This is a Geotechnical Engineering Report and associated Addendum prepared by AECOM for the City of Alexandria, Virginia, for the Edison and Reed Neighborhood Spot Improvement project, which includes proposed storm sewer pipe installations and related infrastructure along Edison Street, West Reed Avenue, and Dale Street. The project involves installing new storm sewer pipes with a maximum diameter of 24 inches, check valves, and multiple storm drain inlets along the specified streets, with pipe inverts located approximately 3 to 6.5 feet below existing ground surface. The investigation included four Standard Penetration Test borings in the original report (conducted April 4-5, 2023) and two additional test pits (TP-05 and TP-06) on Dale Street documented in the November 2024 Addendum. Soil samples were collected and tested by JayKay Testing, LLC in accordance with ASTM standards, including classification testing, California Bearing Ratio testing, compaction characteristics analysis, and corrosion potential assessment to inform design and construction specifications.
The geotechnical investigation identified subsurface conditions consisting of two primary strata: existing fill materials (Stratum A) and alluvial soils (Stratum B), with varying soil classifications including lean clays, fat clays, silts, and poorly graded sands with depths to groundwater ranging from 4 to 8 feet below surface. The report provides detailed engineering recommendations for storm sewer pipe support, bedding materials, subgrade preparation, fill placement and compaction requirements (minimum 95 percent of standard proctor density), and construction dewatering procedures. Key recommendations include undercutting approximately 12 inches of loose soils and replacing with bedding stone wrapped in geotextile fabric, using VDOT-specified aggregate materials, and conducting full-time construction monitoring by a qualified geotechnical engineering firm. Corrosion testing results indicated low sulfate and chloride concentrations with negligible sulfate severity exposure classification per ACI 318, and the soils were classified as non-corrosive per AWWA standards while maintaining corrosive ratings for buried steel elements per FHWA standards.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Geotechnical Engineering Report
July 12, 2023
Prepared for: City of Alexandria
Prepared by AECOM
AECOM Project Number: 60694616
Quality information
Document name Ref Prepared for Prepared by Date Reviewed by
Geotechnical Engineering Report Final City of Alexandria, Virginia Ariana White, PE 07-12-2023 Victor Omelchenko, PE, DGE
Revision history
Revision Revision date Details Name Position
This document has been prepared by AECOM Limited for the sole use of our client (the “Client”) and in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AECOM Limited and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM Limited, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM Limited.
AECOM 1-1
Table of Contents
1 INTRODUCTION AND SCOPE OF WORK ..................................................................... 1-2
2 EXISTING SITE CONDITIONS AND PROPOSED CONSTRUCTION ........................... 2-1 Existing Site Conditions ........................................................................................................... 2-1
Proposed Construction ............................................................................................................ 2-1
3 FIELD EXPLORATION ..................................................................................................... 3-1
Subsurface Exploration ........................................................................................................... 3-1
Boring Stakeout and Subsurface Utility Clearance ................................................................ 3-1
Drilling Methodology and Sampling ........................................................................................ 3-1
4 SUBSURFACE EXPLORATION RESULTS .................................................................... 4-1 Site Geology ............................................................................................................................ 4-1
Subsurface Conditions ............................................................................................................ 4-1
4.2.1 Soil Borings ................................................................................................................ 4-1
Groundwater ............................................................................................................................ 4-2
Soil Laboratory Testing ........................................................................................................... 4-2
4.4.1 Soil Classification Testing Results ............................................................................ 4-2
4.4.2 California Bearing Ratio Testing Results .................................................................. 4-2
4.4.3 Corrosion Testing Results ......................................................................................... 4-2
5 GEOTECHNICAL ENGINEERING RECOMMENDATIONS............................................ 5-1
Storm Sewer Pipes and Junction Boxes ................................................................................ 5-1
Subgrade Preparations ........................................................................................................... 5-2
Pavement Subgrade Preparations .......................................................................................... 5-2
New Fill Placement and Compaction ...................................................................................... 5-2
6 CONSTRUCTION CONSIDERATIONS ........................................................................... 6-1 Construction Monitoring .......................................................................................................... 6-1
7 LIMITATIONS .................................................................................................................... 7-1
List of Figures and Appendices Figure 1 - Site Vicinity Plan Figure 2 - Soil Boring Location Plan Appendix A: Soil Boring Logs (5 pages), USCS Soil Identification Sheet (2 pages) Appendix B: Soil Laboratory Test Results (15 pages)
AECOM 1-2
1 INTRODUCTION AND SCOPE OF WORK
AECOM Technical Services Inc. (AECOM) was retained by the City of Alexandria to conduct a subsurface investigation and analysis for the Edison and Reed Neighborhood Spot Improvement project. The site is located along Edison Street and West Reed Avenue in Alexandria, Virginia.
AECOM’s scope of work for the subject project included drilling a total of four Standard Penetration Test (SPT) borings, soil laboratory testing, and preparation of a geotechnical engineering report with the following information:
A. A soil boring location plan.
B. Soil boring logs.
C. Results of geotechnical soil laboratory testing.
D. Recommendations for support of the proposed storm sewer pipes and proposed inlets.
E. Recommendations for handling of groundwater in the design.
F. Recommendations for pavement subgrades.
G. Recommendations for earthwork requirements, including re-use of site soils for structural fill and backfill over the proposed storm sewer pipes.
AECOM 2-1
2 EXISTING SITE CONDITIONS AND PROPOSED CONSTRUCTION
Existing Site Conditions
The sites are located at the end of the Edison Street cul-de-sac and at West Reed Avenue in Alexandria, Virginia. The existing site conditions include a paved bike trail (near Edison Street) and a paved road (West Reed Avenue). The existing site grading slopes slightly downward to the east.
A Site Vicinity Map is included as Figure 1.
Proposed Construction
AECOM understands that the proposed construction will include installing new storm sewer pipe with a maximum diameter of 24 inches and check valve at the end of the Edison Street cul-de-sac. The proposed construction also includes the addition of multiple storm drain inlets and associated storm drain pipes along West Reed Avenue. The storm sewer pipe inverts will be located at about 3 to 6.5 feet below the existing ground surface. The site will receive no new fill or minimal amounts of new fill.
AECOM 3-1
3 FIELD EXPLORATION
Subsurface Exploration
A total of four soil borings were drilled at the site by Connelly and Associates. One boring was drilled near Edison and three borings along W Reed Ave. The approximate boring locations are illustrated on the Boring Location Plan included as Figure 2. The soil test boring logs are included in Appendix A.
Boring Stakeout and Subsurface Utility Clearance
The boring locations were field located and staked by an AECOM representative. “VA 811” was contacted by our drilling subcontractor to mark the existing underground utilities around the staked boing locations. The soil boring locations and elevations were not surveyed and should be considered approximate. The ground surface elevations at the soil boring locations were estimated from Google Earth and are shown on the boring logs included in Appendix A.
Drilling Methodology and Sampling
Connelly and Associates drilled the soil test borings between April 4th and 5th, 2023. The borings were drilled with a CME-55 truck mounted drill rig using 3-1/4-inch diameter continuous flight hollow stem augers to advance the borings. Representative soil samples were obtained using a 2-inch outside diameter split-barrel spoon sampler in general accordance with ASTM D 1586 standards. Standard penetration tests (SPTs) were performed by driving the split-spoon sampler into the soil a distance of 18 and 24 inches over three or four six-inch intervals, respectively, by means of a 140-pound hammer falling 30 inches. The number of hammer blows required to drive the sampler through the second and third 6-inch intervals (i.e., the N-values) for each sample are indicated on the test boring logs included in Appendix A. Soil samples were obtained continuously from the borings in the upper 10 feet of soil overburden and every five feet below the upper 10 feet to the final boring depths. The N-values provide an indication of the in-place density (granular materials) and consistency (cohesive materials) of the soils. The borings were backfilled with the soil cuttings upon drilling completion or after the 24-hour groundwater measurements were obtained.
