SRCI Complex 1 Hot Water Heater Replacement - Scope of Work and Specifications
This document is a comprehensive scope of work and technical specifications prepared for the State of Oregon for the replacement of six commercial water heating systems at Snake River Correctional Institution (SRCI), a multi-security correctional facility located in Ontario, Oregon. The project involves replacing six existing 250-gallon, 400,000 BTU gas-fired water heaters with six new 250-gallon, 800,000 BTU units serving housing units A, B, and C at the facility. The scope includes installation of new digital mixing valves, BACnet-capable control systems integrated with SRCI's Carrier I-Vue building automation system, new electrical service panels and dedicated circuits, heat-traced rooftop piping for both hot and cold water lines, and associated plumbing specialties including expansion tanks, check valves, ball valves, butterfly valves, and comprehensive piping insulation. The project necessitates temporary hot water heater provision during shutdowns exceeding two hours to enable simultaneous water heater replacement on each housing unit, thereby minimizing crane operations and factory representative startup requirements.
The specifications encompass detailed requirements across multiple divisions including plumbing (Division 22), heating and ventilation (Division 23), and electrical work (Division 26), with particular emphasis on compliance with NEMA standards, NSF potable water requirements, ASME specifications, and comprehensive testing, adjusting, and balancing procedures performed by NEBB-certified TAB specialists. All materials must comply with relevant industry standards for valves, piping, insulation, and control systems, with specific requirements for meter and gauge installation, pipe identification and labeling, equipment supports, and system commissioning. The project includes provisions for temporary hot water supply during construction, requiring contractors to coordinate shutdowns and minimize service interruptions to the active correctional facility, alongside standard field quality control testing including pressure tests at 50 psig above operating pressure and chlorine disinfection procedures for all new and modified potable water piping.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 17820 ITB GTC SC.pdf | ||
| 17820 Addenda 1.pdf | ||
| 17820 Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SRCI Complex 1 Hot Water Heater Replacement Background/Statement of Work
Background: SRCI is located at 777 Stanton Blvd., Ontario, Or. and is a multi-security institution representing the largest facility in the department with 2,336 medium security beds, 154 minimum security beds and 510 Special Housing beds. Complex One opened in August of 1991, the original design had one- 250-gallon water heater per housing unit located on the roof. Since, SRCI Physical Plant has added one
ea. additional matching water heater per housing unit to provide more hot water and a backup if one were to go down.
Project: SRCI has 6 250-gallon gas fired 400,000 btu water heaters located on the roof of housing units A, B, And C. These water heaters have reached the end of life and need replacement. Increasing btu input to 800,000 btu’s will give each housing unit redundancy and prolong the life of the new water heaters.
SRCI Complex 1 Hot Water Heater Replacement Scope of Work
The scope of work for this project is to replace the 6 existing 250 gallon 400,000 btu gas fired water heaters with 6 new 250 gallon 800,000 btu gas fired water heaters for SRCI Complex 1 housing units A, B, and C. These water heaters need to have a horizontal mounted NEMA rated control enclosure (reference detail SB-92747-1) while meeting the specs of detail SB- 91833-1. The 18 existing thermostatic mixing valves are to be replaced with new digital mixing vales. Water heaters and tempering valve are to have BACnet capabilities and programmed into SRCI’s Carrier I-Vue building automation system. Each water heater will have a dedicated circuit and new heat trace on all roof top cold water and hot water lines. The panels servicing these water heaters are to be replaced with new service panels as well.
During demo, one existing water heater can provide sufficient hot water to the housing unit. Following Exhibit 7.15 (E) allows the institution to monitor hot water usage. For shutdowns lasting longer than 2 hours, contractor provides temporary hot water heater which will give the ability to replace both water heaters on each housing unit, minimizing crane picks and factory rep start up.
PROJECT MANUAL
SRCI COMPLEX #1 - HW HEATER
REPLACEMENT
TE Project: 25107
DIVISION 22 - PLUMBING
SECTION 220513 - COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT
SECTION 220519 - METERS AND GAUGES FOR PLUMBING PIPING
SECTION 220523.12 - BALL VALVES FOR PLUMBING PIPING
SECTION 220523.13 - BUTTERFLY VALVES FOR PLUMBING PIPING
SECTION 220523.14 - CHECK VALVES FOR PLUMBING PIPING
SECTION 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
SECTION 220593 - TESTING, ADJUSTING, AND BALANCING FOR PLUMBING
SECTION 220719 - PLUMBING PIPING INSULATION
SECTION 221116 - DOMESTIC WATER PIPING
SECTION 221119 - DOMESTIC WATER PIPING SPECIALTIES
SECTION 222126 – DIAPHRAGM EXPANSION TANKS
SECTION 223400 - FUEL-FIRED, DOMESTIC-WATER HEATERS
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
SECTION 231123 - FACILITY NATURAL-GAS PIPING
DIVISION 26 – WATER HEATER REPLACEMENT
SECTION 260100 – ELECTRICAL GENERAL PROVISIONS
SECTION 260500 – COMMON WORK RESULTS FOR ELECTRICAL
SECTION 260519 – LOW VOLTAGE ELECTRICAL POWER CONDUCTOS AND CABLES
SECTION 260526 – GROUNDING AND BONDING
SECTION 260529 – HANGERS AND SUPPORTS
SECTION 260533 – RACEWAY AND BOXES
SECTION 260548 – VIBRATION AND SEISMIC CONTROLS
SECTION 260553 – ELECTRICAL IDENTIFICATION
PREPARED FOR:
State of Oregon
SRCI COMPLEX #1 HW HEATER REPLACEMENT
COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT 220513- 1
SECTION 220513 - COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes general requirements for single-phase and polyphase, general-purpose, horizontal, small and medium, squirrel-cage induction motors for use on ac power systems up to 600 V and installed at equipment manufacturer's factory or shipped separately by equipment manufacturer for field installation.
1.2 COORDINATION
A. Coordinate features of motors, installed units, and accessory devices to be compatible with the following:
1. Motor controllers.
2. Torque, speed, and horsepower requirements of the load.
3. Ratings and characteristics of supply circuit and required control sequence.
4. Ambient and environmental conditions of installation location.
PART 2 - PRODUCTS
2.1 GENERAL MOTOR REQUIREMENTS
A. Comply with NEMA MG 1 unless otherwise indicated.
2.2 MOTOR CHARACTERISTICS
A. Duty: Continuous duty at ambient temperature of 40 deg C and at altitude of 3300 feet above sea level.
B. Capacity and Torque Characteristics: Sufficient to start, accelerate, and operate connected loads at designated speeds, at installed altitude and environment, with indicated operating sequence, and without exceeding nameplate ratings or considering service factor.
2.3 SINGLE-PHASE MOTORS
A. Motors larger than 1/20 hp shall be one of the following, to suit starting torque and requirements of specific motor application:
1. Permanent-split capacitor.
B. Multispeed Motors: Variable-torque, permanent-split-capacitor type.
COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT 220513- 2
C. Bearings: Prelubricated, antifriction ball bearings or sleeve bearings suitable for radial and thrust loading.
D. Motors 1/20 HP and Smaller: Shaded-pole type.
E. Thermal Protection: Internal protection to automatically open power supply circuit to motor when winding temperature exceeds a safe value calibrated to temperature rating of motor insulation.
Thermal-protection device shall automatically reset when motor temperature returns to normal range.
PART 3 - EXECUTION (Not Applicable)
END OF SECTION
METERS AND GAUGES FOR HVAC PIPING 230519- 1
SECTION 220519 - METERS AND GAUGES FOR PLUMBING PIPING
A. Section Includes:
1. Liquid-in-glass thermometers.
2. Thermowells.
3. Dial-type pressure gages.
4. Gage attachments.
B. Related Requirements:
1. Section 231123 "Facility Natural-Gas Piping" for gas meters.
1.2
A.
ACTION SUBMITTALS
Product Data: For each type of product.
1.3
CLOSEOUT SUBMITTALS
Operation and maintenance data.
2.1 LIQUID-IN-GLASS THERMOMETERS
A. Metal-Case, Industrial-Style, Liquid-in-Glass Thermometers:
1. Manufacturers: Subject to compliance with requirements, provide products by one of the
a. Flo Fab Inc.
b. Miljoco Corporation.
c. Palmer Wahl Instrumentation Group.
d. Tel-Tru Manufacturing Company.
e. Trerice, H. O. Co.
f. Weiss Instruments, Inc.
g. Weksler Glass Thermometer Corp.
h. Winters Instruments - U.S.
i. Or approved equal
2. Standard: ASME B40.200.
3. Case: Cast aluminum; 9-inch nominal size unless otherwise indicated.
http://www.specagent.com/LookUp/?uid=123457060887&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457060888&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457060890&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457060889&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457060891&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457060892&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457060895&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457060893&mf=04&src=wd
METERS AND GAUGES FOR HVAC PIPING 230519- 2
4. Case Form: Adjustable angle Back angle unless otherwise indicated.
5. Tube: Glass with magnifying lens and blue or red organic liquid.
6. Tube Background: Nonreflective aluminum with permanently etched scale markings graduated in deg F.
7. Window: Glass.
8. Stem: Aluminum and of length to suit installation.
a. Design for Air-Duct Installation: With ventilated shroud.
b. Design for Thermowell Installation: Bare stem.
9. Accuracy: Plus or minus 1 percent of scale range or one scale division, to a maximum of
1.5 percent of scale range.
2.2 THERMOWELLS
A. Thermowells:
1. Standard: ASME B40.200.
2. Description: Pressure-tight, socket-type fitting made for insertion in piping tee fitting.
3. Material for Use with Copper Tubing: CNR CUNI.
4. Material for Use with Steel Piping: CRES CSA.
5. Type: Stepped shank unless straight or tapered shank is indicated.
6. Bore: Diameter required to match thermometer bulb or stem.
7. Insertion Length: Length required to match thermometer bulb or stem.
B. Heat-Transfer Medium: Mixture of graphite and glycerin.
2.3 DIAL-TYPE PRESSURE GAGES
A. Direct-Mounted, Metal-Case, Dial-Type Pressure Gages:
2. Ametek U.S. Gauge.
a. Ashcroft Inc.
b. Ernst Flow Industries.
c. Flo Fab inc.
d. Marsh Bellofram.
e. Miljoco Corporation.
f. Noshok.
g. Palmer Wahl Instrumentation Group.
h. REOTEMP Instrument Corporation.
i. Tel-Tru Manufacturing Company.
j. Trerice, H. O. Co.
k. Watts; a Watts Water Technologies company.
l. Weiss Instruments, Inc.
m. Weksler Glass Thermometer Corp.
n. WIKA Instrument Corporation.
o. Winters Instruments - U.S.
p. Or approved equal http://www.specagent.com/LookUp/?uid=123457061072&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457060917&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457060918&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457060919&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457060913&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457060914&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457060915&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457060916&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457060920&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457060921&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457060922&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457060927&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457060923&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457060929&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457060924&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457060925&mf=04&src=wd
METERS AND GAUGES FOR HVAC PIPING 230519- 3
3. Standard: ASME B40.100.
4. Case: Liquid-filled Sealed Solid-front, pressure relief type(s); cast aluminum or drawn steel Insert material; 4-1/2-inch nominal diameter.
5. Pressure Connection: Brass, with NPS 1/4 or NPS 1/2, ASME B1.20.1 pipe threads and bottom-outlet type unless back-outlet type is indicated.
6. Movement: Mechanical, with link to pressure element and connection to pointer.
7. Dial: Nonreflective aluminum with permanently etched scale markings graduated in psi .
8. Window: Glass.
9. Ring: Stainless steel.
10. Accuracy: Grade B, plus or minus 2 percent of middle half of scale range.
2.4 GAGE ATTACHMENTS
A. Snubbers: ASME B40.100, brass; with NPS 1/4 or NPS 1/2, ASME B1.20.1 pipe threads and -type surge-dampening device. Include extension for use on insulated piping.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Install thermowells with socket extending a minimum of 2 inches into fluid and in vertical position in piping tees.
B. Install thermowells of sizes required to match thermometer connectors. Include bushings if required to match sizes.
C. Install thermowells with extension on insulated piping.
D. Fill thermowells with heat-transfer medium.
E. Install direct-mounted thermometers in thermowells and adjust vertical and tilted positions.
F. Install direct-mounted pressure gages in piping tees with pressure gage located on pipe at the most readable position.
G. Install valve and snubber in piping for each pressure gage for fluids.
H. Install test plugs in piping tees.
I. Assemble and install connections, tubing, and accessories between flow-measuring elements and flowmeters according to manufacturer's written instructions.
J. Install connection fittings in accessible locations for attachment to portable indicators.
3.2 CONNECTIONS
A. Install meters and gages adjacent to machines and equipment to allow space for service and maintenance of meters, gages, machines, and equipment.
METERS AND GAUGES FOR HVAC PIPING 230519- 4
3.3
ADJUSTING
After installation, calibrate meters according to manufacturer's written instructions.
B. Adjust faces of meters and gages to proper angle for best visibility.
3.4
THERMOMETER SCALE-RANGE SCHEDULE
Scale Range for Cold and Hot Water Piping: 0 to 150 deg F.
3.5
PRESSURE-GAGE SCALE-RANGE SCHEDULE
Scale Range for Cold and Hot Water Piping : 0 to 100 psi.
BALL VALVES FOR PLUMBING PIPING 220523.12- 1
SECTION 220523.12 - BALL VALVES FOR PLUMBING PIPING
1. Bronze ball valves.
2.1 GENERAL REQUIREMENTS FOR VALVES
A. Source Limitations for Valves: Obtain each type of valve from single source from single manufacturer.
B. ASME Compliance:
1. ASME B1.20.1 for threads for threaded end valves.
2. ASME B16.10 and ASME B16.34 for ferrous valve dimensions and design criteria.
3. ASME B16.18 for solder-joint connections.
4. ASME B31.9 for building services piping valves.
C. NSF Compliance: NSF 61 Annex G for valve materials for potable-water service.
D. Bronze valves shall be made with dezincification-resistant materials. Bronze valves made with copper alloy (brass) containing more than 15 percent zinc are not permitted.
E. Valve Pressure-Temperature Ratings: Not less than indicated and as required for system pressures and temperatures.
F. Valve Sizes: Same as upstream piping unless otherwise indicated.
G. Valve Actuator Types:
1. Handlever: For quarter-turn valves smaller than NPS 4.
H. Valves in Insulated Piping:
1. Include 2-inch stem extensions.
2. Extended operating handles of nonthermal-conductive material and protective sleeves that allow operation of valves without breaking vapor seals or disturbing insulation.
3. Memory stops that are fully adjustable after insulation is applied.
BALL VALVES FOR PLUMBING PIPING 220523.12- 2
2.2 BRONZE BALL VALVES
A. Two-Piece, Bronze Ball Valves with Full Port, and Bronze or Brass Trim:
a. Conbraco Industries, Inc.; Apollo Valves.
b. Crane; Crane Energy Flow Solutions.
c. Hammond Valve.
d. Lance Valves; a division of Advanced Thermal Systems, Inc.
e. Milwaukee Valve Company.
f. NIBCO INC.
g. Watts; a Watts Water Technologies company.
h. Or approved equal
2. Description:
a. Standard: MSS SP-110.
b. CWP Rating: 600 psig.
c. Body Design: Two piece.
d. Body Material: Bronze.
e. Ends: Threaded and soldered.
f. Seats: PTFE.
g. Stem: Bronze or brass.
h. Ball: Chrome-plated brass.
i. Port: Full.
3.1 VALVE INSTALLATION
A. Install valves with unions or flanges at each piece of equipment arranged to allow service, maintenance, and equipment removal without system shutdown.
B. Locate valves for easy access and provide separate support where necessary.
C. Install valves in horizontal piping with stem at or above center of pipe.
D. Install valves in position to allow full stem movement.
3.2 GENERAL REQUIREMENTS FOR VALVE APPLICATIONS
A. If valves with specified CWP ratings are unavailable, the same types of valves with higher CWP ratings may be substituted.
B. Select valves with the following end connections:
http://www.specagent.com/LookUp/?uid=123456984916&mf&src=wd http://www.specagent.com/LookUp/?uid=123456984917&mf&src=wd http://www.specagent.com/LookUp/?uid=123456984918&mf&src=wd http://www.specagent.com/LookUp/?uid=123456984919&mf&src=wd http://www.specagent.com/LookUp/?uid=123456984920&mf&src=wd http://www.specagent.com/LookUp/?uid=123456984921&mf&src=wd http://www.specagent.com/LookUp/?uid=123456984922&mf&src=wd
BALL VALVES FOR PLUMBING PIPING 220523.12- 3
1. For Copper Tubing, NPS 2 and Smaller: Threaded ends except where solder-joint valve-end option is indicated in valve schedules below.
2. For Steel Piping, NPS 2 and Smaller: Threaded ends.
3.3 DOMESTIC HOT- AND COLD-WATER VALVE SCHEDULE
A. Pipe NPS 2 and Smaller:
1. Bronze Valves: May be provided with solder-joint ends instead of threaded ends.
2. Two-piece, bronze ball valves with full port and bronze or brass trim.
BUTTERFLY VALVES FOR HVAC PIPING 230523.13- 1
SECTION 220523.13 - BUTTERFLY VALVES FOR PLUMBING PIPING
1. Iron, single-flange (lug-type) butterfly valves.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of valve.
2.1 PERFORMANCE REQUIREMENTS
A. ASME Compliance:
1. ASME B16.1 for flanges on iron valves.
2. ASME B16.10 and ASME B16.34 for ferrous valve dimensions and design criteria.
3. ASME B31.1 for power piping valves.
4. ASME B31.9 for building services valves.
B. AWWA Compliance: Comply with AWWA C606 for grooved-end connections.
C. Valve Pressure-Temperature Ratings: Not less than indicated and as required for system
D. Valve Sizes: Same as upstream piping unless otherwise indicated.
E. Valve Actuator Types:
1. Hand Lever: For valves NPS 6 and smaller.
F. Valves in Insulated Piping: Provide with 2-inch extended neck stems.
2.2 IRON, SINGLE-FLANGE (LUG-TYPE) BUTTERFLY VALVES
A. Iron, Single-Flange (Lug-Type) Butterfly Valves with Aluminum-Bronze Disc:
http://www.specagent.com/LookUp/?ulid=9703&mf&src=wd
BUTTERFLY VALVES FOR HVAC PIPING 230523.13- 2
a. ABZ Valve and Controls.
b. Apollo Valves; a part of Aalberts Integrated Piping Systems.
c. Bray International, Inc.
d. Center Line; a Crane Co. brand.
e. DeZURIK.
f. DynaQuip Controls.
g. Emerson Commercial & Residential Solutions; Emerson Electric Co.
h. Flo Fab Inc.
i. FNW; Ferguson Enterprises, Inc.
j. Hammond Valve.
k. Jamesbury; Metso.
l. Jenkins Valves; a Crane Co. brand.
m. Jomar Valve.
n. Kennedy Valve Company; a division of McWane, Inc.
o. KITZ Corporation.
p. Lance Valves.
q. Legend Valve & Fitting, Inc.
r. Milwaukee Valve Company.
s. NIBCO INC.
t. Norriseal.
u. Red-White Valve Corp.
v. Stockham; a Crane Co. brand.
w. Sure Flow Equipment Inc.
x. Viega LLC.
y. WATTS.
z. Zurn Industries, LLC.
aa. Or approved equal
2. Standard: MSS SP-67, Type I.
3. CWP Rating: 150 psig.
4. Body Design: Single flange (lug type), suitable for bidirectional dead-end service at rated pressure without use of downstream flange.
5. Body Material: ASTM A126, cast iron or ASTM A536, ductile iron.
6. Seat: EPDMr.
7. Stem: One- or two-piece stainless steel.
8. Disc: Aluminum bronze.
3.1 EXAMINATION
A. Examine valve interior for cleanliness, freedom from foreign matter, and corrosion. Remove special packing materials, such as blocks, used to prevent disc movement during shipping and handling.
B. Operate valves in positions from fully open to fully closed. Examine guides and seats made accessible by such operations.
http://www.specagent.com/LookUp/?uid=123457188679&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457188682&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457188680&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457188726&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457188685&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457188727&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457188693&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457188728&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457188729&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457188686&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457188730&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457188683&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457188731&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457188732&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457188687&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457188733&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457188734&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457188688&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457188689&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457188690&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457188691&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457188684&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457188735&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457188736&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457188694&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457188737&mf=04&src=wd
BUTTERFLY VALVES FOR HVAC PIPING 230523.13- 3
C. Examine mating flange faces for damage. Check bolting for proper size, length, and material.
Verify that gasket is of proper size, that its material composition is suitable for service, and that it is free from defects and damage.
D. Do not attempt to repair defective valves; replace with new valves. Remove defective valves from site.
3.2 INSTALLATION OF VALVES
A. Install valves with unions or flanges at each piece of equipment arranged to allow space for service, maintenance, and equipment removal without system shutdown.
B. Provide support of piping adjacent to valves such that no force is imposed upon valves.
C. Locate valves for easy access.
D. Install valves in horizontal piping with stem at or above center of pipe.
E. Install valves in position to allow full valve actuation movement.
F. Adjust or replace valve packing after piping systems have been tested and put into service, but before final adjusting and balancing. If leakage cannot be repaired, replace valve.
3.3 CHILLED-WATER VALVE SCHEDULE
A. Pipe NPS 2-1/2 and Larger:
1. Iron, Single-Flange Butterfly Valves, NPS 2-1/2 to NPS 12: Aluminum-bronze disc, 200 CWP, and EPDM seat.
3.4 CONDENSER-WATER VALVE SCHEDULE
3.5 HEATING-WATER VALVE SCHEDULE
CHECK VALVES FOR PLUMBING PIPING 220523.14- 1
SECTION 220523.14 - CHECK VALVES FOR PLUMBING PIPING
1. Bronze swing check valves.
2.1 GENERAL REQUIREMENTS FOR VALVES
A. Source Limitations for Valves: Obtain each type of valve from single source from single manufacturer.
B. ASME Compliance:
1. ASME B1.20.1 for threads for threaded end valves.
2. ASME B16.1 for flanges on iron valves.
3. ASME B16.10 and ASME B16.34 for ferrous valve dimensions and design criteria.
4. ASME B16.18 for solder joint.
5. ASME B31.9 for building services piping valves.
C. NSF Compliance: NSF 61 Annex G for valve materials for potable-water service.
D. Bronze valves shall be made with dezincification-resistant materials. Bronze valves made with copper alloy (brass) containing more than 15 percent zinc are not permitted.
E. Valve Pressure-Temperature Ratings: Not less than indicated and as required for system
F. Valve Sizes: Same as upstream piping unless otherwise indicated.
G. Valve Bypass and Drain Connections: MSS SP-45.
2.2 BRONZE SWING CHECK VALVES
A. Class 125, Bronze Swing Check Valves with Bronze Disc:
a. American Valve, Inc.
b. Crane; Crane Energy Flow Solutions.
http://www.specagent.com/LookUp/?uid=123456985075&mf&src=wd http://www.specagent.com/LookUp/?uid=123456985077&mf&src=wd
CHECK VALVES FOR PLUMBING PIPING 220523.14- 2
c. Hammond Valve.
d. Jenkins Valves; Crane Energy Flow Solutions.
e. Kitz Corporation.
f. Macomb Groups (The).
g. Milwaukee Valve Company.
h. NIBCO INC.
i. Powell Valves.
j. Red-White Valve Corporation.
k. Stockham; Crane Energy Flow Solutions.
l. Watts; a Watts Water Technologies company.
m. Or approved equal
2. Description:
a. Standard: MSS SP-80, Type 3.
b. CWP Rating: 200 psig.
c. Body Design: Horizontal flow.
d. Body Material: ASTM B 62, bronze.
e. Ends: Threaded or soldered. See valve schedule articles.
f. Disc: Bronze.
3.1 VALVE INSTALLATION
A. Install valves with unions or flanges at each piece of equipment arranged to allow service, maintenance, and equipment removal without system shutdown.
B. Locate valves for easy access and provide separate support where necessary.
C. Install valves in horizontal piping with stem at or above center of pipe.
D. Install valves in position to allow full stem movement.
E. Install swing check valves for proper direction of flow in horizontal position with hinge pin level.
3.2 ADJUSTING
A. Adjust or replace valve packing after piping systems have been tested and put into service but before final adjusting and balancing. Replace valves if persistent leaking occurs.
3.3 GENERAL REQUIREMENTS FOR VALVE APPLICATIONS
A. If valve applications are not indicated, use the following:
1. Pump-Discharge Check Valves:
http://www.specagent.com/LookUp/?uid=123456985079&mf&src=wd http://www.specagent.com/LookUp/?uid=123456985076&mf&src=wd http://www.specagent.com/LookUp/?uid=123456985080&mf&src=wd http://www.specagent.com/LookUp/?uid=123456985086&mf&src=wd http://www.specagent.com/LookUp/?uid=123456985081&mf&src=wd http://www.specagent.com/LookUp/?uid=123456985082&mf&src=wd http://www.specagent.com/LookUp/?uid=123456985083&mf&src=wd http://www.specagent.com/LookUp/?uid=123456985084&mf&src=wd http://www.specagent.com/LookUp/?uid=123456985078&mf&src=wd http://www.specagent.com/LookUp/?uid=123456985085&mf&src=wd
CHECK VALVES FOR PLUMBING PIPING 220523.14- 3
a. NPS 2 and Smaller: Bronze swing check valves with bronze disc.
B. If valves with specified CWP ratings are unavailable, the same types of valves with higher CWP ratings may be substituted.
C. End Connections:
1. For Copper Tubing, NPS 2 and Smaller: Threaded or soldered.
2. For Steel Piping, NPS 2 and Smaller: Threaded.
3.4 DOMESTIC HOT- AND COLD-WATER VALVE SCHEDULE
A. Pipe NPS 2 and Smaller: Bronze swing check valves, Class 125, bronze disc with soldered or threaded end connections.
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529- 1
SECTION 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
1. Metal pipe hangers and supports.
2. Trapeze pipe hangers.
3. Fastener systems.
4. Equipment supports.
A. Product Data: For each type of product indicated.
2.1 METAL PIPE HANGERS AND SUPPORTS
A. Carbon-Steel Pipe Hangers and Supports:
1. Description: MSS SP-58, Types 1 through 58, factory-fabricated components.
2. Galvanized Metallic Coatings: Pregalvanized or hot dipped.
3. Nonmetallic Coatings: Plastic coating, jacket, or liner.
4. Padded Hangers: Hanger with fiberglass or other pipe insulation pad or cushion to support bearing surface of piping.
5. Hanger Rods: Continuous-thread rod, nuts, and washer made of stainless steel.
B. Copper Pipe Hangers:
1. Description: MSS SP-58, Types 1 through 58, copper-coated-steel, factory-fabricated components.
2. Hanger Rods: Continuous-thread rod, nuts, and washer made of stainless steel.
2.2 TRAPEZE PIPE HANGERS
A. Description: MSS SP-69, Type 59, shop- or field-fabricated pipe-support assembly made from structural carbon-steel shapes with MSS SP-58 carbon-steel hanger rods, nuts, saddles, and U-bolts.
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529- 2
2.3 FASTENER SYSTEMS
A. Powder-Actuated Fasteners: Threaded-steel stud, for use in hardened portland cement concrete with pull-out, tension, and shear capacities appropriate for supported loads and building materials where used.
B. Mechanical-Expansion Anchors: Insert-wedge-type, stainless- steel anchors, for use in hardened portland cement concrete; with pull-out, tension, and shear capacities appropriate for supported loads and building materials where used.
2.4 EQUIPMENT SUPPORTS
A. Description: Welded, shop- or field-fabricated equipment support made from structural carbon-steel shapes.
2.5 MISCELLANEOUS MATERIALS
A. Structural Steel: ASTM A 36/A 36M, carbon-steel plates, shapes, and bars; black and galvanized.
B. Grout: ASTM C 1107, factory-mixed and -packaged, dry, hydraulic-cement, nonshrink and nonmetallic grout; suitable for interior and exterior applications.
1. Properties: Nonstaining, noncorrosive, and nongaseous.
2. Design Mix: 5000-psi, 28-day compressive strength.
3.1 HANGER AND SUPPORT INSTALLATION
A. Metal Pipe-Hanger Installation: Comply with MSS SP-69 and MSS SP-89. Install hangers, supports, clamps, and attachments as required to properly support piping from the building structure.
B. Metal Trapeze Pipe-Hanger Installation: Comply with MSS SP-69 and MSS SP-89. Arrange for grouping of parallel runs of horizontal piping, and support together on field-fabricated trapeze pipe hangers.
1. Pipes of Various Sizes: Support together and space trapezes for smallest pipe size or install intermediate supports for smaller diameter pipes as specified for individual pipe hangers.
2. Field fabricate from ASTM A 36/A 36M, carbon-steel shapes selected for loads being supported. Weld steel according to AWS D1.1/D1.1M.
C. Fastener System Installation:
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529- 3
1. Install powder-actuated fasteners for use in lightweight concrete or concrete slabs less than 4 inches thick in concrete after concrete is placed and completely cured. Use operators that are licensed by powder-actuated tool manufacturer. Install fasteners according to powder-actuated tool manufacturer's operating manual.
2. Install mechanical-expansion anchors in concrete after concrete is placed and completely cured. Install fasteners according to manufacturer's written instructions.
D. Install hangers and supports complete with necessary attachments, inserts, bolts, rods, nuts, washers, and other accessories.
E. Equipment Support Installation: Fabricate from welded-structural-steel shapes.
F. Install hangers and supports to allow controlled thermal and seismic movement of piping systems, to permit freedom of movement between pipe anchors, and to facilitate action of expansion joints, expansion loops, expansion bends, and similar units.
G. Install lateral bracing with pipe hangers and supports to prevent swaying.
H. Install building attachments within concrete slabs or attach to structural steel. Install additional attachments at concentrated loads, including valves, flanges, and strainers, NPS 2-1/2 and larger and at changes in direction of piping. Install concrete inserts before concrete is placed; fasten inserts to forms and install reinforcing bars through openings at top of inserts.
I. Load Distribution: Install hangers and supports so that piping live and dead loads and stresses from movement will not be transmitted to connected equipment.
J. Pipe Slopes: Install hangers and supports to provide indicated pipe slopes and to not exceed maximum pipe deflections allowed by ASME B31.9 for building services piping.
K. Insulated Piping:
1. Attach clamps and spacers to piping.
a. Piping Operating above Ambient Air Temperature: Clamp may project through insulation.
b. Do not exceed pipe stress limits allowed by ASME B31.9 for building services piping.
2. Install MSS SP-58, Type 40, protective shields on cold piping with vapor barrier. Shields shall span an arc of 180 degrees.
3. Shield Dimensions for Pipe: Not less than the following:
a. NPS 1/4 to NPS 3-1/2: 12 inches long and 0.048 inch thick.
3.2 EQUIPMENT SUPPORTS
A. Fabricate structural-steel stands to suspend equipment from structure overhead or to support equipment above floor.
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529- 4
B. Grouting: Place grout under supports for equipment and make bearing surface smooth.
C. Provide lateral bracing, to prevent swaying, for equipment supports.
3.3 METAL FABRICATIONS
A. Cut, drill, and fit miscellaneous metal fabrications for trapeze pipe hangers and equipment supports.
B. Fit exposed connections together to form hairline joints. Field weld connections that cannot be shop welded because of shipping size limitations.
C. Field Welding: Comply with AWS D1.1/D1.1M procedures for shielded, metal arc welding;
appearance and quality of welds; and methods used in correcting welding work; and with the
1. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals.
2. Obtain fusion without undercut or overlap.
3. Remove welding flux immediately.
4. Finish welds at exposed connections so no roughness shows after finishing and so contours of welded surfaces match adjacent contours.
3.4 ADJUSTING
A. Hanger Adjustments: Adjust hangers to distribute loads equally on attachments and to achieve indicated slope of pipe.
B. Trim excess length of continuous-thread hanger and support rods to 1-1/2 inches.
3.5 HANGER AND SUPPORT SCHEDULE
A. Specific hanger and support requirements are in Sections specifying piping systems and equipment.
B. Comply with MSS SP-69 for pipe-hanger selections and applications that are not specified in piping system Sections.
C. Use hangers and supports with galvanized metallic coatings for piping and equipment that will not have field-applied finish.
D. Use nonmetallic coatings on attachments for electrolytic protection where attachments are in direct contact with copper tubing.
E. Use carbon-steel metal trapeze pipe hangers and attachments for general service applications.
F. Use copper-plated pipe hangers and copper attachments for copper piping and tubing.
G. Use padded hangers for piping that is subject to scratching.
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529- 5
H. Horizontal-Piping Hangers and Supports: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Adjustable, Steel Clevis Hangers (MSS Type 1): For suspension of noninsulated or insulated, stationary pipes NPS 1/2 to NPS 30.
2. Yoke-Type Pipe Clamps (MSS Type 2): For suspension of up to 1050 deg F, pipes NPS
4 to NPS 24, requiring up to 4 inches of insulation.
3. Carbon- or Alloy-Steel, Double-Bolt Pipe Clamps (MSS Type 3): For suspension of pipes NPS 3/4 to NPS 36, requiring clamp flexibility and up to 4 inches of insulation.
4. Adjustable, Steel Band Hangers (MSS Type 7): For suspension of noninsulated, stationary pipes NPS 1/2 to NPS 8.
I. Vertical-Piping Clamps: Unless otherwise indicated and except as specified in piping system Sections, install the following types:
1. Extension Pipe or Riser Clamps (MSS Type 8): For support of pipe risers NPS 3/4 to
NPS 24.
J. Hanger-Rod Attachments: Unless otherwise indicated and except as specified in piping system
1. Steel Turnbuckles (MSS Type 13): For adjustment up to 6 inches for heavy loads.
2. Steel Clevises (MSS Type 14): For 120 to 450 deg F piping installations.
K. Building Attachments: Unless otherwise indicated and except as specified in piping system
1. Steel or Malleable Concrete Inserts (MSS Type 18): For upper attachment to suspend pipe hangers from concrete ceiling.
2. Top-Beam C-Clamps (MSS Type 19): For use under roof installations with bar-joist construction, to attach to top flange of structural shape.
3. Side-Beam or Channel Clamps (MSS Type 20): For attaching to bottom flange of beams, channels, or angles.
4. Center-Beam Clamps (MSS Type 21): For attaching to center of bottom flange of beams.
5. Welded Beam Attachments (MSS Type 22): For attaching to bottom of beams if loads are considerable and rod sizes are large.
6. C-Clamps (MSS Type 23): For structural shapes.
7. Welded-Steel Brackets: For support of pipes from below, or for suspending from above by using clip and rod. Use one of the following for indicated loads:
a. Light (MSS Type 31): 750 lb.
b. Medium (MSS Type 32): 1500 lb.
c. Heavy (MSS Type 33): 3000 lb.
8. Side-Beam Brackets (MSS Type 34): For sides of steel or wooden beams.
9. Plate Lugs (MSS Type 57): For attaching to steel beams if flexibility at beam is required.
L. Saddles and Shields: Unless otherwise indicated and except as specified in piping system
HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT 220529- 6
1. Protection Shields (MSS Type 40): Of length recommended in writing by manufacturer to prevent crushing insulation.
M. Comply with MSS SP-69 for trapeze pipe-hanger selections and applications that are not specified in piping system Sections.
N. Use powder-actuated fasteners mechanical-expansion anchors instead of building attachments where required in concrete construction.
IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 220553- 1
SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
1. Equipment labels.
2. Pipe labels.
2.1 EQUIPMENT LABELS
A. Plastic Labels for Equipment:
a. Brady Corporation.
b. Brimar Industries, Inc.
c. Carlton Industries, LP.
d. Champion America.
e. Craftmark Pipe Markers.
f. emedco.
g. Kolbi Pipe Marker Co.
h. LEM Products Inc.
i. Marking Services, Inc.
j. Seton Identification Products; a Brady Corporation company.
k. Or approved equal
2. Material and Thickness: Multilayer, multicolor, plastic labels for mechanical engraving, 1/8 inch thick, with predrilled holes for attachment hardware.
3. Letter and Background Color: As indicated for specific application under Part 3.
4. Maximum Temperature: Able to withstand temperatures of up to 160 deg F.
5. Minimum Label Size: Length and width vary for required label content, but not less than
2-1/2 by 3/4 inch.
6. Minimum Letter Size: 1/4 inch for name of units if viewing distance is less than 24 inches, 1/2 inch for viewing distances of up to 72 inches, and proportionately larger lettering for greater viewing distances. Include secondary lettering two-thirds to three- fourths the size of principal lettering.
http://www.specagent.com/LookUp/?ulid=9463&mf&src=wd http://www.specagent.com/LookUp/?uid=123457184977&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457184978&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457184979&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457184980&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457184981&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457184982&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457184983&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457184984&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457184985&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457184986&mf=04&src=wd
IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 220553- 2
7. Fasteners: Stainless steel rivets or self-tapping screws.
8. Adhesive: Contact-type permanent adhesive, compatible with label and with substrate.
B. Label Content: Include equipment's Drawing designation or unique equipment number, Drawing numbers where equipment is indicated (plans, details, and schedules), and the Specification Section number and title where equipment is specified.
2.2 PIPE LABELS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the
1. Actioncraft Products, Inc.; a division of Industrial Test Equipment Co., Inc.
2. Brady Corporation.
3. Brimar Industries, Inc.
4. Carlton Industries, LP.
5. Champion America.
6. Craftmark Pipe Markers.
7. emedco.
8. Kolbi Pipe Marker Co.
9. LEM Products Inc.
10. Marking Services Inc.
11. Seton Identification Products; a Brady Corporation company.
12. Or approved equal
B. General Requirements for Manufactured Pipe Labels: Preprinted, color coded, with lettering indicating service and showing flow direction in accordance with ASME A13.1.
C. Letter and Background Color: As indicated for specific application under Part 3.
D. Pretensioned Pipe Labels: Precoiled, semirigid plastic formed to partially cover circumference of pipe and to attach to pipe without fasteners or adhesive.
E. Self-Adhesive Pipe Labels: Printed plastic with contact-type, permanent-adhesive backing.
F. Pipe Label Contents: Include identification of piping service using same designations or abbreviations as used on Drawings. Also include:
1. Pipe size.
2. Flow-Direction Arrows: Include flow-direction arrows on distribution piping. Arrows may be either integral with label or applied separately.
3. Lettering Size: Size letters in accordance with ASME A13.1 for piping.
http://www.specagent.com/LookUp/?ulid=9465&mf&src=wd http://www.specagent.com/LookUp/?uid=123457184998&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457184999&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457185000&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457185001&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457185002&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457185003&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457185004&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457185005&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457185006&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457185007&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123457185008&mf=04&src=wd
IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 220553- 3
3.1 PREPARATION
A. Clean piping and equipment surfaces of incompatible primers, paints, and encapsulants, as well as dirt, oil, grease, release agents, and other substances that could impair bond of identification devices.
3.2 INSTALLATION, GENERAL REQUIREMENTS
A. Coordinate installation of identifying devices with completion of covering and painting of surfaces where devices are to be applied.
B. Coordinate installation of identifying devices with locations of access panels and doors.
C. Install identifying devices before installing acoustical ceilings and similar concealment.
D. Locate identifying devices so that they are readily visible from the point of normal approach.
3.3 INSTALLATION OF EQUIPMENT LABELS, AND PIPE LABELS
A. Permanently fasten labels on each item of plumbing equipment.
B. Sign and Label Colors.
1. White letters on an ANSI Z535.1 safety-green background.
C. Locate equipment labels where accessible and visible.
D. Arc-Flash Warning Signs: Provide arc-flash warning signs on electrical disconnects and other equipment where are-flash hazard exists, as indicated on Drawings, and in accordance with requirements of OSHA and NFPA 70E[, and other applicable codes and standards].
3.4 INSTALLATION OF PIPE LABELS
A. Install pipe labels showing service and flow direction with permanent adhesive on pipes.
B. Pipe-Label Locations: Locate pipe labels where piping is exposed or above accessible ceilings in finished spaces; machine rooms; accessible maintenance spaces such as shafts, tunnels, and plenums; and exterior exposed locations as follows:
1. Within 3 ft. of each valve and control device.
2. At access doors, manholes, and similar access points that permit view of concealed piping.
3. Within 3 ft. of equipment items and other points of origination and termination.
4. Spaced at maximum intervals of 25 ft. along each run. Reduce intervals to 10 ft. in areas of congested piping and equipment.
IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 220553- 4
C. Do not apply plastic pipe labels or plastic tapes directly to bare pipes conveying fluids at temperatures of 125 deg F or higher. Where these pipes are to remain uninsulated, use a short section of insulation or use stenciled labels.
D. Flow-Direction Flow Arrows: Use arrows, in compliance with ASME A13.1, to indicate direction of flow in pipes, including pipes where flow is allowed in both directions.
E. Pipe-Label Color Schedule:
1. Low-Pressure Compressed-Air Piping: White letters on an ANSI Z535.1 safety-blue background.
2. High-Pressure Compressed-Air Piping: White letters on an ANSI Z535.1 safety-blue background.
3. Vacuum Piping: White letters on an ANSI Z535.1 Safety blue background.
4. Domestic Cold-Water Piping: White letters on an ANSI Z535.1 safety-green background.
5. Domestic Hot-Water Piping: White letters on an ANSI Z535.1 safety-green background
6. Domestic Hot-Water Return Piping White letters on an ANSI Z535.1 safety-green background.
7. Nonpotable Cold Water: Black letters on an ANSI Z535.1 safety-yellow background.
8. Nonpotable Hot Water: Black letters on an ANSI Z535.1-yellow background.
9. Nonpotable Hot-Water Recirculation: Black letters on an ANSI Z535.1 safety-yellow background.
TESTING, ADJUSTING, AND BALANCING FOR PLUMBING 220593- 1
SECTION 220593 - TESTING, ADJUSTING, AND BALANCING FOR PLUMBING
1. TAB of domestic water system.
2. TAB of plumbing equipment:
a. Domestic hot-water in-line circulation pumps.
3. Pipe-leakage test verification.
4. Testing, adjusting, and balancing of existing plumbing systems and equipment.
1.2 DEFINITIONS
A. AABC: Associated Air Balance Council.
B. NEBB: National Environmental Balancing Bureau.
C. TAB: Testing, adjusting, and balancing.
D. TABB: Testing, Adjusting, and Balancing Bureau.
E. TAB Specialist: An independent entity meeting qualifications to perform TAB work.
F. TDH: Total dynamic head.
INFORMATIONAL SUBMITTALS
A. Qualification Data: Within 30 days of Contractor's Notice to Proceed, submit documentation that the TAB specialist and this Project's TAB team members meet the qualifications specified in "Quality Assurance" Article.
1.4
QUALITY ASSURANCE
A. TAB Specialists Qualifications, Certified by NEBB:
1. TAB Field Supervisor: Employee of the TAB specialist and certified by NEBB .
2. TAB Technician: Employee of the TAB specialist and certified by NEBB.
B. Instrumentation Type, Quantity, Accuracy, and Calibration: Comply with requirements in ASHRAE 111, Section 4, "Instrumentation."
TESTING, ADJUSTING, AND BALANCING FOR PLUMBING 220593- 2
C. ASHRAE 111 Compliance: Requirements in ASHRAE 111 applicable to analogous domestic water system and plumbing equipment balancing.
D. ASHRAE 188 Compliance: Comply with balancing and report requirements, Section 8.3
"Balancing."
E. Code and Authorities Having Jurisdiction Compliance: TAB is required to comply with governing codes and requirements of authorities having jurisdiction.
1.5 FIELD CONDITIONS
A. Full Owner Occupancy: Owner will occupy the site and existing building during entire TAB period. Cooperate with Owner during TAB operations to minimize conflicts with Owner's operations.
B. Partial Owner Occupancy: Owner may occupy completed areas of building before Substantial
Completion. Cooperate with Owner during TAB operations to minimize conflicts with Owner's operations.
PART 2 - PRODUCTS (Not Applicable)
3.1 EXAMINATION
A. Examine the Contract Documents to become familiar with Project requirements and to discover conditions in systems designs that may preclude proper TAB of systems and equipment.
B. Examine installed systems for balancing devices, such as test ports, gauge cocks, thermometer wells, flow-control devices, and balancing valves and fittings. Verify that locations of these balancing devices are applicable for intended purpose and are accessible.
C. Examine approved submittals for plumbing systems and equipment.
D. Examine design data, including plumbing system descriptions, statements of design assumptions for environmental conditions and systems output, and statements of philosophies and assumptions about plumbing system and equipment controls.
E. Examine equipment performance data, including pump curves.
1. Relate performance data to Project conditions and requirements, including pump system effects that can create undesired or unpredicted conditions that cause reduced capacities in all or part of a system.
2. Calculate pump system-effect factors to reduce performance ratings of plumbing equipment when installed under conditions different from the conditions used to rate equipment performance. Compare results with the design data and installed conditions.
TESTING, ADJUSTING, AND BALANCING FOR PLUMBING 220593- 3
F. Examine system and equipment installations, and verify that field quality-control testing, cleaning, and adjusting specified in individual Sections have been performed.
G. Examine test reports specified in individual system and equipment Sections.
H. Examine plumbing equipment and verify that bearings are greased, belts are aligned and tight, filters are clean, and equipment with functioning controls is ready for operation.
I. Examine temporary and permanent strainers. Verify that temporary strainer screens used during system cleaning and flushing have been removed and permanent strainers are installed and clean.
J. Examine control valves for proper installation for their intended function of isolating, throttling, diverting, or mixing fluid flows.
K. Examine system pumps to ensure absence of entrained air in the suction piping.
L. Examine operating safety interlocks and controls on plumbing equipment.
M. Report deficiencies discovered before and during performance of TAB procedures. Observe and record system reactions to changes in conditions. Record default set points if different from indicated values.
3.2 PREPARATION
A. Prepare a TAB plan that includes the following:
1. Equipment and systems to be tested.
2. Strategies and step-by-step procedures for balancing the systems.
3. Instrumentation to be used.
4. Sample forms with specific identification for all equipment.
B. Perform system-readiness checks of plumbing systems and equipment to verify system readiness for TAB work. Include, at a minimum, the following:
1. Domestic Water System:
a. Verify leakage and pressure tests on water distribution systems have been satisfactorily completed in accordance with applicable code and authority having jurisdiction.
b. Water heaters are installed and functioning.
c. Piping is complete and all points of outlet are installed.
d. Water treatment is complete.
e. Systems are flushed, filled, and air purged.
f. Strainers are clean.
g. Shutoff and balance valves are 100 percent open.
h. Suitable access to balancing devices and equipment is provided.
TESTING, ADJUSTING, AND BALANCING FOR PLUMBING 220593- 4
3.3 GENERAL PROCEDURES FOR TESTING AND BALANCING
A. Perform testing and balancing procedures on each system in accordance with the procedures contained in NEBB's "Procedural Standards for Testing, Adjusting, and Balancing of Environmental Systems" and in this Section.
B. Cut insulation, pipes, and equipment casings for installation of test probes to the minimum extent necessary for TAB procedures.
1. Where holes for probes are required in piping or equipment, install pressure and temperature test plugs to seal systems.
2. Install and join new insulation that matches removed materials. Restore insulation, coverings, vapor barrier, and finish in accordance with Section 220716 "Plumbing Equipment Insulation" and Section 220719 "Plumbing Piping Insulation."
C. Mark equipment and balancing devices, including valve position indicators and similar controls and devices, with paint or other suitable, permanent identification material to show final settings.
D. Take and report testing and balancing measurements in inch-pound (IP) units.
3.4 GENERAL PROCEDURES FOR PLUMBING EQUIPMENT
A. Test, adjust, and balance…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .