This document contains questions and answers related to solicitation number 191T7023R0002 for the replacement of pedestrian roof floors at the Naples Consulate. The solicitation requires the supply and installation of a two-layer anti-fracture separating waterproofing system, bituminous membranes with a cold flexibility of -10 to -20 degrees Celsius, reinforcement of an existing portal, painting and plastering works totaling approximately 30 square meters, and completion of all works within 135 calendar days from notice to proceed. Bidders are directed to amendments posted on SAM.gov for clarification on drainage courses, technical specifications, and other questions.

View the file

Other files

File Type Posted
Amendment no. 0001.pdf PDF
Attachment 3. DRAWINGS -V1.pdf PDF
Attachment 1. TECHNICAL SPECIFICATIONS - V1.pdf PDF
Meeting Minutes.pdf PDF
Attachment 2. BILL OF QUANTITIES - V1.pdf PDF
Attachment 2. BILL OF QUANTITIES.pdf PDF
Attachment 1. TECHNICAL SPECIFICATIONS.pdf PDF
191T7023R0002.doc DOC document
Attachment 3. DRAWING.pdf PDF
Cover Letter.pdf PDF
SF-1442.doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers

Question #1: Section L3 “Qualifications of Offerors” the following requirement: “Have an established business with a permanent address and telephone listing in Italy”. Is this requirement eliminatory?

Answer #1: Section L3 “Qualifications of Offerors”. The offeror shall address its plan to obtain all licenses and permits required by local law (see DOSAR 652.242-73 in Section I);

652.242-73 AUTHORIZATION AND PERFORMANCE (AUG 1999)

(a) The Contractor warrants the following:

(1) That is has obtained authorization to operate and do business in the country or countries in which this contract will be performed;

(2) That is has obtained all necessary licenses and permits required to perform this contract;

and,

(3) That it shall comply fully with all laws, decrees, labor standards, and regulations of said country or countries during the performance of this contract.

(b) If the party actually performing the work will be a subcontractor or joint venture partner, then such subcontractor or joint venture partner agrees to the requirements of paragraph (a) of this clause.

Question #2: Page 15 of the Technical Specification do list the provision for a DRAINAGE COURSE as follow:

Supply and installation of a two-layer anti-fracture separating waterproofing system (such as Mapeguard UM 35 produced by MAPEI S.p.A.). The proposed material is used as a waterproofing layer below paving finishes and can also be used as waterproofing of concrete screeds under paving applied with adhesive.

This drainage course is not specifically mentioned on the Drawings on the proposed stratigraphy, and we have interpreted it being the “Filter Fabric” identified on the Cross section of the roofing stratigraphy for areas A, B and C.

We have contacted the Sales Agent from Mapei and were told that this layer cannot be applied on top of the waterproofing felts.

Please clarify the intend of this Drainage course and its proper location of the new roof stratigraphy.

Answer #2: Please see Amendment no. 0001 and revised solicitation text and its attachments posted on SAM.gov.

Question #3: Please indicate the Cold Flexibility of the bituminous membranes requested, for example (-10

°C, -15°C, - 20°C).

Answer #3: Please see Amendment no. 0001 and revised solicitation text and its attachments posted on

Question #4: The bill of quantities includes work related to the reinforcement of the existing portal between Area

A and the Consulate Building. SPECIAL CIVIL WORK (Sp Cat 3). The description listed in the Bill of Quantities is not sufficient to properly evaluate this portion of work. Please provide details or sketches to evidence the work listed.

Answer #4: Please see Amendment no. 0001 and revised solicitation text and its attachments posted on

Question #5: PAINTING (SpCat 5) - The indications in the bill of quantities for the painting works are generic with a statement to foresee approx. 30% of the surfaces. In order to provide appropriate cost estimating please indicate the quantity of painting/plaster works in square meters, considering also the statement referring to the

“lift shaft”. Please see below abstract of the bill of quantities for this item: “The lump sum item also includes the painting of the surfaces of the internal curb of the roof, of the existing pipes and inside the existing lift shaft.

PAINTING INTERNAL PARAPERTS AND RINGS BEAMS * (length=67+89+93)”. Provide quantities in square meters of areas to be painted and re-plastered.

Answer #5: Please see Amendment no. 0001 and revised solicitation text and its attachments posted on

Question #6: Photos do evidence the presence of a railing. The temporary relocation or disassembly of the is not mentioned in the SOW. Please clarify if the railing is a permanent railing fixed to the existing roof, or if the railing is mounted on concrete counterweights sitting on top of the existing flooring tiles to be removed.

Answer #6: For security reason the railing will not be removed.

Question #7: The drawings do not indicate the location and quantities of the existing roof drains or downspouts.

Please update sketch to reflect the location and quantities of the roof drains and downspouts.

Answer #7: Flooring A: no. 4 roof drains. Flooring B: no. 1 roof drains. Flooring C (C1+C2): no. 8 roof drains.

Roof drains are located to the corners of the floors. Downspouts are internal to the walls and not part of the SOW.

Question #8: Time stated for completion of works. The solicitation document is listing a total of 135 calendar days at Section F.2 par C. The Technical Specification instead is listing a total of 120 solar days at par. 8.4. It is important to clarify and issue a proper execution period. In the meantime, we suggest modifying the time stated for completion to a total of 180 calendar days from Notice to proceed. This would allow for: Survey to be performed after award, shop drawings preparation and materials Submittal process for materials and its procurement.

Answer #8: Technical specifications report the timeframe to execute the work without consider the NTP time (15 days).

F.2 52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK

(APR 1984)

The Contractor shall be required to:

(a) commence work under this contract within fifteen (15) days after the date the Contractor receives the notice to proceed,

(b) prosecute the work diligently, and

(c) complete the entire work ready for use not later than hundred thirty-five (135) calendar day from the notice to proceed. The time stated for completion shall include final cleanup of the premises and completion of “punch list” items.

Question #9: Compression resistance for the insulation material is listed in the submittal requirements section 9 of the specification package of 500 Mpa does not apply. The specification instead does describe the insulation as having a compression resistance with a compressive strength value at 10% crushing according to EN 826 equal to 700 kPa. Please correct requirement.

Answer #9: Please see Amendment no. 0001 and revised solicitation text and its attachments posted on

Question #10: The base Flashing as shown on the drawings is further described as Zinc-titanium sheet in the specifications, see description abstract below: “METALLIC PROFILES in Zinc and Titanium to protect the perimeter curbs, with geometry indicated by the COR and including all the necessary anchors”. We suggest the use of Pre-painted galvanized sheet metal for the base and cap flashing works, so as to have the final aspect blend-in with the existing colors of the building exterior, which is generically an Off-white color.

Answer #10: Please submit your proposal in accordance with our solicitation text and its attachments requirements.