After recovery, the soil samples were removed from the samplers and were visually classified by an AECOM engineer. Representative portions of the soil samples were sealed in glass jars and retained for further review. Selected soil samples were assigned for laboratory testing as discussed in Section 4.4. The visual classifications of the soil samples were based on texture and plasticity, in accordance with the Unified Soil Classification System (USCS). A brief description of the USCS is also included in Appendix A.
AECOM 4-1
4 SUBSURFACE EXPLORATION RESULTS
Site Geology
The site lies within the Coastal Plain geological province. The Coastal Plain consists of a seaward thickening wedge of unconsolidated to semi-consolidated sedimentary deposits from the Cretaceous Geologic Period to the Holocene Geologic Epoch. These deposits represent marginal-marine to marine sediments consisting of interbedded sands and clays. The Coastal Plain is bordered to the east by the Atlantic Ocean and to the west by the Piedmont Physiographic Province.
Subsurface Conditions
4.2.1 Soil Borings
The subsurface strata encountered during our subsurface exploration are described below for the purposes of our discussions in this report. It should be noted that these descriptions do not imply continuity of the materials encountered in the borings. The descriptions of the materials have been established to characterize similar subsurface conditions based on material gradations and parent geology. The subsurface materials encountered in the soil borings, along with the range of Standard Penetration Test (SPT) N-Values are described below.
Stratum A: Existing Fill
Existing Fill and Possible fill soils were encountered during our field exploration below pavement.
The existing fill’s depth ranged from 4 feet to 5.5 feet below the existing ground surface (from approximate elevations El. 12 feet to El. 4.5 feet). The Stratum A soils generally consist of soft to medium stiff Lean Clay with sand (CL), Sandy Lean Clay (CL) or loose to medium dense Silty Sand with gravel (SM), Poorly Graded Sand with gravel (SP), Poorly Graded Sand with Silt and Gravel (SP-SM), and Poorly Graded Sand with Clay and Gravel (SP-SC). The Standard Penetration Test N-values for the soils varied between 3 blows per foot (bpf) and 19 bpf.
Stratum B: Alluvial Soils
Alluvial soils were encountered during our field exploration below the existing fill and possible fill soils and extended to the maximum depth explored at the soil borings (extended to approximate elevations of El. 3 feet to El. -15 feet). The Stratum B soils generally consist of very soft to stiff Sandy Lean Clay with gravel (CL), Fat Clay (CH), Fat Clay with sand (CH), Sandy Fat Clay (CH), Elastic silt (MH), Elastic Silt with sand (MH), Silt with sand (ML) and Sandy Silt with gravel (ML) or very loose to dense Poorly Graded Sand with Silt and Gravel (SP-SM), Clayey Sand with gravel (SC), Silty Clayey Sand (SC-SM), Poorly Graded Sand with Clay and Gravel (SP-SC), and Poorly graded Gravel with Silt and Sand (GP-GM). The Standard Penetration Test N-values for the soils varied between Weight of Hammer (WOH) material and 35 blow per foot (bpf).
AECOM 4-2
Groundwater
Groundwater measurements were investigated during drilling operations, upon completion of the borings, and up to about 24 hours after drilling. A 1-inch diameter temporary PVC standpipe was installed in borings B-2 and B-5 to obtain the stabilized 24-hour groundwater level and to prevent the boring sidewalls from caving in. The groundwater observations indicated water present at depths of 4 ft to 8 ft below the existing ground surface. The groundwater observations are indicated on the boring logs in Appendix A.
Perched water conditions may be encountered during construction due to the presence of fine-grained soils interbedded with free-draining sandy soils. It is possible that stabilized groundwater levels are higher. It should be noted that fluctuations in groundwater levels may occur as a result of seasonal variations in rainfall, proximity of the site to large bodies of water, evaporation, construction activity, surface runoff, and other site-specific factors.
Soil Laboratory Testing
Selected soil samples were tested by JayKay to determine the engineering properties of the on-site soils. The soil samples were tested for natural moisture content, grain size distribution, Atterberg limits, compaction characteristics using standard effort, California Bearing Ratio, and corrosion potential. The soil laboratory tests were conducted in accordance with applicable ASTM standards.
4.4.1 Soil Classification Testing Results
Selected split-spoon soil samples were tested to determine the classification of the on-site soils.
The testing included moisture content determinations (ASTM D2216), Atterberg Limits tests (ASTM D4318), mechanical gradation analyses (ASTM D6913), and moisture-density relationships (ASTM D698). The soil laboratory testing results are presented in Appendix B and are incorporated in the boring logs included in Appendix A.
4.4.2 California Bearing Ratio Testing Results
One bulk soil sample was selected from soil boring B-5 to obtain California Bearing Ratio (CBR) values. CBR values for soils compacted to about 95 percent of standard proctor density per ASTM D698 ranged from 3.7 to 4.1. The testing results are presented in Appendix B.
4.4.3 Corrosion Testing Results
Soil samples obtained from borings B-2 and B-9 were tested to determine the corrosion potential of the soils. The soil laboratory test results are included in Appendix B and summarized in Table
4.1 below.
AECOM 4-3
Table 4.1: Corrosion Test Results Summary
Boring Depth (ft)
Approximate Elevation (ft)
Resistivity Ohm-cm
Redox Potential mV pH Sulfide mg/Kg Chloride
(ppm) Sulfate (ppm)
B-2 4 - 8 2 - 6 3,360 41 9.12 Negative 212 143
B-9 2 - 8 1 - 7 2,580 80 8.94 Negative 112 77
The geochemical properties of the soils at the project site need to be considered in the final design of the facilities of the project, including, sewers, structures, and foundations. The test results indicate a low sulfate and chloride concentration in the samples tested. According to AASHTO 2014, concentrations of sulfate greater than 1,000 ppm are considered to be corrosive. In addition, based on the American Concrete Institute (ACI 318), soils with water-soluble sulfate content of less than 150 parts per million (ppm) or less than 0.10% by weight are categorized as having an exposure class of S0 (negligible sulfate severity), and there is not a concern of injurious sulfate attack on concrete at this level of soil sulfate concentration. Concrete can be designed to meet the criteria for Exposure Category S0 as defined in ACI 318. Final selection of the cement grade and approval of the concrete mix should be performed by the project structural engineer.
The American Water Works Association (AWWA) standard C-105 (Polyethylene Encasement for Ductile-Iron Pipe System) and the Ductile Iron Pipe Research Association (DIPRA) provide a 10- Point System to assess the corrosion potential of the soil based on the soil resistivity, redox potential, pH, sulfide/sulfate concentrations, and moisture of the soils. According to this system, samples B-2 and B-9 are both considered non-corrosive. Also, according to Federal Highway Administration (FHWA) NHI-16-072 - Table 5-14, soil samples B-2 and B-9 have corrosivity ratings of corrosive and highly corrosive, respectively, for buried steel elements.
AECOM 5-1
5 GEOTECHNICAL ENGINEERING RECOMMENDATIONS
This geotechnical engineering recommendations are based on the soil boring data and review of the available drawings.
Storm Sewer Pipes and Inlets
Based on the soil borings drilled in the vicinity of the proposed structures, the subgrade soils are anticipated to generally consist of loose to medium dense sandy or gravelly fill soils of Stratum A, medium stiff to stiff cohesive fills of Stratum A or natural soils of Stratum B. It is AECOM’s professional opinion that the storm sewer pipes and inlets can be founded on these soils at the proposed subgrade elevations. However, very loose or high plasticity soil can be anticipated at some locations along the proposed storm sewer alignment that will require treatment.
Preliminarily, we recommend undercutting about 12 inches of loose soils from beneath the utility pipes and replacing this material with 12 inches of bedding stone. Storm sewer pipe material should consist of aggregate No. 25 or 26 materials in accordance with the VDOT Road and Bridge Standards PB-1 and Section 302 of the VDOT Road and Bridge specifications or with AASHTO No. 57 crushed stone or washed gravel. Crushed stone or gravel should be completely wrapped in a woven geotextile stabilization fabric. The actual depth of undercutting should be evaluated by a qualified geotechnical engineer during construction.
