About this file

This is a Geotechnical Engineering Report and associated Addendum prepared by AECOM Technical Services Inc. for the City of Alexandria, Virginia regarding the Edison Street, West Reed Avenue, and Dale Street Neighborhood Spot Improvement project. The report documents subsurface investigation and geotechnical analysis for proposed storm sewer pipe installation with maximum diameter of 24 inches and associated storm drain inlets along the project corridors. Four soil borings were drilled between April 4-5, 2023, at depths ranging from 15 to 25 feet below ground surface to characterize soil conditions and groundwater. An Addendum dated December 4, 2024 provides supplemental recommendations based on additional test pit sampling along Dale Street conducted via air knife and vacuum excavation. The project involves minimal new fill placement, with storm sewer pipe inverts located approximately 3 to 6.5 feet below existing ground surface along Edison Street and West Reed Avenue, and 5 to 6.5 feet along Dale Street.

The geotechnical investigation identified two primary soil strata: existing fill materials (Stratum A) ranging from soft to medium stiff clays and loose to medium dense sands with varying depths of 4 to 5.5 feet, and underlying alluvial soils (Stratum B) composed of soft to stiff cohesive and granular materials extending to depths of 25 feet. Laboratory testing included Atterberg limits, grain size distribution, compaction characteristics, California Bearing Ratio (CBR) testing, and corrosion potential analysis. Key findings indicate low corrosion potential for buried steel elements and soil resistivity values between 2,580 to 3,360 ohm-cm. The report provides recommendations for subgrade preparation, pipe bedding material specifications (VDOT Road and Bridge Standards), compaction requirements to 95 percent standard proctor density, construction dewatering provisions, and undercutting of loose or soft soils with replacement bedding stone. Full-time construction monitoring by qualified geotechnical engineers is recommended during subgrade preparation and earthwork operations to ensure compliance with design and construction criteria.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Geotechnical Engineering Report

July 12, 2023

Prepared for: City of Alexandria

Prepared by AECOM

AECOM Project Number: 60694616

Quality information

Document name Ref Prepared for Prepared by Date Reviewed by

Geotechnical Engineering Report Final City of Alexandria, Virginia Ariana White, PE 07-12-2023 Victor Omelchenko, PE, DGE

Revision history

Revision Revision date Details Name Position

This document has been prepared by AECOM Limited for the sole use of our client (the “Client”) and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AECOM Limited and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM Limited, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM Limited.

AECOM 1-1

Table of Contents

1 INTRODUCTION AND SCOPE OF WORK ..................................................................... 1-2

2 EXISTING SITE CONDITIONS AND PROPOSED CONSTRUCTION ........................... 2-1 Existing Site Conditions ........................................................................................................... 2-1

Proposed Construction ............................................................................................................ 2-1

3 FIELD EXPLORATION ..................................................................................................... 3-1

Subsurface Exploration ........................................................................................................... 3-1

Boring Stakeout and Subsurface Utility Clearance ................................................................ 3-1

Drilling Methodology and Sampling ........................................................................................ 3-1

4 SUBSURFACE EXPLORATION RESULTS .................................................................... 4-1 Site Geology ............................................................................................................................ 4-1

Subsurface Conditions ............................................................................................................ 4-1

4.2.1 Soil Borings ................................................................................................................ 4-1

Groundwater ............................................................................................................................ 4-2

Soil Laboratory Testing ........................................................................................................... 4-2

4.4.1 Soil Classification Testing Results ............................................................................ 4-2

4.4.2 California Bearing Ratio Testing Results .................................................................. 4-2

4.4.3 Corrosion Testing Results ......................................................................................... 4-2

5 GEOTECHNICAL ENGINEERING RECOMMENDATIONS............................................ 5-1

Storm Sewer Pipes and Junction Boxes ................................................................................ 5-1

Subgrade Preparations ........................................................................................................... 5-2

Pavement Subgrade Preparations .......................................................................................... 5-2

New Fill Placement and Compaction ...................................................................................... 5-2

6 CONSTRUCTION CONSIDERATIONS ........................................................................... 6-1 Construction Monitoring .......................................................................................................... 6-1

7 LIMITATIONS .................................................................................................................... 7-1

List of Figures and Appendices Figure 1 - Site Vicinity Plan Figure 2 - Soil Boring Location Plan Appendix A: Soil Boring Logs (5 pages), USCS Soil Identification Sheet (2 pages) Appendix B: Soil Laboratory Test Results (15 pages)

AECOM 1-2

1 INTRODUCTION AND SCOPE OF WORK

AECOM Technical Services Inc. (AECOM) was retained by the City of Alexandria to conduct a subsurface investigation and analysis for the Edison and Reed Neighborhood Spot Improvement project. The site is located along Edison Street and West Reed Avenue in Alexandria, Virginia.

AECOM’s scope of work for the subject project included drilling a total of four Standard Penetration Test (SPT) borings, soil laboratory testing, and preparation of a geotechnical engineering report with the following information:

A. A soil boring location plan.

B. Soil boring logs.

C. Results of geotechnical soil laboratory testing.

D. Recommendations for support of the proposed storm sewer pipes and proposed inlets.

E. Recommendations for handling of groundwater in the design.

F. Recommendations for pavement subgrades.

G. Recommendations for earthwork requirements, including re-use of site soils for structural fill and backfill over the proposed storm sewer pipes.

AECOM 2-1

2 EXISTING SITE CONDITIONS AND PROPOSED CONSTRUCTION

Existing Site Conditions

The sites are located at the end of the Edison Street cul-de-sac and at West Reed Avenue in Alexandria, Virginia. The existing site conditions include a paved bike trail (near Edison Street) and a paved road (West Reed Avenue). The existing site grading slopes slightly downward to the east.

A Site Vicinity Map is included as Figure 1.

Proposed Construction

AECOM understands that the proposed construction will include installing new storm sewer pipe with a maximum diameter of 24 inches and check valve at the end of the Edison Street cul-de-sac. The proposed construction also includes the addition of multiple storm drain inlets and associated storm drain pipes along West Reed Avenue. The storm sewer pipe inverts will be located at about 3 to 6.5 feet below the existing ground surface. The site will receive no new fill or minimal amounts of new fill.

AECOM 3-1

3 FIELD EXPLORATION

Subsurface Exploration

A total of four soil borings were drilled at the site by Connelly and Associates. One boring was drilled near Edison and three borings along W Reed Ave. The approximate boring locations are illustrated on the Boring Location Plan included as Figure 2. The soil test boring logs are included in Appendix A.

Boring Stakeout and Subsurface Utility Clearance

The boring locations were field located and staked by an AECOM representative. “VA 811” was contacted by our drilling subcontractor to mark the existing underground utilities around the staked boing locations. The soil boring locations and elevations were not surveyed and should be considered approximate. The ground surface elevations at the soil boring locations were estimated from Google Earth and are shown on the boring logs included in Appendix A.

Drilling Methodology and Sampling

Connelly and Associates drilled the soil test borings between April 4th and 5th, 2023. The borings were drilled with a CME-55 truck mounted drill rig using 3-1/4-inch diameter continuous flight hollow stem augers to advance the borings. Representative soil samples were obtained using a 2-inch outside diameter split-barrel spoon sampler in general accordance with ASTM D 1586 standards. Standard penetration tests (SPTs) were performed by driving the split-spoon sampler into the soil a distance of 18 and 24 inches over three or four six-inch intervals, respectively, by means of a 140-pound hammer falling 30 inches. The number of hammer blows required to drive the sampler through the second and third 6-inch intervals (i.e., the N-values) for each sample are indicated on the test boring logs included in Appendix A. Soil samples were obtained continuously from the borings in the upper 10 feet of soil overburden and every five feet below the upper 10 feet to the final boring depths. The N-values provide an indication of the in-place density (granular materials) and consistency (cohesive materials) of the soils. The borings were backfilled with the soil cuttings upon drilling completion or after the 24-hour groundwater measurements were obtained.

