191N6025Q0006 - PR15356872 - Statement of Work SOW.xlsx

XLSX spreadsheet 59 KB Posted

Attached to
Supply and Installation of condenser coil for chillers at Consulate Office Building
Solicitation number
191N6025Q0006
Issued by

About this file

This Statement of Work (SOW) details a solicitation for supplying and installing condenser coils for chillers at the U.S. Consulate General in Chennai, India. The project requires procuring 12 post-coated microchannel condensing coils with specific technical specifications, including single-piece aluminum construction, 43 bar design working pressure, and precise dimensional requirements. The work involves replacing leaking condenser coils in two existing screw compressor chillers, which includes removing defective coils, installing new ones, completing pipe joints, conducting leak testing, charging refrigerant, and performance testing.

The solicitation (191N6025Q0006) is issued by the Department of State with a targeted completion in July 2025. Key procurement dates include a mandatory site visit on August 4, 2025, technical query deadline of August 6, 2025, and quote submission deadline of August 13, 2025. Vendors must be registered in the System for Award Management (SAM) if the order exceeds $30,000, have service support availability in Chennai, and submit quotes electronically to ChennaiProcurement@state.gov. Mandatory submission documents include the RFQ letter, vendor QA sheet, NDAA Compliance form, and Technical Evaluation form.

View the file

Other files

File Type Posted
Vendor NDAA Compliance Form.doc DOC document
191N6025Q0006 - PR15356872 - Vendor QA Sheet.pdf PDF
191N6025Q0006 - PR15356872 - RFQ Letter - CO Signed.pdf PDF
Annex B and Safety Requirements.doc DOC document
Technical Evaluation form (generic).doc DOC document
Clauses - Non-Commercial.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOW

CONSULATE GENERAL OF THE

UNITED STATES OF AMERICA

220 Anna Salai, Gemini Circle Chennai 600 006 191N6025Q0006 - PR15356872 - Excel Format to Quote - Supply and installation of Condenser coils for Chiller

PROJECT: Supplying and installtion of Condenser coils for Chiller

BOQ Date: Jul, 2025.
***Please submit your quote ONLY as per this format. Quotes submitted in any other format shall not be considered.
SL #Description of WorkUnitQTYRateAmountRemarks, if any

1 Supply of POST-COATED microchannel condensing coils for the screw compressor chiller plant in office building.

Each condenser coil should be a single piece all aluminum construction including headers, tubes, and fins to avoid galvanic corrosion. Coils and header to be braced as one piece.

The coils design working pressure should be 43 bar.

The total width of the coil to be 2198.9 mm maximum, the height of coil to be 1214.0 mm The width of fins should be 2029.1 mm Fin height 1214.0mm

LS12.000.00
21. Replace the leaking condenser coil in existing screw compressor chillers. This work includes removing the defective coils, install the new coils, completing the pipe joints, leak testing, gas charging and testing the chiller as required.

Replacement of Post coated MCHX coils for chiller 01 & 02 (12 coils)

2.Identify any leak in the existing coils, or any other damage or defects which may affect the performance of the coils or the chillers
3.Disconnect and remove the faulty coils, install new coils, complete the pipe connections with proper bracing.
4.Conduct leak test for all the newly installed coils, pipe joints and other system components to make sure no leaks to move forward.
5.Before charging the refrigerant, vacuum the system, make sure the vacuum is holding to required level and period and proceed to charge the refrigerant.
6.Start and test run the systems of the chiller, observe all the data like system pressure, temperature, compressor performance etc.,
7.Observe the performance of the chiller for a few more days, to make sure the chiller is working well with all the newly replaced condenser coils are performing well.LS1.000.00
Subtotal-A0.00
GST 18%-B0.00
A+B0.00
Duration for Project Completion (Mention No. of working days required)

Note: Qty Mentioned above are indicative

IMPORTANT POINTS:
1Please include any other additional requirement in the above table, as deemed necessary.
2If you notice any deviations between the SOW shared and BOQ, please raise during site inspection or submit questions in writing.
3Please include all applicable charges & provide clear price break-up in the quote.
4Please include brand/ make of product quoted, as applicable.
5Please include necessary remarks in the quote for the purpose of clarity.
6Necessary MS-Scaffoldings/ Suitable ladders to be provided for height above 1.5 meters
7Vendors need to take measurements at the time of site inspection
8The vendor should take extra care on the existing service and utility lines any damages caused during work progress to be rectified and handed over in its original state