19-Drawings.pdf

PDF 16 MB Posted

Attached to
ITB - Water Line Rehabilitation at Deussen Park for Harris County Precinct 1
Solicitation number
25/0393
Issued by
Harris County, Texas

About this file

This is a construction drawings package for the Water Line Rehabilitation project at Deussen Park, prepared by Harris County Engineering Department for Harris County Precinct 1 (UPIN 25101MF3PZ01). The project involves the rehabilitation of water infrastructure at Alexander Deussen Park in Harris County, Texas, with construction work encompassing multiple baseline segments including the installation of PVC water lines (4" through 12" diameter), service line connections, and associated appurtenances. The drawings indicate approximately 476 linear feet of 8-inch water line installation, 358 linear feet of 6-inch water line installation via trenchless construction methods, and various service line installations and reconnections throughout the park. The project includes critical site requirements such as field verification of existing utility locations, tree removal within construction work zones, maintenance of positive drainage capacity, and strict protocols for protecting existing levee structures and trails, with notification requirements to the Coastal Water Authority at least 48 hours prior to construction activities.

The project specifications detail extensive construction standards including PVC C-900 DR-18 piping for all water line mains unless otherwise noted, AWWA C-500 compliant valves, hydrostatic testing requirements, and minimum 3-foot cover for finished grade installations with 12-inch clearance to other utilities at crossings. Construction activities are constrained to maintain at least one lane of traffic in each direction during working hours with lane closures permitted only during off-peak hours (Monday through Friday, 9 a.m. to 4 p.m.), with uniformed peace officers or flaggers required during closures. General construction notes mandate that contractors field-verify existing conditions, provide security at the project site, clean streets daily of construction debris, maintain updated record drawings, and restore conditions to equal or better than pre-construction standards. The drawings include traffic control details, topographic survey information with benchmark elevations referenced to NAVD88 (2001 adjustment), and detailed plan and profile sheets with station-by-station construction guidance across multiple baseline segments.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

H~L\RRIS COUNTY ENGil\JEERING DEPi\RT11ENT

WATER LINE REHABILITATION - DEUSSEN PARK

UPIN NO. 25101MF3PZ01

en 3' -0 ci w u I

0..

I w I

0 .., ,,, .., I .., N en C

I ,,, u

I ui N N t

0..

C

RODNEY ELLIS

COMMISSIONER PRECINCT I

ADRIAN GARCIA

COMMISSIONER PRECINCT 2

11ICHAEL POST, CPA

COUNTY AUDITOR

PROJECT

LOCATION

.0 i----------- --------...... ............ -.,..... ....... ------,-------.

.s:::

CD

a:

CD

C

I ,,, ci .., ,,, .., .., u ..

'E

I

PROJECT LOCATION

KEY NAPS I 417H 417Q 418A

VICINITY MAP

JtT.S.

LINA HIDALGO

COUNTY JUDGE

OCTOBER 2025

PRECINCT 1

Harris County, Texas

TOM S. RAivISEY, P.E.

COMMISSIONER PRECINCT 3

LESLEY BRIONES

COMMISSIONER

11ILTO

COUNTY ENGINEER

PRECINCT 4

RAHivIAN, P. E.

BinkleyBarfield

Btnldey & Barftekl, lnc. I TxEng F-257 1710 Searrist Dr , Houston. TX 7700ll

713.869.J.433 I 81nluey8arfi~ .DCCM.com

NOTICE:

F"OR YOUR SAF"ETY, YOU ARE REOUtREO BY TEXAS LAW TO CAL1. 81 1

AT LEAST 48 HOURS BEfORE YOU DIG SO THAT UNDERGROUND LINES ~ BE MARKED. THIS SIC"-'TURE DOES NOT FlJlflll YOUR

OBUC4TION TO CAU. 8 11

VERIFICATION OF PRIVATE UTILITY LINES

Jn/4--~ ~·-11/04/25 CenterPoint [ner9y noturol 901 utilities shown. (Gos service lines or e not sho•n). This 1ignoture not be used f0< conflict •erificot ion.

Sionotur9 ¥O rod tor six months.

Jn/4--~ ~· 11/04/25

CenterPoint [Mr9y/UND£RCROUND Electricol rocitities Verification ONLY.

{This si9noture ¥91'" ifies ••i1tio9 under9rouno facilities - not to be used for conflic1 Yerificotiofl) Sior,atur• ¥Olid for si• moriths.

8-u:a,,, L f(.& ~/ZB/2.S Approved for AT&T 1,mcler91"01,1ncl concl1,1 i\ locilities only.

Signot1,1re ¥Olicl for one yeor.

NOTICE:

Construction odiacent to or with in Horris County Flood Control District Right-ot-Wgy reouires:

HCFCO 48-hr Pre- Cons t ruct ion Notice

The 48- hour Pre- Construction Form must be completed ond provided to HCFCD ot dcidOhcfcd hctx net

NOTE CITY 5'GNATURE VALID FOR ONE YEAR ONLY, AFTER DATE OF 5'GNATURE .

CITY OF HOUSTON

HOUSTON PUBLIC WORKS

Ouector of Houston Pubhc WDflU Dot•

Binkley & Barfield, Inc. | TxEng F-257

713.869.3433 | BinkleyBarfield.DCCM.com 1710 Seamist Dr, Houston, TX 77008 12/04/2025

R

ENIGNELANOISSEF

OR

P

DESNECIL

SAXETFOETATS

107085

ANDRES BERDUGO

E

II.

Ill.

3.

EXISTING OR PROPOSED HC PUBLIC R.O .

D REQU EQUl:g ~~~Wfo:ON SHEET(S): ------

CURBING

0 STANDARD 6" CURBING PROPOSED

0 4" x 12" CURBING PROPOSED EXCEPT AT MEDIANS AND IS

TRAFFIC

I MEDIAN Cl/TS

0 MEDIAN MODIFICATIONS ARE SHOWN ON SHEET(S): ____ _

181 NO MEDIAN CUT OR RELOCATION IS PROPOSED

11 LEFT / RIGHT TURN LANE

0 LEFT / RIGHT TURN LANE IS SHOWN ON SHEET(S): ___ _

181 NO LEFT / RIGHT TURN LANE IS PROPOSED

Ill TRAFFIC CONTROL PLAN

181 TRAFFIC CONTROL SHOWN ON SHEET(S): 136-143

0 NO WORK IN HC RIGHT OF WAY

IV TRAmC SIGNAL

0 EXISTING TRAFFIC SIGNAL DEVICES (BOXES AND LOOPS)

SHOWN ON SHEET(S):

0 NEW O REBUILT O Mo·"o""1F1""'E=o...,T"'RAF-=Fl"'c-s=-1G=-NAL ____ _

SHOWN ON SHEET(S): __________ _

0 HC FIBER PRESENT

181 NO TRAFlFlC SIGNAL

V TRAFFIC IMPACT ANALYSIS

□ TRAFFIC IMPACT ANALYSIS APPROVED ON DATE:. _____ _

PROJECT NO.: =-==~=-=----181 NO TRAFFIC IMPACT ANALYSIS REQUIRED AND HC APPROVED

0 NO NEW TRIPS GENERATED

VI. TRAFFIC VARIANCE

0 TRAFFIC VARIANCE APPROVED ON DATE.-· _____ _

PROJECT NO.: ___________ _

DESCRIPTION OF PROPERTY

1. LEGAL DESCRIPTION

A. ACREAGE-~=--------------

8. 0 SUBDMSION: ___________ _

0 SURVEY & ABSTRACT:. ________ _

C. ADJACENT ROADS: DEUSSEN PARKWAY AND

LAKE HOUSTON PARKWAY

II. PLATTING

A. SUBDMSION PLAT

(CHECK APPUCABL£)

0 PROPOSED PLAT / REPLAT

0 RECORDED PLAT / REPLAT

0 EXEMPT FROM PLAT / REPLAT

PLAT NAME: N/A

8. STREETS PROPOSED

0 PUBLIC

0 PRIVATE

0 PUBLIC & PRIVATE

181 NONE

NOTE: FINAL CPC101 REQUIRED FOR PLAN APPROVAL

RECORDED PLAT REQUIRED FOR FINAL INSPECTION.