After recovery, the soil samples were removed from the samplers and were visually classified by an AECOM engineer. Representative portions of the soil samples were sealed in glass jars and retained for further review. Selected soil samples were assigned for laboratory testing as discussed in Section 4.4. The visual classifications of the soil samples were based on texture and plasticity, in accordance with the Unified Soil Classification System (USCS). A brief description of the USCS is also included in Appendix A.

AECOM 4-1

4 SUBSURFACE EXPLORATION RESULTS

Site Geology

The site lies within the Coastal Plain geological province. The Coastal Plain consists of a seaward thickening wedge of unconsolidated to semi-consolidated sedimentary deposits from the Cretaceous Geologic Period to the Holocene Geologic Epoch. These deposits represent marginal-marine to marine sediments consisting of interbedded sands and clays. The Coastal Plain is bordered to the east by the Atlantic Ocean and to the west by the Piedmont Physiographic Province.

Subsurface Conditions

4.2.1 Soil Borings

The subsurface strata encountered during our subsurface exploration are described below for the purposes of our discussions in this report. It should be noted that these descriptions do not imply continuity of the materials encountered in the borings. The descriptions of the materials have been established to characterize similar subsurface conditions based on material gradations and parent geology. The subsurface materials encountered in the soil borings, along with the range of Standard Penetration Test (SPT) N-Values are described below.

Stratum A: Existing Fill

Existing Fill and Possible fill soils were encountered during our field exploration below pavement.

The existing fill’s depth ranged from 4 feet to 5.5 feet below the existing ground surface (from approximate elevations El. 12 feet to El. 4.5 feet). The Stratum A soils generally consist of soft to medium stiff Lean Clay with sand (CL), Sandy Lean Clay (CL) or loose to medium dense Silty Sand with gravel (SM), Poorly Graded Sand with gravel (SP), Poorly Graded Sand with Silt and Gravel (SP-SM), and Poorly Graded Sand with Clay and Gravel (SP-SC). The Standard Penetration Test N-values for the soils varied between 3 blows per foot (bpf) and 19 bpf.

Stratum B: Alluvial Soils

Alluvial soils were encountered during our field exploration below the existing fill and possible fill soils and extended to the maximum depth explored at the soil borings (extended to approximate elevations of El. 3 feet to El. -15 feet). The Stratum B soils generally consist of very soft to stiff Sandy Lean Clay with gravel (CL), Fat Clay (CH), Fat Clay with sand (CH), Sandy Fat Clay (CH), Elastic silt (MH), Elastic Silt with sand (MH), Silt with sand (ML) and Sandy Silt with gravel (ML) or very loose to dense Poorly Graded Sand with Silt and Gravel (SP-SM), Clayey Sand with gravel (SC), Silty Clayey Sand (SC-SM), Poorly Graded Sand with Clay and Gravel (SP-SC), and Poorly graded Gravel with Silt and Sand (GP-GM). The Standard Penetration Test N-values for the soils varied between Weight of Hammer (WOH) material and 35 blow per foot (bpf).

AECOM 4-2

Groundwater

Groundwater measurements were investigated during drilling operations, upon completion of the borings, and up to about 24 hours after drilling. A 1-inch diameter temporary PVC standpipe was installed in borings B-2 and B-5 to obtain the stabilized 24-hour groundwater level and to prevent the boring sidewalls from caving in. The groundwater observations indicated water present at depths of 4 ft to 8 ft below the existing ground surface. The groundwater observations are indicated on the boring logs in Appendix A.

Perched water conditions may be encountered during construction due to the presence of fine-grained soils interbedded with free-draining sandy soils. It is possible that stabilized groundwater levels are higher. It should be noted that fluctuations in groundwater levels may occur as a result of seasonal variations in rainfall, proximity of the site to large bodies of water, evaporation, construction activity, surface runoff, and other site-specific factors.

Soil Laboratory Testing

Selected soil samples were tested by JayKay to determine the engineering properties of the on-site soils. The soil samples were tested for natural moisture content, grain size distribution, Atterberg limits, compaction characteristics using standard effort, California Bearing Ratio, and corrosion potential. The soil laboratory tests were conducted in accordance with applicable ASTM standards.

4.4.1 Soil Classification Testing Results

Selected split-spoon soil samples were tested to determine the classification of the on-site soils.

The testing included moisture content determinations (ASTM D2216), Atterberg Limits tests (ASTM D4318), mechanical gradation analyses (ASTM D6913), and moisture-density relationships (ASTM D698). The soil laboratory testing results are presented in Appendix B and are incorporated in the boring logs included in Appendix A.

4.4.2 California Bearing Ratio Testing Results

One bulk soil sample was selected from soil boring B-5 to obtain California Bearing Ratio (CBR) values. CBR values for soils compacted to about 95 percent of standard proctor density per ASTM D698 ranged from 3.7 to 4.1. The testing results are presented in Appendix B.

4.4.3 Corrosion Testing Results

Soil samples obtained from borings B-2 and B-9 were tested to determine the corrosion potential of the soils. The soil laboratory test results are included in Appendix B and summarized in Table

4.1 below.

AECOM 4-3

Table 4.1: Corrosion Test Results Summary

Boring Depth (ft)

Approximate Elevation (ft)

Resistivity Ohm-cm

Redox Potential mV pH Sulfide mg/Kg Chloride

(ppm) Sulfate (ppm)

B-2 4 - 8 2 - 6 3,360 41 9.12 Negative 212 143

B-9 2 - 8 1 - 7 2,580 80 8.94 Negative 112 77

The geochemical properties of the soils at the project site need to be considered in the final design of the facilities of the project, including, sewers, structures, and foundations. The test results indicate a low sulfate and chloride concentration in the samples tested. According to AASHTO 2014, concentrations of sulfate greater than 1,000 ppm are considered to be corrosive. In addition, based on the American Concrete Institute (ACI 318), soils with water-soluble sulfate content of less than 150 parts per million (ppm) or less than 0.10% by weight are categorized as having an exposure class of S0 (negligible sulfate severity), and there is not a concern of injurious sulfate attack on concrete at this level of soil sulfate concentration. Concrete can be designed to meet the criteria for Exposure Category S0 as defined in ACI 318. Final selection of the cement grade and approval of the concrete mix should be performed by the project structural engineer.

The American Water Works Association (AWWA) standard C-105 (Polyethylene Encasement for Ductile-Iron Pipe System) and the Ductile Iron Pipe Research Association (DIPRA) provide a 10- Point System to assess the corrosion potential of the soil based on the soil resistivity, redox potential, pH, sulfide/sulfate concentrations, and moisture of the soils. According to this system, samples B-2 and B-9 are both considered non-corrosive. Also, according to Federal Highway Administration (FHWA) NHI-16-072 - Table 5-14, soil samples B-2 and B-9 have corrosivity ratings of corrosive and highly corrosive, respectively, for buried steel elements.

AECOM 5-1

5 GEOTECHNICAL ENGINEERING RECOMMENDATIONS

This geotechnical engineering recommendations are based on the soil boring data and review of the available drawings.

Storm Sewer Pipes and Inlets

Based on the soil borings drilled in the vicinity of the proposed structures, the subgrade soils are anticipated to generally consist of loose to medium dense sandy or gravelly fill soils of Stratum A, medium stiff to stiff cohesive fills of Stratum A or natural soils of Stratum B. It is AECOM’s professional opinion that the storm sewer pipes and inlets can be founded on these soils at the proposed subgrade elevations. However, very loose or high plasticity soil can be anticipated at some locations along the proposed storm sewer alignment that will require treatment.

Preliminarily, we recommend undercutting about 12 inches of loose soils from beneath the utility pipes and replacing this material with 12 inches of bedding stone. Storm sewer pipe material should consist of aggregate No. 25 or 26 materials in accordance with the VDOT Road and Bridge Standards PB-1 and Section 302 of the VDOT Road and Bridge specifications or with AASHTO No. 57 crushed stone or washed gravel. Crushed stone or gravel should be completely wrapped in a woven geotextile stabilization fabric. The actual depth of undercutting should be evaluated by a qualified geotechnical engineer during construction.

Based on the drilled borings, it is anticipated that groundwater will likely be encountered during construction. Therefore, the contractor should be prepared to provide localized construction dewatering consisting of well points, deep wells or sump pumps. The contractor should evaluate the appropriate dewatering system requirements.

Storm sewer pipe backfill should consist of select fill and regular backfill in accordance with the VDOT Road and Bridge Standards PB-1 and Section 302 of the VDOT Road and Bridge Specifications. All backfill should be placed in loose lifts not exceeding 6 inches in thickness and should be compacted to at least 95 percent of the maximum dry density, determined in accordance with ASTM D 698. In general, the moisture content of the fill materials should be maintained within 2 percent of the optimum moisture content.

Native soils of Stratum B that classify as ML, SM, SC, or more granular are generally considered suitable for reuse as compacted regular backfill, provided they are free of organic matter and other deleterious matter, not contaminated, and have a Liquid Limit (LL) and Plasticity Index (PI) of less than 40 and 15, respectively. Some moisture conditioning of these soils will be required to achieve the compaction requirements. Soils classifying CH, MH, or OH are not considered suitable for reuse as compacted fill or backfill.

Trench boxes and/or sloping of excavations may be needed. All temporary excavations must comply with applicable local, state, and federal safety regulations, including the current OSHA Excavation and Trench Safety Standards. Construction site safety generally is the responsibility of the contractor, who should be solely responsible for the means, methods, and sequencing of construction operations so that a safe working environment is maintained.

AECOM 5-2

The contractor should avoid stockpiling excavated materials or having construction equipment immediately adjacent to the excavations. We recommend that stockpiled materials be kept back from the excavations a minimum distance equal to one-half the excavation depth to limit surcharging the excavation side-walls. If this is impractical due to space constraints, the excavation side-walls can be retained with bracing designed for the anticipated surcharge loads.

Subgrade Preparations

All structure subgrades should be stripped of vegetation, asphalt, roots, topsoil, construction debris, organics, and any other deleterious materials. The utility structure excavations should extend to suitable bearing materials, and final bearing subgrades should be observed and approved by the geotechnical engineer prior to the placement of the gravel bedding materials to verify their suitability to provide foundation support, as recommended herein.

Very loose or soft soils can be anticipated at the proposed utility structure subgrades. We preliminarily recommend undercutting about 12 inches of loose or soft soils and replacing these materials with 12 inches of bedding stone. Storm sewer pipe bedding material should consist of aggregate No. 25 or 26 materials in accordance with the VDOT Road and Bridge Standards PB- 1 and Section 302 of the VDOT Road and Bridge specifications or with AASHTO No. 57 crushed stone or washed gravel. Crushed stone or gravel should be completely wrapped in a woven geotextile stabilization fabric. The actual depth of undercutting should be evaluated, monitored, and documented by a qualified geotechnical engineer during construction. We recommend establishing a budget for the undercutting of soft and yielding existing fill and natural soils.

Pavement Subgrade Preparations

At the onset of any site grading, the entire area should be stripped of vegetation, asphalt, roots, topsoil, construction debris, and any deleterious materials. Following the removal of any unsuitable material, the geotechnical engineer should be present to verify the suitability of the subgrades to receive fill or pavement. Existing fill was encountered in the borings. This fill may contain varying amounts of deleterious matter, and some undercutting of these soils should be expected.

Additionally, fill and subgrade consisting of existing fill soils may be soft and yielding in some areas. Where moisture conditioning and re-compaction do not create stable subgrades, undercutting of these soils may be necessary to stabilize the subgrades to achieve the structural fill compaction requirements. The depth of undercutting, if necessary, will vary depending on the actual soil conditions encountered and should be determined in the field. We recommend establishing a budget for the undercutting of soft and yielding existing fill and natural soils. All undercuts, if necessary, should be approved and performed under the observation of the geotechnical engineer.

New Fill Placement and Compaction

All new compacted structural fill and backfill should be placed in loose lifts not exceeding 6 inches in thickness and should be compacted to at least 95 percent of the maximum dry density, determined in accordance with ASTM D698. In general, the moisture content of the fill materials should be maintained within 2 percent of the optimum moisture content. Materials to be used as

AECOM 5-3

compacted fill should be classified as ML, SM, SC or more granular, and should have a Liquid Limit (LL) and Plasticity Index (PI) of less than 40 and 15, respectively.

Existing fill of Stratum A is generally not considered suitable for re-use as new compacted fill.

Native soils of Stratum B that classify as ML, SM, SC, or more granular are generally considered suitable for reuse as compacted fill, provided they are free of organic matter and other deleterious matter, not contaminated, and have a Liquid Limit (LL) and Plasticity Index (PI) of less than 40 and 15, respectively. Some moisture conditioning of these soils will be required to achieve the compaction requirements. Soils classifying CH, MH or OH are not considered suitable for reuse as compacted fill. The suitability of the onsite soils for reuse as fill should be determined by the geotechnical engineer during construction.

AECOM 6-1

6 CONSTRUCTION CONSIDERATIONS

Construction Monitoring

Monitoring of the construction is strongly recommended to address quality control/quality assurance issues and to promptly address non-conforming construction. Full-time construction monitoring should be provided during subgrades preparation and earthwork operations by a qualified geotechnical engineering firm that is familiar with the design and construction criteria for the project. The monitoring should include observation of the foundation bearing materials, subgrade conditions, subgrade preparation, excavation support systems, compaction testing of fill, etc. We can provide these services, upon request.

AECOM 7-1

7 LIMITATIONS

Interpretation of general subsurface soil conditions presented herein is based on our understanding of the proposed project as described in this report, soil and groundwater conditions encountered in the limited number of soil borings and other data discussed in this report. Although representative portions of the samples taken were tested, subsurface conditions may vary between exploration locations. This report does not reflect any variations that may occur between boring locations or across the site in areas not sampled. The nature and extent of such variations may not become evident until construction. Groundwater conditions during construction may be different from the observations made in the borings. If variations occur, it will be necessary to reevaluate the recommendations in this report.

This report has been prepared for the specific project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No warranty, express or implied, is provided. In the event that any changes in the nature, design, or location of the project as outlined in this report are planned, the conclusions and recommendations contained in this report will not be considered valid unless the changes are reviewed, and the conclusions of this report are modified or verified in writing by AECOM.

AECOM 2

Figure 1- Site Vicinity Plan

N

SITE

TO#49 EDISON AND REED

ALEXANDRIA, VA

SITE VICINITY PLAN

SCALE:

NTS

FIGURE :

1DATE:

05/10/2023

CHECKED BY:

VO

PROJECT NO.:

60694616

12420 Milestone Center Dr, Suite 150 Germantown, MD 20876 Tel: (301) 820-3000

AECOM TECHNICAL SERVICES, INC.

AECOM 3

Figure 2- Soil Boring Location Plan

TO#49 EDISON AND REED

ALEXANDRIA, VA

SOIL BORING LOCATION PLAN

SCALE:

NTS

FIGURE :

2DATE:

05/10/2023

CHECKED BY:

VO

PROJECT NO.:

60694616

12420 Milestone Center Dr, Suite 150 Germantown, MD 20876 Tel: (301) 820-3000

AECOM TECHNICAL SERVICES, INC.

N

B-2

LEGEND:

B-9

B-5

B-7

B-2

Ed iso n St re et

W Reed Ave

APPROXIMATE BORING LOCATION

AECOM 4

Appendix A – Soil Boring Logs (5 pages), USCS Soil Identification Sheet (2 pages)

0.0 - 0.5 ft: Asphalt (6")

0.5 - 2.0 ft: FILL sampled as moist, medium dense, dark gray, fine to coarse, Silty Sand (SM) with Gravel, contains organics and brick fragments

2.0 - 5.5 ft: Moist, stiff, dark gray, medium plasticity, Sandy Lean Clay, contains organics (possible fill)

4.0 ft: changes to stiff

5.5 - 8.0 ft: Moist, medium dense, dark gray and light gray, fine to coarse, POORLY

GRADED SAND WITH SILT AND GRAVEL,

contains organics

6.0 ft: changes to contains pieces of broken cobbles

8.0 - 19.5 ft: Moist, soft to very soft, dark gray, medium plasticity, FAT CLAY WITH SAND, contains organics as decomposed wood

S-1

S-2

S-3

S-4

S-5

S-6

S-7

CL

SP-

SM

CH

4- 8- 6- 5 (N=14)

9- 6- 7- 11 (N=13)

4- 5- 14- 50/4"

(N=19)

17- 19- 8- 4 (N=27)

2- 1- 2- 1 (N=3)

WOH- WOH-

(N=WOH)

WOH- 3- 1

(N=4)

17.5

17.8

56.4

84.5

A

B

(75%)

(75%)

(64%)

(25%)

(67%)

(100%)

(100%)

DRILLER: Austin Moore

DATE STARTED: 4/4/2023

During Drilling

EventDATE COMPLETED: 4/5/2023

BOREHOLE DEPTH: 25.0 FT

SURFACE ELEVATION: 10 FT

LOGGED BY: J. Kaselow

04-05-2023

HAMMER TYPE/WEIGHT: Auto Hammer/140lbs

DRILLING CONTRACTOR: Connelly

CASING TYPE: HSA

CASING SIZE: N/A

Depth (ft)

Date

8.1

Cave in Depth (ft)

13:25

BIT TYPE/SIZE: NA/NA

CHECKED BY: A. White

Date Time

DRILL RIG: CME 55

Groundwater Observations

19.513:0004-04-2023

DRILL METHOD: 3-1/4" I.D. Hollow Stem Auger

24-hour

A E

C O

M S

O

IL

R O

C K

A E

C O

M -G

E O

T E

C H

_P R

O

JE

C T

_E D

IS

O

N A

N D

R E

E D

.G P

J A

E C

O M

-G E

O T

E C

H _P

R O

JE

C

T -D

E S

IG

N

.G D

T

/8 /2

R

E V

-0

PROJECT NUMBER: 60694616

SC = Sonic Core

P = Pitcher Sample

H = Hand Auger Sample SHEET 1 of 2

COORDINATES: N 14111210.63 E 1053923.88

DESCRIPTION

12420 Milestone Center Drive, Suite 150 Germantown, MD 20876

PS = Piston Sample

RC = Rock Core

PROJECT NUMBER: 60694616

B = Bulk Sample

T = Shelby Tube Sample

Log of Boring B-2

G = Geoprobe

S = Split Spoon SampleAECOM TECHNICAL SERVICES, INC.

PROJECT: Edison and Reed

PROJECT LOCATION: W. Reed Ave, Alexandria, VA

F in es C on te nt

P oc ke t P en ts f)

D E

P T

H

F T

2.5

5.0

7.5

10.0

12.5

15.0

T Y

P

E REMARKS

AND TESTS

N U

M B

E R

Li qu id L im itSAMPLES

G R

A P

H

IC

P la st ic

L im it

U S

C S

BLOWS M

oi st ur e C on te nt

E

LE

V

F T

7.5

5.0

2.5

0.0

-2.5

-5.0

S T

R A

T U

M

R E

C

IN

19.5 - 25.0 ft: Wet, medium dense, gray and light gray, fine to coarse, POORLY GRADED

GRAVEL WITH SILT AND SAND

Boring completed at 25.0 FT on 4/5/2023.

1-inch temporary standpipe was installed in the hole after completion. Boring was backfilled with spoils after 24-hr water level was recorded.

S-8

S-9

CH

GP-

GM

10- 5- 5 (N=10)

5- 6- 8 (N=14)

B

(44%)

(NR)

A E

C O

M S

O

IL

R O

C K

A E

C O

M -G

E O

T E

C H

_P R

O

JE

C T

_E D

IS

O

N A

N D

R E

E D

.G P

J A

E C

O M

-G E

O T

E C

H _P

R O

JE

C

T -D

E S

IG

N

.G D

T

/8 /2

R

E V

-0

PROJECT NUMBER: 60694616

SC = Sonic Core

P = Pitcher Sample

H = Hand Auger Sample SHEET 2 of 2

COORDINATES: N 14111210.63 E 1053923.88

DESCRIPTION

12420 Milestone Center Drive, Suite 150 Germantown, MD 20876

PS = Piston Sample

RC = Rock Core

PROJECT NUMBER: 60694616

B = Bulk Sample

T = Shelby Tube Sample

Log of Boring B-2

G = Geoprobe

S = Split Spoon SampleAECOM TECHNICAL SERVICES, INC.

PROJECT: Edison and Reed

PROJECT LOCATION: W. Reed Ave, Alexandria, VA

F in es C on te nt

P oc ke t P en ts f)

D E

P T

H

F T

17.5

20.0

22.5

25.0

T Y

P

E REMARKS

AND TESTS

N U

M B

E R

Li qu id L im itSAMPLES

G R

A P

H

IC

P la st ic

L im it

U S

C S

BLOWS M

oi st ur e C on te nt

E

LE

V

F T

-7.5

-10.0

-12.5

-15.0

S T

R A

T U

M

R E

C

IN

0.0 - 0.4 ft: Asphalt (5")

0.4 - 2.0 ft: Moist, medium stiff, brownish gray, Lean Clay With Sand, contains trace of fine gravel (possible fill)

2.0 - 4.0 ft: Moist, loose, light gray and orangish brown, fine to coarse, Poorly Graded Sand With Silt And Gravel, (possible fill)

4.0 - 6.0 ft: Moist, medium stiff, light brownish gray, SANDY LEAN CLAY WITH GRAVEL, contains wood fragments

4.9 ft: changes to contains 4" band of fine to coarse clayey gravel with some fine to coarse sand

5.2 ft: changes to light gray with mottles of orangish brown

6.0 - 10.0 ft: stiff, orange and brown, high plasticity, SANDY FAT CLAY

10.0 - 18.5 ft: Moist, stiff, light brown, FAT

CLAY

13.5 ft: changes to orangish brown

18.5 - 20.0 ft: Moist, dense, reddish brown, fine to coarse, CLAYEY SAND WITH

GRAVEL

Boring completed at 20.0 FT on 4/5/2023.

1-inch temporary standpipe was installed in the hole after completion. Boring was backfilled with spoils after 24-hr water level was recorded.

S-1

S-2

S-3

S-4

S-5

S-6

S-7

S-8

CL

SP-

SM

CL

CH

CH

SC

2- 3- 4- 6 (N=7)

3- 4- 5- 7 (N=9)

4- 4- 3- 3 (N=7)

3- 4- 5- 7 (N=9)

3- 4- 5- 7 (N=9)

3- 4- 5 (N=9)

3- 3- 6 (N=9)

6- 13- 22 (N=35)

28.7

27.4

28.8

27.7

A

B

(100%)

(100%)

(75%)

(100%)

(100%)

(100%)

(100%)

(100%)

DRILLER: Austin Moore

DATE STARTED: 4/4/2023

During Drilling

EventDATE COMPLETED: 4/5/2023

BOREHOLE DEPTH: 20.0 FT

SURFACE ELEVATION: 16 FT

LOGGED BY: J. Kaselow

04-05-2023

HAMMER TYPE/WEIGHT: Auto Hammer/140lbs

DRILLING CONTRACTOR: Connelly

CASING TYPE: HSA

CASING SIZE: N/A

Depth (ft)

Date

5.8

Cave in Depth (ft)

10:00

BIT TYPE/SIZE: NA/NA

CHECKED BY: A. White

Date Time

DRILL RIG: CME 55

Groundwater Observations

Dry10:0004-04-2023

DRILL METHOD: 3-1/4" I.D. Hollow Stem Auger

24-hour

A E

C O

M S

O

IL

R O

C K

A E

C O

M -G

E O

T E

C H

_P R

O

JE

C T

_E D

IS

O

N A

N D

R E

E D

.G P

J A

E C

O M

-G E

O T

E C

H _P

R O

JE

C

T -D

E S

IG

N

.G D

T

/8 /2

R

E V

-0

PROJECT NUMBER: 60694616

SC = Sonic Core

P = Pitcher Sample

H = Hand Auger Sample SHEET 1 of 1

COORDINATES: N 14110007.71 E 1053697.47

DESCRIPTION

12420 Milestone Center Drive, Suite 150 Germantown, MD 20876

PS = Piston Sample

RC = Rock Core

PROJECT NUMBER: 60694616

B = Bulk Sample

T = Shelby Tube Sample

Log of Boring B-5

G = Geoprobe

S = Split Spoon SampleAECOM TECHNICAL SERVICES, INC.

PROJECT: Edison and Reed

PROJECT LOCATION: W. Reed Ave, Alexandria, VA

F in es C on te nt

P oc ke t P en ts f)

D E

P T

H

F T

T Y

P

E REMARKS

AND TESTS

N U

M B

E R

Li qu id L im itSAMPLES

G R

A P

H

IC

P la st ic

L im it

U S

C S

BLOWS M

oi st ur e C on te nt

E

LE

V

F T

S T

R A

T U

M

R E

C

IN

0.0 - 0.6 ft: Asphalt (7")

0.6 - 2.0 ft: Moist, loose, gray with speckles red, fine to coarse, Poorly Graded Sand With Gravel, strong odor (possible fill)

2.0 - 4.0 ft: Moist, medium dense, light gray and orangish brown, fine to coarse, Poorly Graded Sand With Clay And Gravel, (possible fill)

4.0 - 8.0 ft: Moist, stiff, light gray with orangish brown, high plasticity, SANDY FAT CLAY, little fine to coarse gravel

6.0 ft: changes to reddish brown, few fine to coarse gravel

8.0 - 10.5 ft: Moist, stiff, orange and brown, medium plasticity, ELASTIC SILT

10.5 - 13.5 ft: Wet, medium dense, reddish brown, fine to coarse, POORLY GRADED

GRAVEL WITH SILT AND SAND

13.5 - 15.0 ft: Wet, loose, orangish brown, fine to coarse, POORLY GRADED SAND

WITH CLAY AND GRAVEL

15.0 - 20.0 ft: Moist, medium stiff, light brownish gray, low plasticity, ELASTIC SILT

WITH SAND

Boring completed at 20.0 FT on 4/5/2023.

Boring was left open for 24-hours. Boring was backfilled with spoils after 24-hr groundwater level was recorded.

S-1

S-2

S-3

S-4

S-5

S-6

S-7

S-8

SP

SP-

SC

CH

MH

GP-

GM

SP-

SC

MH

4- 4- 6- 7 (N=10)

6- 5- 6- 4 (N=11)

2- 4- 6- 6 (N=10)

3- 4- 5- 4 (N=9)

2- 4- 5- 6 (N=9)

4- 6- 6 (N=12)

7- 6- 2 (N=8)

2- 2- 3 (N=5)

20.8

29.7

37.6

15.8

30.2

A

B

(88%)

(71%)

(75%)

(100%)

(88%)

(89%)

(89%)

(67%)

DRILLER: Austin Moore

DATE STARTED: 4/4/2023

During Drilling

EventDATE COMPLETED: 4/5/2023

BOREHOLE DEPTH: 20.0 FT

SURFACE ELEVATION: 11 FT

LOGGED BY: J. Kaselow

04-05-2023

HAMMER TYPE/WEIGHT: Auto Hammer/140lbs

DRILLING CONTRACTOR: Connelly

CASING TYPE: HSA

CASING SIZE: N/A

Depth (ft)

Date

4.8

Cave in Depth (ft)

12:45

BIT TYPE/SIZE: NA/NA

CHECKED BY: A. White

Date Time

DRILL RIG: CME 55

Groundwater Observations

10.511:0004-04-2023

DRILL METHOD: 3-1/4" I.D. Hollow Stem Auger

24-hour

A E

C O

M S

O

IL

R O

C K

A E

C O

M -G

E O

T E

C H

_P R

O

JE

C T

_E D

IS

O

N A

N D

R E

E D

.G P

J A

E C

O M

-G E

O T

E C

H _P

R O

JE

C

T -D

E S

IG

N

.G D

T

/8 /2

R

E V

-0

PROJECT NUMBER: 60694616

SC = Sonic Core

P = Pitcher Sample

H = Hand Auger Sample SHEET 1 of 1

COORDINATES: N 14109895.01 E 1053953.41

DESCRIPTION

12420 Milestone Center Drive, Suite 150 Germantown, MD 20876

PS = Piston Sample

RC = Rock Core

PROJECT NUMBER: 60694616

B = Bulk Sample

T = Shelby Tube Sample

Log of Boring B-7

G = Geoprobe

S = Split Spoon SampleAECOM TECHNICAL SERVICES, INC.

PROJECT: Edison and Reed

PROJECT LOCATION: W. Reed Ave, Alexandria, VA

F in es C on te nt

P oc ke t P en ts f)

D E

P T

H

F T

T Y

P

E REMARKS

AND TESTS

N U

M B

E R

Li qu id L im itSAMPLES

G R

A P

H

IC

P la st ic

L im it

U S

C S

BLOWS M

oi st ur e C on te nt

E

LE

V

F T

-5

S T

R A

T U

M

R E

C

IN

0.0 - 0.6 ft: Asphalt (7")

0.6 - 5.0 ft: Moist, medium stiff, dark gray with blue, medium plasticity, Lean Clay With Sand, contains organics (possible fill)

2.0 ft: changes to soft

4.0 ft: changes to dark gray with red

5.0 - 6.0 ft: Wet, very loose, dark gray, fine to coarse, POORLY GRADED SAND WITH

CLAY AND GRAVEL

6.0 - 7.0 ft: Wet, stiff, brownish light gray, fine to coarse, SILT WITH SAND, few fine to coarse gravel

7.0 - 8.0 ft: Wet, loose, brownish light gray, fine to coarse, POORLY GRADED SAND

WITH CLAY AND GRAVEL

8.0 - 11.0 ft: Wet, very loose, brownish light gray, fine to coarse, SILTY CLAYEY SAND, few fine gravel

11.0 - 15.0 ft: Wet, stiff, brownish light gray, low plasticity, SANDY SILT WITH GRAVEL

13.5 ft: changes to medium stiff

14.0 ft: changes to contains 4" cluster of decomposed wood fragments

14.3 ft: changes to reddish gray Boring completed at 15.0 FT on 4/5/2023.

Boring was backfilled with spoils upon completion.

S-1

S-2

S-3

S-4

S-5

S-6

S-7

20 14

CL

SP-

SC

ML

SP-

SC

SC-

SM

ML

7- 4- 4- 4 (N=8)

2- 1- 2- 2 (N=3)

2- 1- 1- 1 (N=2)

6- 6- 3- 4 (N=9)

WOH- WOH-

WOH- 2

(N=WOH)

1- 1- 10 (N=11)

5- 4- 3 (N=7)

19.4

19.7

30.9

A

B

(67%)

(29%)

(38%)

(100%)

(100%)

(100%)

(89%)

DRILLER: Austin Moore

DATE STARTED: 4/5/2023

During Drilling

EventDATE COMPLETED: 4/5/2023

BOREHOLE DEPTH: 15.0 FT

SURFACE ELEVATION: 12 FT

LOGGED BY: J. Kaselow

04-05-2023

HAMMER TYPE/WEIGHT: Auto Hammer/140lbs

DRILLING CONTRACTOR: Connelly

CASING TYPE: HSA

CASING SIZE: N/A

Depth (ft)

Date

4.2

Cave in Depth (ft)

11:25

BIT TYPE/SIZE: NA/NA

CHECKED BY: A. White

Date Time

DRILL RIG: CME 55

Groundwater Observations

5.010:4004-05-2023

DRILL METHOD: 3-1/4" I.D. Hollow Stem Auger

Completion

A E

C O

M S

O

IL

R O

C K

A E

C O

M -G

E O

T E

C H

_P R

O

JE

C T

_E D

IS

O

N A

N D

R E

E D

.G P

J A

E C

O M

-G E

O T

E C

H _P

R O

JE

C

T -D

E S

IG

N

.G D

T

/8 /2

R

E V

-0

PROJECT NUMBER: 60694616

SC = Sonic Core

P = Pitcher Sample

H = Hand Auger Sample SHEET 1 of 1

COORDINATES: N 14109799.87 E 1054166.67

DESCRIPTION

12420 Milestone Center Drive, Suite 150 Germantown, MD 20876

PS = Piston Sample

RC = Rock Core

PROJECT NUMBER: 60694616

B = Bulk Sample

T = Shelby Tube Sample

Log of Boring B-9

G = Geoprobe

S = Split Spoon SampleAECOM TECHNICAL SERVICES, INC.

PROJECT: Edison and Reed

PROJECT LOCATION: W. Reed Ave, Alexandria, VA

F in es C on te nt

P oc ke t P en ts f)

D E

P T

H

F T

T Y

P

E REMARKS

AND TESTS

N U

M B

E R

Li qu id L im itSAMPLES

G R

A P

H

IC

P la st ic

L im it

U S

C S

BLOWS M

oi st ur e C on te nt

E

LE

V

F T

S T

R A

T U

M

R E

C

IN

December 15, 2022 AECOM Technical Services, Inc.

Copyright 2022

IDENTIFICATION OF SOIL

I. DEFINITION OF SOIL GROUP NAMES (ASTM D-2487)

Major Component Minor Component Group/Graphic Symbol Group Name

Coarse- Grained Soils

More than 50% retained on No.

200 sieve

Gravels – > 50% of coarse fraction retained on No. 4 sieve

Fine, No. 4 to ¾” Coarse, ¾” to 3”

Clean Gravels < 5% fines

GW WELL GRADED GRAVEL

GP POORLY GRADED GRAVEL

Gravels with fines 5 - 12% fines

GW-GM WELL GRADED GRAVEL WITH SILT

GW-GC WELL GRADED GRAVEL WITH CLAY

GP-GM POORLY GRADED GRAVEL WITH SILT

GP-GC POORLYGRADED GRAVEL WITH CLAY

Gravels with fines > 12% fines

GM SILTY GRAVEL

GC CLAYEY GRAVEL

Sands – > = 50% of coarse fraction passes No. 4 sieve

Coarse, No. 10 to No. 4 Medium, No. 40 to No. 10 Fine, No. 200 to No. 40

Clean Sands < 5% fines

SW WELL GRADED SAND

SP POORLY GRADED SAND

Sands with fines 5 - 12% fines

SW-SM WELL GRADED SAND WITH SILT

SW-SC WELL GRADED SAND WITH CLAY

SP-SM POORLY GRADED SAND WITH SILT

SP-SC POORLYGRADED SAND WITH CLAY

Sands with fines > 12% fines

SM SILTY SAND

SC CLAYEY SAND

Fine-Grained Soils

50% or more passes the No.

200 sieve

Silts and Clays – Liquid Limit < 50 Low to medium plasticity

Inorganic

CL LEAN CLAY

ML SILT

Organic OL ORGANIC CLAY

ORGANIC SILT

Silts and Clays – Liquid Limit >= 50 Medium to high plasticity

Inorganic

CH FAT CLAY

MH ELASTIC SILT

Organic OH ORGANIC CLAY

ORGANIC SILT

Organic Soils Primarily organic matter, dark in color and organic odor PT PEAT

Other Symbol

FILL

II. DEFINITION OF SOIL COMPONENT PROPORTIONS (ASTM D-2487)

Adjective Criteria Example

GRAVELLY

SANDY >30% to <50% coarse grained component in a fine-grained soil SANDY FAT CLAY

CLAYEY

SILTY >12% to <50% fine grained component in a coarse-grained soil CLAYEY GRAVEL

WITH GRAVEL

WITH SAND >15% to <30% coarse grained component in a fine-grained soil SILT WITH SAND

WITH GRAVEL

WITH SAND >15% to <50% coarse grained component in a coarse-grained soil POORLY GRADED GRAVEL WITH

SAND

WITH SILT

WITH CLAY >5% to <12% fine grained component in a coarse-grained soil POORLY GRADED SAND WITH SILT

December 15, 2022 AECOM Technical Services, Inc.

Copyright 2022

III. RELATIVE DENSITY OR CONSISTENCY

Granular Soils Cohesive Soils (N Values/Pocket Penetrometer Values, tsf) N = 0 to 4 Very Loose N = 0 to 1 / <0.25 Very Soft N = 5 to 10 Loose N = 2 to 4 / 0.25 to 0.5 Soft N = 11 to 30 Medium Dense N = 5 to 8 / 0.5 to 1 Medium Stiff N = 31 to 50 Dense N = 9 to 15 / 1 to 2 Stiff N = >50 Very Dense N = 16 to 30 / 2 to 4 Very Stiff N = >30 / > 4 Hard

IV. GLOSSARY OF MISCELLANEOUS TERMS

Moisture: Dry, moist or wet to indicate visual appearance of specimen.

Color: Overall color, with modifiers such as light to dark or variation in coloration such as mottled, streaks etc.

Symbols: Based on Unified Soil Classification System (USCS). A dual symbol “-“indicates the soil belongs to two groups. A borderline symbol “/” indicates the soil belongs to two possible groups.

Fill: Man-made deposit containing soil, rock and often foreign matter.

Probable Fill: Soils which contain no visually detected foreign matter but which are suspect with regard to origin.

Disintegrated Rock (DR): Residual materials with a SPT resistance between 60 blows per foot (bpf) and refusal.

Partially Weathered Rock (PWR): Residual materials with a SPT resistance between 100 bpf and refusal.

Refusal: Refusal is defined as a SPT of 100 blows for 2” or less penetration.

Boulders: Rounded pieces of rock larger than 12 inches.

Cobbles: Rounded pieces of rock ranging from 3 to 12 inch.

Lenses: 0 to ½ inch seam within a material in a test pit.

Layers: ½ to 12 inch seam within a material in a test pit.

Pocket: Discontinuous body within a material in a test pit.

V. SAMPLE TYPE/SYMBOL

Description Name Symbol

BULK SAMPLE/HAND AUGER B

AUGER CUTTINGS AU

DENISON BARREL

PISTON SAMPLE

SHELBY TUBE

D

PS

T

GEOPROBE G

PITCHER BARREL P

ROCK CORE RC

SPLIT SPOON S

SONIC CORE SC

VI. OTHER ABBREVIATIONS

MC Moisture Content LL Liquid Limit PL Plastic Limit PI Plasticity Index

AECOM 5

Appendix B – Soil Laboratory Test Results (15 pages)

Jay Kay Testing Project Number: 60694616 (Tasks 115.1, 215.1)

Location:

Sample Date: Summary of Laboratory Testing

Sample Identification Depth Atterberg Limits Compaction

B-2 S-2 2 4 17.5 - 34 21 13 - - - A-6 - 52.9 CL

B-2 S-3A, S-4 4 8 - - - - - - - - - - - -

B-2 S-3B 4 6 17.8 - NP NP NP - - - A-1-b - 8.5 SP-SM

B-2 S-5 8 10 56.4 - 76 31 45 - - - A-7-5 - 73.5 CH

B-2 S-6 10 11.5 84.5 - - - - - - - - - - -

B-2 S-7 13.5 15 56.7 - - - - - - - - - - -

B-5 Bulk 0 5 14.5 - 39 16 23 - 115.5 13.2 A-6 - 51.3 CL

B-5 S-3A 4 6 16.4 - - - - - - - - - - -

B-5 S-4 6 8 28.7 - 61 20 41 - - - A-7-6 - 66.3 CH

B-5 S-5 8 10 27.4 - - - - - - - - - - -

B-5 S-6 10 11.5 28.8 - 60 24 36 - - - A-7-6 - 91.1 CH

B-5 S-7 13.5 15 27.7 - - - - - - - - - - -

B-7 S-2 2 4 14.0 - - - - - - - - - - -

B-7 S-3 4 6 20.8 - 65 22 43 - - - A-7-6 - 69.6 CH

B-7 S-4 6 8 29.7 - - - - - - - - - - -

B-7 S-5 8 10 37.6 - 55 32 23 - - - A-7-5 - 86.6 MH

B-7 S-7 13.5 15 15.8 - - - - - - - - - - -

B-7 S-8 18.5 20 30.2 - - - - - - - - - - -

B-9 Bulk 0 5 15.1 - 37 20 17 - - - A-6 - 46.6 SC

B-9 S-2, S-4A 2 8 - - - - - - - - - - - -

B-9 S-4B 6 8 19.4 - - - - - - - - - - -

B-9 S-5 8 10 19.7 - 20 14 6 - - - A-4 - 43.9 SC-SM

B-9 S-6 10 11.5 15.0 - - - - - - - - - - -

B-9 S-7 13.5 15 30.9 - - - - - - - - - - -

Edison & Reed

B o tt o m ft

(814) 404-9283 www.jaykaytesting.com

F in e s

U

S C

S C la s s if ic a ti o n

A S

T M

D -2

A

S

H T

O C la s s if ic a ti o n

M -1 p e c if ic

G ra v it y

A S

T M

D -8

L iq u id

L im it

A

S T

M D

-4

P la s ti c L im it

A

S T

M D

-4

M C

A

S T

M D

-2

O rg a n ic

M a tt e r, A S

T M

D -2

04/25/23 ri n g

I D a m p le p ft

Tested by: ST/JT Reviewed by: JK Jay Kay Testing

P la s ti c it y I n d e x

A

S T

M D

-4 x im u m

D ry

D e n s it y lb

/f t³ ti m u m

M o is tu re

C o n te n t, .0 m

Jay Kay Testing Project Number: 60694616 (Tasks 115.1, 215.1)

Location:

Sample Date: Summary of Atterberg Limit Testing

Atterberg Limit Results

Boring ID Sample ID Boring ID Sample ID

= B-2 S-2 2 4 34 21 13

B-2 S-3B 4 6 NP NP NP

p B-2 S-5 8 10 76 31 45

B-5 Bulk 0 5 39 16 23

= B-5 S-4 6 8 61 20 41 n B-5 S-6 10 11.5 60 24 36 p B-7 S-3 4 6 65 22 43

B-7 S-5 8 10 55 32 23

= B-9 Bulk 0 5 37 20 17 n B-9 S-5 8 10 20 14 6

Tested by: ST/JT Reviewed by: JK

Edison & Reed

(814) 404-9283 www.jaykaytesting.com

Btm LL PL PI

Jay Kay Testing 04/25/23

Top Btm LL PL PI Top

ML

CL

MH or OH

CL-ML

ASTM D-4318

0 20 40 60 80 100 120 140

P la s ti c it y I n d e x

P I)

Liquid Limit,% (LL)

Project Number: 60694616 (Tasks 115.1, 215.1) Jay Kay Testing

Boring ID Sample ID Top Btm Location: -

B-2 S-2 2' 4' Sample Date:

Sieve Size Pass, %

- mm %

6"

3"

2"

1.5"

1"

3/4"

1/2"

3/8"

#4

#10

#20

#40

#60

#100

#200

% Gravel % Sand D10 -

Coarse Fine Coarse Medium Fine D30 - CC

0.0 2.6 = 2.6 1.7 10.8 32.0 = 44.5 D60 - CU

Liquid Limit, %

Plastic Limit, %

Plasticity Index, %

USCS (D-2487) AASHTO (M-145)

CL A-6

Soil Description (D-2487)

NMC Sample Type* Data 4

OM Data 2 Data 5

______________ Data 3 Data 6

+ 3/8"

04/25/23 Tested by: ST/JT Reviewed by: JK Jay Kay Testing

1.8%

Brown sandy lean CLAY

17.5% - -

0.147 65.3

0.074 52.9

Total Total -

0.85 92.5

0.42 84.9

0.25 75.7

9.51 98.2

4.75 97.4

2.00 95.7

25.4 -

19.0 100.0

12.7 98.2

75.0 -

50.8 -

37.5 -

ASTM D-6913

GRAVEL

Diameter

SAND

U.S. Standard Sieve

CLAY/SILT

Hydrometer

150.0 -

3" 3/4" 3/8" #4 #10 #40 #200 0.002

0.0010.010.1110100

P e rc e n t

F in e r

Particle Size, mm

ML

CL MH or OHCL-ML

A-Line: 10.22

PI: 13

Plasticity: CLAY

ASTM D-4318

0 20 40 60 80 100 120 140

P la s ti c it y I n d e x

P

Liquid Limit, % (LL)

Boring ID Sample ID Top Btm Location: -

B-2 S-3B 4' 6' Sample Date:

Sieve Size Pass, %

- mm %

6"

3"

2"

1.5"

1"

3/4"

1/2"

3/8"

#4

#10

#20

#40

#60

#100

#200

% Gravel % Sand D10 0.1086

Coarse Fine Coarse Medium Fine D30 0.5911 CC

3.4 29.1 = 32.5 16.9 27.6 14.5 = 59.0 D60 3.2364 CU

Liquid Limit, %

Plastic Limit, %

Plasticity Index, %

USCS (D-2487) AASHTO (M-145)

SP-SM A-1-b

Soil Description (D-2487)

NMC Sample Type* Data 4

OM Data 2 Data 5

______________ Data 3 Data 6

+ 3/8"

04/25/23 Tested by: ST/JT Reviewed by: JK Jay Kay Testing

20.2%

NP

Light brown poorly-graded SAND with silt and gravel

17.8% - -

Total Total 0.995

29.81

NP

NP

0.25 14.7

0.147 11.2

0.074 8.5

2.00 50.6

0.85 37.4

0.42 23.0

12.7 86.8

9.51 79.8

4.75 67.5

37.5 -

25.4 100.0

19.0 96.6

150.0 -

75.0 -

50.8 -

ASTM D-6913

GRAVEL

Diameter

SAND

U.S. Standard Sieve

CLAY/SILT

Hydrometer

D10

D30

D60

3" 3/4" 3/8" #4 #10 #40 #200 0.002

0.0010.010.1110100

P e rc e n t

F in e r

Particle Size, mm

ML

CL MH or OHCL-ML

A-Line: NP

PI: NP

Plasticity: SILT

ASTM D-4318

NP/NP/NP

0 20 40 60 80 100 120 140

P la s ti c it y I n d e x

P

Boring ID Sample ID Top Btm Location: -

B-2 S-5 8' 10' Sample Date:

Sieve Size Pass, %

- mm %

6"

3"

2"

1.5"

1"

3/4"

1/2"

3/8"

#4

#10

#20

#40

#60

#100

#200

% Gravel % Sand D10 -

Coarse Fine Coarse Medium Fine D30 - CC

0.0 0.4 = 0.4 0.9 4.6 20.6 = 26.1 D60 - CU

Liquid Limit, %

Plastic Limit, %

Plasticity Index, %

USCS (D-2487) AASHTO (M-145)

CH A-7-5

Soil Description (D-2487)

NMC Sample Type* Data 4

OM Data 2 Data 5

______________ Data 3 Data 6

+ 3/8"

04/25/23 Tested by: ST/JT Reviewed by: JK Jay Kay Testing

0.0%

Dark gray fat CLAY with sand

56.4% - -

Total Total -

0.25 89.1

0.147 82.2

0.074 73.5

2.00 98.7

0.85 97.7

0.42 94.1

12.7 -

9.51 100.0

4.75 99.6

37.5 -

25.4 -

19.0 -

150.0 -

75.0 -

50.8 -

ASTM D-6913

GRAVEL

Diameter

SAND

U.S. Standard Sieve

CLAY/SILT

Hydrometer

3" 3/4" 3/8" #4 #10 #40 #200 0.002

0.0010.010.1110100

P e rc e n t

F in e r

Particle Size, mm

ML

CL MH or OHCL-ML

A-Line: 40.88

PI: 45

Plasticity: CLAY

ASTM D-4318

0 20 40 60 80 100 120 140

P la s ti c it y I n d e x

P

Boring ID Sample ID Top Btm Location: -

B-5 Bulk 0' 5' Sample Date:

Sieve Size Pass, %

- mm %

6"

3"

2"

1.5"

1"

3/4"

1/2"

3/8"

#4

#10

#20

#40

#60

#100

#200

% Gravel % Sand D10 -

Coarse Fine Coarse Medium Fine D30 - CC

0.7 6.1 = 6.8 4.4 8.6 28.9 = 41.9 D60 - CU

Liquid Limit, %

Plastic Limit, %

Plasticity Index, %

USCS (D-2487) AASHTO (M-145)

CL A-6

Soil Description (D-2487)

NMC Sample Type* Data 4

OM Data 2 Data 5

______________ Data 3 Data 6

+ 3/8"

04/25/23 Tested by: ST/JT Reviewed by: JK Jay Kay Testing

3.5%

Brown sandy lean CLAY

14.5% - -

Total Total -

0.25 70.5

0.147 60.7

0.074 51.3

2.00 88.8

0.85 86.0

0.42 80.2

12.7 97.8

9.51 96.5

4.75 93.2

37.5 100.0

25.4 99.6

19.0 99.3

150.0 -

75.0 -

50.8 -

ASTM D-6913

GRAVEL

Diameter

SAND

U.S. Standard Sieve

CLAY/SILT

Hydrometer

3" 3/4" 3/8" #4 #10 #40 #200 0.002

0.0010.010.1110100

P e rc e n t

F in e r

Particle Size, mm

ML

CL MH or OHCL-ML

A-Line: 13.87

PI: 23

Plasticity: CLAY

ASTM D-4318

0 20 40 60 80 100 120 140

P la s ti c it y I n d e x

P

Boring ID Sample ID Top Btm Location: -

B-5 S-4 6' 8' Sample Date:

Sieve Size Pass, %

- mm %

6"

3"

2"

1.5"

1"

3/4"

1/2"

3/8"

#4

#10

#20

#40

#60

#100

#200

% Gravel % Sand D10 -

Coarse Fine Coarse Medium Fine D30 - CC

0.0 0.0 = 0.0 0.2 7.2 26.3 = 33.7 D60 - CU

Liquid Limit, %

Plastic Limit, %

Plasticity Index, %

USCS (D-2487) AASHTO (M-145)

CH A-7-6

Soil Description (D-2487)

NMC Sample Type* Data 4

OM Data 2 Data 5

______________ Data 3 Data 6

+ 3/8"

04/25/23 Tested by: ST/JT Reviewed by: JK Jay Kay Testing

0.0%

Orange-brown sandy fat CLAY

28.7% - -

Total Total -

0.25 85.5

0.147 77.2

0.074 66.3

2.00 99.8

0.85 98.7

0.42 92.6

12.7 -

9.51 -

4.75 100.0

37.5 -

25.4 -

19.0 -

150.0 -

75.0 -

50.8 -

ASTM D-6913

GRAVEL

Diameter

SAND

U.S. Standard Sieve

CLAY/SILT

Hydrometer

3" 3/4" 3/8" #4 #10 #40 #200 0.002

0.0010.010.1110100

P e rc e n t

F in e r

Particle Size, mm

ML

CL MH or OHCL-ML

A-Line: 29.93

PI: 41

Plasticity: CLAY

ASTM D-4318

0 20 40 60 80 100 120 140

P la s ti c it y I n d e x

P

Boring ID Sample ID Top Btm Location: -

B-5 S-6 10' 11.5' Sample Date:

Sieve Size Pass, %

- mm %

6"

3"

2"

1.5"

1"

3/4"

1/2"

3/8"

#4

#10

#20

#40

#60

#100

#200

% Gravel % Sand D10 -

Coarse Fine Coarse Medium Fine D30 - CC

0.0 0.0 = 0.0 0.5 3.4 5.0 = 8.9 D60 - CU

Liquid Limit, %

Plastic Limit, %

Plasticity Index, %

USCS (D-2487) AASHTO (M-145)

CH A-7-6

Soil Description (D-2487)

NMC Sample Type* Data 4

OM Data 2 Data 5

______________ Data 3 Data 6

+ 3/8"

04/25/23 Tested by: ST/JT Reviewed by: JK Jay Kay Testing

0.0%

Light brown fat CLAY

28.8% - -

Total Total -

0.25 94.3

0.147 93.1

0.074 91.1

2.00 99.5

0.85 98.2

0.42 96.1

12.7 -

9.51 -

4.75 100.0

37.5 -

25.4 -

19.0 -

150.0 -

75.0 -

50.8 -

ASTM D-6913

GRAVEL

Diameter

SAND

U.S. Standard Sieve

CLAY/SILT

Hydrometer

3" 3/4" 3/8" #4 #10 #40 #200 0.002

0.0010.010.1110100

P e rc e n t

F in e r

Particle Size, mm

ML

CL MH or OHCL-ML

A-Line: 29.20

PI: 36

Plasticity: CLAY

ASTM D-4318

0 20 40 60 80 100 120 140

P la s ti c it y I n d e x

P

Boring ID Sample ID Top Btm Location: -

B-7 S-3 4' 6' Sample Date:

Sieve Size Pass, %

- mm %

6"

3"

2"

1.5"

1"

3/4"

1/2"

3/8"

#4

#10

#20

#40

#60

#100

#200

% Gravel % Sand D10 -

Coarse Fine Coarse Medium Fine D30 - CC

0.0 10.2 = 10.2 3.6 5.3 11.3 = 20.2 D60 - CU

Liquid Limit, %

Plastic Limit, %

Plasticity Index, %

USCS (D-2487) AASHTO (M-145)

CH A-7-6

Soil Description (D-2487)

NMC Sample Type* Data 4

OM Data 2 Data 5

______________ Data 3 Data 6

+ 3/8"

04/25/23 Tested by: ST/JT Reviewed by: JK Jay Kay Testing

8.1%

Light brown sandy fat CLAY

20.8% - -

Total Total -

0.25 76.3

0.147 73.3

0.074 69.6

2.00 86.2

0.85 84.5

0.42 80.9

12.7 91.9

9.51 91.9

4.75 89.8

37.5 -

25.4 -

19.0 100.0

150.0 -

75.0 -

50.8 -

ASTM D-6913

GRAVEL

Diameter

SAND

U.S. Standard Sieve

CLAY/SILT

Hydrometer

3" 3/4" 3/8" #4 #10 #40 #200 0.002

0.0010.010.1110100

P e rc e n t

F in e r

Particle Size, mm

ML

CL MH or OHCL-ML

A-Line: 32.85

PI: 43

Plasticity: CLAY

ASTM D-4318

0 20 40 60 80 100 120 140

P la s ti c it y I n d e x

P

Boring ID Sample ID Top Btm Location: -

B-7 S-5 8' 10' Sample Date:

Sieve Size Pass, %

- mm %

6"

3"

2"

1.5"

1"

3/4"

1/2"

3/8"

#4

#10

#20

#40

#60

#100

#200

% Gravel % Sand D10 -

Coarse Fine Coarse Medium Fine D30 - CC

0.0 0.0 = 0.0 0.0 0.4 13.0 = 13.4 D60 - CU

Liquid Limit, %

Plastic Limit, %

Plasticity Index, %

USCS (D-2487) AASHTO (M-145)

MH A-7-5

Soil Description (D-2487)

NMC Sample Type* Data 4

OM Data 2 Data 5

______________ Data 3 Data 6

+ 3/8"

04/25/23 Tested by: ST/JT Reviewed by: JK Jay Kay Testing

0.0%

Orange-brown elastic SILT

37.6% - -

Total Total -

0.25 99.0

0.147 98.0

0.074 86.6

2.00…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .