EXHIBIT A
COMPREHENSIVE MAINTENANCE PLAN
FOR
HVAC SYSTEMS
Associated Equipment
United States Tri-Mission Rome, Italy
April 2018
SCOPE OF WORK
PREVENTIVE MAINTENANCE SERVICE FOR HVAC SYSTEMS & ASSOCIATED EQUIPMENT
Contractor shall provide all materials, supervision, labor, tools and equipment to perform preventive maintenance. All personnel working in the vicinity shall wear and /or use safety protection while all work is performed. Any questions or injuries shall be brought to the attention of the Post Occupation Safety and Health Officer (POSHO) immediately. Material Safety Data Sheets (MSDS) shall be provided by the Contractor for all HAZMAT materials. Copies shall be provided to the COR for approval.
The Contractor shall inventory, supply and replace expendable parts (e.g., filters, belts, hoses, gaskets) that have become worn down due to wear and tear. The Contractor shall maintain a supply of expendable and common parts on site so that these are readily available for normal maintenance to include: hoses, belts, oil, chemicals, coolant, filters (Air, Fuel, Oil), grease, sealant, thermostat, fuses; in addition to the appropriate tools, testing equipment, safety shoes and apparel for technicians, personal protective equipment (hands, hearing, eye protection), MSDS, cleaning material and oil spill containment kits. The contractor should inventory the supply after each visit and order replacement supplies and have them delivered on site. Maintenance materials shall be unused and are to be industry standard and intended for the task to be performed. Parts are to be OEM approved. Refrigerants are to meet the AHRI_Standard_700-2015 or most recent AHRI Standards.
Refrigerants, parts and maintenance materials delivered to the post are to be new and unused. Reclaimed refrigerants are not to be delivered to posts. Reclaimed refrigerants within post compounds are to be retained and stored and may be used if not contaminated. Refrigerants shall be stored in containers clearly indicating the refrigerant type.
SAFETY AND SPECIAL INSTRUCTIONS:
1. Follow site safety procedures and supervisor’s instructions.
2. Schedule outage with operating personnel.
3. Use extreme caution when climbing access ladders.
4. Perform applicable lockout/tag out steps of site safety procedures.
5. Lockout and disconnect the main power before tightening the main supply lugs in order to avoid the hazard of electrical shock, which could result in serious personal injury or death.
6. Record and report equipment damage or deficiencies.
7. Review and follow the manufacturer’s O&M instructions.
8. Record results in the equipment history log.
9. Allow only qualified personnel to do maintenance work on this equipment.
10. Record results in the equipment history log.
11. Check manufacturer’s specifications for the maximum number of plugged tubes.
12. Allow only qualified personnel to do maintenance work on this equipment.
Comprehensive Maintenance Plan
The Maintenance Plan is a guide for properly maintaining and improving the U.S. government facilities.
Maintenance of various systems serving the same area should be carried out simultaneously in order to avoid disrupting the work activity of the offices concerned more than once.
The operations for switching the Cooling and Heating plants on/off shall be carried out by at least 2 teams composed by 2 people each. These operations are usually carried out during the months of April and October and shall be scheduled in advance with the COR in order to avoid delays in the seasonal operations.
· The maintenance plan consists of several distinct activities required on the following equipment on scheduled basis (daily, monthly, annually, etc.).
List of Equipment
| Post |
| Building |
| ID |
| Equipment details |
| Q.ty |
| Check List |
| Rome |
| Consulate |
| AH |
| # 1 AHU Make Carrier Model 39C101,Serial # 3901005G01, Areas served: Basement, 1st and 2nd floor only for rooms without windows Installed 2002 |
| 1 |
| AH17QU/AH16AN |
| Rome |
| Consulate |
| PR |
| # 2 Pumps P4A / P4B With Inverter controller Make Armstrong/Baldor Model 37H600X99761 hp 10, rpm 1450,Installed 2002, area served:Entire Consulate Building |
| 2 |
| BP84SA/AN |
| Rome |
| Consulate |
| FC |
| Fan Coil make Trane # 5 FC1 large 119 Cm, # 11 FC2 Large 139 Cm, # 7 FC3 Large 159 Cm. Area served: Consulate 2nd floor |
| 23 |
| FC05QU/AN |
| Rome |
| Consulate |
| FC |
| Fan coil Make Trane, # 7 FC1 Large 119 Cm, # 8 FC2 Large 139, # 2FC3 large 159 Cm. Area served Consulate 1st floor |
| 17 |
| FC05QU/AN |
| Rome |
| Consulate |
| FC |
| Fan Coil Make Trane,# 6 FC1, 119 Cm, # 6 FC2 139 Cm, # 3 FC3 159 Cm, # 1 FC1 Only Hot Cm 119 # 1 FC2 only Hoty Cm 99, Area served: Consulate Ground floor |
| 17 |
| FC05QU/AN |
| Rome |
| Consulate |
| FC |
| Fan coil Make Trane # 5 FC1 Cm 119, # 4 FC2 Cm 139, # 4 FC1 only hot Cm 119. area served: Consulate basement floor. |
| 13 |
| FC05QU/AN |
| Rome |
| Consulate |
| AC |
| # 2 AC system Make OLYMPIA UNICO, installed 2002, areas served: Consulate Fiber optic rooms at mezzanine and second floor |
| 2 |
| AS02QU/AN |
| Rome |
| Consulate |
| AC |
| # 2 AC split system installed in the server room at consulate 2nd floor, BTU 18000/24000 |
| 2 |
| AS02QU/AN |
| Rome |
| Consulate |
| AC |
| # 3 AC split system BTU 12000/18000 installed 2004 at consulate basement visa office. |
| 3 |
| AS02QU/AN |
| Rome |
| Consulate |
| AC |
| # 1 AC split system installed in the Consulate public entrance Via Veneto side, above the guard booth door. BTU 24000, installed 2004 |
| 1 |
| AS02QU/AN |
| Rome |
| Embassy cafeteria |
| CH |
| # 2 Chiller air cooled Make McQuay Model M4AC150CR cooling capacity: kW.38. Installed 2009 Area served: AHU and Fan coils Cafeteria |
| 2 |
| CH14MO/SA/AN |
| Rome |
| Embassy cafeteria |
| AH |
| # 1 Air handling unit Make Carrier model 39C11V70002S, Motor fan kW 1,55, Area served: Primary air in the snack bar dining room. Installed 1997. |
| 1 |
| AH17QU/AH16AN |
| Rome |
| Embassy cafeteria |
| AFRN /BW |
| # 1 Furnace gas fired Make Riello 3700 Model 55 With burners Riello Gulliver Model B32 Type 912, installed 1997 Area served:Air handling unit for snack bar dining room. |
| 1 |
| BOCOND31MO/SA/AN |
| Rome |
| Embassy cafeteria |
| AFRN /BW |
| # 1 Furnace gas fired Make Thermital SR3 model 02, installed 1997, Area served: snack bar domestic hot water |
| 1 |
| BOCOND31MO/SA/AN |
| Rome |
| Embassy cafeteria |
| PR |
| # 1 twin secondary pump make Marelli ,Model RD51C, Installed 1997, hot water Recirculating pump for the snack bar dining room (air handling unit) |
| 1 |
| BP84SA/AN |
| Rome |
| Embassy cafeteria |
| PR |
| # 1 twin secondary pump Make Marelli Model RD41C installed 1997, for Hot domestic water recirculatio# |
| 1 |
| BP84SA/AN |
| Rome |
| Embassy cafeteria |
| TE |
| # 1 Expansion Tank lt 50 year 2009, # 1 Exp tank lt 24 year 2008, # 2 safety valve year 2008, installed at cafeteria boiler room |
| 2 |
| TE09AN |
| Rome |
| Embassy cafeteria |
| HO |
| # 1 AHU Kitchen vent with filter installed 2008, Make unknown, installed in the mechanical room above the Embassy cafeteria Kitche# |
| 1 |
| AH17QU/AH16AN |
| Rome |
| Embassy Chancery |
| AFRN /BW |
| # 3 Boilers make Pensotti Type R( Model R9-14, Potenza termica utile: kW 553,5 Or Kcal/h 458.000 Serial Number 4429D /4428D /4430D Year 1998. Burners: Make Riello GI-EMME 900- 3485920, Type 498, Year 1997, kW 1,5, gas oil and methane, installed 1998 Served area: Entire Chancery and partially new wing and Piombino |
| 3 |
| BOIGAS20MO/SA/AN |
| Rome |
| Embassy Chancery |
| AFRN /BW |
| # 1 Furnace gas fired Make : SILE 31.8 kW, installed 2013, Model: Condensa 5.32-150 MAXINOX, 150 liters, Hot water production only. Served area: Chancery, New wing, Piombino |
| 1 |
| BOCOND31MO/SA/AN |
| Rome |
| Embassy Chancery |
| PR |
| # 3 Cooling tower condenser pump P1A-P1B-P1C. Chancery chiller room |
| 3 |
| BP84SA/AN |
PACO, Hp 25. Model:11-40127-7A6L01-1xx7. Installed 1998.
