19-NPS-AVS-02 RFB Document.pdf
PDF 211 KB Posted
- Solicitation number
- RFP NVS 200000000791 3
- Issued by
- Wayne County, Michigan
About this file
Summary of Request for Bid Document
This is a Request for Bid (RFB) issued by Northville Public Schools in Northville, Michigan, for the procurement and installation of Audio/Video Systems across four school locations: Hillside Middle School, Meads Mill Middle School, Moraine Elementary School, and Thornton Creek Elementary School. The project encompasses the supply and installation of 4K displays, Crestron presentation systems, projection screens, WUXGA projectors, amplifiers, speakers, wireless microphone systems, HDBaseT cabling, and related audio/video components. A mandatory vendors' meeting is scheduled for January 30, 2020, at 9:00 AM EST at Hillside Middle School located at 775 North Center Street, Northville, Michigan 48167. Vendor questions must be submitted by February 4, 2020, at 12:00 PM, with answers provided by February 7, 2020, at 5:00 PM. Sealed bids are due February 20, 2020, at 2:00 PM at the Northville Public Schools Administration Building, Business Offices, 405 W. Main Street, Northville, Michigan 48167. The contract award is anticipated for March 10, 2020, with immediate installation and a completion deadline of August 16, 2020.
Proposals must include a 5 percent bid guarantee bond (90-day guarantee), complete bills of materials with line-item pricing and extended costs broken down by building, catalog cut sheets, warranty and service agreements, and a rough installation schedule. The successful vendor will be required to furnish both a Labor and Materials Bond and a Performance Bond valued at the full contract amount. All prices shall remain firm throughout the entire contract duration with no increases permitted. The vendor assumes all responsibility for a complete turnkey system installation and must maintain insurance including General Liability of $2,000,000, Automobile Liability of $2,000,000, and Workers' Compensation as required by the State of Michigan. The Owner will withhold 10 percent retainage until final payment, which follows completion of all vendor obligations. Warranty coverage must extend for a minimum of three years or the manufacturer's warranty, whichever is greater, from the date of acceptance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NORTHVILLE PUBLIC SCHOOLS REQUEST FOR BID
AUDIO/VIDEO SYSTEMS
NORTHVILLE, MICHIGAN W&H Project No: 19-NPS-AVS-02
Wright & Hunter, Inc. © 2020 1/24/2020
SECTION 1
PROJECT SUMMARY & TIMETABLE
1.0 SUMMARY
A. Northville Public Schools (the “Owner”) is soliciting proposals until 2:00 PM, February
20, 2020 for the purchase of Audio/Video Systems (AVS) for the following locations:
1. Hillside Middle School (HMS)
2. Meads Mill Middle School (MMMS)
3. Moraine Elementary School (MES)
4. Thornton Creek Elementary School (TCES)
B. All questions and correspondence concerning this Request for Bid (“RFB”) should be submitted to Brandon Julian at Wright & Hunter, Inc. Address all correspondence and questions to bjulian@wrighthunter.com.
C. Sealed bids will be received at the Owner’s office up until the time noted above.
D. The Owner reserves the right to accept or reject any and all proposals, or any part of any proposal, without penalty. The Owner may award a contract to a single prime Vendor for all elements for the entire project or may award any of the elements separately.
E. Vendors must submit a single proposal for all of the elements described in this section.
No proposal may be withdrawn after the scheduled closing time for the receipt of proposals for at least ninety (90) days.
F. The formal proposals to be received will be evaluated by several criteria including but not limited to cost, concurrence with technical specifications and requirements, with priority on a timely installation schedule.
1.1 INTRODUCTION
A. The intent of this RFB is to secure under contract, all labor, materials, equipment and services of every kind necessary for the proper installation and maintenance of AVS in accordance with the technical specifications included in this RFB and ANSI/TIA/EIA- 568B.1 through ANSI/TIA/EIA-568B.3.
B. This RFB solicits proposals for AVS to meet the current and projected needs of the
Owner.
1.2 STATEMENT OF PURPOSE
A. This RFB solicits proposals for the following major elements as detailed in the specifications section.
1. 4K Displays and mounting hardware
2. Crestron Presentation Systems, Touch Screens, and Programming
3. Projection Screens and related hardware
4. WUXGA Projectors
5. AVS cabinets and related hardware
6. Amplifiers, speakers, sound systems
7. Display Controls
8. HDBaseT cabling, HDMI cabling, Speaker cabling
9. HDBaseT/HDMI Media Extenders
10. Custom faceplates, and related components
11. Visual Presentation Systems and devices
12. Wireless Microphone Systems
13. Provide system testing, documentation, and system warranty.
14. Provide all equipment materials, labor, and services, not specifically mentioned or shown, which may be necessary to complete or perfect all parts of the installation.
Ensure that all components are in compliance with the requirements stated or reasonably inferred by the contract documents.
1.3 TIMETABLE
A. The anticipated timetable of key dates for this RFB are as follows:
RFB Available for Vendors January 24, 2020
Vendor Meeting January 30, 2020 at 9:00 AM
Vendor Questions Due February 4, 2020 by 12:00 PM
Answers Due February 7, 2020 by 5:00 PM
Bids Due February 20, 2020 at 2:00 PM
Award to Vendor March 10, 2020
Start Installation Immediate
Completion Date August 16, 2020
1.4 VENDORS’ MEETING
A. There will be a Vendor’s meeting on January 30, 2020 at 9:00 AM EST. The meeting will be held at Hillside Middle School, located at 775 North Center Street, Northville, Michigan, 48167. Attendance is strongly encouraged.
1.5 FAMILIAL RELATIONSHIP DISCLOSURE STATEMENT
A. As required by Public Act 232 of 2004, all bids shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the owner or any employee of the Vendor and any member of the Northville Public Schools board, or the superintendent of the school district.
B. The Owner will NOT accept a bid that does not include this sworn and notarized disclosure statement at the time of the bid opening.
1.6 IRAN ECONOMICS SANCTIONS ACT
A. As required by the Iran Economic Sanctions Act, Public Act 517 of 2012, all bids shall be accompanied by a sworn and notarized statement certifying that the Contractor is not an “Iran linked business” within the meaning of Act.
B. The Owner will NOT accept a bid that does not include this sworn and notarized disclosure statement at the time of the bid opening.
SECTION 2
VENDOR INFORMATION & PROPOSAL PROCEDURES
2.0 VENDOR RESPONSIBILITY
A. At the time of the bid opening, each Vendor shall have examined the premises and sites to compare them with the contract drawings and specifications.
B. Failure or omission of any Vendor to examine any form, instrument or document shall in no way relieve any Vendor from any obligation with respect to their proposal. No allowances or extra payment will be made to a Vendor for failure to comply with the provisions of this section, or by reason of error or oversight on the part of the Vendor.
C. It is understood, and the Vendor hereby agrees, that it shall be solely responsible for all equipment and/or services that it proposes. Notwithstanding the details presented in these specifications, it is the responsibility of the Vendor to verify the completeness of the equipment required and its suitability to meet the intent of this proposal. Each system proposed shall be for a complete turnkey system.
D. The Owner reserves the right to withdraw this RFB at any time or to reject any or all proposals submitted in response to this RFB, without penalty. The Owner further reserves the right to select a single Vendor as a prime for the entire project or for only portions of it. The Owner also reserves the right to accept or reject any part of any proposal and to accept or reject any or all proposals without penalty. The Owner will be the sole judge of its needs and of the best elements of a proposal to meet those needs and shall award to the lowest responsible bidder as required by law. The Owner’s decision is final.
E. Proposals containing terms and conditions different from this section of the RFB may be rejected.
2.1 CONTRACT LIABILITY
A. The Vendor will be required to assume responsibility for all contractual activities offered in this proposal whether or not the Vendor performs them. Further, the Owner will consider the Vendor to be the sole point-of-contact with regard to contractual matters, including payment of any or all charges resulting from the anticipated contract. If any part of the work or component of the proposed configuration is to be subcontracted, responses to this RFB must include a list of subcontractors, including firm name and address, contact person, complete description of work to be subcontracted or component to be provided and descriptive information concerning subcontractor's organizational abilities.
B. The Owner reserves the right to approve subcontractors for this project and to require the Vendor to replace subcontractors found to be unacceptable. The Vendor is totally responsible for adherence by the subcontractor to all provisions of the contract. All contract clauses between the Owner and the Vendor shall also apply to any contract between the selected Vendor and subcontractor(s).
2.2 PROPOSAL MODIFICATIONS
A. Any explanations or statements, which the Vendor wishes to make, must be written on or attached to the proposal. Unless indicated, it is understood that the proposal is in strict accordance with all requirements and specifications. The Technology Designer and/or the Owner may request additional information to clarify the Vendor’s response, to verify responsiveness to mandatory specifications, or to facilitate the fair comparison of competing bid responses.
B. Proposals shall be deemed final, conclusive and irrevocable. No proposal shall be subject to correction or amendment for any error or miscalculation unless unit prices for the additional or missing item(s) are included on the Bid Form. Submitted bids may be adjusted by unit prices up or down to ensure all bids submitted are compliant and compared fairly. Proposal prices shall provide for a complete turnkey system as specified. Installation shall include, but is not limited to, all labor required for a turnkey system.
2.3 DISCREPANCIES, OMISSIONS AND INTERPRETATIONS
A. Vendors shall promptly notify Wright & Hunter (the “Technology Designer”) of any ambiguities, inconsistencies or errors, which it may discover upon examination of the RFB, the Bid Form, Drawings, AIA documents, purchase orders generated by the Owner, any addenda to the aforementioned documents and all other documents pertaining to the AVS (the “Contract Documents”) or of the site and local conditions. A Vendor requesting clarification or interpretation of the bid documents shall make a written request no later than February 4, 2020 by 12:00 PM. E-mail all questions to:
Brandon Julian Email: bjulian@wrighthunter.com
B. All questions and answers will be shared with all Vendors.
C. If prior to the date fixed for submission of proposals, a Vendor fails to notify the
Technology Designer of a known error in the RFB or of an error that reasonably should have been known to the Vendor and if a contract is awarded to the Vendor, the Vendor shall not be entitled to additional compensation or time, by reason of the error or its later correction.
D. In the event it becomes necessary to provide additional clarifying data or information, or to revise any part of this RFB, supplements or revisions will be provided to all known recipients of the initial RFB.
E. Failure to acknowledge receipt of supplements or revisions, in accordance with the instructions contained in the supplement or revision, may result in proposals not being considered. Each Vendor's proposal shall stipulate that it is predicated upon all the terms and conditions of the RFB and any supplements or revisions thereto. The submission of a proposal is an acknowledgment to comply with all terms of the RFB, the form of Contract and any other contract document, except and only to the extent that the Vendor provides an express objection to a provision or provisions in writing, attached as a separate document along with its proposal, and specifically identifying the objection and providing a proposed alternative thereto. In the absence of the foregoing, the Vendor shall be deemed to have agreed to all stated terms.
2.4 WITHDRAWAL OF PROPOSALS
A. Proposals may be withdrawn, modified and resubmitted at any time prior to the time set for the receipt of proposals. The Vendor may not withdraw its proposal prices during the ninety (90) day period immediately following the proposal bid opening. All proposals and proposal prices shall be guaranteed for that period of time.
B. When the selected Vendor(s) (the “Vendor”) receives the notice of award from the
Owner within the above ninety (90) day period, it shall guarantee the prices through the interval required to execute the Vendor's Bond.
2.5 ACCEPTANCE OF PROPOSAL
A. The Contract Documents shall include all bidding requirements and specifications, the terms of this RFB, the form of Contract, approved project specifications and approved project manual. Except as to any specific objection as required by Paragraph 2.3(E) above, all of the foregoing, as well as the accepted portions of the Vendor's proposal shall become contractual obligations of the Vendor upon award by the Board of Education. Failure of the successful Vendor to accept these obligations in a contractual agreement may result in cancellation of the award and this RFB, forfeiture of the entire bid bond, and any additional damages incurred by the Owner. If the terms, conditions or assumptions included in the Vendor’s proposal or response to this RFB differ from the Contract Documents, the terms and conditions that are most favorable to the Owner, as determined in the Owner's sole discretion, shall be binding.
2.6 SYSTEM ACCEPTANCE
A. Payment will be made only to the successful Vendor for services properly performed under the contract. The Owner will withhold retainage of 10% until final payment, which will follow the Vendor's fulfillment of all obligations.
2.7 INSPECTION OF WORK AND ACCEPTANCE TESTS
A. The Vendor shall at all times, permit and facilitate inspection of the work by the
Technology Designer and by public authorities having jurisdiction. The Technology Designer shall have the authority to stop the work, if necessary, to insure its proper execution. Tests will be performed and documented by the installing Vendor and turned over to the Owner as part of the "as-built" drawings at the time of completion. Deviations and/or corrections to the installation will be completed within ten (10) working days.
2.8 REQUIRED BONDS
A. At the time bids are submitted, Vendors are required to submit a ninety (90) day Bid Guarantee Bond (5% of the total dollar amount).
B. The successful Vendor will be required to furnish a Labor and Materials Bond valued at the full amount of the contract at the time the contract is awarded for all labor and materials to be contracted.
C. The successful Vendor will be required to furnish a Performance Bond valued at the full amount of the contract at the time the contract is awarded.
2.9 INSURANCE
A. The Vendor shall purchase and maintain insurance for protection from the claims set forth below which may arise out of or result from the Vendor's operations under the Contract, whether such operations be by the Vendor or Subcontractor, or by anyone directly employed by any of them:
1. Claims under workers or workmen's compensation, disability benefits and other similar employee benefit acts;
2. Claims for damages because of bodily injury, occupational sickness or disease, or death of the Vendor's employees;
3. Claims for damages because of bodily injury, sickness or disease, or death of any person other than the Vendor's employees;
4. Claims for damages insured by usual personal injury liability coverage, which are sustained by any person as a result of an offense directly, related to the employment of such person by the Vendor;
5. Claims for damages, other than to the work itself, because of injury to or destruction of tangible property, including loss of use resulting therefrom; and
6. Claims for damages because of bodily injury or death of any person or property damage arising out of the maintenance or use of any motor vehicle. The insurance required shall be written in the following minimum limits:
• General Liability: $2,000,000
Including personal injury and property damage $2,000,000 each aggregate
• Automobile Liability: $2,000,000
• Workers’ Compensation:
As required by the State of Michigan
• Employers’ Liability: $2,000,000
B. Certificates shall name the Owner as additional insured.
C. The Vendor's insurance shall either be (I) occurrence-based and in effect from the commencement of work and for 18 months following final completion of the work, or (ii) claims-based and in effect from the commencement of work and in effect for 6 years following final completion of the work.
2.10 QUANTITIES
A. It is understood and agreed that the Owner reserves the right to either increase or decrease quantities and to buy additional services under the terms of any contract resulting from this bid, so long as in accordance with law.
2.11 PRICES
A. Purchase prices shall remain firm throughout the entire contract.
B. The Vendor must use the Bid Form included with this RFB. If additional pages are necessary, they must be in the same format as the original.
C. Any rebates applied in response to this RFB must be applied to line item pricing, and not be included as one lump sum.
2.12 ALTERNATIVES
A. All bid proposals must be based upon the specifications included in this RFB. In addition to a base bid proposal, the submission of voluntary alternatives is acceptable.
The base bid must conform to the materials, labor and terminations established by the bid specifications in this document. The Vendor must bid the base bid to be eligible to bid an alternative. Each Vendor must identify in their response any deviations to the scope of work and any construction requirements not addressed.
2.13 CERTIFICATION OF INDEPENDENT PRICE DETERMINATION
A. By submission of this proposal, the Vendor certifies, and in the case of a joint proposal, each party thereto certifies as to its own organization, that in connection with this procurement:
1. The prices in this proposal have been arrived at independently, without consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices with any other Vendor or with any competitor.
2. Unless otherwise required by law, the prices, which have been quoted in this proposal, have not been knowingly disclosed by any Vendor and will not knowingly be disclosed by the Vendor prior to procurement or prior to award in the case of a negotiated procurement, directly or indirectly to any other Vendor or to any competitor.
3. No attempt has been made or will be made by the Vendor to induce any other person or firm to submit or not to submit a proposal for the purpose of restricting competition.
B. Each person signing this proposal certifies that:
1. He/she is the person in the Vendor's organization responsible within that organization for the decision as to the prices being offered herein.
2. He/she is not the person in the Vendor's organization responsible within that organization for the decision as to the prices being offered herein, but that he/she has been authorized in writing to act as agent for the persons responsible for such decision.
C. By submission of Vendor’s proposal to this project, the Vendor certifies, and in the case of a joint proposal, each party thereto certifies as to its own organization, that in connection with this procurement: the that no relationship exists between the Vendor and the procuring or contracting agency that interferes with fair competition or is in conflict of interest, and no relationship exists between the Vendor and another person or organization that constitutes a conflict-of-interest that is adverse to the Owner.
2.14 PROPRIETARY INFORMATION
A. This is a public bid. Information submitted in response to this RFB is subject to Freedom of Information Act requests and to be viewed by any interested party by request. Any bids identified in whole or in part as proprietary will be disqualified.
B. Unless specifically excluded from this provision, all data, documentation and innovations resulting from contractual services will become the property of the Owner. Data contained in the proposal and all documentation provided as a result of these contractual services cannot be copyrighted and innovations developed as a result of these contractual services cannot be copyrighted or patented. Proposals must clearly specify any data, documentation, software, or other innovations that are proposed to be excluded from this provision and specifically provide, where applicable, for licensing of these materials to the Owner for the life of the system.
2.15 NONCOMPLIANCE
A. Failure to include in the Vendor's proposal all information requested in this RFB may be cause for rejection of the proposal. When responding to this RFB, please clearly state whether your firm complies with each section.
2.16 COST LIABILITY
A. The Owner assumes no responsibility or liability for costs incurred by the Vendor prior to the signing of any Contract resulting from this Request.
PROPOSAL PROCEDURES
2.17 SEALED BID RECEIPT
A. PROPOSALS MUST BE RECEIVED AND TIME STAMPED AT THE NORTHVILLE
PUBLIC SCHOOLS, ADMINISTRATION BUILDING, BUSINESS OFFICES, 405 W.
MAIN STREET, NORTHVILLE, MICHIGAN 48167 ON OR BEFORE THE DUE DATE
AND TIME SPECIFIED. VENDORS ARE RESPONSIBLE FOR TIMELY RECEIPT OF
THEIR PROPOSAL. PROPOSALS WHICH ARE RECEIVED AFTER THE SPECIFIED
DUE DATE AND TIME WILL NOT BE CONSIDERED.
B. The Owner is soliciting proposals until 2:00 PM (EST) on February 20, 2020. Sealed bids will be received at the Northville Public School’s Business Offices, located at 405 W. Main Street Northville, MI 48167 up to this time at which time they will be publicly opened and read aloud at a public meeting.
C. The original, plus two (2) hard copies, and one (1) full electronic copy of the Vendor's proposal must be delivered in sealed package(s). All packages shall be clearly labeled with the following information:
1. Michael Zopf, Assistant Superintendent
Northville Public Schools 405 W. Main Street Northville, Michigan 48167
2. Vendor's Name and Address
3. Project Title: Audio/Video Systems - 19-NPS-AVS-02
4. Proposal Due Date
2.18 BID PROPOSAL REQUIREMENTS
A. Provide the following information as required under each tab, assembled in three (3) ring binders complete with Table of Contents. All pages shall have page numbers, which shall be included in the Table of Contents.
B. The Table of Contents shall be as follows:
1. Tab No. 1 Required Forms: Bid Bond, Familial and Iran Forms
2. Tab No. 2 Bid Proposal Form, District Totals, Mandatory Alternates and
Voluntary Alternates (use electronic forms provided)
3. Tab No. 3 Bill of Materials and Break-Down by Building (use electronic forms provided)
4. Tab No. 4 Catalog Cut Sheets for Base Bid, Mandatory and Voluntary Alternates
5. Tab No. 5 Cover Letter, References and Rough Schedule
6. Tab No. 6 Warranty, Maintenance and Service Agreements
7. Tab No. 7 Audio/Video Systems
8. Tab No. 8 Company Information
C. Description of Contents:
1. Tab No. 1, Required Forms include a Bid Bond, Familial Relationship Disclosure
Statement and Iran Economic Sanctions Form. Forms must be fully executed and include a bid bond, if required. To be considered a qualified bid, all three forms must be fully executed and included with the bid response.
2. Tab No. 2, Bid Proposal Form, shall include a completed bid proposal form and
District totals for the project (use electronic forms provided– Bid Form and District Totals spreadsheet).
a. Mandatory Alternates shall include a complete bill of materials (use electronic forms provided – Mandatory Alternate tab on the Bill of Materials spreadsheet) and any of the following that are applicable: footage, operating characteristics, physical characteristics, equipment configuration for each of the systems.
b. Voluntary Alternates are optional and made available to permit all Vendors to submit alternates to the bid documents. These voluntary alternates shall clearly define the intent of the alternate, cost impact to implement the alternates, and a description of the deviation in functions and features between the alternates and the base bid documents. Include a complete bill of materials (use electronic forms provided - Voluntary Alternate Tab on the Bill of Materials spreadsheet).
3. Tab No. 3, Bill of Materials and Break-Down by Building (use electronic forms provided – Bill of Materials and By Building Tabs on the Bill of Materials spreadsheet – create a separate sheet for each Building), shall include a complete bill of materials depicting quantities, manufacturer, catalog number, complete description, material unit price, labor cost breakdown and extended price.
4. Tab No. 4, Catalog cutsheets for Base Bid, Mandatory and Voluntary Alternates.
5. Tab No. 5, Cover Letter shall include an executive overview of the project and depict the Vendor’s complete understanding of the project, include any clarifications and/or qualifications. References and a rough schedule that illustrates major milestones required to achieve the completion dates specified in the RFB should also be included under this tab. Typical milestone events include (Vendors can include contingencies that will affect their timelines):
a. Approximate equipment order and delivery dates.
b. Estimated installation dates by location.
c. Installation completion date by site.
d. Estimated final test dates.
e. Estimated training dates.
f. Provide an estimate of anticipated manpower required at each building to meet the specified completion dates in the RFB.
6. Tab No. 6, Warranty information and sample maintenance and service contracts.
Include current service rates, trip charge rates and any additional charges that may apply
7. Tab No. 7, Audio/Video Systems, shall include the following information:
a. Description of system operation.
b. System configuration.
c. List of clients of similar size and type with contact information.
d. Number of years providing and installing similar equipment in schools.
e. Manufacturer’s names.
f. List of subcontractors that will or may be utilized on this project.
8. Tab 8, Company information, shall provide information about the prime Vendor, any subcontractors, major suppliers, trainers, project managers, superintendents and service staff that will be involved with the project. Contact and escalation information on the project team will be required by the successful vendor upon award of the project.
SECTION 3
CONTRACT REQUIREMENTS
3.0 GENERAL
A. A form of contract is attached to this RFB and shall be binding on each proposing Vendor except and to the extent set forth in Paragraph 2.3(E). It is acknowledged that the form of contract incorporates by reference the terms of this RFB and, in the event of any conflict among the contract documents; the provision most beneficial to the Owner shall govern. Notwithstanding the foregoing, the Owner reserves the right in its sole discretion to negotiate any term of the Contract prior to contract award so long as any negotiated term does not affect the propriety of the competitive bidding process. While not limiting the breadth of the form of contract's incorporation of the RFB, the following are all required contractual provisions:
3.1 LAWS AND PERMITS
A. The Vendor shall comply with all federal, state and municipal laws, rules, regulations, ordinances, or orders governing or affecting in any way the work under this contract, including board of education policies. Also, the Vendor shall give all notices and obtain all permits necessary and required for this work and shall pay all costs and fees for the same. The Vendor must furnish copies of all approved inspection certificates and approvals from authorities having jurisdiction within thirty (30) days of completion and acceptance of work as evidenced by applicable acceptance documents.
B. Where appropriate, all equipment and installation workmanship shall comply with specifications contained in Electronics Industries Association Standards and the National Electrical Code. As pertinent, all equipment shall be FCC-certified, FCC type accepted and/or UL listed. All work shall be conducted according to the standards of good engineering practice.
3.2 PROTECTION OF PERSONS AND OTHER STRUCTURES
A. The Vendor agrees to exercise special precautions to avoid damage to facilities of the Owner and others. The Vendor hereby assumes responsibility for any and all damage to such facilities arising out of or caused by the conduct or property of the Vendor, whether by the negligence of the Vendor, its agents or employees. The Vendor shall make an immediate report to the Owner and the Technology Designer of any damage to the facilities or others. The Vendor hereby agrees to repair or replace at their own expense or to reimburse the Owner for expenses incurred by the Vendor in making necessary repairs and replacements.
B. The Vendor shall assume all responsibility for bodily injury to persons, including death or damages sustained or claimed by its employees, the employees of the Owner, or by any other person, and also for damage to property, including property of the Vendor, the Owner or any other person; and also, for any interruptions to electric or community antenna television or other communications service which may occur or allegedly occur because of, or result from, or in any manner are connected with, or directly or indirectly, arise out of or are caused in whole or in part by the material provided or the work performed by the Vendor, its agents or employees under this agreement.
C. The Vendor shall assume all responsibility for and shall indemnify and hold the Owner harmless from and against all losses, liabilities, claims, demands, payments, actions, legal proceedings, recoveries, costs, expenses, attorney fees, settlements, judgments, orders and decrees of every nature and description brought or recovered against, or incurred by the Vendor, the Owner, or both of them, by reason of any such bodily injury to person, damage to property, or interruptions to service caused by the Vendor, its agents or employees. Notwithstanding the foregoing, the Vendor shall not be required to indemnify the Owner against liability for damages arising out of bodily injury to persons, damage to property, or interruptions to service caused by or resulting from the negligence of the Owner, its agents or employees. The Vendor's indemnification obligation shall be limited to, but shall fully include, the degree of all fault for which it is responsible.
3.3 SAFETY
A. Each Vendor shall be responsible for its own safety and hazard program. Each program shall be in accordance with provisions of the Occupational Safety and Health Act (OSHA), Michigan OSHA (MIOSHA), the Environmental Protection Agency (EPA), and the Material Safety Data Sheets (MSDS). The Vendor shall maintain an effective safety program and conform to all federal and local safety codes. Upon written request by the Owner and/or the Project Manager, the Vendor shall provide the registered programs documenting safety and hazard programs.
B. During projects in construction zones or if site conditions require, the Vendor and all of his/her staff, agents and/or subcontractors must wear Vendor provided hard hats anytime they are onsite. The Vendor shall assume sole responsibility and liability for hat usage of his/her staff, agents and/or subcontractors.
3.4 IMPLEMENTATION PLAN
A. The successful Vendor must prepare and submit a final implementation plan and timeline as part of the final Contract Documents. The Vendor and the Owner will mutually determine the critical dates that must be met, so long as consistent with the then-applicable Project Schedule. The Vendor will be required to adhere to, meet and maintain activities to the timeline schedule as planned. The Vendor will also be required to be flexible towards changes in the priorities of the timeline schedule during the entire project and will make all related changes at no additional cost to the Owner.
3.5 ADDITIONAL RESOURCE REQUIREMENTS
A. If the Vendor fails to complete the project or a segment of the project within the time period agreed to in the Contract Documents, and if as a result, the Owner finds it necessary to incur any additional costs and/or expenses (for example, needing to hire additional Vendors to complete work which is not being completed in a timely or satisfactory manner), the Vendor shall pay all those costs and expenses incurred by the Owner. These costs and expenses may include, but are not limited to, such items as additional hours spent by the Technology Designer, additional architectural fees and fees related to the acquisition of additional Vendors to complete the job. These costs and expenses may be retained by the Owner from any payments otherwise due to the Vendor for work, which has not been completed within the terms of the Contract Documents. The Owner may hire additional Vendors if seven (7) day notice has been given to the Vendor and the Vendor has failed to remedy the failure, to act in accordance with the notice, or has repudiated the contract. Failure by the Vendor to give adequate assurances when deadlines on the timeline have not been met will also result in the Owner’s right to bring in other Vendors to complete the contract or a segment of the contract.
3.6 CLEAN-UP AND MAINTENANCE
A. During preparation and construction, the project area must be kept free from scrap and debris in accordance with established safety and health standards. Upon completion of work, each day and at the end of the project, the Vendor will be held responsible to clean up and remove debris from the site. Damage to any portion of equipment or existing structure is the responsibility of the Vendor and repairs must be completed before acceptance and final payment is issued.
3.7 PAYMENT FOR SERVICES
A. No later than two (2) weeks prior to the date of the first application for payment, the Vendor shall furnish the Owner with a breakdown of the contract amount setting forth the schedule of values of labor and materials of the various parts of the work on which this contract is based as detailed from the specifications or as further directed by the Owner.
A meeting between the Technology Designer and the Vendor shall also be required before the first application for payment is submitted to set forth the procedure and format in which all applications are to be submitted. Final payment will be made only after the successful completion of a performance-testing period, the Owner’s acceptance of the system and final documentation has been received and approved by the Technology Designer and the Owner.
B. Final payment by the Owner to the Vendor shall be made within thirty (30) days of final completion, Owner acceptance of the system as installed and receipt and approval of final documentation by the Technology Designer and the Owner.
C. Ten percent (10%) of the total contract amount will be withheld and will not be paid until after final acceptance, which includes submission and approval by the Owner and the Technology Designer of all work, testing results, documentation and as-built drawings (see Section 4.37 Owner’s Right to Use).
3.8 CONTRACT PAYMENT SCHEDULE
A. The Vendor shall pay all sales, consumers, use and any and all other applicable taxes required by law.
B. The Technology Designer will review and certify the accuracy of invoices for the Owner's subsequent review, approval and payment. Certification by the Technology Designer that the invoice is an accurate account of work properly performed does not prevent the Owner from disputing the propriety of any applicable payment. Any questions regarding the payment process should be directed to Corey Greenfield at (248) 594-5850 or by e-mail at cgreenfield@wrighthunter.com. All invoices and requests for payment should be sent directly to the Technology Designer at the following address:
Wright & Hunter, Inc.
Attn: Corey Greenfield 818 West 11 Mile Road Royal Oak, MI 48067 mailto:cgreenfield@wrighthunter.com mailto:cgreenfield@wrighthunter.com
C. Rates quoted in response to this request are firm for the duration of the proposed contract phase. No increases will be permitted. Any requests for modification to the original design and/or scope of work must be approved in writing by the Owner prior to any modification.
D. Each Application for Payment shall be consistent with previous applications and payments as certified by the Technology Designer and paid for by the Owner.
1. The Application for Payment at time of Substantial Completion and the final Application for Payment involve additional requirements.
E. Payment Application Times: The date for each progress payment is the 15th day of each month. The period of construction Work covered by each Application for Payment is the period ending fifteen (15) days prior to the date for each progress payment and starting the day following the end of the preceding period.
F. Payment Application Forms: Use AIA Document G 702 and Continuation Sheets G 703 as the form for Application for Payment.
G. If the bid involves more than one project, each project shall have separate payment application forms. The Technology Designer will identify each project.
H. Application Preparation: Complete every entry on the form, including notarization and execution by the person authorized to sign legal documents on behalf of the Vendor.
Incomplete applications will be returned without action.
1. Include amounts of Change Orders and Construction Change Directives issued prior to the last day of the construction period covered by the application.
I. Transmittal: Submit three (3) executed copies of each Application for Payment to the Technology Designer. One copy shall include waivers of lien, proof of items stored, proof of insurance for stored items and similar attachments, when required.
J. Waivers of Mechanics Lien: With each Application for Payment, submit waivers of mechanics lien from every entity who may lawfully be entitled to file a mechanics lien arising out of the Contract, and related to the Work covered by the payment. The Vendor acknowledges that liens cannot be placed on public property and are therefore inapplicable to this project.
K. Application for Payment at Substantial Completion: Actions and submittals that shall proceed or coincide with this application include:
1. As built drawings (should be received by the Technology Consultant Once Vendor states the Project is complete – before punch list has been issued to the Vendor).
2. Warranties (guarantees) and maintenance agreements.
3. Test/adjust/balance reports.
4. Maintenance instructions.
5. Start-up performance reports.
6. Final cleaning.
7. Application for reduction of retainage, and consent of surety.
8. Punch list of incomplete Work.
L. Final Payment Application: Actions and submittals that shall precede or coincide with this application include:
1. Completion of Project closeout requirements.
2. Completion of items specified for completion after Substantial Completion.
3. Transmittal of required Project construction records to the Owner.
4. Proof that taxes, fees and similar obligations have been paid.
5. Removal of surplus materials, rubbish and similar elements.
3.9 VENDOR'S SWORN STATEMENT AND WAIVER OF LIEN
A. The Vendor's sworn statement and waiver of lien shall be submitted with the invoice.
The Vendor must state all subcontractors and status of payment for labor and materials to each. Payment will not be processed until these forms have been received.
3.10 INTERRUPTION OF OCCUPANCY
A. The installation must not interrupt the normal activity of the Owner. All work which will cause disruption of the Owner’s existing systems and services must be accomplished during time periods when it is least inconvenient to the Owner and completed in the shortest possible time frame (i.e. after normal school hours). The Owner is not responsible for any overtime and/or premium time not identified in the Vendor’s base bid pricing response.
B. Each Vendor is responsible to plan, coordinate and execute their work in such a manner that there will be no disruption of the Owner’s operations. If an interruption of operations is unavoidable, the work will be scheduled with the Owner prior to beginning such work.
3.11 REJECTING DEFECTIVE WORK
A. The Technology Designer and/or the Owner will have the authority to disapprove or reject work, which is defective, unsatisfactory, faulty, does not conform to the requirements of the Contract Documents or does not meet the manufacturers’ requirements. The Technology Designer and/or the Owner will also have the authority to require special inspection or testing of the work whether or not the work is fabricated, installed or completed.
3.12 SPECIFICATION DEVIATION
A. Commodities procured under these specifications shall not deviate from those originally contracted for without written approval from the Owner and so long as consistent with law.
B. The Owner has sole responsibility for the interpretation of all documents. Any claims and/or disputes associated with and/or arising from this RFB must be submitted in writing and directed to the Owner within thirty (30) days of dispute and/or claim.
3.13 EXECUTED CONTRACT TO CONSTITUTE ENTIRE AGREEMENT
A. All contracts for work herein are subject to all existing and applicable provisions for the payment of prevailing rate of wages to laborers, workmen and mechanics engaged in the work.
B. Except as set forth in Paragraph 3.13(C) below, the contents of the Contract Documents of the successful Vendor shall be contractual obligations upon bid acceptance. Failure of the successful Vendor to accept these obligations in a contractual agreement may result in a cancellation of award and forfeiture of bid bond.
C. The Owner reserves the right to negotiate provisions in addition to those stipulated in this RFB or proposed by the successful Vendor for the purpose of obtaining the best possible offer. If the Vendor should discover any provisions in the contract that are contrary to or inconsistent with the law, ordinance, order or decree, the Vendor shall immediately report it to the Owner in writing.
3.14 CONTRACT SUSPENSION, TERMINATION AND CANCELLATION
A. The Owner may cancel the contract effective as a result of this RFB in whole or in part as follows:
1. By mutual agreement of the contracting parties. Upon such termination, the Owner’s liability shall be limited to the reasonable value of services performed and deemed acceptable by the Owner upon the date of such mutual agreement.
2. If the Owner deems that such termination is in its best interest. In the event that the Owner gives notice to terminate pursuant to this subsection, such notice shall be given no less than thirty (30) days prior to the date on which the termination becomes effective. Upon such termination, the Owner’s liability shall be limited to the reasonable value of services performed and deemed acceptable by the Owner as of the effective date of the termination.
3. For cause, which shall include, but is not necessarily limited to, failure or unwillingness of the Vendor to comply with the approved program, including attached conditions; failure to comply with applicable state statutes or other applicable laws or policies; or failure to comply with such directives as may become generally applicable at the time; refusing/failing to provide enough properly skilled workers to timely complete the work; failing to pay subcontractors and suppliers; failing to prosecute the work with diligence; and breaching any term of the Contract.
4. Due to lack of appropriation of necessary funding, cancellation due to lack of appropriation shall be without penalty. Upon such cancellation, the Owner’s liability shall be limited to the reasonable value of services performed and deemed acceptable by the Owner as of the effective date of cancellation.
B. The Contract may only be modified by: (i) mutual written agreement of the parties, (ii) a properly-executed change order, signed by the Vendor, Owner and Technology Designer describing the additional/different work, price and time frame for performance, and (iii) a construction change directive issued by the Owner, for which the Vendor must commence prosecution of the work promptly (but no less than 10 days) and any modification to contract price or time will be later determined. In the event the parties cannot mutually agree to an adjustment in price or time for a construction change directive, the Technology Designer shall have the right and authority to determine same.
If the Vendor objects to such determination, it may file a claim in accordance with the Contract. Rejection by the Vendor of any construction change directive may be the basis of contract suspension, termination or cancellation.
C. No cancellation will affect any expenditures or legally binding commitments made prior to receiving notice of the cancellation, suspension or termination provided such expenditures or commitments were made in good faith and not in anticipation of cancellation and are otherwise allowable.
D. Upon execution of the Contract, the Owner shall be deemed the owner of all materials and equipment actually incorporated into or purchased for the project, as well as the owner of all documentation used with respect to same. In the event of cancellation prior to the full term of the contract, the Vendor shall arrange to provide the Owner with all work documents, computer programs and files used/developed by the Vendor during the period the contract was effective. The title to such programs and materials as well as any equipment and materials supplied while the contract is in effect, shall rest with the
3.15 DELAYS AND EXTENSIONS OF TIME
A. If the Vendor is delayed at any time in the progress of the work by any act or neglect of the Owner, an employee of the Owner, any separate Vendor employed by the Owner (whether related to technology improvements or non-technology improvements), changes ordered in the work, acts of God, fires, floods epidemics, quarantine restrictions, or any other cause beyond the Vendor's reasonable control, then the contract time shall be extended by change order for such reasonable time as the Owner and the Vendor may determine. An extension of time for performance shall be the only remedy for any such delay, and damages related to any such delay are inapplicable.
B. If the Technology Designer and/or the Owner determines that the progress of the work falls behind the current project schedule due to the control, management, direction, acts or omissions of the Vendor, its agents or employees, the Vendor shall take whatever remedial action as directed, including, but not limited to the following:
1. Increase staff and labor force
2. Work overtime
3. Add or change subcontractors
4. Utilize more expensive materials/methods
5. Reschedule
C. Costs of any remedial action, which are caused by the control, management direction, acts or omissions of the Vendor, its agents or employees, shall not be assigned to the Owner and no increase in contract price will be authorized.
3.16 DELIVERY OF EQUIPMENT AND/OR MATERIALS
A. Delivery shall be destination, set in place, ready for use unless otherwise specified, with packing and debris removed by the Vendor. The Vendor shall receive and accept its equipment and/or materials from the transportation company or carrier and shall provide all handling, carrying, etc., to the final location for each piece of equipment and/or materials in the building. Crating materials and other trash resulting from the installation shall be removed from the premises daily. Excelsior and similar hazardous trash shall be removed immediately upon unpacking. No accumulation of trash shall be permitted.
B. The Vendor must have a representative at the job site during all unloading and placing of equipment. This service shall be included in the Vendor's proposal (and, thus, the Contract Sum). The Owner shall hold this representative operationally responsible for the services indicated and he/she shall have such capability and be given such responsibility by the Vendor that he/she can act on the Vendor's behalf in any situation, which may arise on the site of delivery. The Vendor’s representative shall use some method, approved by the Owner, to show the item has been inspected and whether it has been "Approved" by the Vendor or if repairs or replacement is necessary. This shall be done prior to the Owner's final inspection. Any Owner rejection shall be honored, even if the Vendor has previously "approved" the equipment.
C. Vendors are cautioned to check their manufacturing and shipping schedules carefully before fixing their proposed delivery schedule. If, for any reason, any items of equipment should arrive prior to the building being ready to receive them, the successful Vendor shall make its own arrangements for temporary storage arrangements at no cost to the Owner. No on site storage will be available and all staging should be complete before delivery and installation of the equipment.
D. Vendors doing work are to cooperate fully and coordinate the work of all other Vendors to expedite the proper and timely completion of the furnishing projects. It is acknowledged that coordination with non-technology contractors (e.g., mechanical and electrical contractors installing improvements to facilitate technology upgrades) is expected and required, so as to provide a seamless and efficient installation of all Owner improvements pursuant to the bond project.
E. In making delivery and installation, the Vendor must repair, at its own expense, any damage done to any of the buildings, equipment or property that are a part of this project that occur as a result of the control, management, direction, acts or omissions of the Vendor, its agents or employees and hold the Owner harmless from any other claims or property damage and/or personal injury.
3.17 SUBCONTRACTING AND ASSIGNMENT
A. The Vendor shall be responsible to the Owner for the acts and omissions of all its employees and all subcontractors, their agents and employees and all other persons performing any of the work under a contract with the Vendor.
B. This Contract, with all its rights and duties, and any part thereof, shall not be deleted, subcontracted or assigned to another Vendor without prior written permission of the
3.18 RECORD KEEPING AND RECORD RETENTION
A. It is acknowledged and agreed that the Vendor shall not be entitled to any additional costs or expenses for its scope of work, other than as is consistent with the Vendor's accepted proposal. For a change in the scope of work, the Vendor's costs shall be determined: (a) if a change order, as agreed in the approved change order, and (b) if a construction change directive and the parties cannot mutually agree to a modified amount, as determined by the Technology Designer. For purposes of the Technology Designer's determination, the Vendor shall establish and maintain adequate records of all expenditures incurred under the construction change directive. All records shall be kept in accordance with general accepted accounting procedures. All procedures shall be in accordance with Federal, State, and local ordinances.
B. The Owner shall have the right to audit, review, examine, copy, and transcribe pertinent records or documents relating to any contract resulting from this RFB held by the
Vendor. The Vendor shall retain all documents applicable to the contract for a period of not less than six (6) years after final payment has been made.
3.19 RISK OF LOSS OR DAMAGE
A. The Owner shall be relieved from all risks of loss or damage…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .