability documented by the COR or Regional Security Officer (RSO), or domestically by DS/IS/IND, may result in removal of a Contractor employee from contract performance. This may include, but is not limited to, the following:
· Notoriously disgraceful conduct, to include, but not limited to: the solicitation of…
This is the start of the file's text. The full file is on GovTribe.