| Rome |
| Embassy Chancery |
| PR |
| # 1 Primary chilled water P2A-P2B-P2C Manufacturer: Paco, Hp 15 Model: 1140127-7A6L01-1xx7, installed;1998 Chancery chiller room |
| 3 |
| BP84SA/AN |
| Rome |
| Embassy Chancery |
| PR |
| # 2 Chilled and Hot water Secondary system P3A-P3B. |
| 2 |
BP84SA/AN
Make Paco Inverter controller Hp 50. Served area: Chancery, and New wing /Piombino partially.installed 1998 Chancery Chiller room
| Rome |
| Embassy Chancery |
| PR |
| # 3 Primary loop Heating pumps P4/A-P4/B-P4/C Make Paco Hp 5 , installed 1998 |
| 3 |
| BP84SA/AN |
| Rome |
| Embassy Chancery Mezzanine floor |
| FC |
| Fan Coil unit make Trane. # 2 FC1A Filter 85x23, # 5 FC2A Filter 107x 23, # 4 FC3A Filter 134x23, Winter/summer use, installed 1998 Chancery Mezzanine floor North ( Ex FMC) |
| 11 |
| FC05QU/AN |
| Rome |
| Embassy Chancery Piombino First floor |
| FC |
| Fan Coil Unit make Unknown , areas served: Lobby, Front office, conference room at the 1st floor ( DAO Section) |
| 6 |
| FC05QU/AN |
| Rome |
| Embassy Chancery Second floor |
| FC |
| Fan coil unit Make Trane # 2 FC1A Filter 85x23, Winter Summer use installed 1998 Second floor corridor |
| 6 |
| FC05QU/AN |
| Rome |
| Embassy Chancery Ground floor |
| FC |
| Fan coil make Trane #4 FC1A Filter 85X23, #5 FC2A filter 107X23, #2 FC3A Filter 134X23, # 2 FC3A Filter 134X23, #2 FC2B Filter 107X23 Winter/Summer use, installed 1998 North side ODC ( Ex Personnel) |
| 15 |
| FC05QU/AN |
| Rome |
| Embassy Chancery Ground floor |
| FC |
| Fan coil unit Make Trane.,#7 FC1A filter 85x23, #3 FC2A 107X23, #2FC3A filter 134x23,. Winter/summer use installed 1998 Chancery Ground floor including post one ( Only Unclassified rooms) |
| 8 |
| FC05QU/AN |
| Rome |
| Embassy Chancery & Piombino ground floor |
| FC |
| Fan coil unit Make Trane. #2 FCO filter 85x20,#7 FC1A filter 85x23, #3 FC2A 107X23, #2FC3A filter 134x23, # 2 CH-1 filter 49x23. Winter/summer use installed 1998 ( Piombino & Chancery Ground floor) RSO area ( Unclassified rooms only) |
| 5 |
| FC05QU/AN |
| Rome |
| Embassy Chancery |
| CH |
| #3 Centrifugal Compressors Number 1/2/3 Make McQuay,Model PEH063 Type 099564701F Volt 380 Hz 50 LRA 559 RLA238. Condensate Number 1/2/3, Make McQuay Model C18112/201, project pressure 15,5 bar. Evaporator number 1/2/3 make McQuay Model E2012/175project pressure 13,5 bar. COOLING CAPACITY kWf 734 EACH. (120 Ton) Areas served: Chancery, New wing and Piombino, installed at chancery basement 1998 |
| 3 |
| WC01M0/QU/SA/AN |
| Rome |
| Embassy Chancery |
| AH |
| # 1 Primary air handling unit AHU1 Make Trane Model BCH B0241LD 0, S.# R97G96309,Air flow 440 lts/s.Capacity thermal exchange battery 2 Ton 24.000BTU Motor kW 0,55 RPM 1450, Filter 49x60.Area served: Chiller room |
| 1 |
| AH17QU/AH16AN |
| Rome |
| Embassy Chancery |
| AH |
| # 1 Primary air handling unit AHU 6 Make Trane Model BCH B054, air flow 180lts/s. Capacity thermal exchange battery 2 Ton/54.000 BTU, Motor kW 1,1. Installed 1998, area served: Round conference room, Unit installed above ceiling. # 2 filters 49x49x 4,5. |
| 1 |
| AH17QU/AH16AN |
| Rome |
| Embassy Chancery |
| TE |
| # 2 Expansion Tanks lts 500 year 1998, # 3 Safety valve year 1998, # 3 blowing off valve year 1998, installed at Chancery boiler room. |
| 2 |
| TE09AN |
| Rome |
| Embassy Chancery |
| CT |
| # 3 cooling towers Make Marley Model NC4203C# Serial # 104174-001-97. For 3 McQuay Chillers, Installed 1998. area served Chancery,Piombino and New Wing |
| 3 |
| CT09MO/QU/SA/AN |
| Rome |
| Power Building |
| AH |
| # 1 Air handling unit Make Carrier Model 39LC1C5, Installed in the power building at the Embassy compound, area served: UPS battery room. Year 1992. |
| 1 |
| AH17QU/AH16AN |
| Rome |
| Embassy Chancery |
| AC |
| # 5 Ac split unit Make Unknown Btu 9000/12000, installed recently at: Post one, Basement Chancery SY, (#2)SY Storage close to chancery boiler room. |
| 5 |
| AS02QU/AN |
| Rome |
| Grazioli Buildings |
| AFRN /BW |
| # 3 gas furnace Make BUDERUS, # 1 & 2 kW 460 Kcal/h 395000 installed 2013, # 3 installed 2000. Kcal/h 300.000, with 3 burners CUENOD kW 460, Mod. BBNC46GX507/8A installed 2013. Area served: Heating and hot domestic water for all apartments in the building A & B. |
| 3 |
| BOIGAS20MO/SA/AN |
| Rome |
| Grazioli Buildings |
| PR |
| # 2 Twin Pump Make Grundfos ModelA96087040P2122100031 kW. 1,5 installed 2013 Heating for building A & B Plus a twin pump for primary circuit heating and hot domestic water, Make Grundfos, mod. A964402331P21228000326, kW 1,5 |
| 2 |
| BP84SA/AN |
| Rome |
| Grazioli Buildings |
| PR |
| # 2 Twin circulation pump Make Grundfos Model A96402124P2122400085 for domestic hot water Buildings A & B, kW 0,75 Installed 2013 |
| 2 |
| BP84SA/AN |
| Rome |
| Grazioli Buildings |
| PR |
| # 3 Anti-condensation pump Make Grundfos, kW 0,22 Installed 2013 |
| 3 |
| BP84SA/AN |
| Rome |
| Grazioli Buildings |
| PR |
| # 2 Re-circulating pump for boiler hot domestic water |
| 2 |
| BP84SA/AN |
| Rome |
| Grazioli Buildings |
| TE |
| # 3 Expansion tanks make ELBY, lts 300 year 2013, # 3 safety valve year 2013, # 3 Blowing off valve year 2013 installed at Grazioli boiler room. |
| 3 |
| TE09AN |
| Rome |
| Mel Sembler Bldg |
| CH |
| # 3 Chiller air cooled Make TRANE, four compressors for each chiller Model:CGAM090CAPMHE , Cooloing capacity kW 255.61 / Ton 72.7 Installed 2013, areas served Mezzanine, 1st,2nd,3rd floors Installed on the roof at MSB |
| 3 |
| CH14MO/SA/AN |
| Rome |
| Mel Sembler Bldg |
| PR |
| # 2 Centrifugal pump Make GRUNDFOS ModelModel MGE132MB4FF265-G3 kW 7,5 Installed 2013 area served MSB Secondary chilled water at mezzanine and 1st floor |
| 2 |
| BP84SA/AN |
| Rome |
| Mel Sembler Bldg |
| PR |
| # 2 centrifugal pump Make GRUNDFOS kW 7,5 Model MGE132MB4FF265-G3 Installed 2013, area served: Secondary chilled water for 2nd and 3rd floors MSB |
| 2 |
| BP84SA/AN |
| Rome |
| Mel Sembler Bldg |
| CH |
| # 1 Air cooled chiller Make TRANE, Model CVXAM240SDOADBO, S.# TCKM012, WITH #2 COMPRESSOR SKROLL installed on the MSB roof 2012, Cooling kW. 64,5, Area served: Fan coils unit installed in the Young conference room at MSB 1st floor.Located on the MSB roof |
| 1 |
| CH14MO/SA/AN |
| Rome |
| Mel Sembler Bldg |
| FC |
| # 8 Fan coil unit Make RIELLO # 2 FCU V 9 Cooling W 4,600 & # 6 FCU V 15 W 7,450, Chiller located on the MSB roof, Installed 2012 at Young Conf room MSB 1st floor |
| 7 |
| FC05QU/AN |
| Rome |
| Mel Sembler Bldg |
| AC |
| # 3 Server room conditioning Make Hiross Model HPM S20VA. Condensers located on the MSB roof, Evaporators inside the MSB server room on second floor,Installed 2007 |
| 2 |
| AS02QU/AN |
| Rome |
| Mel Sembler Bldg |
| AFRN /BW |
| # 3 furnace gas fired Make Riello kW 532,4, Model 3600 BTS 450 with Burners Riello RS 70 M. area served: Heating system of the Entire Mel Sembler Building, installed 2006 |
| 3 |
| BOIGAS20MO/SA/AN |
| Rome |
| Mel Sembler Bldg |
| PR |
| # 3 Pumps MSB secondary system Make Klein Model 50-200-154,HP 2, installed in the MSB boiler room.1988 anti-condenser pumps removed |
| 3 |
| BP84SA/AN |
| Rome |
| Mel Sembler Bldg |
