SBU Document Notice V1.pdf
PDF 28 KB Posted
- Attached to
- Penstock #5 Amistad DB - Amistad Dam
- Solicitation number
- 191BWC24R0002
About this file
This document provides details for a federal contract opportunity with the International Boundary and Water Commission U.S.-Mexico. Solicitation number 191BWC24R0002 seeks the design and construction/repair of the irrigation and penstock gates in Amistad Dam's Penstock #5. Interested contractors must first complete the IBWC's nondisclosure agreement form and provide it to the contracting officer to obtain access to several secure but unclassified documents with specifications and drawings related to the dam and penstock. These documents will be made available to no more than two email addresses per contractor. Unsuccessful offerors must submit a release form for the nondisclosure agreement within seven days of notification. The response deadline and award date are not specified. The International Boundary and Water Commission U.S.-Mexico is the contracting agency.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 191BWC24R0002 - Amistad Penstock #5
The documents listed below will be made available to interested contractors once a IBWC Form 358
Nondisclosure Agreement has been completed and provided to the CO (philip.johnson@ibwc.gov). Access will be granted for no more than two email addresses per contractor.
All unsuccessful contractors must submit IBWC Form 358A-Nondisclosure Agreement Release within seven days of receiving notice of their unsuccessful offer.
AVAILABLE SBU DOCUMENTS
SBU_00_31_19_01_1-3-B-1_USACE_Amistad_Penstock_#5_Trip_Report_20190610.pdf
SBU_00_31_19_01_1-3-B-2_Amistad_Dam_Irrigation_Penstock_Gate_Study_200610_REDACTED.pdf
SBU_00_31_19_01_1-3-B-3_Opening_Gates_in_Penstock_4_19860506.pdf
SBU_00_31_19_01_1-3-C_Amistad_Specifications_Vol_II_UDA_65-3.pdf
SBU_00_31_19_01_1-3-C_Amistad_Specifications_Vol_I_UDA_65-3.pdf
SBU_00_31_19_01_1-3-E_Amistad_Dam_1971_O-M_Manual.pdf
SBU_00_31_19_01_Table_1_Penstock_5_Drawings_HS.pdf
SBU_01_55_00_01_1-6-C_Amistad_Dam_Structural_Analysis_of_Bridge_Deck_200601.pdf
Added with Amendment A0001
SBU_DC_0_00_1-17-G_Report_on_Control_Changes_to_Penstock_Gates_4_and_5_19701119.pdf
SBU_DC_0_00_1-17-G_Westinghouse_Class_11-210_Irrigation_Gate_Control_19660517.pdf
All forms are available at: www.ibwc.gov/resources-info/ mailto:philip.johnson@ibwc.gov https://www.ibwc.gov/resources-info/
File details come from the government source that posted it. Updated .