Based on the drilled borings, it is anticipated that groundwater will likely be encountered during construction. Therefore, the contractor should be prepared to provide localized construction dewatering consisting of well points, deep wells or sump pumps. The contractor should evaluate the appropriate dewatering system requirements.
Storm sewer pipe backfill should consist of select fill and regular backfill in accordance with the VDOT Road and Bridge Standards PB-1 and Section 302 of the VDOT Road and Bridge Specifications. All backfill should be placed in loose lifts not exceeding 6 inches in thickness and should be compacted to at least 95 percent of the maximum dry density, determined in accordance with ASTM D 698. In general, the moisture content of the fill materials should be maintained within 2 percent of the optimum moisture content.
Native soils of Stratum B that classify as ML, SM, SC, or more granular are generally considered suitable for reuse as compacted regular backfill, provided they are free of organic matter and other deleterious matter, not contaminated, and have a Liquid Limit (LL) and Plasticity Index (PI) of less than 40 and 15, respectively. Some moisture conditioning of these soils will be required to achieve the compaction requirements. Soils classifying CH, MH, or OH are not considered suitable for reuse as compacted fill or backfill.
Trench boxes and/or sloping of excavations may be needed. All temporary excavations must comply with applicable local, state, and federal safety regulations, including the current OSHA Excavation and Trench Safety Standards. Construction site safety generally is the responsibility of the contractor, who should be solely responsible for the means, methods, and sequencing of construction operations so that a safe working environment is maintained.
AECOM 5-2
The contractor should avoid stockpiling excavated materials or having construction equipment immediately adjacent to the excavations. We recommend that stockpiled materials be kept back from the excavations a minimum distance equal to one-half the excavation depth to limit surcharging the excavation side-walls. If this is impractical due to space constraints, the excavation side-walls can be retained with bracing designed for the anticipated surcharge loads.
Subgrade Preparations
All structure subgrades should be stripped of vegetation, asphalt, roots, topsoil, construction debris, organics, and any other deleterious materials. The utility structure excavations should extend to suitable bearing materials, and final bearing subgrades should be observed and approved by the geotechnical engineer prior to the placement of the gravel bedding materials to verify their suitability to provide foundation support, as recommended herein.
Very loose or soft soils can be anticipated at the proposed utility structure subgrades. We preliminarily recommend undercutting about 12 inches of loose or soft soils and replacing these materials with 12 inches of bedding stone. Storm sewer pipe bedding material should consist of aggregate No. 25 or 26 materials in accordance with the VDOT Road and Bridge Standards PB- 1 and Section 302 of the VDOT Road and Bridge specifications or with AASHTO No. 57 crushed stone or washed gravel. Crushed stone or gravel should be completely wrapped in a woven geotextile stabilization fabric. The actual depth of undercutting should be evaluated, monitored, and documented by a qualified geotechnical engineer during construction. We recommend establishing a budget for the undercutting of soft and yielding existing fill and natural soils.
Pavement Subgrade Preparations
At the onset of any site grading, the entire area should be stripped of vegetation, asphalt, roots, topsoil, construction debris, and any deleterious materials. Following the removal of any unsuitable material, the geotechnical engineer should be present to verify the suitability of the subgrades to receive fill or pavement. Existing fill was encountered in the borings. This fill may contain varying amounts of deleterious matter, and some undercutting of these soils should be expected.
Additionally, fill and subgrade consisting of existing fill soils may be soft and yielding in some areas. Where moisture conditioning and re-compaction do not create stable subgrades, undercutting of these soils may be necessary to stabilize the subgrades to achieve the structural fill compaction requirements. The depth of undercutting, if necessary, will vary depending on the actual soil conditions encountered and should be determined in the field. We recommend establishing a budget for the undercutting of soft and yielding existing fill and natural soils. All undercuts, if necessary, should be approved and performed under the observation of the geotechnical engineer.
New Fill Placement and Compaction
All new compacted structural fill and backfill should be placed in loose lifts not exceeding 6 inches in thickness and should be compacted to at least 95 percent of the maximum dry density, determined in accordance with ASTM D698. In general, the moisture content of the fill materials should be maintained within 2 percent of the optimum moisture content. Materials to be used as
AECOM 5-3
compacted fill should be classified as ML, SM, SC or more granular, and should have a Liquid Limit (LL) and Plasticity Index (PI) of less than 40 and 15, respectively.
Existing fill of Stratum A is generally not considered suitable for re-use as new compacted fill.
Native soils of Stratum B that classify as ML, SM, SC, or more granular are generally considered suitable for reuse as compacted fill, provided they are free of organic matter and other deleterious matter, not contaminated, and have a Liquid Limit (LL) and Plasticity Index (PI) of less than 40 and 15, respectively. Some moisture conditioning of these soils will be required to achieve the compaction requirements. Soils classifying CH, MH or OH are not considered suitable for reuse as compacted fill. The suitability of the onsite soils for reuse as fill should be determined by the geotechnical engineer during construction.
AECOM 6-1
6 CONSTRUCTION CONSIDERATIONS
Construction Monitoring
Monitoring of the construction is strongly recommended to address quality control/quality assurance issues and to promptly address non-conforming construction. Full-time construction monitoring should be provided during subgrades preparation and earthwork operations by a qualified geotechnical engineering firm that is familiar with the design and construction criteria for the project. The monitoring should include observation of the foundation bearing materials, subgrade conditions, subgrade preparation, excavation support systems, compaction testing of fill, etc. We can provide these services, upon request.
AECOM 7-1
7 LIMITATIONS
Interpretation of general subsurface soil conditions presented herein is based on our understanding of the proposed project as described in this report, soil and groundwater conditions encountered in the limited number of soil borings and other data discussed in this report. Although representative portions of the samples taken were tested, subsurface conditions may vary between exploration locations. This report does not reflect any variations that may occur between boring locations or across the site in areas not sampled. The nature and extent of such variations may not become evident until construction. Groundwater conditions during construction may be different from the observations made in the borings. If variations occur, it will be necessary to reevaluate the recommendations in this report.
This report has been prepared for the specific project discussed and has been prepared in accordance with generally accepted geotechnical engineering practices. No warranty, express or implied, is provided. In the event that any changes in the nature, design, or location of the project as outlined in this report are planned, the conclusions and recommendations contained in this report will not be considered valid unless the changes are reviewed, and the conclusions of this report are modified or verified in writing by AECOM.
AECOM 2
Figure 1- Site Vicinity Plan
N
SITE
TO#49 EDISON AND REED
ALEXANDRIA, VA
SITE VICINITY PLAN
SCALE:
NTS
FIGURE :
1DATE:
05/10/2023
CHECKED BY:
VO
PROJECT NO.:
60694616
12420 Milestone Center Dr, Suite 150 Germantown, MD 20876 Tel: (301) 820-3000
AECOM TECHNICAL SERVICES, INC.
AECOM 3
Figure 2- Soil Boring Location Plan
TO#49 EDISON AND REED
ALEXANDRIA, VA
SOIL BORING LOCATION PLAN
SCALE:
NTS
FIGURE :
2DATE:
05/10/2023
CHECKED BY:
VO
PROJECT NO.:
60694616
12420 Milestone Center Dr, Suite 150 Germantown, MD 20876 Tel: (301) 820-3000
AECOM TECHNICAL SERVICES, INC.
N
B-2
LEGEND:
B-9
B-5
B-7
B-2
Ed iso n St re et
W Reed Ave
APPROXIMATE BORING LOCATION
AECOM 4
Appendix A – Soil Boring Logs (5 pages), USCS Soil Identification Sheet (2 pages)
0.0 - 0.5 ft: Asphalt (6")
0.5 - 2.0 ft: FILL sampled as moist, medium dense, dark gray, fine to coarse, Silty Sand (SM) with Gravel, contains organics and brick fragments
2.0 - 5.5 ft: Moist, stiff, dark gray, medium plasticity, Sandy Lean Clay, contains organics (possible fill)
4.0 ft: changes to stiff
5.5 - 8.0 ft: Moist, medium dense, dark gray and light gray, fine to coarse, POORLY
GRADED SAND WITH SILT AND GRAVEL,
contains organics
6.0 ft: changes to contains pieces of broken cobbles
8.0 - 19.5 ft: Moist, soft to very soft, dark gray, medium plasticity, FAT CLAY WITH SAND, contains organics as decomposed wood
S-1
S-2
S-3
S-4
S-5
S-6
S-7
CL
SP-
SM
CH
4- 8- 6- 5 (N=14)
9- 6- 7- 11 (N=13)
4- 5- 14- 50/4"
(N=19)
17- 19- 8- 4 (N=27)
2- 1- 2- 1 (N=3)
WOH- WOH-
(N=WOH)
WOH- 3- 1
(N=4)
17.5
17.8
56.4
84.5
A
B
(75%)
(75%)
(64%)
(25%)
(67%)
(100%)
(100%)
DRILLER: Austin Moore
DATE STARTED: 4/4/2023
During Drilling
EventDATE COMPLETED: 4/5/2023
BOREHOLE DEPTH: 25.0 FT
SURFACE ELEVATION: 10 FT
LOGGED BY: J. Kaselow
04-05-2023
HAMMER TYPE/WEIGHT: Auto Hammer/140lbs
DRILLING CONTRACTOR: Connelly
CASING TYPE: HSA
CASING SIZE: N/A
Depth (ft)
Date
8.1
Cave in Depth (ft)
13:25
BIT TYPE/SIZE: NA/NA
CHECKED BY: A. White
Date Time
DRILL RIG: CME 55
Groundwater Observations
19.513:0004-04-2023
DRILL METHOD: 3-1/4" I.D. Hollow Stem Auger
24-hour
A E
C O
M S
O
IL
R O
C K
A E
C O
M -G
E O
T E
C H
_P R
O
JE
C T
_E D
IS
O
N A
N D
R E
E D
.G P
J A
E C
O M
-G E
O T
E C
H _P
R O
JE
C
T -D
E S
IG
N
.G D
T
/8 /2
R
E V
-0
PROJECT NUMBER: 60694616
SC = Sonic Core
P = Pitcher Sample
H = Hand Auger Sample SHEET 1 of 2
COORDINATES: N 14111210.63 E 1053923.88
DESCRIPTION
12420 Milestone Center Drive, Suite 150 Germantown, MD 20876
PS = Piston Sample
RC = Rock Core
PROJECT NUMBER: 60694616
B = Bulk Sample
T = Shelby Tube Sample
Log of Boring B-2
G = Geoprobe
S = Split Spoon SampleAECOM TECHNICAL SERVICES, INC.
PROJECT: Edison and Reed
PROJECT LOCATION: W. Reed Ave, Alexandria, VA
F in es C on te nt
P oc ke t P en ts f)
D E
P T
H
F T
2.5
5.0
7.5
10.0
12.5
15.0
T Y
P
E REMARKS
AND TESTS
N U
M B
E R
Li qu id L im itSAMPLES
G R
A P
H
IC
P la st ic
L im it
U S
C S
BLOWS M
oi st ur e C on te nt
E
LE
V
F T
7.5
5.0
2.5
0.0
-2.5
-5.0
S T
R A
T U
M
R E
C
IN
19.5 - 25.0 ft: Wet, medium dense, gray and light gray, fine to coarse, POORLY GRADED
GRAVEL WITH SILT AND SAND
Boring completed at 25.0 FT on 4/5/2023.
1-inch temporary standpipe was installed in the hole after completion. Boring was backfilled with spoils after 24-hr water level was recorded.
S-8
S-9
CH
GP-
GM
10- 5- 5 (N=10)
5- 6- 8 (N=14)
B
(44%)
(NR)
A E
C O
M S
O
IL
R O
C K
A E
C O
M -G
E O
T E
C H
_P R
O
JE
C T
_E D
IS
O
N A
N D
R E
E D
.G P
J A
E C
O M
-G E
O T
E C
H _P
R O
JE
C
T -D
E S
IG
N
.G D
T
/8 /2
R
E V
-0
PROJECT NUMBER: 60694616
SC = Sonic Core
P = Pitcher Sample
H = Hand Auger Sample SHEET 2 of 2
COORDINATES: N 14111210.63 E 1053923.88
DESCRIPTION
12420 Milestone Center Drive, Suite 150 Germantown, MD 20876
PS = Piston Sample
RC = Rock Core
PROJECT NUMBER: 60694616
B = Bulk Sample
T = Shelby Tube Sample
Log of Boring B-2
G = Geoprobe
S = Split Spoon SampleAECOM TECHNICAL SERVICES, INC.
PROJECT: Edison and Reed
PROJECT LOCATION: W. Reed Ave, Alexandria, VA
F in es C on te nt
P oc ke t P en ts f)
D E
P T
H
F T
17.5
20.0
22.5
25.0
T Y
P
E REMARKS
AND TESTS
N U
M B
E R
Li qu id L im itSAMPLES
G R
A P
H
IC
P la st ic
L im it
U S
C S
BLOWS M
oi st ur e C on te nt
E
LE
V
F T
-7.5
-10.0
-12.5
-15.0
S T
R A
T U
M
R E
C
IN
0.0 - 0.4 ft: Asphalt (5")
0.4 - 2.0 ft: Moist, medium stiff, brownish gray, Lean Clay With Sand, contains trace of fine gravel (possible fill)
2.0 - 4.0 ft: Moist, loose, light gray and orangish brown, fine to coarse, Poorly Graded Sand With Silt And Gravel, (possible fill)
4.0 - 6.0 ft: Moist, medium stiff, light brownish gray, SANDY LEAN CLAY WITH GRAVEL, contains wood fragments
4.9 ft: changes to contains 4" band of fine to coarse clayey gravel with some fine to coarse sand
5.2 ft: changes to light gray with mottles of orangish brown
6.0 - 10.0 ft: stiff, orange and brown, high plasticity, SANDY FAT CLAY
10.0 - 18.5 ft: Moist, stiff, light brown, FAT
CLAY
13.5 ft: changes to orangish brown
18.5 - 20.0 ft: Moist, dense, reddish brown, fine to coarse, CLAYEY SAND WITH
GRAVEL
Boring completed at 20.0 FT on 4/5/2023.
1-inch temporary standpipe was installed in the hole after completion. Boring was backfilled with spoils after 24-hr water level was recorded.
S-1
S-2
S-3
S-4
S-5
S-6
S-7
S-8
CL
SP-
SM
CL
CH
CH
SC
2- 3- 4- 6 (N=7)
3- 4- 5- 7 (N=9)
4- 4- 3- 3 (N=7)
3- 4- 5- 7 (N=9)
3- 4- 5- 7 (N=9)
3- 4- 5 (N=9)
3- 3- 6 (N=9)
6- 13- 22 (N=35)
28.7
27.4
28.8
27.7
A
B
(100%)
(100%)
(75%)
(100%)
(100%)
(100%)
(100%)
(100%)
DRILLER: Austin Moore
DATE STARTED: 4/4/2023
During Drilling
EventDATE COMPLETED: 4/5/2023
BOREHOLE DEPTH: 20.0 FT
SURFACE ELEVATION: 16 FT
LOGGED BY: J. Kaselow
04-05-2023
HAMMER TYPE/WEIGHT: Auto Hammer/140lbs
DRILLING CONTRACTOR: Connelly
CASING TYPE: HSA
CASING SIZE: N/A
Depth (ft)
Date
5.8
Cave in Depth (ft)
10:00
BIT TYPE/SIZE: NA/NA
CHECKED BY: A. White
Date Time
DRILL RIG: CME 55
Groundwater Observations
Dry10:0004-04-2023
DRILL METHOD: 3-1/4" I.D. Hollow Stem Auger
24-hour
A E
C O
M S
O
IL
R O
C K
A E
C O
M -G
E O
T E
C H
_P R
O
JE
C T
_E D
IS
O
N A
N D
R E
E D
.G P
J A
E C
O M
-G E
O T
E C
H _P
R O
JE
C
T -D
E S
IG
N
.G D
T
/8 /2
R
E V
-0
PROJECT NUMBER: 60694616
SC = Sonic Core
P = Pitcher Sample
H = Hand Auger Sample SHEET 1 of 1
COORDINATES: N 14110007.71 E 1053697.47
DESCRIPTION
12420 Milestone Center Drive, Suite 150 Germantown, MD 20876
PS = Piston Sample
RC = Rock Core
PROJECT NUMBER: 60694616
B = Bulk Sample
T = Shelby Tube Sample
Log of Boring B-5
G = Geoprobe
S = Split Spoon SampleAECOM TECHNICAL SERVICES, INC.
PROJECT: Edison and Reed
PROJECT LOCATION: W. Reed Ave, Alexandria, VA
F in es C on te nt
P oc ke t P en ts f)
D E
P T
H
F T
T Y
P
E REMARKS
AND TESTS
N U
M B
E R
Li qu id L im itSAMPLES
G R
A P
H
IC
P la st ic
L im it
U S
C S
BLOWS M
oi st ur e C on te nt
E
LE
V
F T
S T
R A
T U
M
R E
C
IN
0.0 - 0.6 ft: Asphalt (7")
0.6 - 2.0 ft: Moist, loose, gray with speckles red, fine to coarse, Poorly Graded Sand With Gravel, strong odor (possible fill)
2.0 - 4.0 ft: Moist, medium dense, light gray and orangish brown, fine to coarse, Poorly Graded Sand With Clay And Gravel, (possible fill)
4.0 - 8.0 ft: Moist, stiff, light gray with orangish brown, high plasticity, SANDY FAT CLAY, little fine to coarse gravel
6.0 ft: changes to reddish brown, few fine to coarse gravel
8.0 - 10.5 ft: Moist, stiff, orange and brown, medium plasticity, ELASTIC SILT
10.5 - 13.5 ft: Wet, medium dense, reddish brown, fine to coarse, POORLY GRADED
GRAVEL WITH SILT AND SAND
13.5 - 15.0 ft: Wet, loose, orangish brown, fine to coarse, POORLY GRADED SAND
WITH CLAY AND GRAVEL
15.0 - 20.0 ft: Moist, medium stiff, light brownish gray, low plasticity, ELASTIC SILT
WITH SAND
Boring completed at 20.0 FT on 4/5/2023.
Boring was left open for 24-hours. Boring was backfilled with spoils after 24-hr groundwater level was recorded.
S-1
S-2
S-3
S-4
S-5
S-6
S-7
S-8
SP
SP-
SC
CH
MH
GP-
GM
SP-
SC
MH
4- 4- 6- 7 (N=10)
6- 5- 6- 4 (N=11)
2- 4- 6- 6 (N=10)
3- 4- 5- 4 (N=9)
2- 4- 5- 6 (N=9)
4- 6- 6 (N=12)
7- 6- 2 (N=8)
2- 2- 3 (N=5)
20.8
29.7
37.6
15.8
30.2
A
B
(88%)
(71%)
(75%)
(100%)
(88%)
(89%)
(89%)
(67%)
DRILLER: Austin Moore
DATE STARTED: 4/4/2023
During Drilling
EventDATE COMPLETED: 4/5/2023
BOREHOLE DEPTH: 20.0 FT
SURFACE ELEVATION: 11 FT
LOGGED BY: J. Kaselow
04-05-2023
HAMMER TYPE/WEIGHT: Auto Hammer/140lbs
DRILLING CONTRACTOR: Connelly
CASING TYPE: HSA
CASING SIZE: N/A
Depth (ft)
Date
4.8
Cave in Depth (ft)
12:45
BIT TYPE/SIZE: NA/NA
CHECKED BY: A. White
Date Time
DRILL RIG: CME 55
Groundwater Observations
10.511:0004-04-2023
DRILL METHOD: 3-1/4" I.D. Hollow Stem Auger
24-hour
A E
C O
M S
O
IL
R O
C K
A E
C O
M -G
E O
T E
C H
_P R
O
JE
C T
_E D
IS
O
N A
N D
R E
E D
.G P
J A
E C
O M
-G E
O T
E C
H _P
R O
JE
C
T -D
E S
IG
N
.G D
T
/8 /2
R
E V
-0
PROJECT NUMBER: 60694616
SC = Sonic Core
P = Pitcher Sample
H = Hand Auger Sample SHEET 1 of 1
COORDINATES: N 14109895.01 E 1053953.41
DESCRIPTION
12420 Milestone Center Drive, Suite 150 Germantown, MD 20876
PS = Piston Sample
RC = Rock Core
PROJECT NUMBER: 60694616
B = Bulk Sample
T = Shelby Tube Sample
Log of Boring B-7
G = Geoprobe
S = Split Spoon SampleAECOM TECHNICAL SERVICES, INC.
PROJECT: Edison and Reed
PROJECT LOCATION: W. Reed Ave, Alexandria, VA
F in es C on te nt
P oc ke t P en ts f)
D E
P T
H
F T
T Y
P
E REMARKS
AND TESTS
N U
M B
E R
Li qu id L im itSAMPLES
G R
A P
H
IC
P la st ic
L im it
U S
C S
BLOWS M
oi st ur e C on te nt
E
LE
V
F T
-5
S T
R A
T U
M
R E
C
IN
0.0 - 0.6 ft: Asphalt (7")
0.6 - 5.0 ft: Moist, medium stiff, dark gray with blue, medium plasticity, Lean Clay With Sand, contains organics (possible fill)
2.0 ft: changes to soft
4.0 ft: changes to dark gray with red
5.0 - 6.0 ft: Wet, very loose, dark gray, fine to coarse, POORLY GRADED SAND WITH
CLAY AND GRAVEL
6.0 - 7.0 ft: Wet, stiff, brownish light gray, fine to coarse, SILT WITH SAND, few fine to coarse gravel
7.0 - 8.0 ft: Wet, loose, brownish light gray, fine to coarse, POORLY GRADED SAND
WITH CLAY AND GRAVEL
8.0 - 11.0 ft: Wet, very loose, brownish light gray, fine to coarse, SILTY CLAYEY SAND, few fine gravel
11.0 - 15.0 ft: Wet, stiff, brownish light gray, low plasticity, SANDY SILT WITH GRAVEL
13.5 ft: changes to medium stiff
14.0 ft: changes to contains 4" cluster of decomposed wood fragments
14.3 ft: changes to reddish gray Boring completed at 15.0 FT on 4/5/2023.
Boring was backfilled with spoils upon completion.
S-1
S-2
S-3
S-4
S-5
S-6
S-7
20 14
CL
SP-
SC
ML
SP-
SC
SC-
SM
ML
7- 4- 4- 4 (N=8)
2- 1- 2- 2 (N=3)
2- 1- 1- 1 (N=2)
6- 6- 3- 4 (N=9)
WOH- WOH-
WOH- 2
(N=WOH)
1- 1- 10 (N=11)
5- 4- 3 (N=7)
19.4
19.7
30.9
A
B
(67%)
(29%)
(38%)
(100%)
(100%)
(100%)
(89%)
DRILLER: Austin Moore
DATE STARTED: 4/5/2023
During Drilling
EventDATE COMPLETED: 4/5/2023
BOREHOLE DEPTH: 15.0 FT
SURFACE ELEVATION: 12 FT
LOGGED BY: J. Kaselow
04-05-2023
HAMMER TYPE/WEIGHT: Auto Hammer/140lbs
DRILLING CONTRACTOR: Connelly
CASING TYPE: HSA
CASING SIZE: N/A
Depth (ft)
Date
4.2
Cave in Depth (ft)
11:25
BIT TYPE/SIZE: NA/NA
CHECKED BY: A. White
Date Time
DRILL RIG: CME 55
Groundwater Observations
5.010:4004-05-2023
DRILL METHOD: 3-1/4" I.D. Hollow Stem Auger
Completion
A E
C O
M S
O
IL
R O
C K
A E
C O
M -G
E O
T E
C H
_P R
O
JE
C T
_E D
IS
O
N A
N D
R E
E D
.G P
J A
E C
O M
-G E
O T
E C
H _P
R O
JE
C
T -D
E S
IG
N
.G D
T
/8 /2
R
E V
-0
PROJECT NUMBER: 60694616
SC = Sonic Core
P = Pitcher Sample
H = Hand Auger Sample SHEET 1 of 1
COORDINATES: N 14109799.87 E 1054166.67
DESCRIPTION
12420 Milestone Center Drive, Suite 150 Germantown, MD 20876
PS = Piston Sample
RC = Rock Core
PROJECT NUMBER: 60694616
B = Bulk Sample
T = Shelby Tube Sample
Log of Boring B-9
G = Geoprobe
S = Split Spoon SampleAECOM TECHNICAL SERVICES, INC.
PROJECT: Edison and Reed
PROJECT LOCATION: W. Reed Ave, Alexandria, VA
F in es C on te nt
P oc ke t P en ts f)
D E
P T
H
F T
T Y
P
E REMARKS
AND TESTS
N U
M B
E R
Li qu id L im itSAMPLES
G R
A P
H
IC
P la st ic
L im it
U S
C S
BLOWS M
oi st ur e C on te nt
E
LE
V
F T
S T
R A
T U
M
R E
C
IN
December 15, 2022 AECOM Technical Services, Inc.
Copyright 2022
IDENTIFICATION OF SOIL
I. DEFINITION OF SOIL GROUP NAMES (ASTM D-2487)
Major Component Minor Component Group/Graphic Symbol Group Name
Coarse- Grained Soils
More than 50% retained on No.
200 sieve
Gravels – > 50% of coarse fraction retained on No. 4 sieve
Fine, No. 4 to ¾” Coarse, ¾” to 3”
Clean Gravels < 5% fines
GW WELL GRADED GRAVEL
GP POORLY GRADED GRAVEL
Gravels with fines 5 - 12% fines
GW-GM WELL GRADED GRAVEL WITH SILT
GW-GC WELL GRADED GRAVEL WITH CLAY
GP-GM POORLY GRADED GRAVEL WITH SILT
GP-GC POORLYGRADED GRAVEL WITH CLAY
Gravels with fines > 12% fines
GM SILTY GRAVEL
GC CLAYEY GRAVEL
Sands – > = 50% of coarse fraction passes No. 4 sieve
Coarse, No. 10 to No. 4 Medium, No. 40 to No. 10 Fine, No. 200 to No. 40
Clean Sands < 5% fines
SW WELL GRADED SAND
SP POORLY GRADED SAND
Sands with fines 5 - 12% fines
SW-SM WELL GRADED SAND WITH SILT
SW-SC WELL GRADED SAND WITH CLAY
SP-SM POORLY GRADED SAND WITH SILT
SP-SC POORLYGRADED SAND WITH CLAY
Sands with fines > 12% fines
SM SILTY SAND
SC CLAYEY SAND
Fine-Grained Soils
50% or more passes the No.
200 sieve
Silts and Clays – Liquid Limit < 50 Low to medium plasticity
Inorganic
CL LEAN CLAY
ML SILT
Organic OL ORGANIC CLAY
ORGANIC SILT
Silts and Clays – Liquid Limit >= 50 Medium to high plasticity
Inorganic
CH FAT CLAY
MH ELASTIC SILT
Organic OH ORGANIC CLAY
ORGANIC SILT
Organic Soils Primarily organic matter, dark in color and organic odor PT PEAT
Other Symbol
FILL
II. DEFINITION OF SOIL COMPONENT PROPORTIONS (ASTM D-2487)
Adjective Criteria Example
GRAVELLY
SANDY >30% to <50% coarse grained component in a fine-grained soil SANDY FAT CLAY
CLAYEY
SILTY >12% to <50% fine grained component in a coarse-grained soil CLAYEY GRAVEL
WITH GRAVEL
WITH SAND >15% to <30% coarse grained component in a fine-grained soil SILT WITH SAND
WITH GRAVEL
WITH SAND >15% to <50% coarse grained component in a coarse-grained soil POORLY GRADED GRAVEL WITH
SAND
WITH SILT
WITH CLAY >5% to <12% fine grained component in a coarse-grained soil POORLY GRADED SAND WITH SILT
December 15, 2022 AECOM Technical Services, Inc.
Copyright 2022
III. RELATIVE DENSITY OR CONSISTENCY
Granular Soils Cohesive Soils (N Values/Pocket Penetrometer Values, tsf) N = 0 to 4 Very Loose N = 0 to 1 / <0.25 Very Soft N = 5 to 10 Loose N = 2 to 4 / 0.25 to 0.5 Soft N = 11 to 30 Medium Dense N = 5 to 8 / 0.5 to 1 Medium Stiff N = 31 to 50 Dense N = 9 to 15 / 1 to 2 Stiff N = >50 Very Dense N = 16 to 30 / 2 to 4 Very Stiff N = >30 / > 4 Hard
IV. GLOSSARY OF MISCELLANEOUS TERMS
Moisture: Dry, moist or wet to indicate visual appearance of specimen.
Color: Overall color, with modifiers such as light to dark or variation in coloration such as mottled, streaks etc.
Symbols: Based on Unified Soil Classification System (USCS). A dual symbol “-“indicates the soil belongs to two groups. A borderline symbol “/” indicates the soil belongs to two possible groups.
Fill: Man-made deposit containing soil, rock and often foreign matter.
Probable Fill: Soils which contain no visually detected foreign matter but which are suspect with regard to origin.
Disintegrated Rock (DR): Residual materials with a SPT resistance between 60 blows per foot (bpf) and refusal.
Partially Weathered Rock (PWR): Residual materials with a SPT resistance between 100 bpf and refusal.
Refusal: Refusal is defined as a SPT of 100 blows for 2” or less penetration.
Boulders: Rounded pieces of rock larger than 12 inches.
Cobbles: Rounded pieces of rock ranging from 3 to 12 inch.
Lenses: 0 to ½ inch seam within a material in a test pit.
Layers: ½ to 12 inch seam within a material in a test pit.
Pocket: Discontinuous body within a material in a test pit.
V. SAMPLE TYPE/SYMBOL
Description Name Symbol
BULK SAMPLE/HAND AUGER B
AUGER CUTTINGS AU
DENISON BARREL
PISTON SAMPLE
SHELBY TUBE
D
PS
T
GEOPROBE G
PITCHER BARREL P
ROCK CORE RC
SPLIT SPOON S
SONIC CORE SC
VI. OTHER ABBREVIATIONS
MC Moisture Content LL Liquid Limit PL Plastic Limit PI Plasticity Index
AECOM 5
Appendix B – Soil Laboratory Test Results (15 pages)
Jay Kay Testing Project Number: 60694616 (Tasks 115.1, 215.1)
Location:
Sample Date: Summary of Laboratory Testing
Sample Identification Depth Atterberg Limits Compaction
B-2 S-2 2 4 17.5 - 34 21 13 - - - A-6 - 52.9 CL
B-2 S-3A, S-4 4 8 - - - - - - - - - - - -
B-2 S-3B 4 6 17.8 - NP NP NP - - - A-1-b - 8.5 SP-SM
B-2 S-5 8 10 56.4 - 76 31 45 - - - A-7-5 - 73.5 CH
B-2 S-6 10 11.5 84.5 - - - - - - - - - - -
B-2 S-7 13.5 15 56.7 - - - - - - - - - - -
B-5 Bulk 0 5 14.5 - 39 16 23 - 115.5 13.2 A-6 - 51.3 CL
B-5 S-3A 4 6 16.4 - - - - - - - - - - -
B-5 S-4 6 8 28.7 - 61 20 41 - - - A-7-6 - 66.3 CH
B-5 S-5 8 10 27.4 - - - - - - - - - - -
B-5 S-6 10 11.5 28.8 - 60 24 36 - - - A-7-6 - 91.1 CH
B-5 S-7 13.5 15 27.7 - - - - - - - - - - -
B-7 S-2 2 4 14.0 - - - - - - - - - - -
B-7 S-3 4 6 20.8 - 65 22 43 - - - A-7-6 - 69.6 CH
B-7 S-4 6 8 29.7 - - - - - - - - - - -
B-7 S-5 8 10 37.6 - 55 32 23 - - - A-7-5 - 86.6 MH
B-7 S-7 13.5 15 15.8 - - - - - - - - - - -
B-7 S-8 18.5 20 30.2 - - - - - - - - - - -
B-9 Bulk 0 5 15.1 - 37 20 17 - - - A-6 - 46.6 SC
B-9 S-2, S-4A 2 8 - - - - - - - - - - - -
B-9 S-4B 6 8 19.4 - - - - - - - - - - -
B-9 S-5 8 10 19.7 - 20 14 6 - - - A-4 - 43.9 SC-SM
B-9 S-6 10 11.5 15.0 - - - - - - - - - - -
B-9 S-7 13.5 15 30.9 - - - - - - - - - - -
Edison & Reed
B o tt o m ft
(814) 404-9283 www.jaykaytesting.com
F in e s
U
S C
S C la s s if ic a ti o n
A S
T M
D -2
A
S
H T
O C la s s if ic a ti o n
M -1 p e c if ic
G ra v it y
A S
T M
D -8
L iq u id
L im it
A
S T
M D
-4
P la s ti c L im it
A
S T
M D
-4
M C
A
S T
M D
-2
O rg a n ic
M a tt e r, A S
T M
D -2
04/25/23 ri n g
I D a m p le p ft
Tested by: ST/JT Reviewed by: JK Jay Kay Testing
P la s ti c it y I n d e x
A
S T
M D
-4 x im u m
D ry
D e n s it y lb
/f t³ ti m u m
M o is tu re
C o n te n t, .0 m
Jay Kay Testing Project Number: 60694616 (Tasks 115.1, 215.1)
Location:
Sample Date: Summary of Atterberg Limit Testing
Atterberg Limit Results
Boring ID Sample ID Boring ID Sample ID
= B-2 S-2 2 4 34 21 13
B-2 S-3B 4 6 NP NP NP
p B-2 S-5 8 10 76 31 45
B-5 Bulk 0 5 39 16 23
= B-5 S-4 6 8 61 20 41 n B-5 S-6 10 11.5 60 24 36 p B-7 S-3 4 6 65 22 43
B-7 S-5 8 10 55 32 23
= B-9 Bulk 0 5 37 20 17 n B-9 S-5 8 10 20 14 6
Tested by: ST/JT Reviewed by: JK
Edison & Reed
(814) 404-9283 www.jaykaytesting.com
Btm LL PL PI
Jay Kay Testing 04/25/23
Top Btm LL PL PI Top
ML
CL
MH or OH
CL-ML
ASTM D-4318
0 20 40 60 80 100 120 140
P la s ti c it y I n d e x
P I)
Liquid Limit,% (LL)
Project Number: 60694616 (Tasks 115.1, 215.1) Jay Kay Testing
Boring ID Sample ID Top Btm Location: -
B-2 S-2 2' 4' Sample Date:
Sieve Size Pass, %
- mm %
6"
3"
2"
1.5"
1"
3/4"
1/2"
3/8"
#4
#10
#20
#40
#60
#100
#200
% Gravel % Sand D10 -
Coarse Fine Coarse Medium Fine D30 - CC
0.0 2.6 = 2.6 1.7 10.8 32.0 = 44.5 D60 - CU
Liquid Limit, %
Plastic Limit, %
Plasticity Index, %
USCS (D-2487) AASHTO (M-145)
CL A-6
Soil Description (D-2487)
NMC Sample Type* Data 4
OM Data 2 Data 5
______________ Data 3 Data 6
+ 3/8"
04/25/23 Tested by: ST/JT Reviewed by: JK Jay Kay Testing
1.8%
Brown sandy lean CLAY
17.5% - -
0.147 65.3
0.074 52.9
Total Total -
0.85 92.5
0.42 84.9
0.25 75.7
9.51 98.2
4.75 97.4
2.00 95.7
25.4 -
19.0 100.0
12.7 98.2
75.0 -
50.8 -
37.5 -
ASTM D-6913
GRAVEL
Diameter
SAND
U.S. Standard Sieve
CLAY/SILT
Hydrometer
150.0 -
3" 3/4" 3/8" #4 #10 #40 #200 0.002
0.0010.010.1110100
P e rc e n t
F in e r
Particle Size, mm
ML
CL MH or OHCL-ML
A-Line: 10.22
PI: 13
Plasticity: CLAY
ASTM D-4318
0 20 40 60 80 100 120 140
P la s ti c it y I n d e x
P
Liquid Limit, % (LL)
Boring ID Sample ID Top Btm Location: -
B-2 S-3B 4' 6' Sample Date:
Sieve Size Pass, %
- mm %
6"
3"
2"
1.5"
1"
3/4"
1/2"
3/8"
#4
#10
#20
#40
#60
#100
#200
% Gravel % Sand D10 0.1086
Coarse Fine Coarse Medium Fine D30 0.5911 CC
3.4 29.1 = 32.5 16.9 27.6 14.5 = 59.0 D60 3.2364 CU
Liquid Limit, %
Plastic Limit, %
Plasticity Index, %
USCS (D-2487) AASHTO (M-145)
SP-SM A-1-b
Soil Description (D-2487)
NMC Sample Type* Data 4
OM Data 2 Data 5
______________ Data 3 Data 6
+ 3/8"
04/25/23 Tested by: ST/JT Reviewed by: JK Jay Kay Testing
20.2%
NP
Light brown poorly-graded SAND with silt and gravel
17.8% - -
Total Total 0.995
29.81
NP
NP
0.25 14.7
0.147 11.2
0.074 8.5
2.00 50.6
0.85 37.4
0.42 23.0
12.7 86.8
9.51 79.8
4.75 67.5
37.5 -
25.4 100.0
19.0 96.6
150.0 -
75.0 -
50.8 -
ASTM D-6913
GRAVEL
Diameter
SAND
U.S. Standard Sieve
CLAY/SILT
Hydrometer
D10
D30
D60
3" 3/4" 3/8" #4 #10 #40 #200 0.002
0.0010.010.1110100
P e rc e n t
F in e r
Particle Size, mm
ML
CL MH or OHCL-ML
A-Line: NP
PI: NP
Plasticity: SILT
ASTM D-4318
NP/NP/NP
0 20 40 60 80 100 120 140
P la s ti c it y I n d e x
P
Boring ID Sample ID Top Btm Location: -
B-2 S-5 8' 10' Sample Date:
Sieve Size Pass, %
- mm %
6"
3"
2"
1.5"
1"
3/4"
1/2"
3/8"
#4
#10
#20
#40
#60
#100
#200
% Gravel % Sand D10 -
Coarse Fine Coarse Medium Fine D30 - CC
0.0 0.4 = 0.4 0.9 4.6 20.6 = 26.1 D60 - CU
Liquid Limit, %
Plastic Limit, %
Plasticity Index, %
USCS (D-2487) AASHTO (M-145)
CH A-7-5
Soil Description (D-2487)
NMC Sample Type* Data 4
OM Data 2 Data 5
______________ Data 3 Data 6
+ 3/8"
04/25/23 Tested by: ST/JT Reviewed by: JK Jay Kay Testing
0.0%
Dark gray fat CLAY with sand
56.4% - -
Total Total -
0.25 89.1
0.147 82.2
0.074 73.5
2.00 98.7
0.85 97.7
0.42 94.1
12.7 -
9.51 100.0
4.75 99.6
37.5 -
25.4 -
19.0 -
150.0 -
75.0 -
50.8 -
ASTM D-6913
GRAVEL
Diameter
SAND
U.S. Standard Sieve
CLAY/SILT
Hydrometer
3" 3/4" 3/8" #4 #10 #40 #200 0.002
0.0010.010.1110100
P e rc e n t
F in e r
Particle Size, mm
ML
CL MH or OHCL-ML
A-Line: 40.88
PI: 45
Plasticity: CLAY
ASTM D-4318
0 20 40 60 80 100 120 140
P la s ti c it y I n d e x
P
Boring ID Sample ID Top Btm Location: -
B-5 Bulk 0' 5' Sample Date:
Sieve Size Pass, %
- mm %
6"
3"
2"
1.5"
1"
3/4"
1/2"
3/8"
#4
#10
#20
#40
#60
#100
#200
% Gravel % Sand D10 -
Coarse Fine Coarse Medium Fine D30 - CC
0.7 6.1 = 6.8 4.4 8.6 28.9 = 41.9 D60 - CU
Liquid Limit, %
Plastic Limit, %
Plasticity Index, %
USCS (D-2487) AASHTO (M-145)
CL A-6
Soil Description (D-2487)
NMC Sample Type* Data 4
OM Data 2 Data 5
______________ Data 3 Data 6
+ 3/8"
04/25/23 Tested by: ST/JT Reviewed by: JK Jay Kay Testing
3.5%
Brown sandy lean CLAY
14.5% - -
Total Total -
0.25 70.5
0.147 60.7
0.074 51.3
2.00 88.8
0.85 86.0
0.42 80.2
12.7 97.8
9.51 96.5
4.75 93.2
37.5 100.0
25.4 99.6
19.0 99.3
150.0 -
75.0 -
50.8 -
ASTM D-6913
GRAVEL
Diameter
SAND
U.S. Standard Sieve
CLAY/SILT
Hydrometer
3" 3/4" 3/8" #4 #10 #40 #200 0.002
0.0010.010.1110100
P e rc e n t
F in e r
Particle Size, mm
ML
CL MH or OHCL-ML
A-Line: 13.87
PI: 23
Plasticity: CLAY
ASTM D-4318
0 20 40 60 80 100 120 140
P la s ti c it y I n d e x
P
Boring ID Sample ID Top Btm Location: -
B-5 S-4 6' 8' Sample Date:
Sieve Size Pass, %
- mm %
6"
3"
2"
1.5"
1"
3/4"
1/2"
3/8"
#4
#10
#20
#40
#60
#100
#200
% Gravel % Sand D10 -
Coarse Fine Coarse Medium Fine D30 - CC
0.0 0.0 = 0.0 0.2 7.2 26.3 = 33.7 D60 - CU
Liquid Limit, %
Plastic Limit, %
Plasticity Index, %
USCS (D-2487) AASHTO (M-145)
CH A-7-6
Soil Description (D-2487)
NMC Sample Type* Data 4
OM Data 2 Data 5
______________ Data 3 Data 6
+ 3/8"
04/25/23 Tested by: ST/JT Reviewed by: JK Jay Kay Testing
0.0%
Orange-brown sandy fat CLAY
28.7% - -
Total Total -
0.25 85.5
0.147 77.2
0.074 66.3
2.00 99.8
0.85 98.7
0.42 92.6
12.7 -
9.51 -
4.75 100.0
37.5 -
25.4 -
19.0 -
150.0 -
75.0 -
50.8 -
ASTM D-6913
GRAVEL
Diameter
SAND
U.S. Standard Sieve
CLAY/SILT
Hydrometer
3" 3/4" 3/8" #4 #10 #40 #200 0.002
0.0010.010.1110100
P e rc e n t
F in e r
Particle Size, mm
ML
CL MH or OHCL-ML
A-Line: 29.93
PI: 41
Plasticity: CLAY
ASTM D-4318
0 20 40 60 80 100 120 140
P la s ti c it y I n d e x
P
Boring ID Sample ID Top Btm Location: -
B-5 S-6 10' 11.5' Sample Date:
Sieve Size Pass, %
- mm %
6"
3"
2"
1.5"
1"
3/4"
1/2"
3/8"
#4
#10
#20
#40
#60
#100
#200
% Gravel % Sand D10 -
Coarse Fine Coarse Medium Fine D30 - CC
0.0 0.0 = 0.0 0.5 3.4 5.0 = 8.9 D60 - CU
Liquid Limit, %
Plastic Limit, %
Plasticity Index, %
USCS (D-2487) AASHTO (M-145)
CH A-7-6
Soil Description (D-2487)
NMC Sample Type* Data 4
OM Data 2 Data 5
______________ Data 3 Data 6
+ 3/8"
04/25/23 Tested by: ST/JT Reviewed by: JK Jay Kay Testing
0.0%
Light brown fat CLAY
28.8% - -
Total Total -
0.25 94.3
0.147 93.1
0.074 91.1
2.00 99.5
0.85 98.2
0.42 96.1
12.7 -
9.51 -
4.75 100.0
37.5 -
25.4 -
19.0 -
150.0 -
75.0 -
50.8 -
ASTM D-6913
GRAVEL
Diameter
SAND
U.S. Standard Sieve
CLAY/SILT
Hydrometer
3" 3/4" 3/8" #4 #10 #40 #200 0.002
0.0010.010.1110100
P e rc e n t
F in e r
Particle Size, mm
ML
CL MH or OHCL-ML
A-Line: 29.20
PI: 36
Plasticity: CLAY
ASTM D-4318
0 20 40 60 80 100 120 140
P la s ti c it y I n d e x
P
Boring ID Sample ID Top Btm Location: -
B-7 S-3 4' 6' Sample Date:
Sieve Size Pass, %
- mm %
6"
3"
2"
1.5"
1"
3/4"
1/2"
3/8"
#4
#10
#20
#40
#60
#100
#200
% Gravel % Sand D10 -
Coarse Fine Coarse Medium Fine D30 - CC
0.0 10.2 = 10.2 3.6 5.3 11.3 = 20.2 D60 - CU
Liquid Limit, %
Plastic Limit, %
Plasticity Index, %
USCS (D-2487) AASHTO (M-145)
CH A-7-6
Soil Description (D-2487)
NMC Sample Type* Data 4
OM Data 2 Data 5
______________ Data 3 Data 6
+ 3/8"
04/25/23 Tested by: ST/JT Reviewed by: JK Jay Kay Testing
8.1%
Light brown sandy fat CLAY
20.8% - -
Total Total -
0.25 76.3
0.147 73.3
0.074 69.6
2.00 86.2
0.85 84.5
0.42 80.9
12.7 91.9
9.51 91.9
4.75 89.8
37.5 -
25.4 -
19.0 100.0
150.0 -
75.0 -
50.8 -
ASTM D-6913
GRAVEL
Diameter
SAND
U.S. Standard Sieve
CLAY/SILT
Hydrometer
3" 3/4" 3/8" #4 #10 #40 #200 0.002
0.0010.010.1110100
P e rc e n t
F in e r
Particle Size, mm
ML
CL MH or OHCL-ML
A-Line: 32.85
PI: 43
Plasticity: CLAY
ASTM D-4318
0 20 40 60 80 100 120 140
P la s ti c it y I n d e x
P
Boring ID Sample ID Top Btm Location: -
B-7 S-5 8' 10' Sample Date:
Sieve Size Pass, %
- mm %
6"
3"
2"
1.5"
1"
3/4"
1/2"
3/8"
#4
#10
#20
#40
#60
#100
#200
% Gravel % Sand D10 -
Coarse Fine Coarse Medium Fine D30 - CC
0.0 0.0 = 0.0 0.0 0.4 13.0 = 13.4 D60 - CU
Liquid Limit, %
Plastic Limit, %
Plasticity Index, %
USCS (D-2487) AASHTO (M-145)
MH A-7-5
Soil Description (D-2487)
NMC Sample Type* Data 4
OM Data 2 Data 5
______________ Data 3 Data 6
+ 3/8"
04/25/23 Tested by: ST/JT Reviewed by: JK Jay Kay Testing
0.0%
Orange-brown elastic SILT
37.6% - -
Total Total -
0.25 99.0
0.147 98.0
0.074 86.6
2.00…