| PR |
| # 2 Pumps MSB primary system Make Klein Model 80-200-404, HP 7,5 Installed in the MSB boiler room,1988 |
| 2 |
| BP84SA/AN |
| Rome |
| Mel Sembler Bldg |
| AC |
| # 1 VRF AC system, Condenser Make Sanyo, Model SPW-CR1304GDZH8B,S.Number 0005278, 380 Volt, kW 11,6, located on the MSB roof.Area served: # 8 indoor unit model SPW-FTR 164 EX H56B.located in the MSB 1st floor FCS & P.A. sections.Installed 2009.Rooms: 125,124,122,118,117,116,115,123,114. |
| 1 |
| AS02QU/AN |
| Rome |
| Mel Sembler Bldg |
| AC |
| # 1 VRF AC System Make Sanyo, Condenser Installed on the MSB roof ModelECO I 2 way multi SPW-C0705DX HN8, Volt 380 kW 9,6. # 5 indoor unit installed in the Presidential suite. Installed 2010. |
| 1 |
| AS02QU/AN |
| Rome |
| Mel Sembler Bldg |
| AC |
| # 2 VRF in parallel AC System Make Sanyo, condenser installed in the MSB east parking lot Model SPW-C0905 DXHN8 380 volt kW.12,4, Model SPWC1305DXHN8 Volt 380, kW 18,1 # 12 indoor unit installed at MSB ground floor east side Areas served,Ground floor ,various offices APO and mail room section: room number G26,GC4,G39,G28,G29,G29 outside ,G30,G31. # 8 indoor unit installed at Mezzanine floor room number:M28,M28A,M27,M25,M19,M18,M26,M17 Installed 2010. |
| 1 |
| AS02QU/AN |
| Rome |
| Mel Sembler Bldg |
| AFRN /BW |
| # 1 Wall mounted gas furnace Make Sile S.# 0001022009 Model Super rapida 31N3 V kW 26, Cat 112H3+ Installed 2010, area served: # 2 bathrooms in the Gym at MSB Groung floor east side. |
| 1 |
| BOCOND31MO/SA/AN |
| Rome |
| Mel Sembler Bldg |
| AC |
| # 1 VRF AC system Make Sanyo model SPW-CR704GDZH8B, kW 9,53, # 8 indoor unit installed in the Sallustiana Guardbooth.Condenser installed on the CAC roof. Installed 2006. |
| 1 |
| AS02QU/AN |
| Rome |
| Mel Sembler Bldg |
| AC |
| # 1 Chiller make Sanyo Model SCP-AR251E8 kW 12,9,Installed on the CAC roof, area served; AH for CAC primary air in the cac room.installed 2006 |
| 1 |
| AS02QU/AN |
| Rome |
| Mel Sembler Bldg |
| AH |
| # 1 AHU Make Trane,Model CCIA 009 Heating/Cooling for Primary air in the cac room, Unit installed on the CAC roof 2006. |
| 1 |
| AH17QU/AH16AN |
| Rome |
| Mel Sembler Bldg |
| AFRN /BW |
| # 1 Natural Gas furnace make Sile, Model Super rapida 31 R est Installed 2006, area served: HU Primair air for the CAC. Located in the CAC boiler room |
| 1 |
| BOCOND31MO/SA/AN |
| Rome |
| Mel Sembler Bldg |
| AC |
| # 1 VRF AC System Make Sanyo Model SPW CR605 GX H56B, kW 5,72, # 5 Indoor unit installed in the MSB ground floor print shop room G51, G04, G03. Instelled 2007. |
| 1 |
| AS02QU/AN |
| Rome |
| Mel Sembler Bldg |
| AC |
| # 3 AC system with inverter make Daikin Models RMXS 14OE8V1B,RZQ 14 0B8W1B,RMXS140 E8V1B.Condenser unit installed on the MSB former garages roof, area served: # 10 Split installed in the various offices in the former multipurpose area, room:G55,G57,G59,G61,G62,G56,G58,G60.Installed 2010. |
| 3 |
| AS02QU/AN |
| Rome |
| Mel Sembler Bldg |
| FC |
| # 51 Fan Coils unit cooling only installed in varius offices in the MSB 3rd floor. |
| 51 |
| FC05QU/AN |
(# 41 SEVESO POWER PR 30, # 7 SEVESO POWER PR 40, # 1 SEVESO POWER PR 80, # 1 SANGIORGIO SPT400, # 1 Make Unknown).
| Rome |
| Mel Sembler Bldg |
| FC |
| # 59 Fan Coils unit cooling only installed in varius offices in the MSB 2nd floor. (# 30 SEVESO POWER PR 30, # 6 SEVESO POWER PR 40, # 2 SEVESO POWER PR 80, # 6 ELECTRA AHN 2030, # 10 TRANE CWE05-2P, # 5 Make Unknown). |
| 59 |
| FC05QU/AN |
| Rome |
| Mel Sembler Bldg |
| FC |
| # 50 Fan Coils unit cooling only installed in varius offices in the MSB 1st floor, installed 1980. (# 37 YORK YFC 30, # 4 YORK YFC 40, # 9 Make Unknow). |
| 50 |
| FC05QU/AN |
| Rome |
| Mel Sembler Bldg |
| FC |
| # 41 Fan Coils unit cooling only installed in varius offices in the MSB mezzanine floor, installed 1980. (# 40 YORK YFC 30, # 7 YORK YFC 40, # 2 Make Unknow). |
| 41 |
| FC05QU/AN |
| Rome |
| Mel Sembler Bldg |
| AC |
| # 10 Various Ac split sys Make unknown Btu 12000/18000 Installed 1994 rooms served: MSB 3rd floor 88, 64,48,30,28,27,26,21,19,20,18. |
| 10 |
| AS02QU/AN |
| Rome |
| Mel Sembler Bldg |
| AC |
| # 17 Various AC split sys Make unknown, BTU 12000/18000 installed 1994, area served: MSB 2nd floor Rooms: 21,59,58,24,16,14,13,12,11,09,08,07,06,05,03,02, |
| 17 |
| AS02QU/AN |
| Rome |
| Mel Sembler Bldg |
| AC |
| # 8 Various Ac split sys Make unknown Btu 12000/18000, installed 1994, area served: MSB 1st floor rooms: 58,11,08,08,07,hall,05,23. |
| 8 |
| AS02QU/AN |
| Rome |
| Mel Sembler Bldg |
| AC |
| # 7 Various AC split sys BTU 12000/18000, installed 1994, area served: various rooms at MSB mezzanine floor. |
| 7 |
| AS02QU/AN |
| Rome |
| Mel Sembler Bldg |
| AC |
| # 15 AC split sys Make unkown BTU 9000/18000, Area served: MSB ground floor various offices. |
| 15 |
| AS02QU/AN |
| Rome |
| Mel Sembler Bldg |
| CH |
| # 1 Chiller Make Carrier Model Puron kW 9,60 30RA11-9B S. Number 04AR23518, Area served: MSB second floor Admin area Rooms: 12,13,14. |
| 1 |
| CH14MO/SA/AN |
| Rome |
| Mel Sembler Bldg |
| TE |
| # 2 Expansion Tanks lt 500 year 2005, # 1 Exp. Tank lt 500 year 2004, # 3 Exp. Tanks lt 80 year 2005, # 3 safety valve year 2005. Installed at Mel Sembler Boiler room. |
| 6 |
| TE09AN |
| Rome |
| Mel Sembler Bldg |
| TE |
| # 1 Safety valve, # 1 blowing off valve and # 1 expansion tank installed in wall mounted gas furnace at MSB close to boiler room, for Gym hot domestic water. Year 2010. |
| 1 |
| TE09AN |
| Rome |
| Mel Sembler Bldg |
| AC |
| # 4 AC split unit BTU 12000/18000, Installed in the MSB Annex Guard locker room at ground floor and offices at 1st floor.Date of installation 2000. |
| 4 |
| AS02QU/AN |
| Rome |
| Multiple use building |
| CH |
| # 1 Chiller air cooled Make Airwell Model AQL A 80 STD R407C, Colling capacity: kW 75,installed 2007. area served: Fan coils Marine House and Motor pool. Located on the motorpool roof |
| 1 |
| CH14MO/SA/AN |
| Rome |
| Multiple use building |
| PR |
| # 2 Centrifugal pump Make KSB, Model Etabloc 50-200/224. installed 2007, area served Marine House and Motor pool, chilled and hot water.Pumps located in the first room at the former GSO corridor side motorpool |
| 2 |
| BP84SA/AN |
| Rome |
| Multiple use building |
| CH |
| # 1 Chiller air cooled Make Carrier Model 30RBS-080-0130, with Pro dialog panel Serial Number 12F006833 , Cooling capacity: kW 78,5 Installed 2010, area served: fan coil at Former GSO at ground floor and Shops.Chiller installed close to the USUN Bldg. |
| 2 |
| CH14MO/SA/AN |
| Rome |
| Multiple use building |
| AH |
| # 1 Air handling unit Make Rhoss Model 09.0 UTA BA/6R-03, cooling capacity Kcal 20,300. Installed 1987,Area served: Commissary, The system has also a vapor producer humidifier |
| 1 |
| AH17QU/AH16AN |
| Rome |
| Multiple use building |
| AH |
| # 1 Air handling unit Make Comit 20.000Kcal Cooling. Area served: Locker room and restroom at the garage.Installed 2002. |
| 1 |
| AH17QU/AH16AN |
| Rome |
| Multiple use building |
| FC |
| # 6 Air heaters installed 2007, located in the garage. |
| 6 |
| FC05QU/AN |
| Rome |
| Multiple use building |
