19-2026-06-03 PROCURE W-Reed-Shed-Pergola-Design-Details.pdf
PDF 2 MB Posted
- Solicitation number
- 2041
- Issued by
- Arlington County, Alexandria City, Virginia
About this file
This file contains design specifications and a building permit for a storage shed and planting pergola project at Four Mile Run Park in Alexandria, Virginia, issued by the City of Alexandria Department of Code Administration. The project involves the procurement and installation of a Western Red Cedar Kit Pergola (10' x 12' configuration) along with a storage shed at 101 Dale Street. The design details include comprehensive assembly instructions, hardware specifications, and technical drawings prepared by Walpole Outdoors LLC. The pergola assembly requires 5.5-inch square posts, 1.5-inch by 7.25-inch carrying beams and joists, and 1.5-inch square lathing, with specified stainless steel fasteners including 3/8-inch by 5-inch lag bolts, 3-inch trim-head screws, and 2.5-inch deck screws. The building permit (Case Number BLD2018-01292) was issued on July 12, 2018, with an expiration date of January 12, 2019, and an estimated construction cost of $1,500. Construction hours are restricted to Monday through Friday 7:00 a.m. to 6:00 p.m. and Saturdays 9:00 a.m. to 6:00 p.m., with all construction prohibited on Sundays and designated holidays.
The permit requires compliance with the 2012 Virginia Construction Code and mandates multiple inspections including foundation, structural members, fasteners, and final completion inspections. Special conditions include erosion and sediment control measures, a requirement to call Miss Utility 811 before digging, consultation with a geotechnical engineer due to marine clay soil conditions, and separate trade permits for electrical, mechanical, and plumbing work if applicable. Shop drawings must be signed and sealed by the manufacturer and a Commonwealth of Virginia registered design professional before installation. The project is located within a floodplain and resource protection area, and work within 15 feet of overhead electrical lines requires coordination with Dominion Virginia Power. Total permit fees amounted to $112.37, covering building, administrative, information technology, permit center, training, and Virginia training costs.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRK2018-00003
.01 Material:
Product Class:
Master Item #:
6-30-13Date Drawn:
Drawn By:
Rev. Date:
Scale:
GENERAL INSTRUCTIONS
Product:
Description: Western Red Cedar Kit Pergola
Part Item #:
WESTERN RED CEDAR PERGOLA
GENERAL INSTRUCTIONS
Steps:
1. Upon receiving your pergola, please check to see that you have all the parts required. Reference the drawings for Post, Beam, Joist, and Lathing counts. Refer to the Hardware sheet to determine what the quantities of hardware should be for your pergola.
2. Using the drawings provided layout the post locations on the ground or surface on which you are install upon. Use the diagonal measurements to check to make sure you are placing the locations in a square fashion (this way the pergola will not look like a "parrallelogram" from above).
3. Begin digging holes. The holes should be approximately 12" in diameter, and 36" deep. If you are placing this structure on a concrete pad, or wall, you will need to core drill a 4" diameter hole with a minimum depth of 18", you may need to contact your local contractor to make these types of holes.
4. Take each post with it's pipe inserted and secured (see detail) in the bottom in each hole, and prop up with 2x4 boards as stands that angle back to the ground, or some other surface, for support. Each post will be delivered with 4" extra on the bottom in case there is a slight grade difference across your patio or grade surface. Be mindful of the directions of the bevels on the tops of the posts, the long/narrow flat spot on the top of the post should run in the same direction as the joists. Once you have the posts in their respective holes you can fasten a 2x4 between the tops of the posts to keep them at the exact distance they need to be from each other. You may use the 2-1/2" screws provided for this task, just remember to remove them so you can use them on the final assembly of the lathing. You may need 2 other people to help you in this procedure.
Once you have all posts plumb and in the correct spot, you can pour your concrete, or grout depending on your application.
5. Once the concrete has cured enough for you to begin work on the top, make sure you have all the drawings handy. Begin installing the beams use the 5/16" drill bit to drill pilot holes for the lag bolts, then joists, and finally lathing as shown on the drawing. View the "Typical Connections" drawing on 'how' members should be fastened to each other.
Items You will need that are NOT supplied:
- 8' Long 2x4 studs to support posts - Safety goggles
- 8' Step Ladder - Bags of concrete/grout
- Drill, with assorted bits - Wrench/Socket for lag bolts
- Tape measure - 3/8" Hi-Speed steel drill bit
- 5/16" Drill bit
M:\1-Standard-Products\SP-Wood-Fence\Pergola\2017-WRC-KitPergola.dwg, General Instruction, 2/15/2018 8:26:57 AM
.02 Material:
Product Class:
Master Item #:
6-30-13Date Drawn:
Drawn By:
Rev. Date:
Scale:
FASTENERS AND HARDWARE
Product:
Description:
Part Item #:
WESTERN RED CEDAR KIT PERGOLA - FASTENERS
10' x 10' 10' x 12' 10' x 14'
Beams to post -
8" x 5" lag bolt & wash stainless steel
28 pcs
Joists to beams - 3" stainless steel trim-head screws
35 pcs
Lath to joists - 2 1/2" stainless steel deck screws
90 pcs
Beams to post -
8" x 5" lag bolt & wash stainless steel
28 pcs
Joists to beams - 3" stainless steel trim-head screws
40 pcs
Lath to joists - 2 1/2" stainless steel deck screws
100 pcs
Beams to post -
8" x 5" lag bolt & wash stainless steel
28 pcs
Joists to beams - 3" stainless steel trim-head screws
45 pcs
Lath to joists - 2 1/2" stainless steel deck screws
110 pcs
M:\1-Standard-Products\SP-Wood-Fence\Pergola\2017-WRC-KitPergola.dwg, Hardware10x, 2/15/2018 8:26:57 AM
LAG HEAD
AND WASHER
VIEW FROM
OUTSIDE OF POST
VIEW FROM
INSIDE OF POST
2"
2"
3 1/4"
1 1/16" 1 1/16"
Drill 5/16" dia. pilot hole (4-1/2" deep) thru the beam and into the post, quickly insert your first lag to hold secure.
2x8 BEAM
5 1/2" PostSTAINLESS STEEL
LAG BOLTS
3" Screw
(1) per notch stagger at neighboring notch
Pre-drill w/CountersinkBeam
Joist
1-1/2"sq.
Lath
Top of Joist
2-1/2" Screw
.05 Material:
Product Class:
Master Item #:
6-30-13Date Drawn:
Drawn By: SDD Rev. Date:
Scale:
Western Red Cedar - Typical Connections Product:
Description:
Part Item #:
CARRYING BEAMS TO POSTS
JOISTS TO CARRYING BEAMS
LATHING TO JOISTS
1/16/17 M:\1-Standard-Products\SP-Wood-Fence\Pergola\2017-WRC-KitPergola.dwg, TypConn, 2/15/2018 8:26:57 AM
4" Extra/Grade
34"
66"
2-1/2" OD Pipe
5-1/2"sq. Posts
8"
12"
12"
3/8"x5" SS lag & Washer
1. Insert pipe into post 34".
2. Drill a hole at the top lag location using a 3/8" high speed steel drill bit, be careful to only drill to the other side of the pipe, but not the other side of the post (a total depth of 4").
3. Insert the lag bolt with washer and tighten to secure.
4. Repeat steps 2 and 3 for the middle, and then again for the bottom lag locations.
Bevel
.06 Material:
Product Class:
Master Item #:
6-30-13Date Drawn:
Drawn By: SDD Rev. Date:
Scale:
Western Red Cedar - Typical Connections Product:
Description:
Part Item #:
SECURING PIPE INTO POST
M:\1-Standard-Products\SP-Wood-Fence\Pergola\2017-WRC-KitPergola.dwg, PostInsert, 2/15/2018 8:26:58 AM
12'-0" O.C. Posts
'-0
" O .C
. P os ts
18"
16 3/8"
15 1/8 "
LATHING
O.C.
15'-0" O.A. Beam
'-4
" O .A
. J ois t
1 1/2" X 7 1/4"
JOISTS
1 1/2" X 7 1/4"
CARRYING
BEAMS
1 1/2" SQ.
LATHING
13'-5 1/2" O.A. Lathing
5 1/2" SQ.
POSTS
18"
JOISTS O.C.
187 7/16"
187 7/16"
1.00 Product:
10x12 Western Red Cedar Pergola
SKU # :
140252
1/16/17Date Drawn:
Drawn By: SDD Rev. Date: xxxx Mgr. Approval:
Customer Signature / Date :
Note: In order for Walpole Outdoors LLC to begin construction on this job, all drawings must be approved and signed by the CUSTOMER and/or ARCHITECT / CONTRACTOR.
NO
TI
CE
: A ny an d a ll i tem s c on tai ne d i n t his do cu me nt ar e p ro tec ted by fe de ra l c op yri gh t la ws (t itle
, U .S
. C od
e) , p lea se do no t d ist rib ute
, o r d up lic ate in an y ma nn er w ith ou t e xp re ss ed w ritt en co ns en t fr om an au tho riz ed
W alp ole O utd oo rs
LL
C Re pr es en tat ive (S ec tio n 1 of th e 1
6 C op yri gh t A ct)
W alp ole O utd oo rs
LL
C
Not to Scale
Plan View
M:\1-Standard-Products\SP-Wood-Fence\Pergola\2017-WRC-KitPergola.dwg, 10x12-Plan, 2/15/2018 8:26:58 AM
15'-0"
18" OC
7'-8" Clear Under
Beam
3'-0"
12'-0" OC
8" 8" 13'-5 1/2"
1-1/2"x7-1/4" Joist
1-1/2"x7-1/4" Carry Beams
1-1/2"sq. Lathing
5-1/2"sq.
Post
1.01 Product:
12ft Side View Western Red Cedar Pergola
SKU # :
1/16/17Date Drawn:
Drawn By: SDD Rev. Date: xxxx Mgr. Approval:
Customer Signature / Date :
Note: In order for Walpole Outdoors LLC to begin construction on this job, all drawings must be approved and signed by the CUSTOMER and/or ARCHITECT / CONTRACTOR.
NO
TI
CE
: A ny an d a ll i tem s c on tai ne d i n t his do cu me nt ar e p ro tec ted by fe de ra l c op yri gh t la ws (t itle
, U .S
. C od
e) , p lea se do no t d ist rib ute
, o r d up lic ate in an y ma nn er w ith ou t e xp re ss ed w ritt en co ns en t fr om an au tho riz ed
W alp ole O utd oo rs
LL
C Re pr es en tat ive (S ec tio n 1 of th e 1
6 C op yri gh t A ct)
W alp ole O utd oo rs
LL
C
Not to Scale
Side View
M:\1-Standard-Products\SP-Wood-Fence\Pergola\2017-WRC-KitPergola.dwg, 12x-Side, 2/15/2018 8:26:58 AM
8'-3 1/4" Clear Under
Joist
12" 15 1/8" OC
13'-4"
3'-0"
10'-0" OC
1'-3 3/4" 1-1/2" x 7-1/4"
Joists
1-1/2"sq. Lathing
1-1/2" x 7-1/4" Carry Beams1'-8"
9'-0" Overall
1.02 Product:
10ft End View Western Red Cedar Pergola
SKU # :
1/16/17Date Drawn:
Drawn By: SDD Rev. Date: xxxx Mgr. Approval:
Customer Signature / Date :
Note: In order for Walpole Outdoors LLC to begin construction on this job, all drawings must be approved and signed by the CUSTOMER and/or ARCHITECT / CONTRACTOR.
NO
TI
CE
: A ny an d a ll i tem s c on tai ne d i n t his do cu me nt ar e p ro tec ted by fe de ra l c op yri gh t la ws (t itle
, U .S
. C od
e) , p lea se do no t d ist rib ute
, o r d up lic ate in an y ma nn er w ith ou t e xp re ss ed w ritt en co ns en t fr om an au tho riz ed
W alp ole O utd oo rs
LL
C Re pr es en tat ive (S ec tio n 1 of th e 1
6 C op yri gh t A ct)
W alp ole O utd oo rs
LL
C
Not to Scale
End View
M:\1-Standard-Products\SP-Wood-Fence\Pergola\2017-WRC-KitPergola.dwg, 10x-End, 2/15/2018 8:26:58 AM
Graphic depiction of storage shed
Storage Shed Basis of Design - The City will accept approved equivalents
Storage Shed - Roof Layout Shop Drawings
City of Alexandria, Virginia Department of Code Administration
301 King Street, Suite 4200
Alexandria, Virginia 22314 email: permit.center@alexandriava.gov
BUILDING PERMIT
Case Number: BLD2018-01292 Issued: 07/12/2018 Expires: 01/12/2019
MASTER BUILDING PERMIT NUMBER:
Project Address: 101 DALE ST
Project Name: FOUR MILE RUN PARK Project Description:
PARCEL RESTRICTIONS:
FloodPlain 2011 Resource Protec
PROPOSED STORAGE SHED AND PLANTING PERGOLA. INSTALL FOOTINGS FOR
PLANTING PERGOLA
Project Details:
CODE EDITION: 2012 Virginia Construction Code
USE GROUPS: U Utility, misc., Fence > 6' ht, Shed, Carport;
CONSTR TYPE: NA
OCCUPANT LOAD:
BUILDING AREA:
GROSS
ALTERED
NEW
EST. CONSTRUCTION COST:
$1,500
CATEGORIES OF WORK:
Non-Residental Alteration
OWNER INFORMATION:
CITY OF ALEXANDRIA
PO BOX 178
ALEXANDRIA VA 22313-1500
CONTRACTOR INFORMATION:
Contact Information:
Primary Phone:
FEES: License Information:
License Type:
License Number: No License
License Exp. Date:
BUILDING PERMIT $85.00
Admin - Permit $11.90
InfoTech - Permit $4.25
PermCtr- Permit $9.35
Training - Permit $0.17
Va Tng - Permit $1.70
$112.37Total:
Prohibited Hours of Construction:
Day Before After
Mon-Fri 7am 6pm
Saturday 9am 6pm
Sunday All hours Holidays per 11-5-5(a)5(a)* All Hours
* Section 11-5-5 (a)5(a) defines holidays as
January 1st, Memorial Day, July 4th, Labor Day, Thanksgiving Day, Christmas Day.
RIGHT IS RESERVED TO INSPECT WORK AUTHORIZED BY THIS PERMIT AS OFTEN AS NECESSARY TO DETERMINE COMPLIANCE WITH
THE VIRGINIA UNIFORM STATEWIDE BUILDING CODE. AUTHORIZATION TO ALTER, USE, OR CROSS PUBLIC SIDEWALKS, CURBS, OR
OTHER PUBLIC SPACES MUST BE OBTAINED FROM THE DEPARTMENT OF TRANSPORTATION AND ENVIRONMENTAL SERVICES. THIS
PERMIT EXPIRES IF WORK IS NOT STARTED OR IF WORK IS ABANDONED FOR SIX MONTHS. ONE & TWO-FAMILY DWELLING
CONSTRUCTION PERMITS, INCLUDING NEW DWELLINGS, ADDITIONS, ALTERATIONS, AND/OR ACCESSORY STRUCTURES, MUST BE
COMPLETED WITHIN THREE YEARS OF PERMIT ISSUANCE. IF WORK WILL BE PERFORMED WITHIN 15 FEET OF OVERHEAD
ELECTRICAL WIRES, PERMITEE MUST OBTAIN ASSISTANCE FROM THE VIRGINIA POWER OFFICE. CALL 703.934.9660. THIS PERMIT
MUST BE POSTED ON THE WORK SITE AND VISIBLE FROM THE PUBLIC WAY UNTIL THE WORK RECEIVES AN APPROVED FINAL
INSPECTION.
PLEASE CALL 703.838.4900 TO SCHEDULE OR CANCEL INSPECTIONS AND OBTAIN INSPECTION RESULTS 24 HOURS A DAY.
Please fill out our Customer Service
Survey at
<http://alexandriava.gov/Code>
BUILDING OFFICIAL: GREGG FIELDS
Please visit the Online Alexandria Permit Center at permits.alexandriava.gov to apply for additional permits.
BLD_Permit2012 Page 1 of 4
Old (Expired) Building Permit for shed & pergola
101 DALE ST
7/12/2018
Case #: BLD2018-01292
CONDITIONS
ByDate Updated
TagByChanged
Status
StatusHoldTitle Condition
Code
None AUTO 7/6/2018 BTCHMET1010 CA PERMIT DISPLAY
This permit must be posted on the work site and must be visible from the public way until the work receives an approved final inspection.
None AUTO 7/6/2018 BTCHMET1020 CA PERMIT EXPIRATION
This permit expires if the authorized work is not started within six months of the issue date or if the work is abandoned for a period of six months.
None AUTO 7/6/2018 BTCHMET1030 CA REQUIRED INSPECTIONS
Work must be inspected in accordance with the Virginia Uniform Statewide Building Code to include: foundation systems, footing excavations, preparatory work, and reinforcement material prior to placement of concrete; structural members and fasteners prior to concealment; electrical, mechanical, fire protection, access control, and plumbing materials, equipment and systems prior to concealment; energy conservation material &insulation prior to concealment;
and final inspection upon completion of the work. Work performed or concealed without benefit of an approved inspection may be required to be removed or opened for inspection purposes. Please call 703.838.4900 to request or cancel inspections and obtain inspection results 24 hours a day. To receive inspections results by phone, fax or e-mail, please make sure your contact information is filed with the Permit Center 703.746.4200 and select result desired when scheduling.
None AUTO 7/6/2018 BTCHMET1040 CA CITY INSPECTION RIGHTS
Right is reserved to inspect work authorized by this permit as often as necessary to determine compliance with the
Virginia Uniform Statewide Building Code and City approvals.
None AUTO 7/6/2018 BTCHMET1050 CA AUTHORIZED HOURS OF CONSTRUCTN
Allowed hours of Construction are Monday - Friday 7:00am-6:00pm; Saturdays 9:00am-6:00pm; allowed Pile Driving hours are Monday - Friday 9:00am-6:00 pm and Saturdays between 10:00am and 4:00pm. Construction and Pile Driving
Noise and Activities are prohibited on Sundays, and Holidays defined as January 1, Memorial Day, July 4, Labor Day, Thanksgiving Day and Christmas Day. Requests for Noise Variances may be made to the Office of Environmental
Quality 703.746.4065.
None AUTO 7/6/2018 BTCHMET1060 CA CONTRACTOR LICENSING
Contractors are required to be properly licensed by the DPOR/Commonwealth of Virginia (804.367.8511;
www.dpor.virginia.gov) and the City of Alexandria/Business Licenses (703.746.3914). BEFORE hiring contractors, please verify licensing information. Contractor licenses issued by Maryland, DC, or other States are not valid in Virginia.
None AUTO 7/6/2018 BTCHMET1070 CA CODE WEBPAGE
Visit alexandriava.gov/code for information on service initiatives, status of permits in process, the Daily Inspection
Viewer, Permit Center wait time, and much more.
None AUTO 7/6/2018 BTCHMET1080 CA RECORD RETENTION
For your records, please retain a copy of your permit documents - approved set of plans and/or as-builts. In accordance with State Law, Code Administration only retains construction records for 3 years after the final inspection or issued
Certificate of Occupancy.
None AUTO 7/6/2018 BTCHMET1090 CA THIRD PARTY INSPECTIONS
Third Party Inspections of work will not be accepted unless approved by the Building Official prior to the permit being issued.
None AUTO 7/6/2018 BTCHMET1100 CA RESIDENTIAL PERMIT TIME FRAME
Permits for One and Two Family Dwelling, including new dwellings, additions, alterations and/or accessory structures, must be completed within 3 years of the permit issue date.
BLD_Permit2012 Page 2 of 4
None AUTO 7/6/2018 BTCHMET1110 CA STOP WORK ORDERS
Work started without benefit of required permits or that exceed the scope of issued permits may be subject to STOP
WORK ORDERS. Work must remain stopped until permits are obtained/amended and applicable fees paid.
None AUTO 7/6/2018 BTCHMET1120 CA WALL CHECK SURVEY
A Wall Check Survey may be required after the foundation or first floor walls are in place. Wall check surveys shall be submitted to the Permit Center. Work that proceeds without an approved Wall check Survey is at the owner's risk and may be required to be removed or relocated.
None AUTO 7/6/2018 BTCHMET1130 CA RODENT CONTROL MEASURES
Approved rodent control/abatement measures must be in place 7 days before site disturbance begins and must remain in place until exterior work is complete. Site and dumpsters must be clean and secure at the end of each work day to prevent rodent harborage and the accumulation of loose trash.
None AUTO 7/6/2018 BTCHMET1140 CA TRADE PERMITS
Separate trade permits and inspections required - Plumbing, Electrical and Mechanical.
None AUTO 7/6/2018 BTCHMET1150 CA ELEVATOR PERMITS
Separate permits and inspections required for elevators, escalators, dumb waiters, chair lifts, and elevating equipment such as motorized masonry scaffolding.
None AUTO 7/6/2018 BTCHMET1160 CA FPS PERMITS
Separate permits required for fire alarm, fire detection, fire suppression, access control, and fire sprinkler systems. A
Knox Box is required to be installed in buildings where any fire alarm, fire detection, fire suppression or sprinkler systems are installed. The Alexandria Department of Communications must be notified in advance whenever a fire protection system is taken out of service for any reason - 703.838-4660.
None AUTO 7/6/2018 BTCHMET1170 CA CERTIFICATE OF OCCUPANCY
An issued Certificate of Occupancy (CO) is required before occupancy. When applicable, a height survey must be approved by Planning & Zoning before a CO is considered. Please allow a minimum of 3-5 workdays when scheduling
CO inspections 703.746.4200. When planning for Grand Opening Events, please allow sufficient time for the CO and
Business License process - 703.746.3914 or 3903.
None AUTO 7/6/2018 BTCHMET1180 CA FPP STORAGE
A Fire Prevention Code Permit is required for storage of chemicals.
None AUTO 7/6/2018 BTCHMET1190 CA FPP ASSEMBLY
A Fire Prevention Code Permit is required for Assembly Uses. Assembly permits are not the same as a Certificate of
Occupancy.
None AUTO 7/6/2018 BTCHMET1200 CA SPECIAL INSPECTIONS
This job has been approved for Special Inspections (SI). Only inspection reports generated by pre-approved personnel will be accepted. For more information on SI process and required submission of electronic inspection results, please refer to the City's "Special Inspection Program Guidelines & Procedures" handout (alexandriava.gov/code) or contact a
New Construction Supervisor on 703.746.4200.
None AUTO 7/6/2018 BTCHMET1210 CA SHOP DRAWINGS
Shop drawings are required as indicated on plans. Shop drawings must be signed and sealed by the manufacturer and a
Commonwealth of Virginia registered design professional . Shops must be submitted to Code Administration for review and approval prior to installation and an approved copy must be on site for inspection.
None AUTO 7/6/2018 BTCHMET1220 CA SPECIAL CONDITION
None AUTO 7/6/2018 BTCHMET2001 TES ELECTRIC WARNING
Prior to the performance of work within 15 feet of overhead power lines, the applicant must contact Dominion Virginia
Power at 1.888.667.3000.
BLD_Permit2012 Page 3 of 4
None 7/11/2018 KXMMET2002 TES RIGHT-OF-WAY WARNING
Any work within the public right-of-way, or movement of construction equipment across curb and gutter or sidewalk, requires separate permitting from the Department of Transportation and Environmental Services.
None AUTO 7/6/2018 BTCHMET2003 TES OVERHEAD UTILITY CHANGE
All existing overhead utilities are required to be placed underground when the point where the wires first contact the building is changed, or when the wires come from a diffrent pole.
None AUTO 7/6/2018 BTCHMET2005 TES OVERHEAD WAIVER
A waiver of the underground requirement may be requested. A non-refundable $100 fee is required. One of five conditions must be satisfied for approval. Application and information is available from Transportation and
Environmental Services, Room 4130, City Hall.
None 7/11/2018 KXMMET2007 TES MARINE CLAY
This project is in a marine clay area. It is recommended that the applicant consult a geotechnical engineer.
None 7/11/2018 KXMMET2012 TES EROSION & SEDIMENT CONTROL
Erosion and sediment control measures must be installed and approved prior to any land disturbing activities.
None 7/11/2018 KXMMET2014 TES MISS UTILITY
Before you dig, you must call Miss Utility at 811. A minimum of 48 hours notice is required. Alexandria Sanitation
Authority is not part of Miss Utility and must be called separately at 703.549.3381.
None 7/11/2018 KXMMET2021 TES LAND DISTURBANCE
Any land disturbing activities which result in 2,500 square feet or more of disturbed area will require a Grading Plan in accordance with city code section 5-6-224 and as further explained in the Memorandum to Industry No. 02-08, dated April 28, 2008.
None 7/11/2018 KXMMET4000 TES BUILD PER SITE PLAN
Approved by Transportation & Environmental Services for construction of individual buildings in compliance with the approved site plan. Any changes from the approved site plan will void this approval.
BLD_Permit2012 Page 4 of 4
File details come from the government source that posted it. Updated .