18-C. 21 WB-11 STRENGTHENING SKETCHES SSK-101 TO 104.pdf
PDF 5 MB Posted
- Attached to
- Broward County Judicial Court West Tower Repairs
- Solicitation number
- PNC2132739C1
- Issued by
- Broward County, Florida
About this file
This is a structural design and construction document package for the Broward County Judicial Complex West Tower beam repair project located in Fort Lauderdale, Florida. The scope of work encompasses relieving the load on existing Level 21 floor girder 21WB-11 by providing a steel post on grid intersection C/3.5 extending from the 21st floor to the roof. The project includes field verification of existing conditions, installation of an 8-inch diameter XXS (extra extra strong) pipe post with base plates, anchoring using 3/4-inch diameter HIT-RE500 post-installed anchors with 8-inch embedment, application of corrosion protection and intumescent paint for fire protection, roof repair with new insulation, and relocation of MEP (mechanical, electrical, plumbing) ductwork below Level 22. The construction sequence involves preparation at Level 21, installation of structural components at Levels 21, 22, and 23, and application of 150 kip jacking force from two concurrent jacks for a total of 300 kip load. The contractor is responsible for all means and methods, securing permits, site cleanliness, compliance with OSHA regulations, and maintaining facility operations without disruption.
The structural design must comply with the 2023 Florida Building Code, American Welding Society AWS D1.1-01, ASCE 7-22, AISC 360-16, and ACI 318-19. Special inspections are required for structural steel welding, details, high-strength bolting, sprayed fire-resistant materials, post-installed anchors, roof insulation, and HVAC structural steel. All structural steel must conform to ASTM standards (A572/A529 Grade 50, A53 Grade B for pipes, and A572 Grade 50 for bars, rods, and plates). Welders must be certified within the past six months per AWS D1.1. The contractor must establish a monitoring plan prior to construction, including daily manual optical surveying of control points and telltale crack gauge readings, with a 3/16-inch horizontal or vertical movement threshold triggering a work stoppage. Concrete grout must achieve a minimum 8,000 psi compressive strength at 28 days. Any existing damage caused by construction must be repaired by the contractor at no additional cost to the owner. The permit set consists of sheets SSK-100 through SSK-105, issued May 6, 2026, with revisions addressing all structural details, anchoring specifications, roof penetration repair, and MEP modifications.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COURTHOUSE
PARKING
GARAGE
EAST
WING
MAIN PLAZA
MARK DATE ISSUED FOR:
PROJECT NO:
SHEET TITLE / SHEET NUMBER
c
D
C
B
A
1 2 3 4 5
F
1 2 3 4 5 6 7
6 7
G
CLIENT
CONSULTANTS
JOINT VENTURE TEAM
FORT LAUDERDALE, FLORIDA
AECOM
605 3RD AVE,
NEW YORK, NY 10158
KEY PLAN
REGISTRATION
/6
/2
:4
:1
P
M C
U s e rs \K ri s h n a n S
\D o c u m e n ts
\2
B
C C
-S tr u c tu ra l C
E N
T R
A L R
S -N
Y R
E V
-n o M
E P a h m e d
.m o s ta fa L
S R
K C
.r v t
COVER SHEET
SSK-100
60176229
BROWARD COUNTY
COURTHOUSE
1 05/06/2026 PERMIT
3D VIEW
DRAWING LIST
SHEET NUMBER SHEET NAME REV
SSK-100 COVER SHEET 1
SSK-101 GENERAL NOTES 1
SSK-102 LEVEL 21 BEAM STRENGTHENING PART PLANS & SECTIONS 1
SSK-103 LEVEL 21 BEAM STRENGTHENING PART PLANS AND SECTIONS 1
SSK-104 LEVEL 21 BEAM STRENGTHENING PART PLANS AND SECTIONS 1
SSK-105 LEVEL 21 BEAM STRENGTHENING MEP MODIFICATIONS 1
MONITORING
ACTIVITY
DESCRIPTION OF
MONITORING
SYSTEM
DATA ACQUISITION
AND MONITORING
FREQUENCY
DATA ANALYSIS
FREQUENCY FOR
THRESHOLD
OCCURRENCE
THRESHOLD
CRITERIA
REQUIRED ACTION
OF THRESHOLD IS
REACHED
EXISTING BUILDING
MOVEMENT MONITORING
MANUAL OPTICAL
SURVEYING EQUIPMENT
MOUNTED ON CONTROL
POINTS SHOWN ON PLAN
MANUAL DAILY. IN-
CREASE FREQUENCY IF
50 % THRESHOLD
REACHED
MONITORING POINT
DATA IS IMMEDIATELY
PROCESSED UPON
ACQUISITION BY
SURVEYOR; RELATIVE
MOVEMENT IS
IMMEDIATELY
IDENTIFIED AND
REPORTED TO EOR.