| AC |
| # 2 split system installed in the mechanics shop and maintenance storage, cooling capacity: 12000 each. |
| 2 |
| AS02QU/AN |
| Rome |
| Multiple use building |
| BO |
| # 3 Hot water GAS Heater, installed at Multiple use building Marine House. |
| 3 |
| BOCOND31MO/SA/AN |
| Rome |
| Pinciana Apt 1 |
| AC |
| # 1 Air conditioner VRF Make Fujitsu Airstage, Model AJHA72LALH, Cooling kW 22,4 Heating kW 25,0. Area served: Pinciana apt 1 basement floor.Machine installed in the garden Direct expansion to # 9 internal units |
| 1 |
| AS02QU/AN |
| Rome |
| Pinciana Apt 1 |
| AC |
| # 1 Air conditioner VRF Make Fujitsu Airstage, Model AJH144LALH, Cooling kW 45,0 Heating kW 50,0. Area served: Pinciana apt 1 Ground floor.Machine installed in the garden Direct expansion to # 14 internal units, |
| 1 |
| AS02QU/AN |
| Rome |
| Pinciana Apt 1 |
| AC |
| # 9 Internal units Make fujitsu Model Airstage wall/floor installations, area served Pinciana Apartment 1 Basement floor Year 2016 |
| 9 |
| AS02QU/AN |
| Rome |
| Pinciana Apt 1 |
| AC |
| # 14 internal units Make fujitsu Model Airstage wall/floor installations, area served Pinciana Apartment 1 Ground floor, Year 2016. |
| 14 |
| AS02QU/AN |
| Rome |
| Pinciana Apt 2 |
| AC |
| # 1 AC split system Make Westinghouse installed in the living room at Pinciana 2 apt. BTU 18000, installed on the balcony |
| 1 |
| AS02QU/AN |
| Rome |
| Pinciana Apt 2 |
| AC |
| # 1 Split unit Make Westinghouse 14500 BTU installed in the bedroom, Outdoor unit instaled on the balcony |
| 1 |
| AS02QU/AN |
| Rome |
| Pinciana Apt 3 |
| AC |
| # 1 Air conditioner VRF Make Fujitsu Airstage, Model AJH144LALH, Cooling kW 45,0 Heating kW 50,0. Area served: Pinciana apt 3 floor 2. Equipment installed in the garden Direct expansion to # 14 internal units, |
| 1 |
| AS02QU/AN |
| Rome |
| Pinciana Apt 3 |
| AC |
| # 14 internal units Make fujitsu Model Airstage wall/floor/concealed installations, area served Pinciana Apartment 1 Ground floor, Year 2016. |
| 14 |
| AS02QU/AN |
| Rome |
| Pinciana Apt 4 |
| AC |
| # 1 AC Split system Make westinghouse BTU 24000,outdoor unit installed on the balcony. |
| 1 |
| AS02QU/AN |
| Rome |
| Pinciana Apt 4 |
| AC |
| # 1 AC Split system Make Westinghouse 18.500 BTU outdoor unit located on the terrace |
| 1 |
| AS02QU/AN |
| Rome |
| Pinciana Apt 4 |
| AC |
| # 1 AC Split system make Westinghouse BTU 10500 for Pinciana 4 Guest room, Condenser located on the terrace. |
| 1 |
| AS02QU/AN |
| Rome |
| Pinciana Apt 4 |
| Ac |
| # 1 AC Split system Make Westinghouse BTU 10500 for Pinciana 4 outdoor unit on the terrace |
| 1 |
| AS02QU/AN |
| Rome |
| Pinciana Apt 4 |
| AC |
| # 1 AC Split system airwell 12000 BTU for Pinciana 4 master bedroom,outdoor unit located on the kitchen terrace |
| 1 |
| AS02QU/AN |
| Rome |
| Pinciana Apt 4 |
| AC |
| # 1 AC unit window type BTU 9000. 2nd bedroom Pinc 4 |
| 1 |
| AS02QU/AN |
| Rome |
| Pinciana Apt 4 |
| AC |
| # 1 AC unit window type BTU 9000, Pinc 4 Kitchen |
| 1 |
| AS02QU/AN |
| Rome |
| Pinciana Apt 4 |
| AC |
| # 1 AC Split system Make westinghouse BTU 10500, outdoor unit located on the terrace, area served Mansard bedroom. |
| 1 |
| AS02QU/AN |
| Rome |
| Pinciana Bldg |
| AFRN /BW |
| # 2 Natural Gas Furnace Make Biklim Model PRI M/250, Kcal/h 250.000 with Burners Cuenod PCS 045, Installed 1986, area served: Heating and domestic hot water for Pinciana apartments (4) and villa allegri. |
| 2 |
| BOIGAS20MO/SA/AN |
| Rome |
| Pinciana Bldg |
| PR |
| # 2 Anti-condensate pump Make Vergani Model T 50-161 HP 0,75. |
| 2 |
| BP84SA/AN |
| Rome |
| Pinciana Bldg |
| PR |
| # 2 Heating Secondary system pump for Villa Allegri Make Klein Model GH50-75.4 HP 0.75. |
| 2 |
| BP84SA/AN |
| Rome |
| Pinciana Bldg |
| PR |
| # 2 Domestic hot water re-circulation pump for Villa Allegri, Make Lombarda Model G80-804, kW 0,80 |
| 2 |
| BP84SA/AN |
| Rome |
| Pinciana Bldg |
| PR |
| # 2 Domestic hot water re-circulating for Pinciana Apts 1,2,3,4.Make Vergani Model TK 50-162D HP 0.50. |
| 2 |
| BP84SA/AN |
| Rome |
| Pinciana Bldg |
| PR |
| # 2 Heating Secondary system pump for Pinciana Apts 1,2,3,4, Make Vergani Model G80-804 HP 0.80. |
| 2 |
| BP84SA/AN |
| Rome |
| Pinciana Bldg |
| PR |
| # 2 Re-circulation pump for domestic hot water boiler located in the building basement, Make Vergani Model TK 50-HP 0.75. |
| 2 |
| BP84SA/AN |
| Rome |
| Pinciana Bldg |
| TE |
| # 3 Expansion tanks lt 300 year 1993, # 2 safety valve year 2004, # 2 blowing off valve year 2004, installed at Pinciana boiler room. |
| 3 |
| TE09AN |
| Rome |
| Pinciana Guard booth |
| AC |
| # 1 AC Split system Make westinghouse 24000 BTU, outdoor unit installed on the Pinciana guard booth roof. |
| 1 |
| AS02QU/AN |
| Rome |
| USUN Bldg |
| FC |
| # 19 Fan Coil Unit Make Trane, Model Unitrane FV 04 FC/1-2-3 Winter/summer use, Model CH-1 Hot only Installed 1998 AREA SERVED: USUN Ground floor |
| 19 |
| FC05QU/AN |
| Rome |
| USUN Bldg |
| AFRN /BW |
| # 1 Natural Gas Furnace, Make Riello, Model 3500SAT 450 kW 522,4 Burners Make Riello Model RS 70 installed 2010 Installed 2010, Served areas Consulate,USUN,Marine House and Multipurpose buildings. |
| 3 |
| BOIGAS20MO/SA/AN |
| Rome |
| USUN Bldg |
| CT |
| # 1 Cooling tower make:Marley-Cofimco Fan motor Hp 7 (Inverter controller). Area served: USUN and Consulate Bldgs.Installed:2001 |
| 1 |
| CT09MO/QU/SA/AN |
| Rome |
| USUN Bldg |
| CH |
| # 1 chiller water cooled CARRIER 30HC140-A0089-BEE, located USUN Basement, Serving USUN Bldg, Consulate Bldg and Multipurpose Bldg. Pelec= 112 kWe, Pcool= 481 kWf. Refrigerant R134a 106 kg |
| 1 |
| CH14MO/SA/AN |
| Rome |
| USUN Bldg |
| AH |
| # 1 Primary air handling unit AHU Make Carrier Model 39C101,Serial # 3901006G01, Installed 2002, Areas served: Waiting room of ground floor and offices of 2nd floor Installed 2002 |
| 1 |
| AH17QU/AH16AN |
| Rome |
| USUN Bldg |
| PR |
| # 2 Pumps P3A / P3B With Inverter controller Make Armstrong/Baldor Model 07M337W264 hp 10, rpm 1450,Installed 2002, area served: Entire USUN Bldg. |
| 2 |
| BP84SA/AN |
| Rome |
| USUN Bldg |
| PR |
| # 1 P1 Condenser water pump Make Armstrong/Baldor Model 07J287W41661. Installed 2002, (cooling tower pump) |
| 1 |
| BP84SA/AN |
| Rome |
| USUN Bldg |
| PR |
| # 1 P2 Chilled water pump Make Armstrong / Baldor,Model 37H600w49361 installed 2002 (USUN Primary chilled water) |
| 1 |
| BP84SA/AN |
| Rome |
| USUN Bldg |
| PR |
| # 2 Primary pump for circulating the hot water in the USUN and Consulate Building. Make Salsom Model SCX65-110N kW 1,6 Installed 2010. |
| 2 |
| BP84SA/AN |
| Rome |
| USUN Bldg |
| PR |
| # 1 Twin secondary pump Make Salmson Model DCX50-90N kW 0,8. Installed 2010.Aerea served: Garage |
| 1 |
| BP84SA/AN |
| Rome |
| USUN Bldg |
| PR |
| #1 Twin secondary pump Make Salmson Model DCX50-110N, kW 1,5, Installed 2010. Area served: Former GSO. |
| 1 |
| BP84SA/AN |
| Rome |
| USUN Bldg |
| PR |
| # 1 Twin secondary pump Make Salmson kW 0,8 Model DCX50-90N, installed 2010 Area served: Marine House. |
| 1 |
| BP84SA/AN |
| Rome |
| USUN Bldg |
| PR |
| # 3 Anti-condensate pump Make Salsom Model SCX80-25, kW 1,04, installed 2010 on each gas furnace |
| 3 |
| BP84SA/AN |
| Rome |
| USUN Bldg |
| FC |
| Fan Coil Make Trane: # 1 Serie FC1 large 119 Cm. # 2 FC2 large 139 Cm.#3 CUH large 119 (Only hot)area served: USUN Basement floor |
| 6 |
| FC05QU/AN |
| Rome |
| USUN Bldg |
| FC |
| Fan coil Make Trane # 8 FC1 Model Unitrane Large 119 Cm. #10 FC2 large 139 Cm, #1 FC3 Large 159 Cm. Area served: USUN 1 st floor |
| 19 |
| FC05QU/AN |
| Rome |
| USUN Bldg |
| FC |
| Fan Coil Make Trane # 11 FC1 Large 119 Cm, #6 FC2 Large 139 Cm, # 7 FC3 Large 159 Area served Usun 2nd floor |
| 24 |
| FC05QU/AN |
| Rome |
| USUN Bldg |
| AC |
| # 2 AC system Make OLIMPIA UNICO, installed 2002, areas served: USUN Fiber optic rooms at mezzanine and second floor |
| 2 |
| AS02QU/AN |
| Rome |
| USUN Bldg |
| AC |
| # 2 AC system for USUN server room LIEBERT HIROSS 5100A0000202010PO |
| 2 |
| AS02QU/AN |
| Rome |
| USUN Bldg |
| AC |
| # 2 Hiross unit for P.A. server room, Installed 2006.Model HTC |
| 2 |
| AS02QU/AN |
| Rome |
| USUN Bldg |
| TE |
| # 3 Expansion tanks Make Elbi lt 300, year 2010, # 6 safety valve year 2010, # 3 blowing off valve year 2010, installed at USUN Bldg boiler room. |
| 3 |
| TE09AN |
| Rome |
| USUN CMR |
| AC |
| # 3 Chiller Make Robur Model RTYF 180-238/2 Series GA ,cooling capacity kW 52,43, Frig./h 45.114, termal power kW 69.6, Kcal 55.900.Installed 2004 at S. Sebastiano residence Gruppi ad assorbimento alimentati a gas metano, due dei tre forniscono in inverno il riscaldamento per la villa e acqua calda sanitaria per i boiler. |
| 3 |
| AS02QU/AN |
| Rome |
| USUN CMR |
| AFRN /BW |
| # 1 Boiler oil fired make Termo Vamp, Model SN80 Installed 1987 at S. Sebastiano residence, Burner Make Quenod Mod. C 10 OF of 1985. |
| 1 |
| BOCOND31MO/SA/AN |
| Rome |
| USUN CMR |
| PR |
| # 2 Twin pumps Make Lowara Model PL 15 G Installed 2004 at S. Sebastiano residence |
| 2 |
| BP84SA/AN |
| Rome |
| USUN CMR |
| PR |
| # 4 Pumps make Grundfos, Model D648 and Model 150 Installed 2004, for two hot water producer.S. Sebastiano Residence boiler room. |
| 4 |
| BP84SA/AN |
| Rome |
| USUN CMR |
| PR |
| # 24 H & C fan coil unit installed on the Basement (4),Ground (12) and 1st (8) Floors.at San Sebastiano residence.Make Seveso Type floor installation |
| 24 |
| BP84SA/AN |
| Rome |
| USUN CMR |
| TE |
| # 3 Expansion tanks Make Elbi Lts 80,24,24. # 3 Safety valve installed 2004.Installed in the CMR boiler room at San Sebastiano residence. |
| 3 |
| TE09AN |
| Rome |
| USUN CMR |
| AC |
| # 1 AC Split system installed in the ground floor kitchenat San Sebastiano residence, Make unknow 16.000BTU. |
| 1 |
| AS02QU/AN |
| Rome |
| Val Di Sole Apt 1 |
| AC |
| # 2 AC Split sys Make westingouse BTU 18.500 and No 2 Westinghouse BTU 10500. Condenser installed on the balcony Val Di Sole Ground floor APT 1 |
| 4 |
| AS02QU/AN |
| Rome |
| Val di Sole Apt 2 |
| AC |
| # 2 AC Split sys Make westingouse BTU 18.500 and No 2 Westinghouse BTU 10500. Condenser installed on the balcony, Val di Sole 1st floor apt 2 |
| 4 |
| AS02QU/AN |
| Rome |
| Val di Sole Apt 3 |
| AC |
| # 2 AC Split sys Make westingouse BTU 18.500 and No 2 Westinghouse BTU 10500. Condenser installed on the balcony, Val Di Sole 2nd floor apt 3 |
| 4 |
| AS02QU/AN |
| Rome |
| Val Di Sole Apt 4 |
| AC |
| # 2 AC Split sys Make westingouse BTU 18.500 and No 2 Westinghouse BTU 10500. Condenser installed on the balcony, Val di sole 3rd floor Apt 4 |
| 4 |
| AS02QU/AN |
| Rome |
| Val di Sole Bldg |
| AFRN /BW |
| # 2 Cast iron boilers Kcal/h 150.000 Make ICI Model TRA - 15 with Gas Burners Make Cuenod Model C-22 Installed 1995. Area served: Heating and hot domestic water for the entire building. Installed 1995 |
| 2 |
| BOIGAS20MO/SA/AN |
| Rome |
| Val di Sole Bldg |
| PR |
| # 2 Pumps Make Vergani Model T50-161 Hp 0,75, Primary Val di sole boiler room, installed 1995 |
| 2 |
| BP84SA/AN |
| Rome |
| Val di Sole Bldg |
| PR |
| # 1 Twin Pump Make Vergani Mogel PK 50-162 S HP 0,50, Secondary sys Val di Sole boiler room, installed 1995 |
| 1 |
| BP84SA/AN |
| Rome |
| Val di Sole Bldg |
| PR |
| Anti Condensate pump |
| 2 |
| BP84SA/AN |
| Rome |
| Val di Sole Bldg |
| TE |
| # 3 Exp. Tanks lt 250 year 2003, # 2 Safety valve year 2002, # 2 blowing off valve year 2001, installed at Val Di Sole boiler room. |
| 3 |
| TE09AN |
| Rome |
| Vatican Residence |
| AC |
| # 1 AC Split system Make Aermec Model Cupido 210, BTU 20000, installed 2001, area served: Vatican residence living and dining rooms. |
| 3 |
| AS02QU/AN |
| Rome |
| Vatican Residence |
| AC |
| # 1 AC Split system Make Hitachi Model RAS 24 C1, Btu 21000,Installed 2001, area served: Vatican residence study.R22 |
| 1 |
| AS02QU/AN |
| Rome |
| Vatican Residence |
| AC |
| # 1 AC Split system Make Aermec Model Unknow, BTU 18000, installed 1994, area served: Vatican residence master bedroom. |
| 1 |
| AS02QU/AN |
| Rome |
| Vatican Residence |
| AC |
| # 2 AC System Make Aermec model CX 160, BTU 14000, installed 1994, Area served: 2 guest bedrooms at the Vatican residence |
| 2 |
| AS02QU/AN |
| Rome |
| Vatican Residence |
| AC |
| # 1 AC Split system make Aermec model Harmonia, BTU 9000, installed 1997, area served: Vatican residence office at 1st floor. |
| 1 |
| AS02QU/AN |
| Rome |
| Vatican Residence |
| AC |
| # 1 AC Split system Make McQuay Model M5LC028CRACP0A, BTU 24000, installed 2006, area served: Vatican residence main and family kitche# |
| 2 |
| AS02QU/AN |
| Rome |
| Vatican Residence |
| AC |
| # 1 AC Split system Make Roca, Model DFMn 275-21-1, BTU 9000, area served: Vatican residence laundry room. |
| 1 |
| AS02QU/AN |
| Rome |
| Vatican Residence |
| AC |
| # 1 AC Dual Split Ariston Model A-IDF18-OAX, R410, INSTALLED 2009, Area served: Annex guest house ground & 1st floor |
| 1 |
| AS02QU/AN |
| Rome |
| Vatican Residence |
| AFRN /BW |
| # 1 Gas furnace wall mounted Make Savio Model Gaia 424RS kW 26000 installed 2000, Area served: Vatican residence Annex guest house 1st & 2nd floors heating only |
| 1 |
| BOCOND31MO/SA/AN |
| Rome |
| Vatican Residence |
| AC |
| # 1 AC Split system Make Samsung , model AQV12UGAX, Btu 12000, r410, installed 2010, Area served: Vatican residence Metronotte guard booth. |
| 1 |
| AS02QU/AN |
| Rome |
| Villa Allegri |
| AC |
| # 2 AC Split unit system Make Laminox, BTU 14500, outdoor unit installed in Villa Allegri court yard |
| 2 |
| AS02QU/AN |
| Rome |
| Villa Allegri |
| AC |
| # 1 AC Split unit system make westinghouse BTU 10500, outdoor unit installed in the Villa Allegri terrace |
| 1 |
| AS02QU/AN |
| Rome |
| Villa Allegri |
| AC |
| # 1 Split system make westinghouse BTU 14500, outdoor unit installed in the Villa Allegri roof |
| 1 |
| AS02QU/AN |
| Rome |
| Villa Allegri |
| AC |
| # 3 AC Split system Make Sanyo, BTU 1800 each, for ground floor sun porch, Entrance villa and small living room, outdoor unit installed in the court yard |
| 3 |
| AS02QU/AN |
| Rome |
| Villa Allegri |
| AC |
| # 2 AC Split unit system BTU 14000 each make unkown for studio room at Villa Allegri 1st floor, outdoor unit installed on the villa Allegri roof. |
| 2 |
| AS02QU/AN |
| Rome |
| Villa Taverna |
| AFRN /BW |
| # 3 Natural Gas Furnace Make Riello kW 151,5, Model 3900,130GTA.Gas burners Riello Gulliver Model BS3 Kcal/h 55,900-162.500, Installed 2001, Heating and hot water for the villa |
| 3 |
| BOIGAS20MO/SA/AN |
| Rome |
| Villa Taverna |
| PR |
| # 1 Twin pump primary heating hot water Make Grundfos Model LMD 100-125-140 kW 1,1,Installed 2001 |
| 1 |
| BP84SA/AN |
| Rome |
| Villa Taverna |
| PR |
| # Twin pump secondary heating system make Grundfos, model LMD 200-187-kW,1.5 Installed 2001 |
| 1 |
| BP84SA/AN |
| Rome |
| Villa Taverna |
| PR |
| # 1 Twin pump domestic hot water circuit Make Grundfos LMD 50-160,kW 0,37, Installed 2001 |
| 1 |
| BP84SA/AN |
| Rome |
| Villa Taverna |
| PR |
| # 3 Anti-condensation circuit pump make Grundfos Model UPS 32/30.Installed 2001, |
| 3 |
| BP84SA/AN |
| Rome |
| Villa Taverna |
| PR |
| # 2 Boiler hot water re-circulation pump, Make Vergani Model T40-152,kW 0,25.Installed at villa taverna basement |
| 2 |
| BP84SA/AN |
| Rome |
| Villa Taverna |
| AFRN /BW |
| # 1 Natural Gas Furnace Make Riello 3500-S160 kW 195, installed 1997. Hot water for swimming pool only. |
| 1 |
| BOCOND31MO/SA/AN |
| Rome |
| Villa Taverna |
| AFRN /BW |
| # 1 Natural Gas Furnace Make Riello Model 2RCT-8 with Burner Riello Mod GS 40, Kcal/h 54.000, kW 62.8,installed 1992, Area served: Theater, Swimming pool dressing room and Kitchen at Villa Taverna |
| 1 |
| BOCOND31MO/SA/AN |
| Rome |
| Villa Taverna |
| PR |
| # 2 re-circulating pump Make Majmar Model UP26-65 installed 1992, area served Theater, And swimming pool dressing room at villa taverna |
| 2 |
| BP84SA/AN |
| Rome |
| Villa Taverna |
| AFRN /BW |
| # 1 Natural Gas Furnace wall mounted Make Beretta Model Fabula 32 CSI 120 kW 31,7 Installed 2010, area served: heating and domestic hot water for the staff quarters apartment. |
| 1 |
| BOCOND31MO/SA/AN |
| Rome |
| Villa Taverna |
| AC |
| # 2 AC Dual Split system heating pump Make Samsung, ( 4 indoor unit 9000 btu) (2 outside unit), Installed 2010, area served: Villa Taverna Staff Quarters |
| 2 |
| AS02QU/AN |
| Rome |
| Villa Taverna |
| CH |
| # 1 Chiller air cooled Make Galletti Model MCA 025 HO Heating pump,Cooling capacity: kW 22,86 Installed 2004, Area served: # 6 fan coils wall mounted in the Theater at Villa Taverna |
| 1 |
| CH14MO/SA/AN |
| Rome |
| Villa Taverna |
| FC |
| # 6 Fan coil unit Make Galletti Heating and cooling with three way valve and remote control installed 2004 |
| 6 |
| FC05QU/AN |
| Rome |
| Villa Taverna |
| AC |
| # 1 Dual split Make Sanyo Model SAP-CMRV1923GJH, Heating pump, Installed 2005, Two indor units installed in the Presidential suite, the outdoor unit is installed below the roof |
| 1 |
| AS02QU/AN |
| Rome |
| Villa Taverna |
| AC |
| # 1 AC package unit Make Carrier Model 50TA036A9, BTU 36.000 ( Ton 3) Installed 2003, areas served At second floor Fullbright and Marshall rooms Primary air. |
| 1 |
| AS02QU/AN |
| Rome |
| Villa Taverna |
| AC |
| # 1 AC package unit Make Carrier Model 50TA036A9, BTU 36.000 ( Ton 3) Installed 2003, areas served at 1st floor guest rooms Primary air. |
| 1 |
| AS02QU/AN |
| Rome |
| Villa Taverna |
| AC |
| # 1 AC package unit Make Carrier, Installed 1997,Model 50Tf0400K9 Cooling capacity kW 11,7. Area served Ford and Nato suites at 2nd floor (Primary air) |
| 1 |
| AS02QU/AN |
| Rome |
| Villa Taverna |
| CH |
| # 1 Air cooled chiller Make Carrier Model 30GH 020, Cooling capacity kW 52,5, Installed 1999, Area served: Fan coils ( 12 ) installed in the villa ground floor,Located at Villa Taverna at mechanical area |
| 1 |
| CH14MO/SA/AN |
| Rome |
| Villa Taverna |
| PR |
| # 2 Chilled water pump, Make Lowara Model CN 32-200-05, installed 1999.Primary chilled water to Villa |
| 2 |
| BP84SA/AN |
| Rome |
| Villa Taverna |
| CH |
| # 1 Air cooled chiller Make Carrier Model 30RBS-050-0419-PE, Cooling capacity: 51,4 kW, Area served: fan coils (12) in the villa ground floor. Installed 2013, Located at Villa Taverna Mechanical area |
| 1 |
| CH14MO/SA/AN |
| Rome |
| Villa Taverna |
| AC |
| # 1 Mono split Make Westinghouse Model UGE 455/185C/SRO 18C, BTU 18.000 Installed 2005, Area served: Master bedroom at 1st floor, The outdoor unit is in the garden near the Patio below the bedroom window. |
| 1 |
| AS02QU/AN |
| Rome |
| Villa Taverna |
| AC |
| # 1 AC Dual Split Make Delchi, Model 2X18.000, BTU 18.000 each, installed 1989, outdoor unit installed on the balcony of small living room,Patio side. |
| 1 |
| AS02QU/AN |
| Rome |
| Villa Taverna |
| AC |
| # 1 AC Dual Split Make Delchi, Model BTU 2 X 245 C, BTU 24.500 each installed 1989, outdoor unit installed on the balcony of green living room |
| 1 |
| AS02QU/AN |
| Rome |
| Villa Taverna |
| FC |
| # 12 Fan coil unit H & C installed 2008, the units are installed in the ground floor only |
| 12 |
| FC05QU/AN |
| Rome |
| Villa Taverna |
| AC |
| # 1 AC Split system Make Westinghouse Model WSC12 PB5MB, Btu 12000, installed 2004, area served guard house monitor room |
| 1 |
| AS02QU/AN |
| Rome |
| Villa Taverna |
| AC |
| # 3 AC Split system Make carrier BTU 12000 each, installed 2006, Area served ACC room |
| 3 |
| AS02QU/AN |
| Rome |
| Villa Taverna |
| AC |
| # 3 Split system Make Unknow BTU 12000 each, installed 2006, area served: Fine art shops, near the genarator room |
| 3 |
| AS02QU/AN |
| Rome |
| Villa Taverna |
| AFRN /BW |
| # 1 Natural Gas Furnace Wall mounted Make Beretta, Model Mynute C.S.I. kW 24.00 Installed 2003, area served: radiator of the Guard house. |
| 1 |
| BOCOND31MO/SA/AN |
| Rome |
| Villa Taverna |
| AC |
| # 1 AC Split system Make Carrier, 12000 BTU, Area served: Refrigerator room |
| 1 |
| AS02QU/AN |
| Rome |
| Villa Taverna |
| AC |
| #2 AC Split system Make Carrier BTU 12000 each, installed 2005, area served: Staff office close to the kitchen |
| 2 |
| AS02QU/AN |
| Rome |
| Villa Taverna |
| CH |
| # 1 Chiller air cooled Make Airwell installed 2005, area served: fan coil unit (4)installed in the Manager office at the mezzanine floor and one on the ground floor, the outdoor unit is installed out side patio at Villa taverna |
| 1 |
| CH14MO/SA/AN |
| Rome |
| Villa Taverna |
| AC |
| # 1 Trial split Make airwell, installed 2005, outdoor unit installed outside Patio, area served Rooms at ground floor near house manager. |
| 1 |
| AS02QU/AN |
| Rome |
| Villa Taverna |
| AFRN /BW |
| # 2 Natural Gas Furnace. Make ARISTON Model Genius HP 65 kW 65. Area served: heating of # 3 green house in the garden, Heating system and hot domestic water in the gardner's shop. Installed 2013 |
| 2 |
| BOCOND31MO/SA/AN |
| Rome |
| Villa Taverna |
| PR |
| # 3 Pumps Make DAB, for recirculating of: green house heating , solar panel and hot domestic water. Installed 2013 |
| 3 |
| BP84SA/AN |
| Rome |
| Villa Taverna |
| AC |
| # 1 AC Split system make Unknow,installed 2006, BTU 12000. area served Gardener's shop |
| 1 |
| AS02QU/AN |
| Rome |
| Villa Taverna |
| AC |
| # 2 AC Split system make unknow installed 1988, BTU 9000 each, outdoor unit installed in the living room balcony. |
| 2 |
| AS02QU/AN |
| Rome |
| Villa Taverna |
| AH |
| # 2 Air handling Unit Make CETRA, Models CT 100 and CT 7, Installed abobe the kitchen |
| 2 |
| AH17QU/AH16AN |
| Rome |
| Villa Taverna |
| AC |
| # 7 Air conditioning window Type, cooling capacity from 7000 to 9000 BTU, Installed in the staff quarter and dressing rooms in the villa. |
| 7 |
| AS02QU/AN |
| Rome |
| Villa Taverna |
| FC |
| # 3 Air heaters installed 2007, located in the green house. |
| 3 |
| FC05QU/AN |
| Rome |
| Villa Taverna |
| TE |
| # 1 ExpansionTank Lt 2000 Year 2000, #2 Exp tank 50 lt Year 2000, #1 Exp. Tank lt 50 year 2001.# 3 Safety valve year 2000, # 3 Blowing off valve year 2000.installed at V. Taverna boiler room |
| 4 |
| TE09AN |
| Rome |
| Villa Taverna |
| TE |
| # 1 Expansion tank lt 24 year 2000, #1 safety valve year 2000, # 1 blowing off valve year 2000, installed at V.Taverna swimming pool boiler room. |
| 1 |
| TE09AN |
| Rome |
| Villa Taverna |
| TE |
| #1 Expansion Tank lt 80 year 2004, # 1 safety valve year 2001, # 1 blowing off valve 2001. installed at Villa Taverna Teather boiler room. |
| 1 |
| TE09AN |
| Rome |
| Villa Taverna |
| TE |
| # 1 Expansion Tank, safety valve and blowing off valve installed in the wall mounted gas furnace at Villa Taverna staff quarter Bldg.year 2010. |
| 1 |
| TE09AN |
| Rome |
| Villa Taverna |
| TE |
| # 2 Expansion tanks lt 50 year 1993, # 2 safety valve year 2000, installed at Villa Taverna green house boiler room. |
| 2 |
| TE09AN |
| Rome |
| Villa Taverna |
| TE |
| #1 Expansion Tank, Safety valve and blowing off valve in the wall mounted gas furnace Make Beretta, year 2006, installed at Villa Taverna main entrance guard booth. |
| 1 |
| TE09AN |
| Rome |
| Villa Taverna |
| HO |
| # 2 AHU Kitchen vent with filter installed 2002, Make Cetra, Model CT-07 and CT-02, installed at villa taverna above kitche# |
| 2 |
| AH17QU/AH16AN |
| Rome |
| Villa Taverna |
| HO |
| # 1 AHU kitchen vent with filter installed 2002, Make Cetra model CT-100, installed on the ceiling in the small kitche# |
| 1 |
| AH17QU/AH16AN |
| Rome |
| Villa Taverna |
| HE |
| # 1 Heat exchanger installed in the swimming pool equipment room at Villa Taverna. |
| 1 |
| HX16SA/AN |
| Rome |
| Mel Sembler Bldg |
| AC |
| # 1 VFR System Make Sanyo Eco I W-2 way multi, Model SPW C1306DXH8 Cooling capacity kW 11.1. Areas served: Ground floor Library, corridor office and small office. 1st floor and one office on the mezzanine room and corridor number: M5,109,1C3,102,105,1C1,G14,G13,G12,G08 . installed 2011. |
| 1 |
| AS02QU/AN |
| Rome |
| Mel Sembler Bldg |
| AC |
| # 1 VFR System Make Sanyo Eco I W-3 Way Multi Model SPW C0905DZH8, Cooling capacity 8,12. Areas served west conference and presidential room first floor with N0. 6 internal unit : MSB room 112 no 2 unit, room 110 no 3 unit and room 111 no1 unit .Installed 2011. |
| 1 |
| AS02QU/AN |
| Rome |
| Mel Sembler Bldg |
| AC |
| # 2 VFR System in parallel Make Sanyo Model SPW-C0706DXH8 kW 5,54 2 WAY Multi ECO I,and Model SPW-C1306DXH8 kW 11,1 2 WAY MULTI ECO I. AREAS SERVED: Warehouse at MSB 3rd floor whit 5 unit room 314, 310, 313 and MSB west wing 2nd floor with 10 unit room 207,208,209,206,205,202. |
| 2 |
| AS02QU/AN |
| Rome |
| Mel Sembler Bldg |
| AC |
| # 1 VRF System in parallel make Sanyo ECO I W 3 Way Model SPW-C0705DEZH8 kW. 5,93 cooling S. Number 0006508, installed 2011, and #1 VRF ECO 3Way Multi, kW 8,12 cooling S. Number 0015708,Model SPW-C0905DZH8 installed 2011on the MSB roof close to old main chillers areas served: Marine House North wing, Service areas, Kitche# with 13 internal unit ceiling mounted. |
| 2 |
| AS02QU/AN |
| Rome |
| Mel Sembler Bldg |
| AC |
| # 1 VRF system in parallel Make Sanyo Eco I Model SPW- C0705DZH8 kW 5,93, S.Number 0006308 And # 1 VFR ECO I SPW-C0905DZ kW8,12, S. Number 0015808, installed 2011 on the MSB roof, areas served: Marine House South wing, Marine rooms, halls, storage, with 18 internal units ceiling mounted. |
| 2 |
| AS02QU/AN |
| Rome |
| Mel Sembler Bldg |
| AH |
| # 1 AHU unit Make Sanyo Model SPW-DR364GXH56B kW. 10,60 cooling Installed 2011 area served: Primary air in the Marine House rooms at MSB 4th floor. |
| 1 |
| AH17QU/AH16AN |
| Rome |
| Mel Sembler Bldg |
| AH |
| # 1 AHU unit Make Sanyo Model SPW-GU105XH, kW 10,7 cooling installed 2011 , area served Marine house hall at MSB 4th floor |
| 1 |
| AH17QU/AH16AN |
| Rome |
| Vatican residence |
| AFRN /BW |
| # 1 Natural Gas Furnace Make Thermital Model BFD45 kW 31,70, Burner Cuenod Model C5 Hot domestic water only. # 1 Gas furnace Biasi Model SG58 kW 64,00, Burner Cuenod Model C10. Only Heating system for villa and driver room. Vatican residence. |
| 2 |
| BOCOND31MO/SA/AN |
| Rome |
| Villa Taverna |
| AC |
| # 1 Chiller Carrier Mod. 30RH013 - 9B Cooling kW. 11,50 Heating kW 13,80. Area served Floors: -1 & - 2.installe 2009. # 1 Chiller Mod 30AWH008HB , Serial Number 05AZI05694, area served floor - 3 cooling only.Installed 2013. The entire system to control the temperature and umidify is completed of # 2 Daikin Mod VAM 150 FA 8VE, 16 Amp. Installed 2009. |
| 4 |
| AS02QU/AN |
| Rome |
| Villa Taverna |
| FC |
| # 3 Fan coils unit Carrier Mod. 39C075CV, and 2 Fan Coils unit Carrier Mod. Unknow. Installed in the wine cellar. |
| 5 |
| FC05QU/AN |
| Rome |
| Vatican Residence |
| PR |
| # 2 Pums for heating secondary system, Make KSB installed 2009, Vatican Residence boiler room |
| 2 |
| BP84SA/AN |
| Rome |
| Vatican Residence |
| PR |
| # 1 Circulating pump Make Grundfos for domestic hot water recirculating. At Vatican Embassy boiler room. |
| 1 |
| BP84SA/AN |
| Rome |
| Vatican Residence |
| TE |
| # 2 Expansion tanks lts 25 year 2006, # 2 safety valve year 2006, , installed at Vatican residence boiler room. |
| 2 |
| TE09AN |
| Rome |
| Vatican Residence |
| AC |
| # 1 AC system Make Dalchi HS 037 R22, installed 1994, at garden area served: AHU below sun porch for primary air in the veranda room. |
| 1 |
| AS02QU/AN |
| Rome |
| Vatican Residence |
| AH |
| # 1 AHU Make Delchi installed 1994 below the villa sun porch. Area served: Sun porch primary air. |
| 1 |
| AH17QU/AH16AN |
| Rome |
| Vatican residence |
| AFRN /BW |
| # 1 Natural Gas furnace wall mounted in the basement kitchen, Make Savio. for hot domestic water only. |
| 1 |
| BOCOND31MO/SA/AN |
| Rome |
| Vatican residence |
| AC |
| # 2 AC Split system Make Daikin Model FVXS50 FV 18, installed 2009, R410 area served: 1st floor bedroom and TV room at Vatican residence. |
| 2 |
| AS02QU/AN |
| Rome |
| Vatican Residence |
| AC |
| # 1 AC Split system Make Ariston Model A-HIMW10-OGX R410, area served: 1st floor small bedroom at Vatican residence |
| 1 |
| AS02QU/AN |
| Rome |
| Vatican Residence |
| AC |
| # 1 AC Split system Make Ariston Model A-IMW12 HOBX, R410 installed 2009 area served: Bedroom 2nd floor.At Vatican Residence |
| 1 |
| AS02QU/AN |
| Rome |
| Vatican Residence |
| AC |
| # 1 Package unit Make Clivet Model Elfo fresh CPAN- U 200, R410, Air purifier for the master bed room at 1st floor. Installed 2011 below the roof |
| 1 |
| AS02QU/AN |
| Rome |
| Vatican Residence |
| AC |
| # 1 Package Unit make Clivet, Model Elfo Fresh CPAN - U 650, Air purifier for various rooms at 1st and 2nd floor. Installed 2011 below the roof. |
| 1 |
| AS02QU/AN |
| Rome |
| Consulate |
| AH |
| # 2 AHU Make TRANE, model CC007 m³/h 2300 Veneto side and 1500 m³/h side upper parking lot.Installed 2012, Trane Sales Order 26K2256. Area served: Consulate Basement area public visa and Visa employees. |
| 2 |
| AH17QU/AH16AN |
| Rome |
| USUN Bldg |
| AC |
| # 2 AC Split Systems: # 1 Safe area at the UNUN Bsm Airwell 24000 BTU Model AWAY YAZ3. # 1 Security room Make Airwell, Model CGN17. The external units installed in the garden Via Boncompagni side. |
| 2 |
| AS02QU/AN |
| Rome |
| Mel Sembler Bldg |
| AC |
| # 1 AC Split system Make Mitsubishi Model MFZ - KA 50 VA2, BTU 18000, ceiling installation, the external unis is installed outside Via Friuli, installed 2012, with inverter and heat pump |
| 1 |
| AS02QU/AN |
| Rome |
| Villa Taverna |
| SO |
| # 1 Solar boiler for hot domestic water in the gardner's house, Make ARISTON Mod. MACC-CD@ 200 cylinder, 192 Liters.Installed 2013 |
| 1 |
| WH05QU |
| Rome |
| Villa Taverna |
| SO |
| # 1 Solar boiler for hot domestic water in the swimming pool restrooms. Installed 2012 |
| 1 |
| WH05QU |
| Rome |
| Mel Sembler Bldg |
| CH |
| # 1 Chiller AIR COOLED Make Trane, installed on MSB roof, area served: AHU installed in the ground floor for the gym area. CCGAM120SDOABA0, S.#X37608A6E,Cooling capacity kW 31,7, installed 2009 |
| 1 |
| CH14MO/SA/AN |
| Rome |
| Mel Sembler CAC |
| CH |
| # 1 Chiller air cooled Sanyo, MSB CAC Room at Sallustiana public entrance, area served: AHU for CAC Room. |
| 1 |
| CH14MO/SA/AN |
| Rome |
| Mel Sembler Bldg |
| AC |
| # 1 VFR System Make Sanyo Eco I W-2 way mult installed roof G06, # 9 indoor unit served room B02,B06,B07A,BO7,BO5,BO7B, west wing basement, Warehouse area. |
| 1 |
| AS02QU/AN |
| Rome |
| Mel Sembler Bldg |
| AC |
| # 1 AC Split unit 18000 BTU AIRWELL wall installation, the external unit is outside near ex garage , installed 2012 inverter and heat pump |
| 1 |
| AS02QU/AN |
| Rome |
| Mel Sembler Bldg |
| AH |
| # 1 AHU installed in the ceiling inside room G52 served primary air MULTIPURPOUSE AREA room G 55,G57,G59,G61,G62,G56,G58,G60 |
| 1 |
| AH17QU/AH16AN |
| Rome |
| Mel Sembler Bldg |
| AC |
| # 3 AC Split system make Daikin, 12000 BTU each, installed 2013, |
| 3 |
| AS02QU/AN |
| Rome |
| Mel Sembler Bldg |
| AH |
| # 1 AHU make Trane CCA18 26K1680 Gym Area |
| 1 |
| AH17QU/AH16AN |
| Rome |
| Mel Sembler CAC |
| AH |
| # 1 AHU make Trane VEDERE MODELLO area served CAC at sallustiana |
| 1 |
| AH17QU/AH16AN |
| Rome |
| Mel Sembler CAC |
| AFRN /BW |
| #1 Natural Gas Furnace wall mounted Make unknown area served: radiators for the entire annex |
| 1 |
| BOCOND31MO/SA/AN |
| Rome |
| Mel Sembler Bldg |
| AC |
| # 2 Units Make Emerson Model HPSC 12L000, PM/D1/31-33-35, Serial Number 11084880001 & 11084880002, External units installed in the inner courtyard and # 2 units ceiling mounted in the MSB mezzanine floor telephone switchroom. Installed 2012. |
| 2 |
| AS02QU/AN |
| Rome |
| Mel Sembler Bldg |
| AC |
| # 1 VRF System Make Panasonic, Mod. U8ME1e81, Serial # 6317500238, Cooling kW 5,54. Installed 2012, Area served: # 3 Split units installed in the Gym area, Ceiling mounted. |
| 1 |
| AS02QU/AN |
| Rome |
| Snack bar |
| HD |
| #1 Humidifier cylinder Make unknown three-phases installed in the mechanical room snack bar, area served AHU snack bar. |
| 1 |
| HD01SA |
| Rome |
| Embassy Chancery |
| HD |
| # 1 Humidifier Cylinder Make unknown three-phases installed at the Chancery basement floor, Area served AHU installed inside the false ceiling |
| 1 |
| HD01SA |
| Rome |
| Mel Sembler Bldg |
| AC |
| # 3 AC system Make Emerson Liberty Model Hiross S20VA0000202011PO, 18 Amp. Installed 2008, Area served: Server room at the MSB 2nd floor. Condenser installed on the MSB roof. |
| 3 |
| AS02QU/AN |
| Rome |
| Consulate |
| SP |
| # 1 Sump Pump installed at Consulate basement inside the electrical room |
| 1 |
| BP84SA/AN |
| Rome |
| Mel Sembler Bldg |
| SP |
| # 1 Sump Pump installed inside the elevator pits at the MSB twin elevator |
| 1 |
| BP84SA/AN |
| Rome |
| Embassy Chancery |
| SP |
| # 1 Sump Pump installed at the Chancery fire pump room. |
| 1 |
| BP84SA/AN |
| Rome |
| Villa Taverna |
| SP |
| # 1 Sump Pump installed at Villa Taverna wine cellar. |
| 1 |
| BP84SA/AN |
| Rome |
| Power Building |
| FN |
| # 2 Exhaust fan in the UPS battery room, and # 1 Supply fan Make Greenheck. # 1 Exhaust fan in the generator room. All in the power building. |
| 4 |
| FN34SA/AN |
| Rome |
| Embassy Cafeteria |
| FN |
| # 2 exhaust fan Make Vortice installed in the mechanical snack bar room, # 1 Exhaust fan installed in the mechanical room for the restroom snack bar, Make Technik |
| 3 |
| FN34SA/AN |
| Rome |
| Multiple use building |
| FN |
| # 2 exhaust fan installed inside the cryptoportico at multiple use garage. |
| 2 |
| FN34SA/AN |
| Rome |
| USUN Bldg |
| FN |
| # 2 Exhaust fan installed at the mechanical room Make Loren Cook Co, EF1 & EF2. # 1 Exhaust fan installed in the electrical room basement floor room B17B.# 1 installed in the boiler room |
| 3 |
| FN34SA/AN |
| Rome |
| Multiple use building |
| FN |
| #1 Exhaust fan installed at the restroom side motorpool, # 1 Exhaust fan installed corridor above ceiling,#1 exhaust fan installed in the garage shop area. |
| 2 |
| FN34SA/AN |
| Rome |
| Embassy Chancery |
| FN |
| # 1 exhaust fan installed at the Chancery round conference room at the ground floor Make Greenheck EF 5 |
| 1 |
| FN34SA/AN |
| Rome |
| Consulate |
| FN |
| # 1 Exhaust fan installed in the roof mechanical room, Make Systemair. # 1 Exhaust fan installed in the 2nd floor restroom 21 at Consulate Bldg |
| 2 |
| FN34SA/AN |
| Rome |
| Val di Sole Bldg |
| FN |
| # 2 exhaust fan installed in the garage at Val Di Sole residence Make Vortice. |
| 2 |
| FN34SA/AN |
| Rome |
| Mel Sembler Bldg |
| FN |
| # 1 exhaust fan installed in the generator room at Mel Sembler Bldg. Make Marelli Aeraulica |
| 1 |
| FN34SA/AN |
| Rome |
| Pinciana Bldg |
| FN |
| # 1 exhaust fan installed in the Apt 1 Kitchen make Dayton Electric. # 1 Exhaust fan installed in the boiler room Make Vortice. # 1 exhaust fan installed in the storage and water tanks room. At Pinciana residence |
| 3 |
| FN34SA/AN |
| Rome |
| Grazioli Buildings |
| FN |
| # 1 exhaust fan installed in the electrical room at Grazioli Bldg A. |
| 1 |
| FN34SA/AN |
| Rome |
| Villa Taverna |
| FN |
| # 1 exhaust fan installed in the Villa taverna switchgear building, Make Climaservice |
| 2 |
| FN34SA/AN |
| Rome |
| Villa Allegri |
| FN Radon |
| # 2 Exhaust fan installed on the roof, the system, sucks air from the interspace under the ground floor |
| 2 |
| FN34SA/AN |
| Rome |
| USUN CMR |
| FN Radon |
| # 1 Exhaust fan installed on the roof, the system, sucks air from the basement areas. |
| 1 |
| FN34SA/AN |
| Rome |
| Mel Sembler Bldg |
| FN |
| # 1 Exhaust fan installed in the MSB Fire pump room.Installed 2005, Make unkown |
| 1 |
| FN34SA/AN |