111. JURISDICTIONS

181 CITY OF HOUSTON

0 ET J, CITY OF HOUSTON

0 ETJ, CITY OF _______ _

0 NO ETJ

IV HCAD ACCOUtfl NOS <ALL) 0401560000097. 0401560000098

V UNOBSTRUCTED VISIBIUJY EASEMENT (U V E l

D REQUIRED PER PLANNING COMMISSION / HC REGULATIONS

SHOWN ON SHEET(S): __ _

llll NOT REQUIRED PER PLANNING COMMISSION / HC REGULATIONS

VERSION 21.0 FlllRUARY 20, 2025

OD

DITTNTION BASIN

0 HCFCD DRAINAGE

0 HC ROADSIDE DITC

0 HC STORM SEWER

IV HC 01/TF All CAI.CU

□ROADSIDE DITCH OUTF

AI.LOWABLE OUTFALL

PROPOSED OUTF All RA

0 ~:~iJ~iivr

FROM DRAINAG

~~~tJ8 r= ==~':-:-::--__ - ~-_-...,-_-...,-_-~---_-_----=-

7. STORMWATER OUALITY

SWPPP: CONSTRUCTION MEASURES {COMPLETE FOR ALL PROJECTS)

NUMBER OF ACRES DISTURBED: ______ _

181 DISTURBS > lAC. SITE PLAN & DETAILS ON SHEET(S): 144 - 157 0 DISTURBS < lAC. N/A

II. APPLICABILITY FOR PERMANENT FEATURES {COMPLETE FOR ALL PROJECTS)

EXEMPT NEW DEVELOPMENT·

0 PROJECT IS ON A PARCEL. WITHIN A LARGER COMMON PLAN OF DEVELOPMENT OR SALE.

LESS THAN 5 ACRES.

THIS EXEMPTION IS VERIFlED WITH THE PLAT AND/OR GENERAL PLAN ON THE PROPERTY.

EXEMPT REDEVELOPMENT·

181 THE INCREASE IN THE TOTAL AMOUNT OF IMPERVIOUS SURFACE. CURRENT PROJECT AND

ANY SINCE 10/01/2001. ON A PREVIOUSLY DEVELOPED 5 ACRE OR LARGER PARCEL

INDMDUALLY AND/OR CONTIGUOUSLY OWNED. IS LESS THAN 1 ACRE.

NEW IMPERVIOUS:

CURRENT PROJECT PREVIOUS PROJECT S TOTAL TOTAL CURRENT +PREVIOUS

EXEMPT GRANDFATHERED·

0 DRAINAGE FROM THIS PROJECT OUTFAI.LS DIRECTLY INTO AN EXISTING AND APPROVED

DRAINAGE SYSTEM PRIOR TO 10/01/2001 WITH NO NEW DETENTION REQUIREMENT.

INCLUDE THE ORIGINAL DRAINAGE AREA MAP OF THAT SYSTEM FOR VERIFICATION.

DA MAP NAME: ___ DATE: ___ APPROVED HC PROJECT NO.: __ _

9. WATER AND WASTEWATER

I COMMERCIAL PROJECTS

DOES THE PROPERTY HAVE UTILITIES?

181 PROPOSED 181 EXISTING ONO

CHECK APPLICABLE

0 PUBLIC WATER & SANITARY

0 PRIVATE WATER WELL & SEPTIC SYSTEM

181 PUBLIC WATER & PRIVATE SEPTIC SYSTEM

0 PRIVATE WATER WELL & PUBLIC SANITARY

0 LETTER FROM THE DISTRICT / MUNICIPALITY AUTHORIZING

MUNICIPALITY AUTHORIZING StRVICE & CONNECTION.

UTILITY DISTRICT / MUNICIPALITY NAME: ______ _

□PROPOSED OR EXISTING SEPTIC TANK(S) AND DISPOSAL AREA(S)

SHOWN ON SHEET(S): _______ _

181 All EXISTING AND PROPOSED UTIUTIES ACCURATELY

SHOWN & LABELED ON THE SITE PLANS.

NOTE: SEP17C SYSTEMS REQUIRE HC WA~TEWATER REVIEW

HC SEPTIC PERMIT/REQUEST NO. ___ _

NOTE: DEDICATED UNDERGROUND FIRE LINES MUST BE SUBMITTED

TO THE HARRIS COUNTY FIRE PROTECTION GROUP FOR REVIEW AND

PERMITTING BY THE UNDERGROUND FIRE LINE CONTRACTOR. CML

REVIEW DOES /l"OT REVIEW OR APPROVE UNDERGROUND FIRE LINES

FOR THE FIRE PROTECTION SYSTEMS.

J 2. PERMITS REQUIRED

ORM WATER QUALITY

ORIGINAL O AMENDMENT TO PERMIT NO.: ____ --.,,__

0 SE C (EXISTING) 0 SEPTIC (PROPOSED)

0 CML IT[ WORK (PHASE II PERMIT CLASS I (UNSHADED

0 CML E WORK (PHASE II PERMIT CLASS II (ALL OT

.VJOl.A!!ONS

0 EXISTING VIOLATIO

VIOLATION NUMBE

D STORM SEWER IS SUBMERGED (AGREEMENT MUST BE PROV!

filfilS:

A PERMIT IS ON SITE.

A R.0.W. REQUIRED FO E OF WORK IN

111. GENERALPROJECT DOES NOT MEET THE DEFINITION Of" SIGN1F1CANT REDEVEl.OPMENT (Port A, D PROJ:rc,t~~8 1 ifEW/~~~~~f PA'IT'"w~~t~Hl°'m'R1?o°1c1\8'N"3~~er Quality Man09ernent)

W.S.E. 0 OUTFALL IS _______ _

PROposrn DRAINAGE AREA

DEVELOPMENT AREA: ____ _

DEVELOPMENT AREA (NET NEW DEVELOPED AREA): ____ _

MPACT DEVELOPMENT (LID)

PROPOSED DETENTION ____ ACRE FEET

PROPOSED DETENTION UME CALCULATIONS ARE SHOWN ON

DETENTION VOLUME PROVI

APPROVED HC PROJECT NO.:~---

DETENTION BASIN SERVICE AR

Ill 01/TFAl,L

OUTFALL TO

OHC ROADSIDE DITCH OUTFALL:

PROPOSED OUTF All RA TE: __ ( CFS ALLOWABLE OLITFAl.l RATE: D.0027 x

0 HC STORM SEWER OUTFALL:

CAPACITY ALLOCATED TO TRACT F

FROM DRAINAGE AREA MAP OAT

0 ALL

AUTOMATIC SHUTOFF PLAN FOR RO

S APPEAR ON SHEET(S)·~--

P THE PROJECT.

BY CERTIFIES THAT THESE AREAS

(ONlY COMPl.£TE If OW..OE or UNINCORPORATED HARRIS COUNTY)

0 STORMWATER QUALITY PERMIT REQUIREMENT IS COVERED BY:

0 EXISTING SWQMP

PROJECT TITlE: --------------=-------

HC PROJECT NO.: ______ HC SWQ PERMIT NO.: _____ _

SWQ SERVICE AREA MAP INCLUDED ON SHEET(S): ____ _

0 INDUSTRIAi. PERMITTING. (IAC AND SUPPORTING DOCUMENTATION MUST BE SUBMITTED)

PERMIT NO: _____ _

IF THE PROJECT IS NOT EXEMPT. OUTSIDE OF HARRIS COUNTY'S JURISDICTION, OR COVERED

BY AN EXISTING SWQMP, A STORMWATER QUALITY MANAGEMENT PLAN IS REQUIRED.

IV. PERMANENT SWO FEATURES (COMPLETE IF NOT EXEMPT)

0 SITE PLAN ON SHEET(S):

0 VEGETATIVE CONTROLS USED: (FILTER STRIP, GRASSY SWALE. URBAN FORESTRY. LID)

DETAILS AND CALCULATIONS APPEAR ON SHEET(S):

0 BASIN STRUCTURE USED (WET, ORY. WETLANDS)

STRUCTURAL CONTROL IN BASIN:

DETAILS/CALCULATIONS ON SHEET(S):

0 HYDRODYNAMIC TYPE SEPARATOR MODEL: __________ _

DETAILS/CALCULATIONS ON SHEET(S):

0 OTHER(S):

STRUCTURAL CONTROL(S):

DETAILS/CALCULATIONS ON SHEET(S):

8. FLOODPLAIN STATUS

GENERAi, INFORMATION FIRM PANEL(S) FOR PROPERTY: 48201C0520l.

FIRM PANEL(S) DATE: JJNE 18, 2007

STATUS OF PROPERTY ON MAP

0 ENTIRELY LOCATED IN UNSHADED ZONE X

181 LOCATED PARTIALLY OR ENTIRELY IN ANY A ZONE OR SHADED ZONE X,

DELINEATE FLOODPLAIN BOUNDARY ON CONSTRUCTION DRAWINGS

(DRAINAGE LAYOUT PG. N0 . .2L} (lX BASE FLOOD LEVEL~)

(0.2X BASE FLOOD LEVEL....51.L)

0 SITE REMOVED FROM FLOODPLAIN BY LOMR, LOMR-F, LOMA

CASE NO. _____ REVISED FLOODPLAIN IS SHOWN ON SHEET(S): __

ELEVATION INFORMATION

BENCHMARK USED

181 HARRIS COUNTY FLOODPLAIN REFERENCE MARK

0 HARRIS-GALVESTON COASTAL SUBSIDENCE DISTRICT

BENCHMARK (FOR COASTAL AREAS)

DESCRIPTION OF BENCHMARK INCLUDING ELEVATION, DATUM AND

YEAR OF ADJUSTMENT (2001 ADJ.) HARRIS COUNTY FlOODPLAJN REFERENCE MARK NO. 070150. El£V. 26.63 fT. NA'ID88 (2001 ADJ.)

111 flOODPlA/N DCTERMINATION BASED ON GROUND ELEVATION

D m8P,~~.J:lfr5o Ez~lrEEL/ ABOVE THE 1 X BASE FLOOD LEVEL

181 PROPERTY LIES PARTIALLY OR ENTIRELY BELOW THE IX BASE

FLOOD LEVEL

IV flOODPlA/N STORAGE SUMMARY (APPUEs ONLY TO PORTION or LANO LOCATED 'lfTTHIN Fl.OOOP\AIN AS OUJNEATED BY f1RM PANEL)

A. TOTAL VOLUME OF MATERIAi. PROPOSED TO BE MOVED OR PLACED WITHIN

THE FIRM DELINEATED FLOODPLAIN (FILL. BASE. CONCRITT. ASPHALT. ETC.):

BELOW 0.2X BASE FLOOD ELEVATION~(2001 ADJ.)__!!_ CUBIC YARDS

8. TOTAL VOLUME OF MATERIAi. PROPOSED TO BE REMOVED FROM THE FIRM

DELINEATED FLOODPLAIN:

BELOW 0.2X BASE FLOOD ELEVATI0N..M.i_ (2001 ADJ.)__!!_ CUBIC YARDS

C. FILL AREA & VOLUME CALCULATIONS ARE SHOWN ON SHEET(S): ~

HARRIS COUNTY

OFFICE OF THE COUNTY ENGINEER

IIBVIEW SHEET

HC OR :!:.?1:·~ .;: _""::..: ,_· :_L_:_--=---,

JO. SIDEWALKS 8 1 0 9 3

0 SIDEWALKS ARE PROPOSED IN THIS DEVELOPMENT

181 NO SIDEWALKS ARE PROPOSED IN THIS DEVELOPMENT

ll. LANDSCAPING

BE FOR

PROPOSED BRIO ENTIAL SUBrDIVSJONS

0 COMMERCIAi. BUILDING(S) PROPOSED AND LANDSCAPING When the C<Jldy Enpna:r has determined 11ml a~ bmdmmlr.: "'ill be n:quircd to be established fm the prapmed project. the dcvelopcl thaD be required to imtaD a bcdmarl: pa KCtion 8.0. pmt 2 of the Hmi>C-,-.Rc;ul,1iom

SHOWN ON SHEET(S): ___ _

181 NO COMMERCIAi. BUILDING(S) PROPOSED

FOR PROJECTS LOCATED IN ANY FLOODPLAIN

b a~ 8cDchmm, required fm this pojcd, (ro!. ~ ~- Harri.J C~-)LJ yn LJ m> lfar'IC"' Bcnchma:rl israpiircd. thepopo,ed bcnchma\: informatiooi,IM\\nm dx:cU't): _

Orttlopmmt comtructt>d or placrd in accrxdonct with these plans will comply with all provisions of tht Rrgulations of Hollis Count)', Te.ros for Roodplain Manogemmt.

No ntt pu is allowt>d In tht flood plain and no fill is aflowrd in tht ftoodwoy.

FOUNDATION NOTES: (Applies to only buUdingJ or buUding odditiom rrquiring o doSJ II permit)

All water hrat~, furnacn, air conditicr,ing unitJ, rltttrical distribution ponrls, ond any other mtchonicol ot rltttrical rquipment must br rltvottd in occordoncr with Stttion 4.0S of Harris County Roodplain rrgulations.

Any rltttrical drcuit serving a light switch or outltt locottd brlaw tht bast (100-yrar} /food rlrvation shall br dr~ from abovr and br on a seporatt brrakrr.

All matrriolJ ustd brlow thr (100-yror} bosr /food rlrvotion art on opprovrd FEMA Trchnical Bullrtin 1-08 as Coss S wotrr-rnistant, and approvrd in occordancr with FEMA Ttthnical Bullrtin 1-08 for foundation oprnings.

Critical fodtitin locotrd in thr O . .Z,C or SOOyr floodplain or l" ot lOOyr floodplain shall havr thr lowrst floor rlrvotrd ta 3 frrt or morr above thr 0.1" flood rlrvotion, or 14 inches abovr thr crown of thr adjacrnt roodi which ~ rrsultJ in a highrr rlrvation.

Roodproofing and sraling mrosu,n must br tolrn to rnsurr that tmic substoncrs will not br displacrd by or rrlrosrd into floodwotrrs.

Accns routrs rlrvottd ta or abovr thr lrvrl of thr bosr flood shall br p,o.,,idtd to all critical faa'litirs to thr utmt possiblr.

A complrtrd as-built crrtificatt must br submittrcl aftrr thr strurturr is comp/rtr and brfarr it is occupitd.

Thr County Enginttr's 0/ficr will post a final insptttion noticr on thr stTucturr oner oil rtquirrmrntJ havr bttn mrt.

No fill may br usrd to rlrvatr structurrs in thr l" or lOOyr flood plain. Structurrs may br constructrd on on opm foundation, such os pi~, ot oo continuous foundation woUs with propaly siud ond locatrd openings. All foundations arr rtquirrd to br dnignrd by a rrgistrrrd profrssional rnginttr.

All strurturrs shall br drsignrd to withstand a thrtt srcond gust basic wind sprrd of 110mph.

Complrtrd "Elewtlon Certlficatts to br submittrd: onr at prrmitting, a srcond o[trr thr slab is pourrd or sub--Jloor is installrd and t,garr thr framing starts, and a third Is rrquirrd oner construction is Jinishtd. •(PER CURRENT FIRM PANElJ

HARR.15 COUNTY OfTICE OF lllE COUNTY OIOL''EER

- PEDJlT omcr NOTE:

THE PER.\llT MANAGER S10NA'JlJR.E R.D'R.ESO-T.i

THE FOLL<N,'INO:

•• THECOMJ'LETIONOFRE\~'OflltESF:

PUNS

Tho'1'ERPOSE NO OBJECTION TO THE PROl'OSED

DESICIN ON PRJ\',"T[ PROPERTI'

APPROV Al OF WORK IN HAlllt15 COUNTY

~IAOOA!NEI>RJOHTOFWAY

APPROV Al OF '1i·CJIU.. ts PROPOSED HARRIS COIJNn' RJOKT OF \\'AYTHAT IS TOBE

ACCEPT£D BY THE COUNTY

Tl£ PR0J£CT WAS R£'Yt£WED. H0WE'VER. THIS 00[5 NOT M!AN THE ENT1RE PROJECT. CNCUJCXNC AU SUPP0RT1NC Qt.TA ANO CALCUI.ATOCS HAVE BEEN COWPl[T[LY CHECKED ANO vtRlflED, lHESE 0RAWINCS AR£ SIGNED, Qt.TEO ANO SEAUD BY A ~ (NQN[[R UCCNS£D TO PRACTICE IN THE SfAT[ Of trXAS, WHCH THERUOR[ COHVEYS TH[ [NCIH[[R'S R£SP0NSIBIIJlY ANO ~N'TABQJTY. THIS D0Ci NOT RnDt NIT PARTY fR0l,1 CDWP\."l'INC WITH APPRCJPRIAT[ F'lllCRAL, SfAT[ ANO lOCAl. OMRONMENTAL RULES. LAWS, ANO REGUlATOCS ANO Nff OTHER LECAl.LY A[X)PT[[) RECULAT10N OR ORDIHANC[ RELATED TO LAND DEVEl.oPMENT. Ir THE aTY SICNATURE'S ARE RE0UIRED BY ORDINANCE. COUNTY PCRWITS WU NOT BE !SSUED UHl1.. SUCH SIGNATVRES ARE 08TAINtD. PlAAI APPROVAL (XPIRAT10N TO m:: 1H ~ WID1 L0CAl. CO'YERN[M[Nl COt£ Ot. 24~

ENGINEER'S CERTIFICATION

'· ANDRES - ' • UCENS[l) PROFESSIONAi. ENCINEER IN THE SlATE or TEXAS, DO H£REBY a:rn THAT THE

INFORMATION PRESENTED ON THIS SHEET IS TRUE AND CORRECT TO THE B(S1 OF IIY KNOWUDCE AND THAT I AM NOT VIOLATING ANY PROVISION or THE C\IRRENT TEXAS ENCINEERING PRACTIC[ ACT ANO RULES CONCERJ<ING THE PRACT1C[ or ENGINEERING ANO PROf"ESSIONAL ENGINEERING UCENSURE. I C[R1lfY TO THE BEST or IIY KNOWUDCE THAT THE P\ANS IN f-------------------!THEIR EKTIRffi' ARt DESIGNED PER THE HARRIS COUNTY EHG1NEERING SlANDARDS, REGU\ATIONS. ANO GUIDELINES UNLESS HCOCE SIGNATURE BLOCK: PROVIOED A VARIANCE BY THE COUNTY ENGIN£ER OR HIS OESICNEE. SHOULD IT 6£ DEEMED BY Ha:D SlAFF.--THAl.THE f-------------------1 PLANS DO NOT MEET THE COUIITYS SlANDARDS, R[CUIATIONS ANO GUIDELINES AND 010

Dlnd""' P.l,. C.f JIii •. . .

.~-twm.Did,~ .~ ......... cta. ... lDclll~c:actlS.

:.0~618"-.dLfUl~d· 2025-10-27-13:09-.lO

REV. NO. OAT[ SHEET NO.

HC PROJECT NO. 2'0111II007:I

NOT RECOVE AN APPROVED VARW<CE. THE APPROVAL or SAID PLANS BECOMES NUll AN VOID ANO THE OESIGN P\ANS MUST BE CORRECTED AT NO CHARGt: TD THE COUNTY.

THE COMPl.£TEO PROJECT CONSISTS OF DRAWING SHEITS _1_ THRV ~ sa:;N,\T\JR[ ~l[

REVISIONS

NOTE: REVISION BlOCK IS TO BE USED ONLY FOR CHANGES MADE

AFTER PL.ANS HAVE BEEN APPROVED BY HARRIS COUNTY.

DESCRIPTION

HCFCD PROJECT NO. 2:508180110

SHEET NUMBER 3 OF 12._

1. PROPERTY DESCRIPTION

LOCATION INFORMATION

A. HARRIS COUNTY COMMISSIONER'S PRECINCT:

1811020504

8. KEY MAP: __ 4---'1-'-7D"-'''-4-'-1'-'7H'-"-, ---'4-'-17M=•-4:.a1;::;8A.;..,_..c41'-'8E"'--__ _

C. ADDRESS: ---~O~DEV==SSEN=~PAAKW==A-'-Y ___ _

11. LEGAL DESCRIPTION

A. ACREAGE: N A

8. 0 SUBDMSION:

181 SURVEY & ABSTRACT: N/A

C. ADJACENT ROADS: PO/SSfN PARKWAY

Ill PLATTING

A. SUBDMSJ0N PLAT

0 PRQPOS[0 PLAT / REPLAT

0 RECORDED PLAT / REPLAT

PLAT NAME:

8. STREETS PROPOSED

0 PUBUC

0 PRIVATE

0 PUBLIC "' PRIVATE

181 NONE

JV JURISDICTIONS

181 CITY OF HOUSlON

0 ETJ, CITY OF HOUSTON

0 ETJ, CITY OF ________ _

0 NO ETJ

0 UTILITY DISTRICT (NAME,_ _______ _

V HCAD ACCOUNT NOS (ALL}

040156D000097, 040156D000098

Ill.

WORK IN HCFCD RIGHT-OF-WAY

ERSHED ______ _

IT No. ________ _

OF OUTFALLS ______ _

SING

BRIDGE/CULVERT CROSSING

ATION OF CHANNEL

E

ROSSING

PERMIT NUM

D US ARMY COR

0 OTHER

0 NO PERMITS R

EXPLAIN:

E

OUR[[) ON PROJl:C1S WITH WORK IN A REm<OICC SECTION 11 or TH£ n.ooo CR!T£R1A, AND PROCEDUR£ 1W1UA1. fOR W

.U...Lll<I-"-",;au"""""'---""'=' SEE SHEET __ OF THESE PLANS.

L-Ell<l:,,.,__......""'"""'----"''-'-"'""'• SEE SHEET __ OF THESE Pl.ANS.

OR EXISTING ANO PROPOSED RICHT(S) or WAY INCLUDING DELINEATION ANO

RECORDING INFORMATION PER HCFC0 POUCY, CRITERIA, .!I PROCEDURE MANUAL

(i.e., DRAINAGE EASEMENT, FEE STRIP, ETC.) ANO GR.ANTEE (e.g. COH, HCFCD, PUBLIC, TXDOT, ETC.)

VERSION 1.0 OCTOBER 2019

JV

A.

EA (AIIOUt-lT INCREASED IMPERVIOUS AREA): ____ _ 0PMEt-lT (LID)

PTION _________________ _

THAN 20 ACRES)

TO 640 ACRES)

0 .75, O£TDlll0N - SDMC[ ,Rf}, M,WWUW 0UTTLCM' PRCMDCD (PEAK Fl.OW fllOM

IIASD<)

, • EXCrnlANC[ 100-l[NI

D. ADDmONAL CR EO DETENTION BASINS

V

VI

VOLUME OF CE STORAGE VOLUME • __ _

lt-lTO HCFC0 CHANNEL = -----\:

ON --------'<--

FOtlPltOffmloonDINAKfROOOP\AIN

DrwlDplwnt~Ol,-ad#lccmrdDncTMUIUW.panl_.,t:llfftlllYMttl promiM1o/dw.,.._ffl,...,..,M!nrJllar,_.

,.,__..,. • ._., .. dw,,.,,_~_,,ao/ab--..4illdw,,_,,_.., HARRIS COUNTY

FLOOD CONTROL DISTRICT

REVIEW SHEET

3. SWQDISCHARGE INTO FCD FACILITY

I. SWPPP· CONSTRUCTION MEASURES. (Must complete)

181 DISTURBS > 1AC. SITE PLAN & DETAILS ON SHEET(S)

144 - 157

0 DISTURBS <1AC. N/A

•11 APPLICABILllY FOR PERMANENT FEATURES (Must complete\

EXEMPT NEW DEVEL PPMENT·

0 PROJECT IS ON A PARCEL (A COMMON PLAN OF DEVELOPMENT)

LESS THAN 5 ACRES. (Must be vedfied with plot)

EXEMPT BEPEYELPPMENT·

181 PROJECT DOES NOT l.tEET THE DEFINmON OF SIGNlflCANT

REDEVELOPMENT (Port A.Sec. 2.59 of Regulofons of Horris County, Texas for Stormwoter Ouolity Management)

EXEMPT GRAND[ATHERED·

0 PROJECTS DRAINAGE TIES DIRECTLY INTO AN EXISTING DRAINAGE

SYSTEM PRIOR TO OCTOBER 1, 2001.

(FOR VERIFICATION: PROVIDE ORIGINAL DRAINAGE AREA MAP

INClUDING CALCULATIONS)

181 PROJECT'S SWO REQUIREMENTS FALL WITHIN THE JURISDICTION OF:

CITY OF HOUSlON

0 STORMWATER OUAIJTY PERMIT REQUIREMENT IS COVERED BY AN

EXISTING SWOMP WITHIN PROJECT TITLE:

HARRIS COUNTY PROJECT No _____ & SWO PERMIT No.

STORMWATEB OUAUJX MANAGEMENT PLAN·

0 SITE PLAN ON SHEET(S)

111 PERMANENT SWO FEATURES. (COMPLETE IF NOT EXEMPT)

0 VEGETATM CONTROLS USED: (FILTER STRIP, GRASSY SWALE,

URBAN FORESTRY DETAILS AND CALCULATIONS APPEAR ON

SHEET(S) __________ _

0 POND STRUCTURE USED (WET, ORY, WETLANDS) DETAILS AND

CALCULATIONSAPPEAR ON SHEET(S), _________ _

0 HYDRODYNAMIC TYPE SEPARATOR MODEL: _______ _

0 OTHER(S): _________ _

HCFC0 PROJECT #-----

ENGINEERING nRM ----------•..--------

REPORT ACCEPTANCE DATE ---~----.,-

DATE SHEET NO.

4. FLOOD PLAIN STATUS

I. GENERAL INFORMATION

nRM PANa(S) FOR PROPERTY: 46201 C05201, nRM PANEL(S) DATE: .RINE 18. 2007

STATUS OF PROPERTY ON MAP

0 ENTIRELY LOCATED IN UNSHADED ZONE "X"

1!1 LOCATED PART1All.Y OR ENTIRELY IN ANY "A" ZONE OR SHADED ZONE "X", DELINEATE rtOOOPLAIN BOUNDARY ON CONSTRUCTION 0RA\\1NGS (DRAINAGE LAYOUT PG. NO.~) (Ui BASE rtOOD ~)

(0.2lli BASE rtOO0 t.rVELaJL)

0 SITE REMO\IED f"ROM rtOODPLAIN BY L0MR, LOMR-F, LOMA CASE NO _____ REVISED rtDO0PI.AIN IS SHOWN ON SHEET __

ELEVATION INFORMATlON

BENCHMARK USED

l!I HARRIS COUt-lTY rtOO0PLAIN REFERENCE MARK

0 HARRIS-GALVESTON COASTAL SUBSJ0ENCE DISTRICT

BENCHMARK g;f COASTAL AREAS)

~~~& (1lit,~fu:fCL~m.fi:&1~j!;, ~~N REFERENCE MARK NO. 070150, El.EV. 26.63 FT. NAVD88 (2001 ADJ.)

11 FLOOD PLAIN DETERMINATION BASED ON GROUND ELEVATION

o ~gP~~J/fJi r2~.A80VE THE BASE rtooo L£VEL 1!1 PROPERTY LIES PARTlALI. Y OR ENTIRELY BELOW THE BASE rtOOD

L£V[L

111 FLOODPLAIN STORAGE SUMMARY

(APPt.J[S ONLY 10 PORTION Of LANO LOO.TEO W1THIH FEWA REGUIATORY rtOODPIAIN).

A. TOTAL VOLUME OF MATERIAL PROPOSED TO BE MOVED OR PLACED WITHIN

THE FIRM DELINEATED FLOODPLAIN (FILL BASE, CONCRETE. ASPHALT. ETC.):

BELOW 0.2% BASE FLOOD ELEVATION (2001 ADJ.) ~ CUBIC YARDS ___..lL_

8. TOTAL VOLUME or MATERIAL PROPOSED TO BE REMOVED FROM THE FIRM

DELINEATED FLOODPLAIN:

BELOW 0.2% BASE FLOOD ELEVATION (2001 ADJ.) .fil..l!. CUBIC YARDS ___..lL_

INCLUDING CALCULATIONS)

C. FILL AREA & VOLUME CALCULATIONS ARE SHOWN ON SHEET ~

HCFCD SIGNATURE BLOCK

PROJECT NAME: IIA1EJI 1H: R[HAaJTAllCN - D0JSSEN ,_ - 2024

ADDRESS: __ ,_Zllll __ S01NEJ1 ___ STR£Et __ , _HOUSltlN. ___ T>_TI044 _________ _

WAS ACCEPTED BY HARRIS COUt-lTY FLOOD CONTROL DISTRICT FOR THE PURPOSES LISTED BELOW:

HARRIS COUNTY FLOOD CONTROL DISTRICT

""""'°" NO 08J[Cll0H 8 ut;t_-guc,UA, "'----... ==noos=--ux:,~m,-OU!Sl)[=""""a,,..HCftt)=-RICHI=..,,,=-"".,.'"'•-----

"'----------~----~------Fo:f l?EMS LOCATED WtTiel £X?STIC HCf'CD RDfl-<lf'-UY

"'---... ==ITI~IIS=ux:,=m,~wmtN=--=PS0POS[l)==~HCftt>=,--,RD<l=,-_,,,=-c _ _.-,,c-----

NO RE\'IO RE0URED:

"'------~,_=-l'[JOl1TT1NC==""""..,,..o"'nos=~-------- AO0moNAL CO~MENTS:

PMM

TI-I[ PR0.1:CT WAS REWWD>. H01JrOtR. THIS D0C5 N0t MEAN TH[ CHTIR£ PROJ(Cf, NCUIDING All SlJl'P0RltNC DATA AND CAI.DJLAT10NS HAV[ B([N COiCP\LTtlT Ot[QCD) AHO YERllED. TH(S[ CIRAWlNCS ARI SIGHED. OAlED ANO SCALED BY A ~ [NQH£[R l.CCNS[J) TO PRACTa: IN TH[ STATE fE TEXAS. WHDt no£F'ORE C0NY£'r'S TKE (HQJr£ER"S R£SP0NSIBQJ1Y AND ACCOUN'lASIJJY. THIS 00CS NOi RDJEYE Nl'f PIRTY F'R0M COW?\.YD«. WITH APPROPR1Att FtIIERAL STATE ANO LDCM. OMRONM[NTN.. RU.CS. WWS. AND R[GI.AAJ10NS NC> Nff OTHER L!GAil.LY AD0PfrD RECtU.110H OR OROINNCC RllATED TO LAND IJC\'EIJPlitOO. f" Tl1E an SIGNATURES ARE REClHD BT 0RDNANC[. COUNTY PERMITS WU N01 B£ r5SIJEO I.Ml. Sl04 SICNA.T\RES AR£ OBTAIHID. Pl.AH APA1NAt £IPIRA~ TO B[ IN ACC0Rl'.WG: '#ITH L0CAL C0\IERNEMENT COD£ 0l 20.

ENGINEER'S CERT/ FICA TION

I, ANDR£S BERllU00 , A LICENSED PROFESSIONAL ENGINEER IN THE STATE OF TEXAS, DO HEREBY CERTIFY

THAT TH[ INFORMATION PRESENTED ON THIS SHEET IS TRUE ANO CORRECT TO THE BEST OF MY KNOWLEDGE ANO THAT I All NOT \IIOlATINC ANY PROVISION or THE CURR[t-lT TEXAS ENGINEERING PRACTICE ACT ANO RUL£S CONCERNING THE PRACTICE or ENCIN[ERING ANO PROFESSIONAL ENGINEERING LICENSURE.

ANY VIOLATIONS Will BE FORWARDED TO THE HARRIS COUNTY DISTRICT ATTORNEYS OFFICE FOR PROSECUTION.

THE COMPLETED PROJECT CONSISTS or DRAWING SHEETS ___l_ THRU ~ .

0ESCRIPTION P.E. I

HARRIS COUt-lTY rtOOD CONTROL PROJECT NO. 2508190119 SHEET NUMBER 4 OF 15 7

,.r-------------------------------------------------------------------------------------------------------------------------, c..

"' "' N w I

I w I I ...

-r e 0 .., -I!

c..

C

.D a:

C

::J

HCED GENERAL CONSTRUCTION NOTES

GENERAL

1. THE CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS BEFORE BEGINNING CONSTRUCTION.

2. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING SECURITY TO PROTECT THE PROJECT SITE, CONTRACTOR PROPERTY, EQUIPMENT, AND WORK.

3. THE CONTRACTOR IS RESPONSIBLE FOR CLEANING STREETS OF CONSTRUCTION DIRT AND DEBRIS AT

CLOSE OF EACH WORK DAY.

4. THE CONDITION OF THE ROAD AND/OR RIGHT-OF-WAY, UPON COMPLETION OF THE JOB SHALL BE AS

GOOD AS OR BETTER THAN PRIOR TO STARTING WORK.

5. PRIOR TO CONSTRUCTION, THE CONTRACTOR, ALONG WITH CONCURRENCE FROM THE FIELD ENGINEER, SHALL DETERMINE HIS/HER LAY-DOWN AND/OR STAGING AREA LOCATIONS.

6. THE CONTRACTOR SHALL NOTIFY ALL PROPERTY OWNERS A MINIMUM OF 24 HOURS PRIOR TO BLOCKING

DRIVEWAYS OR ENTERING UTILITY EASEMENTS.

7. TRAFFIC INGRESS AND EGRESS FOR DRIVEWAYS AND PEDESTRIAN ACCESS FACILITIES SHALL BE

MAINTAINED THROUGHOUT CONSTRUCTION.

8. THE CONTRACTOR SHALL REMOVE ANY FENCES, POSTS, MAILBOXES, PLANTERS, PERMANENT TRASH CONTAINERS, CULVERTS, ETC. OR SECTIONS THEREOF, THAT ENCROACH WITHIN THE COUNTY'S RIGHT-OF-WAY. NOTE: PRIOR TO CONSTRUCTION, THE PROPERTY OWNER WAS PAID TO RELOCATE OR REPLACE THESE ITEMS OUTSIDE OF THE COUNTY'S RIGHT-OF-WAY. IF THE OWNER HAS FAILED TO DO SO, THE CONTRACTOR WILL REPLACE THEM WITH THE MINIMUM LEVEL OF QUALITY NEEDED TO SECURE THE PROPERTY AND/OR MAINTAIN MAIL DELIVERY. IN THAT CASE, PAYMENT FOR THESE INSTALLMENTS

WILL BE INCLUDED AS EXTRA WORK ITEMS OR AS OVERRUNS TO EXISTING PAY ITEMS.

ANY DAMAGE CAUSED BY THE CONTRACTOR TO SUCH ITEMS LOCATED OUTSIDE OF THE COUNTY'S RIGHT-OF-WAY, SHALL BE REPLACED WITH LIKE-KIND OR BETTER AT THE CONTRACTOR'S EXPENSE.