3/16" HORIZONTAL OR
VERTICAL
STOP WORK IF
THRESHOLD IS
REACHED AND ANALYZE
DATA BY EOR
EXISTING BUILDING
CRACK MONITORING
PERMANENTLY
MOUNTED "TELLTALE"
CRACK CAUGE
MANUAL DAILY
INCREASE FREQUENCY
IF MOVEMENT IS
DETECTED
RELATIVE MOVEMENT IS
IMMEDIATELY
IDENTIFIED BY
MONITORING
TECHNICIAN BY
COMPARISON TO
EARLIER READING AND
REPORTED TO EOR.
ALL MOVEMENT
ANALYZED
REPORT TO EOR TO
ANALYZE DATA BASED
ON COMBINED RESULTS
WITH BUILDING
MOVEMENT
MONITORING ACTIVITIES
COURTHOUSE
PARKING
GARAGE
EAST
WING
MAIN PLAZA
MARK DATE ISSUED FOR:
PROJECT NO:
SHEET TITLE / SHEET NUMBER
c
D
C
B
A
1 2 3 4 5
F
1 2 3 4 5 6 7
6 7
G
CLIENT
CONSULTANTS
JOINT VENTURE TEAM
FORT LAUDERDALE, FLORIDA
AECOM
605 3RD AVE,
NEW YORK, NY 10158
KEY PLAN
REGISTRATION
/6
/2
:4
:1
P
M C
U s e rs \K ri s h n a n S
\D o c u m e n ts
\2
B
C C
-S tr u c tu ra l C
E N
T R
A L R
S -N
Y R
E V
-n o M
E P a h m e d
.m o s ta fa L
S R
K C
.r v t
GENERAL NOTES
SSK-101
60176229
BROWARD COUNTY
COURTHOUSE
GENERAL NOTES:
1. DESIGN, DETAILING, FABRICATION AND EXECUTION OF ALL CONSTRUCTION, INCLUDING
TEMPORARY STRUCTURES, SHALL CONFORM TO THE REQUIREMENTS OF
THE FOLLOWING PUBLICATIONS:
A. 2023 FLORIDA BUILDING CODE.
B. AMERICAN WELDING SOCIETY "STRUCTURAL WELDING CODE –STEEL" (AWS D1.1-01).
C. AMERICAN SOCIETY OF CIVIL ENGINEERS "MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES" (ASCE 7-22).
D. AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC) "SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS" (AISC 360-16).
E. AMERICAN CONCRETE INSTITUTE "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE" (ACI 318-19).
2. THE SCOPE OF WORK ENCOMPASSES RELIEVING THE LOAD ON EXISTING LEVEL 21 FLOOR GIRDER 21WB-11 BY PROVIDING
A STEEL POST ON GRID INTERSECTION C/3.5 FROM 21ST FLOOR TO ROOF.
3. DIMENSIONS SHOWN ON THE CONTRACT DRAWINGS MAY VARY FROM THE ACTUAL CONDITIONS THAT EXIST AT THE CONSTRUCTION SITE. VERIFY BY FIELD MEASUREMENTS ALL DIMENSIONS, CURVATURES AND ELEVATIONS OF EXISTING STRUCTURES THAT MAY BE NECESSARY TO LOCATE, ALIGN, DIMENSION AND DETAIL ANY CONDITION REQUIRED TO PERFORM THE WORK. FIELD MEASUREMENTS SHALL BE PERFORMED PRIOR TO AND COORDINATED WITH THE PREPARATION OF SHOP DRAWINGS AND WITH THE MANUFACTURING, FABRICATION AND INSTALLATION OF ALL ITEMS OF CONSTRUCTION. ALL VARIATIONS FROM THE CONTRACT DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. DIMENSIONS BASED ON FIELD MEASUREMENTS
SHALL BE CLEARLY MARKED ON THE SHOP DRAWINGS AND ALL OTHER SUBMITTALS.
4. PROTECT EXISTING STRUCTURES TO PREVENT DAMAGE DURING THE PERFORMANCE OF THE WORK OF THIS CONTRACT. ANY DAMAGE OR ALTERATION RESULTING FROM THE CONSTRUCTION SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER, TO ITS ORIGINAL CONDITION AND TO THE SATISFACTION OF THE OWNER.
5. INFORM THE ENGINEER OF ALL DISCREPANCIES IN THE CONTRACT DRAWINGS PRIOR TO INITIATION OF ANY WORK. PROCEED AS
DIRECTED BY THE ENGINEER.
6. THE MEANS AND METHODS OF CONSTRUCTION SHALL SOLELY BE THE RESPONSIBILITY OF THE CONTRACTOR. ANY IMPLIED MEANS
OR METHODS ON THE DRAWINGS ARE TO BE UNDERSTOOD AS SUGGESTED.
7. THE CONSTRUCTION SITE SHALL BE MAINTAINED IN A CLEAN AND ORDERLY MANNER TO PROTECT THE SAFETY OF BUILDING STAFF, WORKERS, THE PUBLIC, AND PROPERTY, AND SO THAT FACILITY OPERATIONS ARE NOT DISRUPTED.
8. IN THE EVENT THAT THERE IS A CONFLICT BETWEEN ANY OF THE CODES OR STANDARDS REFERENCED ON THE CONTRACT
DOCUMENTS THE STRICTER OR MORE CONSERVATIVE SHALL CONTROL.
9. THE STRUCTURAL DESIGN IS BASED ON THE FULL INTERACTION OF ALL ITS COMPONENT PARTS. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO MAKE PROPER AND ADEQUATE PROVISIONS FOR STABILITY OF AND ALL STRESSES TO THE STRUCTURE
DUE TO ANY CAUSE DURING CONSTRUCTION.
10. CONTRACTOR SHALL MAKE THE NECESSARY NOTIFICATIONS AND SECURE THE NECESSARY PERMITS
11. CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE LIMITS OF WORK SHOWN ON THE DRAWINGS, PRIOR TO
DEMOBILIZATION.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH ALL PERTINENT REGULATIONS , SPECIFICALLY OSHA
REGULATIONS, AND ANY OTHER LOCAL OR OWNER IMPOSED REQUIREMENTS.
13. SUBSTANTIAL CHANGES GOVERNED BY FIELD CONDITIONS OR UNUSUAL CONDITIONS
SHALL BE REPORTED TO THE ENGINEER OF RECORD PROMPTLY.
14 AN ENGINEER DESIGNATED FOR SPECIAL INSPECTION IS RESPONSIBLE FOR PERFORMANCE
OF THAT INSPECTION DUTY IN CONFORMANCE WITH THE APPLICABLE BUILDING CODE. SEE
"SPECIAL INSPECTIONS" NOTES FOR LISTING OF APPLICABLE CODE SECTIONS.
15. DO NOT SCALE THESE DRAWINGS.
SPECIAL INSPECTION:
PROVIDE THE FOLLOWING SPECIAL INSPECTIONS PER 2023 FLORIDA BUILDING CODE
A. STRUCTURAL STEEL - WELDING
B. STRUCTURAL STEEL - DETAILS
C. STRUCTURAL STEEL - HIGH STRENGTH BOLTING
D. SPRAYED FIRE-RESISTANT MATERIALS
E. POST INSTALLED ANCHORS
F. ROOF INSULATION
G. HVAC
STRUCTURAL STEEL
1. ALL STRUCTURAL STEEL WORK SHALL CONFORM TO THE SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS ANSI/AISC 360-16.
2. ALL DIMENSIONS MUST BE VERIFIED IN FIELD BY THE CONTRACTOR PRIOR TO THE FABRICATION OF STEEL.
3. THE STRUCTURAL STEEL SHALL CONFORM TO THE FOLLOWING:
A. STRUCTURAL SHAPES AND COLUMN BASE PLATES: ASTM A572 OR A529 GRADE 50, HAVING A
MINIMUM YIELD STRENGTH OF 50 KSI, UNLESS NOTED OTHERWISE
B. ALL STEEL PIPES TO BE ASTM A53 GR.B
C. BARS, RODS AND PLATES: ASTM A572 GR. 50 UNLESS NOTED OTHERWISE
D. THREADED RODS SHALL BE ASTM F1554 GR. 55
4. ALL WELDING SHALL BE IN ACCORDANCE WITH THE AWS D1.1, STRUCTURAL WELDING CODE. ALL WELDING ELECTRODES SHALL BE
E70XX, EXCEPT FOR WELDING TO EXISTING STEEL MEMBER.
5. EACH WELDER, TACKER, AND WELDING OPERATOR MUST BE CERTIFIED BY TEST WITHIN THE PAST SIX MONTHS TO PERFORM THE TYPE
OF WORK REQUIRED IN CONFORMANCE WITH THE AWS D1.1 STRUCTURAL WELDING CODE.
6. ALL CONNECTIONS SHALL BE WELDED IN ACCORDANCE TO AWS D1.1-STRUCTURAL WELDING CODE AND WITH THE AISC
MANUAL REQUIREMENTS.
7. THE CONTRACTOR SHALL SUPPLY ALL PLATES, CLIPS, SEAT ANGLES, ANGLE BRACKETS, BRACING, SHORING, CONNECTIONS, ETC, AS REQUIRED FOR COMPLETION OF THE STRUCTURE, EVEN IF SUCH ITEMS ARE NOT EXPLICITLY CALLED FOR ON THE STRUCTURAL
DRAWINGS.
8. PROVIDE INTUMESCENT PAINT FOR ALL STRUCTURAL STEEL MEMBERS AND CONNECTION ELEMENTS FOR FIRE PROTECTION BETWEEN
LEVELS 21 & 23.
9. POSTS AND BASE PLATES EXPOSED TO WEATHER ABOVE LEVEL 22 SHALL BE GALVANIZED FOR CORROSION PROTECTION. APPLY COMPATIBLE PRIMER ON PIPE/PLATES BETWEEN LEVEL 22 TO 23 FOR ADHERENCE OF INTUMESCENT PAINT.
CONCRETE MATERIALS
1. NON-SHRINK GROUT 28 DAY MIN. COMPRESSIVE STRENGTH 8,000 PSI
POST INSTALLED ANCHORS
1. THE CONTRACTOR SHALL ARRANGE FOR POST INSTALLED ANCHOR MANUFACTURER’S REPRESENTATIVE TO PROVIDE ONSITE INSTALLATION TRAINING FOR ALL OF THEIR ANCHORING PRODUCTS SPECIFIED. THE STRUCTURAL ENGINEER OF RECORD MUST RECEIVE DOCUMENTED CONFIRMATION THAT ALL OF THE CONTRACTOR’S PERSONNEL WHO INSTALL ANCHORS ARE TRAINED PRIOR TO THE
COMMENCEMENT OF INSTALLING ANCHORS.
2. EXISTING REINFORCING BARS IN THE CONCRETE STRUCTURE MAY CONFLICT WITH SPECIFIC ANCHOR LOCATIONS. UNLESS NOTED ON THE DRAWINGS THAT THE BARS CAN BE CUT, THE CONTRACTOR SHALL REVIEW THE EXISTING STRUCTURAL DRAWINGS AND SHALL LOCATE THE POSITION OF THE REINFORCING BARS AND/OR POST TENSION TENDONS AT THE LOCATIONS OF THE CONCRETE ANCHORS, BY GPR, X-RAY, OR OTHER MEANS. MODIFICATIONS TO BE SUBMITTED FOR REVIEW PRIOR TO FABRICATION
3. ALL POST INSTALLED ANCHORS SHALL BE 3/4" DIA HIT-RE500 V3-HAS-E-55 WITH 8" EMBEDMENT UNLESS OTHERWISE NOTED. ALL
ANCHORS EXPOSED TO WEATHER SHALL BE OF TYPE HAS-R 316 SS.
MONITORING PLAN NOTES:
PRIOR TO CONSTRUCTION, THE CONTRACTOR AND THE ENGINEER OF RECORD SHALL MAKE A JOINT INSPECTION OF THE EXISTING CONSTRUCTION AND NOTE ANY EXISTING STRUCTURAL DEFECTS, I.E. CRACKS, SIGNS OF BUILDING MOVEMENTS, E.T.C. A SIMILAR SURVEY SHALL BE MADE AFTER THE PROJECT IS COMPLETE TO DETERMINE IF ANY DAMAGE HAS OCCURRED. THE CONTRACTOR SHALL PROVIDE
THE EOR ADVANCE NOTICE PRIOR TO DATE OF INSPECTION.
PRIOR TO ANY WORK , THE CONTRACTOR SHALL HAVE A LICENSED SURVEYOR TO CHECK EXISTING BUILDINGS ELEVATIONS AT CONTROL
POINTS.
DURING CONSTRUCTION , ANY CRACK MONITORS AND "TELL-TALES" INSTALLED SHALL BE READ A MINIMUM OF ONCE EVERY DAY.
PROVIDE ALL READING TO THE ENGINEER OF RECORD FOR REVIEW AS THEY BECOME AVAILABLE. THE ENGINEER OF RECORD SHALL
ADJUST THE DURATION BETWEEN THE READINGS BASED ON THE RATE OF MOVEMENT IF ANY.
ALL BUILDING MOVEMENT SHALL BE REPORTED LIVE TO EOR OR HIS REPRESENTATIVE WHO WILL BE ONSITE DURING PRE-LOADING.
CRACK MONITORING SHALL BE PROVIDED TO EOR WITHIN 24 HOURS OF TAKING READINGS.
REFER TO SECTION 4 IN SSK-103 FOR MONITORING CONTROL POINTS.
1 05/06/2026 PERMIT
ABBREVIATIONS
PL. PLATE
TYP. TYPICAL
VIF. VERIFY IN FIELD
SIM. SIMILAR
DIA. DIAMETER
DN
UP
UP
2.5
2.5 3
AA
BB
B.5
CC
C.5
DD
D.5
E
E.5
F
G
3.5
3.5
5 5.5 6 7
1.5
1.5
4.7
A.3A.3
A.7A.7
F.7
6.5
B.2
B.6
B.8
2.3
2.3 2.6 2.8
3.3
3.3 3.9 4.5 6.4
C.6
3.7
3.7
21WB-10 21WB-1121WB-9 21WB-12
MEP DUCT WORK BELOW LEVEL
22 SLAB TO BE RELOCATED. SEE
NOTES IN SSK-103
SSK-103
SIM.
SSK-103
COURTHOUSE
PARKING
GARAGE
EAST
WING
MAIN PLAZA
MARK DATE ISSUED FOR:
PROJECT NO:
SHEET TITLE / SHEET NUMBER
c
D
C
B
A
1 2 3 4 5
F
1 2 3 4 5 6 7
6 7
G
CLIENT
CONSULTANTS
JOINT VENTURE TEAM
FORT LAUDERDALE, FLORIDA
AECOM
605 3RD AVE,
NEW YORK, NY 10158
KEY PLAN
REGISTRATION
/6
/2
:4
:1
P
M C
U s e rs \K ri s h n a n S
\D o c u m e n ts
\2
B
C C
-S tr u c tu ra l C
E N
T R
A L R
S -N
Y R
E V
-n o M
E P a h m e d
.m o s ta fa L
S R
K C
.r v t
LEVEL 21 BEAM
STRENGTHENING
PART PLANS &
SECTIONS
SSK-102
60176229
BROWARD COUNTY
COURTHOUSE
1/8" = 1'-0"
21ST FLOOR STRENGTHENING PLAN
1 05/06/2026 PERMIT
C
3.5 43.3 3.93.7
8' - 4" 8' - 4" 4' - 11" 10' - 0" 1' - 9"
23B-9
NEW 8" DIA XXS POST BELOW
EXISTING CFRP PROVIDED AS PART
OF CANT. BEAM REMEDIATION.
CFRP REINFORCEMENT TO BE
PROVIDED AROUND BEAM IF NOT
ALREADY INSTALLED.
C
3.5 43.3 3.93.7
8' - 4" 8' - 4" 4' - 11"
22B-5
NEW 8" DIA XXS POST ABOVE
AND BELOW
C
3.5 43.3 3.93.7
8' - 4" 8' - 4" 4' - 11" 10' - 0" 1' - 9"
NEW 8" DIA XXS POST
21WB-11
COLUMN BELOW COLUMN BELOW
21WB-10
B
-1
3 3.5 4
LEVEL 21
EL: 318' - 5" TOS
LEVEL 22 MECH. ROOM ROOF
EL: 336' - 9" TOS
3.3
LEVEL 23
EL: 348' - 10" TOS
3.93.7
1' - 9"10' - 0"4' - 11"8' - 4"8' - 4"
23B-9
22B-5
21WB-10 21WB-11
SUBJECT BEAM
TO BE UNLOADED
A
B
3 MONITORING
POINT 2
MONITORING
POINT1
EXISTING FRP
3/8" PL. WITH (16) 3/4" DIA HIT
RE500 - HAS ANCHORS, W/ 8"
MIN. EMBED SPACED AT 8" O.C.
E.F. AND 3/8" BOTTOM PLATE
WITH (4) 3/4" DIA HIT RE500 V3.
3/8"
SSK-103
SSK-103
SSK-103
3.5
LEVEL 21
EL: 318' - 5" TOS
CONCRETE
COLUMN BELOW
JACKS
1 1/2"X8"X8" PL.
1 1/2" NON-
SHRINK GROUT
5/16
1/2
FINISHES
VERIFY IN FIELD
3/8
3/8
TYP
SSK-103
1" PL
2'
5/8"X3"X1'-3" STIFF. PL
NEAR & FAR SIDE
1'
PROVIDE SHIMS AFTER JACKING. ADD SHIM
THICKNESS TO WELD SIZE SHOWN BASED
ON SHIM THICKNESS.
1 1/2"1 1/2"
REMOVE THE 1" PL
ALONG THIS LINE AFTER JACK REMOVAL
22B-5
3/8" PL
2'
5"
SLAB
1"
2"X1'-3"X2'-6" CAP PL
2" BASE PL.
1 1/2" NON-SHRINK GROUT
5/16
TYP
3.5
4"
3"
PERMANENT 8"XXS PIPE
SSK-103
5/16
TYP
EXISTING INSULATION. SEE DWG.
SSK-104 FOR ROOF REPAIR.
1'
5"
8"
LEVEL 22 MECH. ROOM ROOF
EL: 336' - 9" TOS
3.5
LEVEL 23
EL: 348' - 10" TOS
3.7
2" CAP PL
EXISTING FRP (VIF)
SEE ANCHOR DETAIL
IN SECTION 12
EXIST. BEAM
23B-9
MONITORING POINT1
SSK-103
5/16
TYP
1' - 4"
3" 5"
3/8" PL TYP.
1/4
TYP
C
3/4" DIA HIT RE500 -HAS ANCHORS
W/MIN. 8" EMBED @ 8" O.C.
2" BASE PL.
1 1/2" GROUT
FOR ROOF INSULATION REPAIR
SEE DWG. SSK-104
LEVEL 22 MECH. ROOM ROOF
EL: 336' - 9" TOS
C
3.5
SSK-103
CONCRETE
COLUMN BELOW
EXISTING L21 SLAB
2"X2'-3" X2'-3" BASE PL.
8" XXS PIPE
TYP
1/2
(4) 1" DIA HIT RE500 V3-HAS-E-55
COUNTER SUNK ANCHOR WITH
8" EMBEDMENT RODS TYP.
T Y
P
4"TYP.
4"
PL. 1 1/2"X10"X2'-1"
1/2
1/2
TYP.
1" PL
8"
8"
(2) 2" DIA GROUT HOLES
1/2"x2"x2" KEEPER PL. AT ALL
FOUR CORNERS WELDED TO 2'-3"
SQUARE BASE PL. BEFORE
JACKING
1/4"
1/ 4"
(3/8)
TYP.
C
3.5
EXISTING L22 SLAB
(2) 2" DIA GROUT HOLES
8" XXS PIPE
TYP
5/16
(4) 1" DIA HIT RE500 V3-HAS-R-316
SS ANCHORS WITH 8"
EMBEDMENT TYP.
3"
3"
1' - 0" 1' - 0"
1'
1'
2'
C
3.5
EXISTING CONCRETE
BEAM
2"X2'-0" X2'-0" PL
8" XXS PIPE
(4) 1" DIA HIT RE500 V3-HAS-R-316
SS ANCHORS WITH 8"
EMBEDMENT TYP.
3"
3"
6"
TYP
5/16
1' - 0" 1' - 0"
1'
1'
2' - 0"
LEVEL 22 MECH. ROOM ROOF
EL: 336' - 9" TOS
3.7
11" 1/2"X11"X3'-0" PL NEAR &
FAR SIDE OF CONCRETE COL.
3/8" WEB PL.
L4X3X1/2
3/8" WEB PL. EXTENDED 3'-0"
BELOW CONCRETE BEAM.
3" 9"
9" 9"
6"
6" 9"
9" 9"
3"
3'
4"
6 1/2"
8"
1/4"
SSK-103
SSK-103
1" DIA HIT RE500 V3-
HAS-E-55 WITH MIN.
12" EMBEDMENT TO
EXIST. CONC COL.
C
3.7
11"
11"
TYP
5/16
5/16
L4X3X1/2
L4X3X1/2
3/8" WEB PL. EXTENDED 3'-0"
BELOW CONCRETE BEAM.
3/8" WEB PL. EXTENDED 3'-0"
BELOW CONCRETE BEAM.
6" 8"
8" 8"
6"
8"
8"
5/8" PL
1" 1"
5/16
SSK-103
C
LEVEL 22 MECH. ROOM ROOF
EL: 336' - 9" TOS
3'
EXIST. COLUMN
EXIST. BEAM
EXIST. COLUMN
EXIST.
BEAM
L4X3X1/2
L4X3X1/2
3/8" WEB PL. EXTENDED 3'-0"
BELOW CONCRETE BEAM.
SSK-103
SSK-103
6" 8" 8" 8" 6"
6" 9"
9" 9"
3"
COURTHOUSE
PARKING
GARAGE
EAST
WING
MAIN PLAZA
MARK DATE ISSUED FOR:
PROJECT NO:
SHEET TITLE / SHEET NUMBER
c
D
C
B
A
1 2 3 4 5
F
1 2 3 4 5 6 7
6 7
G
CLIENT
CONSULTANTS
JOINT VENTURE TEAM
FORT LAUDERDALE, FLORIDA
AECOM
605 3RD AVE,
NEW YORK, NY 10158
KEY PLAN
REGISTRATION
/6
/2
:4
:1
P
M C
U s e rs \K ri s h n a n S
\D o c u m e n ts
\2
B
C C
-S tr u c tu ra l C
E N
T R
A L R
S -N
Y R
E V
-n o M
E P a h m e d
.m o s ta fa L
S R
K C
.r v t
LEVEL 21 BEAM
STRENGTHENING
PART PLANS AND
SECTIONS
SSK-103
60176229
BROWARD COUNTY
COURTHOUSE
CONSTRUCTION SEQUENCE NOTES:
AT LEVEL 21, REMOVE FLOOR FINISH(IF PRESENT) LOCALLY AROUND COLUMN AT GRID C/3.5. CLEAN THE SURFACE ON TOP OF FLOOR SLAB AND INSTALL BASE PLATE AND BASE PLATE ANCHORS. RELOCATE MEP DUCT WORK BELOW LEVEL 22 SLAB IN THE VICINITY OF NEW POST
LOCATION AT GRID C/3.5
PROVIDE WEB AND BOTTOM PLATES ON BEAM 22B-5 AT LEVEL 22, COLUMN BRACKET PLATES AT GRID C/3.7 BELOW LEVEL 22, BASE PLATE
ON TOP OF BEAM 22B-5 UPON REMOVAL OF ROOF FINISHES.
VERIFY IN FIELD THE CFRP STRENGTHENING OF BEAM 23B-9 WAS COMPLETED BY OTHERS AND INSTALL PERMANANT 8" DIA XXS PIPE
BETWEEN LEVELS 22 AND 23.
INSTALL PERMANANT 8" DIA XXS PIPE BETWEEN LEVELS 21 AND 22 AND GRADUALLY APPLY 150 KIP JACKING FORCE CONCURRENTLY ON BOTH JACKS AT LEVEL 21(TOTAL LOAD IS 300 KIP). STOP JACKING IF DEFLECTIONS THRESHOLD IDENTIFIED ON THE MONITORING PLAN.
REMOVE JACKS AND BRACKET/STIFFENER PLATES ON 8" XXS PIPE ON LEVEL 21 AFTER WELDING BASE PLATES.
3/16" = 1'-0"
FRAMING PLAN AT ELEVATION +348'-10"
PART PLAN
3/16" = 1'-0"
LEVEL 22 MECH. ROOM ROOF (EL.
+336'-9") PART PLAN
3/16" = 1'-0"
LEVEL 21 FLOOR (EL. +318'-5") PART
PLAN
3/16" = 1'-0"
SECTION
3D - BEAM REMEDIATION WITH NEW
POST
3/4" = 1'-0"
DETAIL A
3/4" = 1'-0"
DETAIL - B
3/4" = 1'-0"
DETAIL-C
3/4" = 1'-0"
SECTION
3/4" = 1'-0"
PLAN-A
3/4" = 1'-0"
PLAN-B
NOTES:
FOR MEP DUCT WORK RELATED MODIFICATIONS SEE SSK-105.
3/4" = 1'-0"
PLAN-C
3/4" = 1'-0"
DETAIL - D
3/4" = 1'-0"
PLAN - D
3/4" = 1'-0"
DETAIL - F
2'
3.5
NEW STRUCTURAL POST
ANGLED RESIN FILL AT ALL TERMINATION POINTS
PRIMER PER MANUFACTURES RECOMMENDATION
EMBED POLYESTER REINFORCING FABRIC WRAP
IN ACRYLIC FLASHING WHILE STILL WET
CUT POLYESTER REINFORCING FABRIC COLLAR TO
FIT SNUG AROUND PENETRATION. EMBED ACRYLIC
FLASHING WHILE STILL WET
EXISTING ROOFING MEMBRANE
EXISTING INSULATION
EXISTING CONCRETE DECK
NEW INSULATION IS TO MATCH EXISTING IN
THICKNESS AND TYPE
PRIME DECK PER MANUFACTUREDS RECOMENATION
8"
M
IN
1' -6"
OVERLAP
1' -6"
4"
3"
1"
GENERAL NOTES:
1. THE IS A SUGGESTIVE DETAIL FOR REPAIRING THE EXISTING ROOF TO ALLOW THE INSTALATION
OF THE NEW ROOF DUNNAGE.
2. THE CONTRACTOR IS TO CONFIRM IF THE ROOFING ASSEMBLY IS UNDER WARRANTY.
IF THE ASSEMBLY IS UNDER WARRANTY THE CONTRACRTOR IS TO SECURE THE PARAMETERS
FOR THE ROOF REPAIR DETAILS AND EXECUTION TO MAINTAIN THE WARRANTY.
3. CONTRACTOR IS TO COORDINATE THE ROOFING ASSEMBLY OPENING WITH BUILDING MANAGEMENT
AND THE CONTRACTOR HOLDING THE WARRANTY.
4. CONTRACTOR SHALL COORDINATE EXTENT OF OPENING TO ALLOW THE INSTALLATION OF THE
TEMPORARY AND STAY IN PLACE STRUCTURAL POST.
5. CONTRACTOR IS TO VERIFY ALL FIELD CONDITIONS IN THE AREA OF THE NEW PENETRATIONS
6. CONTRACTOR SHALL CO-ORDINATE DIRECTLY WITH ROOFING MANUFACTURER TO RECEIVE APPROVAL FOR ROOF REPAIR INSTALLATION TO CONFIRM WARRANTY IS NOT VOIDED AT REPAIR LOCATION.
PIPE DIAMETER PLUS 2" (51 mm)
R E
C O
M M
E N
D E
D
8" m m
3" m m
A
LAP LINE
FOLD LINE
POLYESTER FINGER CUTS
CUT LINE
ISOMETRIC VIEW
2" (51 mm) OVERLAP
ANGLED RESIN FILL AT ALL TERMINATION POINTS
COURTHOUSE
PARKING
GARAGE
EAST
WING
MAIN PLAZA
MARK DATE ISSUED FOR:
PROJECT NO:
SHEET TITLE / SHEET NUMBER
c
D
C
B
A
1 2 3 4 5
F
1 2 3 4 5 6 7
6 7
G
CLIENT
CONSULTANTS
JOINT VENTURE TEAM
FORT LAUDERDALE, FLORIDA
AECOM
605 3RD AVE,
NEW YORK, NY 10158
KEY PLAN
REGISTRATION
/6
/2
:4
:1
P
M C
U s e rs \K ri s h n a n S
\D o c u m e n ts
\2
B
C C
-S tr u c tu ra l C
E N
T R
A L R
S -N
Y R
E V
-n o M
E P a h m e d
.m o s ta fa L
S R
K C
.r v t
LEVEL 21 BEAM
STRENGTHENING
PART PLANS AND
SECTIONS
SSK-104
60176229
BROWARD COUNTY
COURTHOUSE
1" = 1'-0"
ROOF REPAIR DETAIL AT BASE PLATE
ON ROOF LEVEL
| 05062026 Level 21 Beam Remediation PERMIT SET SS |
| SSK-100 - COVER SHEET |
| SSK-101 - GENERAL NOTES |
| SSK-102 - LEVEL 21 BEAM STRENGTHENING PART PLANS & SECTIONS |
| SSK-103 - LEVEL 21 BEAM STRENGTHENING PART PLANS AND SECTIONS |
| SSK-104 - LEVEL 21 BEAM STRENGTHENING PART PLANS AND SECTIONS |
| SSK-105 - LEVEL 21 BEAM STRENGTHENING MEP MODIFICATIONS |
MEP Modification SSK-105 Signed and sealed
File details come from the government source that posted it. Updated .