ALSO, IF THESE ITEMS ARE LOCATED WITHIN THE PROJECT RIGHT-OF-WAY AND ARE DESIGNATED TO REMAIN, ANY DAMAGE CAUSED BY THE CONTRACTOR TO SUCH ITEMS, SHALL BE REPLACED WITH

LIKE-KIND OR BETTER AT THE CONTRACTOR'S EXPENSE.

TREES, BUSHES, SHRUBBERY AND OTHER DAMAGED PLANTINGS DESIGNATED TO REMAIN SHALL BE REPLACED WITHIN 72 HOURS OF REMOVAL AND ARE TO BE THOROUGHLY WATERED-IN. NO SEPARATE

PAY.

9. PAVED SURFACES, PAVEMENT MARKERS AND MARKINGS SHALL BE PROTECTED FROM DAMAGE BY

TRACKED EQUIPMENT.

1D. IRON RODS DISTURBED DURING CONSTRUCTION ARE TO BE REPLACED BY A REGISTERED PROFESSIONAL

LAND SURVEYOR FOR THE ORIGINAL PROPERTY OWNER AT NO SEPARATE PAY.

11. CONSTRUCTION STAKING WILL BE PROVIDED BY THE CONTRACTOR. TWO COPIES OF STAKING NOTES TO

BE PROVIDED TO THE ENGINEER PRIOR TO CONSTRUCTION.

12. THE COUNTY OR THE COUNTYS SURVEYOR SHALL PROVIDE A BENCHMARK OR TEMPORARY BENCHMARK

AND SURVEY CONTROLS.

13. THE CONTRACTOR SHALL MAINTAIN UPDATED RED-LINED RECORD DRAWINGS ON SITE FOR INSPECTION BY

THE ENGINEER.

14. MOWING, MAINTENANCE, AND CLEAN-UP OF THE PROJECT SHALL MEET THE REQUIREMENT OF SPECIFICATION ITEM 560 (NO SEPARATE PAY). MOWING, MAINTENANCE, AND CLEAN-UP IS REQUIRED

• FOR THE PROJECT LIMITS AND DURATION, REGARDLESS OF THE CONTRACTOR'S SCOPE OF ACTIVITIES

WITHIN THE PROJECT LIMITS.

15. THE REMOVAL OF ANY ABANDONED UTILITIES REQUIRED TO COMPLETE THE WORK SHALL BE INCIDENTAL

AND NO SEPARATE PAYMENT SHALL BE MADE.

16. IT IS THE CONTRACTOR'S RESPONSIBILITY TO STOCKPILE NECESSARY MATERIAL ON-SITE OR AT A SECURED OFF-SITE LOCATION AT NO ADDITIONAL EXPENSE TO HARRIS COUNTY. ANY SUITABLE EXCAVATED MATERIAL ON THE PROJECT WHICH IS AVAILABLE AT THE TIME OF NEED; WHETHER FROM

STORM SEWER, ROADWAY, ANO/OR CHANNEL EXCAVATION, SHALL BE USED BEFORE BORROW IS BROUGHT

ON-SITE.

17. MANHOLES, JUNCTION BOXES, INLETS, ANO RISERS ARE TO BE PRE-CAST OR CAST IN PLACE.

TRAFFIC CONTROL

1. THE CONTRACTOR SHALL PROVIDE ANO INSTALL TRAFFIC CONTROL DEVICES IN

CONFORMANCE WITH PART VI OF THE MOST RECENT EDITION OF THE MANUAL ON

UNIFORM TRAFFIC CONTROL DEVICES AND THE APPROVED TRAFFIC CONTROL PLAN.

2. THE CONTRACTOR SHALL MAINTAIN AT LEAST ONE LANE OF TRAFFIC IN EACH

DIRECTION DURING WORKING HOURS EXCEPT DURING FLAGGING OPERATION OR PROVIDE

DETOURS AROUND THE CONSTRUCTION SITE ANO PROVIDE PUBLIC NOTIFICATION.

3. LANE CLOSURES SHALL BE DURING OFF-PEAK HOURS ONLY (MONDAY THROUGH FRIDAY

9 A.M. TO 4 P.M.) UNIFORMED PEACE OFFICERS OR FLAGGERS IN RADIO CONTACT ARE

REQUIRED TO DIRECT TRAFFIC DURING LANE CLOSURES.

4. DETOURS REQUIRE PRIOR APPROVAL OF THE FIELD ENGINEER ANO PRECINCT. DETOUR

PLANS, IF ALLOWED, MUST INCLUDE APPROPRIATE DETOUR SIGNAGE, PUBLIC NOTICE VIA

SIGNAGE TWO WEEKS IN ADVANCE STATING THE DATES OF THE AGREED UPON DATE OF

CLOSURE ANO DATE THE ROAD WILL RE-OPEN TO TRAFFIC. CONTRACTOR TO USE (WITH

PRIOR APPROVAL OF THE FIELD ENGINEER) HIGH EARLY STRENGTH CONCRETE AND OTHER

RELATED CONSTRUCTION METHODS TO MINIMIZE THE DURATION OF THE DETOUR AND TO

ENSURE THAT THE ROADWAY IS OPEN ON, OR PRIOR TO, THE AGREED UPON DATE.

5. ONE DAY PRIOR TO THE IMPLEMENTATION OF A TRAFFIC CONTROL PLAN PHASE OR STEP,

OR THE IMPLEMENTATION OF AN ADDITIONAL, REVISED, OR NEW TRAFFIC CONTROL

ELEMENT, THE CONTRACTOR SHALL MEET WITH THE ENGINEER TO GIVE A DETAILED

DESCRIPTION OF THE CONTRACTOR'S PLAN AND PREPARATIONS. THE CONTRACTOR

SHALL OBTAIN WRITTEN CONCURRENCE FROM THE ENGINEER THAT ADEQUATE PROJECT

PROGRESS HAS BEEN ACHIEVED AND THAT ADEQUATE PREPARATIONS ARE IN PLACE

PRIOR TO SWITCHING TRAFFIC. IF, IN THE OPINION OF THE ENGINEER, REQUIRED

PROGRESS AND ADEQUATE PREPARATIONS ARE NOT COMPLETE, THE CONTRACTOR SHALL

NOT IMPLEMENT THE NEXT PHASE, STEP, OR ELEMENT OF TRAFFIC CONTROL UNTIL

INCOMPLETE CONSTRUCTION ITEMS OR PREPARATIONS ARE COMPLETED. TIME EXTENSIONS

WILL NOT BE GRANTED FOR DELAYS CAUSED BY THE INCOMPLETE CONSTRUCTION ITEMS

OR INADEQUATE CONTRACTOR PREPARATIONS REQUIRED TO IMPLEMENT TRAFFIC CONTROL.

6. TRAFFIC CONTROL PER THE CONTRACT IS REQUIRED FOR THE ENTIRE DURATION OF THE

PROJECT, INCLUDING THE PUNCHLIST PERIOD. PAYMENT FOR TRAFFIC CONTROL THAT IS

PROPERLY INSTALLED FOR LESS THAN A FULL MONTH SHALL BE BASED ON A

PERCENTAGE BASIS OF THE TIME INSTALLED. TRAFFIC CONTROL PAYMENTS TO THE

CONTRACTOR SHALL END 10 DAYS AFTER SUBSTANTIAL COMPLETION, ALTHOUGH PROPER

TRAFFIC CONTROL MUST BE MAINTAINED UNTIL PUNCHLIST COMPLETION.

7. THE PURPOSE OF THE CONSTRUCTION SEQUENCE ANO TRAFFIC HANDLING OUTLINED HEREIN

IS TO DOCUMENT A VIABLE TCP THAT CAN BE UTILIZED TO CONSTRUCT THE PROJECT. IT IS

THE BASIS OF ESTIMATION FOR THE TRAFFIC CONTROL BID ITEMS, AND IS TO BE UTILIZED

ANO IMPLEMENTED, UNLESS OTHERWISE DIRECTED BY THE ENGINEER.

IF THE CONTRACTOR CHOOSES TO USE A DIFFERENT TCP, HE/SHE SHALL PREPARE ANO

SUBMIT THE ALTERNATIVE TCP TO THE COUNTY FOR APPROVAL NO LESS THAN 10 WORKING

DAYS PRIOR TO THE PROPOSED IMPLEMENTATION DATE. THE TCP SHALL BE DRAWN TO SCALE

ANO SIGNED & SEALED BY A PROFESSIONAL ENGINEER LICENSED TO PRACTICE IN THE STATE

OF TEXAS. UPON APPROVAL BY HARRIS COUNTY, THE ALTERNATIVE PLAN SHALL BECOME THE

BASIS FOR A "CHANGE IN CONTRACT" TO REVISE THE TRAFFIC CONTROL BID ITEMS

ACCOROINGL Y ANO BECOME PART OF THE CONTRACT DOCUMENTS.

HCFCD GENERAL NOTES:

FENCES AND/OR OTHER ENCROACHMENTS IN THE HCFCD RIGHT-OF-WAY ARE NOT TO BE REMOVED UNLESS OTHERWISE STATED ON THE PLANS. IN CASES WHERE FENCE REMOVAL IS INDICATED ON THE PLANS, THE FENCE SHALL BE REMOVED AND PLACED NEATLY ON THE ADJACENT PROPERTY AT THE START OF CONSTRUCTION. WHERE THERE IS NOT A SEPARATE ITEM LISTED ON THE UNIT PRICE SCHEDULE, THE ENCROACHMENT REMOVAL IS

INCIDENTAL TO SITE PREPARATION AND RESTORATION.

DO NOT ENTER PRIVATE PROPERTY WITHOUT PROPER WRITTEN AUTHORIZATION FROM THE OWNER. PROVIDE COPY

OF WRITTEN PERMISSION TO HCFCD.

STRIP VEGETATION AND TOPSOIL AND STOCKPILE FOR REUSE ONSITE. MATERIAL FOUND UNACCEPTABLE BY THE ENGINEER WILL BE REMOVED AND PAID AS EXCAVATION AND OffSITE DISPOSAL. NO SEPARATE MEASUREMENT AND PAYMENT WILL BE MADE FOR STRIPPING, STOCKPILING AND PLACING ON-SITE TOPSOIL. THE COST FOR THIS WORK WILL BE INCIDENTAL TO RELATED PAY ITEMS UNDER SPECIFICATION SECTION NUMBER 02.315 LISTED ON THE UNIT

PRICE SCHEDULE.

RIPRAP AND GRANULAR FILL MATERIAL REMOVED DURING EXCAVATION, MEETING SPEGIFICATION SECTION NUMBER 02.378, SHALL BE REUSED AS DIRECTED BY THE ENGINEER. REUSED MATERIAL WILL BE MEASURED AND PAID FOR AS EXCAVATION AND ON-SITE FILL UNDER SPECIFICATION NUMBER 02.315. NO SEPARATE MEASUREMENT OR PAYMENT WILL BE MADE FOR PROCESSING, HANDLING, STOCKPILING, AND PLACING MATERIAL FOUND TO BE ACCEPTABLE FOR REUSE. UPON APPROVAL OF THE ENGINEER, DISPOSAL OF NONCONFORMING RIPRAP AND GRANULAR FILL MATERIAL WILL BE MEASURED AND PAID FOR AS REMOVE AND DISPOSE OF CONCRETE RUBBLE

UNDER SPECIFICATION SECTION NUMBER 02120, MATERIAL DISPOSAL.

THE LOCATION AND GRADE OF THE BACKSLOPE INTERCEPTOR STRUCTURES AND SWALES MAY BE ADJUSTED IN THE FIELD BY THE ENGINEER AT THE TIME OF CONSTRUCTION. UNLESS OTHERWISE INSTRUCTED BY THE ENGINEER, THE BACKSLOPE INTERCEPTOR STRUCTURE SHALL BE SET AT A MAXIMUM DEPTH OF 2.5 FEET AND THE MINIMUM GRADE FOR BACKSLOPE SWALES SHALL BE 0.2::l

ADJUST AND/DR EXTEND YARD DRAINS TO OUTFALL AT TOE OF CHANNEL PER STANDARD OUTFALL DETAILS.

PAYMENT WILL BE INCIDENTAL TO SITE PREPARATION AND RESTORATION.

COMPLETED SECTIONS OF THE CHANNEL WILL BE TURNED OVER FOR VEGETATION ESTABLISHMENT IN MAXIMUM 150D LINEAR FOOT SEGMENTS. CONTRACTOR MAY NOT DISTURB GREATER THAN 1500 LF OF CHANNEL AT A TIME.

CLEAR AND REMOVE AU SILT FROM CULVERTS, PIPES AND UNDER BRIDGES TO THE PROPOSED DESIGN GRADES TO

PROVIDE POSITIVE FLOW.

LENGTHS AND DIAMETERS REPRESENTED ON PLANS ARE APPROXIMATE. CONTRACTOR WILL BE RESPONSIBLE FOR

FIELD VERIFICATION PRIOR TO ORDERING MATERIALS.

ACTIVITIES THAT DISTURB BIRD. HABITAT, INCLUDING BUT NOT LIMITED TO CLEARING, GRUBBING, AND IMPACTS TO STRUCTURES WHERE MIGRATORY BIRDS AND BALD EAGLES MIGHT NEST, REQUIRE A NEST HABITAT SURVEY. DO NOT PROCEED UNTIL HARRIS COUNTY FLOOD CONTROL DISTRICT HAS CONDUCTED A NEST HABITAT SURVEY TO VERIFY ACTIVE MIGRATORY BIRD NESTS AND BALD EAGLE NESTS ARE NOT PRESENT. THE HARRIS COUNTY FLOOD

CONTROL DISTRICT MUST PROVIDE WRITTEN AUTHORIZATION TO PROCEED.

WHEN BANK EROSION REPAIRS CAU FOR THE PLACEMENT OF .3"x5" GRANULAR FILL IN THE CHANNEL BOTTOM TO ESTABLISH A BASE FOR REBUILDING THE SLOPE. THE .3"x5" GRANULAR FILL SHALL BE LIMITED TO AN ELEVATION

6-INCHES ABOVE THE NORMAL WATER SURF ACE ELEVATION LEVEL.

THE CONTRACT CONTAINS UNIT ITEMS FOR THE ESTABLISHMENT OF BEST MANAGEMENT PRACTICES FOR STORM WATER QUALITY PURPOSES. WHEN NOT CALLED FOR IN THE PROJECT PLANS, COORDINATE THE NEED AND LOCATION OF THESE UNIT ITEMS WITH THE DISTRICT REPRESENTATIVE ON SITE PRIOR TO PLACEMENT. THESE UNIT ITEMS INCLUDE. BUT ARE NOT LIMITED TO, REINFORCED SILT FENCE FOR MATERIAL STOCKPILES, ANCHORED SODDING FOR DISTURBED EARTHEN AREAS OR AROUND CONCRETE AND CONCRETE INTERCEPTOR, AND STABILIZED CONSTRUCTION

ACCESS FOR PROJECT SITE INGRESS/EGRESS.

WHEN INCLUDED IN THE SCOPE OF WORK, THE PURPOSE OF DEEP PLOWING THE SLOPE OR BERM OF A CHANNEL IS TO BREAK UP THE DESICCATED SOILS AND TO ELIMINATE ANY VOIDS, OR RILLING CLOSE TO THE SURFACE OF THE SLOPE OR BERM. THE CONTRACTOR WILL DEEP PLOW THE SLOPE OR BERM TO A MINIMUM DEPTH OF 2 FEET IN AREAS CONTAINING VOIDS AND/OR RILLING. IN AREAS OF VOIDS ONLY, THE SURFACE FROM WHICH THE 2 FEET DEPTH IS MEASURED WILL BE THE LEVEL OF THE SURROUNDING UNDISTURBED SOIL. IN AREAS OF RILLING, THE RILLS WILL FIRST BE KNOCKED DOWN AND LEVELED OFF. THE 2 FEET DEPTH WILL THEN BE MEASURED FROM THIS NEW SURF ACE. THE CONTRACTOR WILL DETERMINE THE MEANS AND METHODS FOR DEEP PLOWING.)

TREES AND PLANTS LOCATED WITHIN A DESIGNATED TREE PROTECTION ZONE (TPZ) SHALL BE PRESERVED. REFER TO SPECIFICATION SECTION 01566 - TREE AND PLANT PROTECTION, FOR DETAILED INFORMATION ON TREE AND PLANT PRESERVATION PRACTICES AND PROCEDURES INCLUDING, BUT NOT LIMITED TO, ROOT PRUNING, VEGETATION

TRIMMING, FENCING AND OTHER PRESERVATION OPERATIONS.

IF APPLICABLE, CONTRACTOR SHALL AVOID ANY WETLAND AREAS BEYOND THE LIMITS OF EXCAVATION AND CLEARING. AS THE FIRST WORK ITEM CONTRACTOR WILL BE RESPONSIBLE FOR INSTALLING FENCING OR OTHER MATERIAL TO IDENTIFY AND PROTECT THE IDENTIFIED WETLAND AREAS, UNLESS WETLANDS HAVE BEEN IDENTIFIED AND FENCED BY HCFCD PRIOR TO CONSTRUCTION AND CONTRACTOR HAS WRITTEN EVIDENCE, 0/F SUCH.

~\\\11'"'"'''1 /// ~,\.''':,.:,·•.'/,; •Vi,; E:,c / 111///

1:..'Y..-t~FE-:~:~:;·· ... ·.,.~,\ .S • : ~ ~ l = ~ 81093 !

; i ~ ==

2 ~ \,.. . ..,, . .,. : ~: :· •.:-.~,:-;-)$ 3 ~_,:~.:.. -·---' .$" ..! ,'O· ~ g ;;;,.,. . ...• • '"'; . ....._;, ❖,. :·.- __ ,. ,.,, .. 10).Y·,.;,:=' ~r::::::-.-------::::::-:::=-=-----------.----:::-:::::--r:-::-:-:-:--T""------------------------------------==-----.----------------,-------------Tnc;;;;;e;:;,-.;c;;~---------4;m.:-'--"-...,_""-...::a:-:.'rr'-------1 .., NO. REVISIONS DATE NAME @~ = s·1nkley8arf"1eld ...-... PROJECT °WATER LINE REHABILITA'r~,DliUBSEN. PARK i t--,/\r--+----------4--'-----'-----l-----=--I HARR Is CO u NTY ~~~t UPIN 25101 MF3PZ01 f ~ ENGINEERING DEPARTMENT ~ ~EE~!:!,~ ~~; :=~::-~"'""' c~:~~A~ ~~~J5 l>O/";,, :?-.., .. I\· 171DSeamistDJ,Houston,TX77008 ~~fc>'f&'202S Iu1:.:::,11.,ANB~T: 1I,1.ALt: l"""t.t. 1 r.u:

71l.869.34ll I Binldey11ar11etd.DCCM.com HORIZ: VALUE VERT: VALUE 5 / 157

Q.

"' "' N g " I fr I l5 I

0 ., .., ., I ., N

"' C "i e g t N N u i, HCFCD NOTES CONTINUED:

1. THE PROJECT PLANS ARE INTENDED AS A GUIDE. THE REPAIR AREA LIMITS WILL BE DETERMINED IN THE FIELD BY

THE HCfCD REPRESENTATIVE. DUE TO THE DYNAMIC CONDITIONS IN THE FIELD, PROJECT SCOPE AND QUANTITIES MAY VARY FROM THE PLANS AND/OR CROSS SECTIONS. HCFCD RESERVES THE RIGHT TO ADJUST PLANS AND

QUANTITIES AS NECESSARY. PROJECT SCOPE MAY BE ADJUSTED AS PRIORITIES CHANGE.

2. THE PURPOSE OF THE CHANNEL DESIL T IS TO RESTORE POSITIVE DRAINAGE DURING LOW FLOW CONDITIONS. UNLESS SPECIFICALLY STATED OTHERWISE, IT IS NOT THE INTENT OF THE PROJECT TO DEEPEN THE CHANNEL BEYOND ITS ORIGINAL DESIGN CONFIGURATION. EXCAVATION OF SILT SHOULD NOT UNDERMINE THE TOE OF THE SLOPE.

CONSTRUCTION NOTES FOR WORK IN EXISTING OR PROPOSED

HARRIS COUNTY FLOOD CONTROL DISTRICT RIGHT-OF-WAY

1. OBTAIN AND COMPLY WITH ALL APPLICABLE CITY, COUNTY, STATE, AND FEDERAL PERMITS.

2. NOTIFY THE HARRIS COUNTY ROAD CONTROL DISTRICT'S DEVELOPMENT COORDINATION AND INSPECTION DEPARTMENT AT LEAST 48 HOURS PRIOR TO CONSTRUCTION. PLEASE SUBMIT THE HCFCD- 48-HOUR PRE-CONSTRUCTION NOTIFICATION FORM AND A COPY OF THE APPROVED PLANS BY EMAIL TO DCIDCIHCFCD.HCTX.NET

3. FOR WORK IN FLOOD CONTROL DISTRICT RIGHT-OF-WAY, CONTACT THE HARRIS COUNTY FLOOD CONTROL DISTRICT DEVELOPMENT COORDINATION AND INSPECTION DEPARTMENT REQUESTING INSPECTION OF APPLICABLE ITEMS. PRIOR

TO REQUESTING INSPECTION, THE DRAINAGE RIGHT-OF-WAY SHALL BE STAKED AND FLAGGED.

4. TO SCHEDULE A FINAL INSPECTION, THE ENGINEER SHALL SUBMIT A CONSTRUCTION CERTIFICATION LETTER TO THE HARRIS COUNTY FLOOD CONTROL DISTRICT'S DEVELOPMENT COORDINATION AND INSPECTION DEPARTMENT UPON THE

COMPLETION OF CONSTRUCTION

5. PROTECT, MAINTAIN, AND RESTORE EXISTING BACKSLOPE DRAINAGE SYSTEMS.

6. BACKSLOPE SWALE AND INTERCEPTOR STRUCTURE ELEVATIONS AND LOCATIONS ARE APPROXIMATE. FINAL ELEVATIONS AND LOCATIONS SHALL BE FIELD VERIFIED BY THE ENGINEER PRIOR TO INSTALLATION.

7. ESTABLISH TURF GRASS ON ALL DISTURBED AREAS WITHIN THE CHANNEL AND DETENTION BASIN RIGHT-OF-WAY, EXCEPT THE CHANNEL BOTTOM AND WHERE CONCRETE PAVING IS USED. THE MINIMUM ACCEPTANCE CRITERIA IS

75" COVERAGE OF LIVE BERMUDA GRASS AND NO EROSION OR RILLS DEEPER THAN 4 INCHES.

PERFORM ALL ACTIVITIES WITHIN HARRIS COUNTY FLOOD CONTROL DISTRICT RIGHT-OF-WAY IN ACCORDANCE WITH

THE MOST RECENT HARRIS COUNTY FLOOD CONTROL DISTRICT STANDARD SPECIFICATIONS.

EXCAVATE CHANNEL FLOWLINE TO DESIGN ELEVATIONS SHOWN ON THE PLANS AND DOWNSTREAM AS NECESSARY TO ENSURE NO STANDING WATER REMAINS IN THE FACILITY (E.G. STORM SEWER, LATERAL CHANNEL. OR DRY BOTTOM DETENTION BASIN) DURING NORMAL WATER SURF ACE CONDITIONS IN THE CHANNEL IN ORDER THAT THE FACILITY WILL FUNCTION AS INTENDED. FOR WET BOTTOM DETENTION BASINS, ENSURE NO WATER IS ABOVE THE DESIGN PERMANENT POOL ELEVATION DURING NORMAL WATER SURFACE CONDITIONS IN THE CHANNEL.

MAINTAIN FLOW IN THE CHANNEL DURING CONSTRUCTION AND RESTORE AREAS DISTURBED BY CONSTRUCTION

ACTIVITY.

REMOVE ALL EXCAVATED MATERIAL FROM THE HARRIS COUNTY FLOOD CONTROL DISTRICT RIGHT-OF-WAY. NO FILL IS TO BE PLACED WITHIN A DESIGNATED FLOOD PLAIN UNLESS SPECIFIED IN THE DESIGN PLANS.

SWPPP CONSTRUCTION NOTES:

1. CONTRACTOR SHALL IMPLEMENT INLET PROTECTION DEVICES AND REINFORCED FILTER FABRIC

BARRIER ALONG ROAD AND SIDE DITCHES AT LOCATIONS SHOWN ON THE STORM WATER

POLLUTION PREVENTION (SWPP) PLANS TO KEEP SILT AND OR EXCAVATED MATERIALS FROM

ENTERING INTO THE STORM WATER INLETS AND DITCHES EVENTUALLY POLLUTION THE RECEIVING

STREAM.

2. DURING THE EXCAVATION PHASE OF THE PROJECT. CONTRACTOR SHALL SCHEDULE THE WORK IN

SHORT SEGMENTS SO THAT EXCAVATION MATERIALS CAN BE QUICKLY HAULED AWAY FROM THE

SITE AND TO PREVENT IT FROM STAYING UNCOLLECTED ON THE EXISTING PAVEMENT. ANY LOOSE EXCAVATED MATERIAL WHICH FALLS ON PAVEMENTS OR DRIVEWAYS SHALL BE SWEPT BACK INTO

THE EXCAVATED AREA

3. CONTRACTOR SHALL CLEAN UP THE EXISTING STREET INTERSECTIONS ANO DRIVEWAYS DAILY. AS

NECESSARY, TO REMOVE ANY EXCESS MUD, SILT, OR ROCK TRACKED FROM THE EXCAVATED

AREA.

4. CONTRACTOR SHALL FOLLOW GOOD HOUSEKEEPING PRACTICES DURING THE CONSTRUCTION OF

THE PROJECT, AND ALWAYS CLEANING UP DIRT AND LOOSE MATERIAL AS CONSTRUCTION

PROGRESSES.

5. CONTRACTOR TO INSPECT AND MAINTAIN THE ARES LISTED BELOW AT LEAST ONCE EVER

FOURTEEN (14) CALENDAR DAYS ANO WITHIN 24 HOURS OF THE ENO OF A STORM EVEN OF 0.5

INCHES OR GREATER.

• DISTURBED AREAS OF THE CONSTRUCTION SITE THAT HAVE NOT BEEN FINALLY STABILIZED.

• AREAS USED FOR STORAGE OF MATERIALS THAT ARE EXPOSED TO PRECIPITATION.

• STRUCTURAL CONTROL MEASURES.

• LOCATIONS WHERE VEHICLES ENTER OR EXIT THE SITE.

6. CONTRACTOR TO BE RESPONSIBLE TO MAINTAIN EXISTING DITCHES AND OR CULVERTS FOR

UNOBSTRUCTED DRAINAGE AT ALL TIMES. WHERE SODDING IS DISTURBED BY EXCAVATION ON

BACKFILLING OPERATIONS, SUCH AREAS SHALL BE REPLACED BY SEEDING OR SODDING. SLOPES

4: 1 OR STEEPER SHALL BE REPLACED BY BLOCK SODDING.

GEOTECHNICAL NOTES

STORM SEWER

• DESIGN AND CONSTRUCTION SHOULD ADDRESS BEDDING AND BACKFILL. WATER CONTROL, AND

TRENCHING AND SHORING CONSIDERATIONS FOR OPEN-CUT INSTALLATION. A TRENCHLESS

CONSTRUCTION CAN BE CONSIDERED FOR THE STORM SEWER WITHIN THE DOWDELL WOODS

SUBDIVISION WHICH WILL BE INSTALLED BENEATH THE EXISTING DRAINAGE DITCH. DESIGN ANO CONSTRUCTION CONSIDERATIONS FOR OPEN CUT AND TRENCHLESS CONSTRUCTION ARE PRESENTED

IN THE FOLLOWING PARAGRAPHS.

TRENCH EXCAVATION

EXCAVATION FOR THE STORM SEWER CAN EITHER BE SLOPED, IF SPACE IS AVAILABLE OR

VERTICAL. INFORMATION FOR EACH SITUATION IS PRESENTED BELOW.

SLOPED EXCAVATIONS.

• • THE OCCUPATIONAL SAFETY ANO HEALTH ADMINISTRATION (OSHA) STANDARDS (29 CFR, PART

1926.650 TO .652, SUBPART P. APPENDIX A PROVIDE FOUR OPTIONS FOR THE DESIGN OF

SLOPING AND BENCHED EXCAVATIONS. THE DESIGN OPTION 2 IS BASED ON SOIL TYPE. THREE

SOIL TYPES ARE INCLUDED IN APPENDIX A OF THE OSHA REGULATIONS. BASED ON THE OSHA

DEFINITIONS, THE ON-SITE CLAYS ARE INTERPRETED AS TYPE B SOILS, AND THE SANDS ARE

INTERPRETED AS TYPE C SOILS

• BASED ON THE OSHA STANDARDS. OPEN-CUT EXCAVATIONS ABOVE THE WATER TABLE SHOULD

BE CONSTRUCTED WITH SLOPES NO STEEPER THAN 1-VERTICAL ON 1-HORIZONTAL (45) FOR TYPE

B SOILS AND NO STEEPER THAN 1-VERTICAL ON 1.5-HORIZONTAL (34) FOR TYPE C SOILS.

FLATTER SLOPES WOULD BE NECESSARY FOR EXCAVATIONS BELOW THE WATER TABLE. IT SHOULD

BE NOTED THAT FLATTER SLOPES MIGHT BE NECESSARY DUE TO THE PRESENCE OF SILT AND

SAND, IF LOCALIZED INSTABILITIES OR SLOUGHING IS ENCOUNTERED. THE OSHA STANDARDS

REQUIRE SITE-SPECIFIC ENGINEERING DESIGN OF EXCAVATIONS GREATER THAN 20 FT.

VERTICAL EXCAVATIONS.

• VERTICAL EXCAVATIONS MAY ALSO BE CONSIDERED FOR THE UTILITY TRENCHES. THE MINIMUM

EXCAVATION WIDTH WILL DEPEND ON THE NOMINAL PIPE SIZE. VERTICAL EXCAVATIONS SHOULD

BE SHEETED AND BRACED OR CONSTRUCTED WITH THE AID OF A PREFABRICATED TRENCH BOX.

ALL VERTICAL EXCAVATIONS DEEPER THAN 5 FT REQUIRE A TRENCH SAFETY SYSTEM. THE OSHA

STANDARDS FOR EXCAVATIONS (29 CFR PART 1926.652C) PROVIDE FOUR OPTIONS FOR THE

DESIGN OF EARTH SUPPORT SYSTEMS FOR VERTICAL TRENCH EXCAVATIONS. DESIGN OPTION 1

CAN BE USED FOR TIMBER AND ALUMINUM HYDRAULIC SHORING SYSTEMS FOR EXCAVATIONS LESS THAN 20 FT. THIS DESIGN APPROACH IS BASED ON USING ONE OF THREE SOIL CLASSIFICATIONS

INCLUDED IN APPENDIX A OF THE OSHA REGULATIONS.

BEDDING ANO BACKFILL

• ITEM 430 OF THE HARRIS COUNTY SPECIFICATIONS OUTLINES REQUIREMENTS FOR CONSTRUCTION

OF UNDERGROUND UTILITIES. BEDDING ANO BACKFILL DETAILS PRESENTED IN ORDINARY PIPE BEDDING, DRAWING NO. HC430-1 IS APPLICABLE IF THE STORM SEWER IS LOCATED OUTSIDE OF THE ROADWAY. BEDDING AND BACKFILL DETAILS PRESENTED IN SPECIAL PIPE BEDDING, DRAWING

NO. HC430-2 IS APPLICABLE IF THE STORM SEWER IS CONSTRUCTED BELOW THE ROADWAY.

IF SANDS OR SIL TS ARE ENCOUNTERED, AND IF A FIRM, ORY BOTTOM IS NOT PRESENT UPON COMPLETION OF EXCAVATION, OEWATERING AND BEDDING AND BACKFILL MEETING SPECIAL PIPE

BEDDING FOR UNSTABLE SOIL CONDITIONS, AS OUTLINED IN DRAWING NO. HC430-3 MAY BE

REQUIRED.

A REPLACEMENT OUTFALL STRUCTURE WILL BE CONSTRUCTED NEAR THE BOTTOM THE CYPRESS

CREEK. HARRIS COUNTY FLOOD CONTROL DISTRICT (HCFCD) MINIMUM REQUIRED SIDE SLOPE OF

4-HORIZONTAL TO 1-VERTICAL CHANNEL IS CONSIDERED FOR THE PROPOSED OUTFALL

STRUCTURE AT THE CYPRESS CREEK. ENGINEERING ANALYSES WERE PERFORMED TO EVALUATE

THE PROPOSED CHANNEL SIDE SLOPES. OUR SLOPE STABILITY ANALYSES ARE PRESENTED IN THE

FOLLOWING REPORT SECTIONS.

EROSION CONTROL

• GEOTECHNICAL SOIL CONDITIONS, CHANNEL HYDRAULICS. AND ACTUAL FIELD CONDITIONS ARE

ESSENTIAL IN DEVELOPING A GOOD EROSION CONTROL PLAN. HOWEVER, DUE TO THE DYNAMIC

AND COMPLEX NATURE OF WATER FLOW AND THE SOIL INTERFACE, EROSION CONTROL PLANS ARE

USUALLY BASED ON EMPIRICAL RELATIONSHIPS, WATER FLOW FUNDAMENTALS. AND FIELD

EXPERIENCE.

• SIGNIFICANT SOILS EROSIONS ALONG THE SIDE SLOPES AT THE CYPRESS CREEK WERE OBSERVED

DURING OUR SITE VISIT. IT IS RECOMMENDED THAT THE SLOPES THAT DAMAGED BY SHALLOW

SLIDES. RILLS, AND GULLIES BE EXCAVATED (BENCHING TO CREATE A BETTER BOND BETWEEN NEW

FILL AND OLD FILL). THE EROSION DAMAGED AREAS SHOULD BE OVER-EXCAVATED (AT LEAST

3-FT INTO UN-DISTURBED SLOPE SOILS). REPAIR ONLY THE DAMAGED AREAS WILL RISK OF

RE-OCCURRING OF THE SLOPE EROSION. THE NEW FILL SOILS SHOULD BE PLACED AND

COMPACTED IN HORIZONTAL LIFTS OF NO MORE THAN 6 IN. AFTER COMPACTION. THE MATERIALS

SHOULD BE COMPACTED TO 95% OF THE MAXIMUM DRY DENSITY (ASTM D 698). THE MOISTURE

CONTENTS FOR BACKFILL SHOULD BE WITHIN 1% ORY TO 3% WET OF THE OPTIMUM MOISTURE

CONTENT.

COH GENERAL CONSTRUCTION NOTES

WATER NOTES:

1. WATER LINES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE LATEST CITY OF HOUSTON INFRASTRUCTURE DESIGN

MANUAi., STANDARD SPECIFICATION, AND CONSTRUCTION DETAILS.

2. All 4· THROUGH 12" WATER LINE TO BE AWWA C-900 PVC DR-18 BLUE PRESSURE RATED WATER MAIN WITH 2" ANO

SMAI.LER WATER SERVICE LINE TO BE CONTINUOUS TYPE K COPPER TUBING PER COH STANDARD SPECIFICATION SECTION 02503. All 4· THRU 54· 01 PIPE WATER LINES SHALL BE AWWA C151 WITH INSIDE LINING WITH AWWA C104

AND DOUBLE WRAPPED WITH 8-MIL POLYETHYLENE SHEETS.

3. CONCRETE THRUST BLOCKS SHALL BE PROVIDED AS NECESSARY TO PREVENT PIPE MOVEMENT. USE RESTRAINED JOINTS WHERE PREVENTING MOVEMENT OF 16" OR GREATER PIPE IS NECESSARY DUE TO THRUST.

4. All WATER LINES UNDER PROPOSED OR FUTIJRE PAVING ANO TO A POINT OF ONE (1) FOOT BACK OF All PROPOSED OR FIJTURE CURBS SHALL BE ENCASED IN BANK SAND TO 12" OVER PIPE AND BACKFILLED WITH CEMENT

STABILIZED SAND TO WITHIN ONE (1) FOOT OF SUBGRADE.

5. All WATER LINE AND SEWER LINE CROSSINGS SHALL BE CONSTRUCTED PER CITY OF HOUSTON AND TCEQ

REGULATIONS.

6. All WATER VALVES SHALL BE SUPPLIED AND INSTALLED IN ACCORDANCE WITH THE LATEST EDITION OF AWWA C-500

AND SHALL BE OF THE RESILIENT SEAT TYPE.

7. All WATER LINES TO BE DISINFECTED IN CONFORMANCE WITH AWWA C-651 AND THE TEXAS STATE DEPARTMENT OF HEAi.TH. AT LEAST ONE BACTERIOLOGICAL SAMPLE SHALL BE COLLECTED FOR EVERY 1,000 LINEAR FEET OF WATER

LINE AND SHALL BE REPEATED IF CONTAMINATION PERSISTS.

8. ALL BELOW GRADE VALVES SHALL BE CASKETED, HUB-END GATE VALVES WITH A CAST IRON BOX, EXCEPT WHERE

FLANGES ARE CAI.LED OUT ON THE PLANS.

9. 4· THRU 12• FIT TINGS SHALL BE CEMENT MORTAR LINED COMPACT DUCTILE IRON PRESSURE FITTINGS PER ANSI A21.53. OR PUSH ON FITTINGS PER ANSI A21.10 PRESSURE RATED Al 250 PSIG.

10. HYDROSTATIC TESTING: ALL WATER PIPE SHALL BE TESTED FOR LEAKAGE IN ACCORDANCE WITH THE LATEST CITY OF HOUSTON STANDARD CONSTRUCTION SPECIFICATIONS. TESTS ARE TO BE PERFORMED ON THE ENTIRE FOOTAGE OF

WATER PIPE LINE INCLUDED IN THE PROJECT.

11. All WATER LINES TO HAVE 3' MINIMUM COVER TO FINISHED GRADE AND MINIMUM 12" CLEARANCE TO OTHER UTILITIES AT CROSSING UNLESS OTHERWISE NOTED ON PLANS. All WATER LINE INSTAI.LED OVER 8' DEEP SHALL UTILIZE

RESTRAINED JOINT FITTINGS.

12. CONTRACTOR SHALL KEEP WATER PIPE CLEAN AND CAPPED (OR OTHERWISE EFFECTIVELY COVERED) OPEN PIPE ENDS TO EXCLUDE INSECTS, ANIMALS OR OTHER SOURCES OF CONTAMINATION FROM UNFINISHED PIPE LINES AT TIMES WHEN

CONSTRUCTION IS NOT IN PROGRESS.

SANITARY SEWER NOTES:

1. ALL SANITARY SEWERS CROSSING WATER LINES WITH A CLEARANCE BETWEEN 12 INCHES AND 9 FEET SHALL HAVE A

MINIMUM OF ONE 18' JOINT OF 150 PSI DUCTILE IRON OR (GREEN) C900 PVC PIPE MEETING ASTM SPECIFICATION D2241 CENTERED ON WATER LINE. WHEN WATER LINE IS BELOW SANITARY SEWER, PROVIDE MINIMUM 2 FOOT

SEPARATION. •

2. CONTRACTOR SHALL PROVIDE A MINIMUM HORIZONTAi. CLEARANCE OF 9' FEET BETWEEN WATER LINES AND SANITARY

SEWER MANHOLES AND LINES.

GRADING NOTES:

1. GENERAL CONTRACTOR AND ALL SUBCONTRACTORS SHALL VERIFY THE SUITABILITY OF All EXISTING AND PROPOSED

SITE CONDITIONS INCLUDING GRADES AND DIMENSIONS BEFORE STARTING CONSTRUCTION. THE ENGINEER SHALL BE

NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES.

2. BEFORE STARTING CONSTRUCTION, CONTRACTOR SHALL VERIFY BENCHMARK ELEVATION AND NOTIFY ENGINEER IF ANY

DISCREPANCY AND/OR CONFLICT IS FOUND.

3. CONTRACTOR SHALL ENSURE THERE IS POSITIVE DRAINAGE FROM THE PROPOSED BUILDINGS AND NO PONDING IN PAVED AREAS. AND SHALL NOTIFY ENGINEER IF ANY GRADING DISCREPANCIES ARE FOUND IN THE EXISTING AND

PROPOSED GRADES PRIOR TO PLACEMENT OF PAVEMENT OR UTILITIES.

4. CONTRACTOR SHALL PROTECT All MANHOLE COVERS, VALVE COVERS, VAULT LIDS. FIRE HYDRANTS, POWER POLES, GUY WIRES. AND TELEPHONE BOXES THAT ARE TO REMAIN IN PLACE AND UNDISTURBED DURING CONSTRUCTION.

5. All EXISTING CONCRETE PAVING, SIDEWALK, AND CURB DEMOLITION SHALL BE REMOVED AND DISPOSED OF BY CONTRACTOR. DISPOSAi. SHALL BE AT AN APPROVED OFF-SITE. LAWFIJL LOCATION, UNLESS DIRECTED OTHERWISE BY

THE OWNER.

~J-:-:::--,-------=::-:::::::-:-:::----------r-:-:::=--r--::-T""------------------------------------==----,--------------.-------------r,;;;;:;-;;,;:,=c,""----------------------, NO. REVISIONS DATE NAME

@ BinkleyBarfield --- PROJECT m,-ER LINE REHABILITATION DEUSSEN PARK .., ., I ·11

I\ HARRIS I\

I\ ENGINEERING I\

COUNTY

DEPARTMENT

...... /ffW Bmkkry & Barf'aold, Inc. I TxEng F-257

1110 Seamist Or, Houston, TX nooa

~)t UPIN 25101 MF3PZ01 a ANDRES BERDUGO a f~Nt.tl Ut..J'-'n:it'IIUN:

07085 ::IJ GENERAL NOTES

'CEN't/•Qw#'. UN<nr< BY: I

(SHEET 2 OF 3) lu~0/16/25 a'ONAL t.,P. PD

~ L-',._.l._j_ ________________ ....J. ___ _l.. __ ..1.... ___________________________________ --==:=:::=--....L-.:..:.:=:=:...!.======::..........1. _____ -=====~----L.._:.:_~-.L...--.:..:..:::~;:__:..::::;=-:..::;:..:.:.....:.:..==------'--=---'c....;.:'-'---' I\ ~~IWl6'2025 1 uc~11.,;B ~r: I ~<..ALc: I ~"5"' i~'51 713.869.3'33 I Binlleyllllr1ield.OCCM.com HORIZ: VALUE VERT: VALUE

"'r-------------------------------------------------------------------------------------------------------------------------, a.

N l:l

"' z "' C) a.

"' 0 I I ...

C ..

f g

AT&T TEXAS/SWBT FACILITIES

1. THE LOCATIONS OF AT&T TEXAS/SWBT FACILITIES ARE SHOWN IN AN APPROXIMATE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .