CC_F86_SWPPP_Cover_Sheet.pdf
PDF 14 KB Posted
- Attached to
- Primary Waste Water Lagoon Cell Renovation Federal contract opportunity
- Solicitation number
- 17-102-SOL-00013
About this file
Attachment 4: Storm Water Pollution Prevention Plan Cover Sheet
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| Amendment_0002.pdf | ||
| Amendment_0001.pdf | ||
| SF1442.pdf | ||
| CC_F86_Lagoon_Plans_signed.pdf | ||
| Heavy_&_Highway_WD.pdf | ||
| CC_F86_SWPPP.pdf | ||
| CC_F86_SWPPP_Modification_Form.pdf | ||
| SF1442.pdf | ||
| CC_F86_Specifications_signed.pdf | ||
| PAST_PERFORMANCE_SURVEY.pdf | ||
| Answers_to_Questions_for_Sources_Sought_Notice_17.pdf | ||
| CC_F86_Specifications_signed.pdf | ||
| CC_F86_Lagoon_Plans_signed.pdf | ||
| 01100_Summary.pdf | ||
| Sources_Sought_Questionnaire_slw_edits.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STORM WATER POLLUTION PREVENTION PLAN
Aberdeen Area Indian Health Service Sanitation Facilities Construction
Project AB-16-F86
Date: January 12, 2017
Project Name: Fort Thompson Primary Lagoon Cell Renovation
Project Location: Located 1.5 miles east of the community of Fort Thompson, Crow Creek Reservation, South Dakota
Project Engineer: IHS Engineer
Name: Noah Buikema Address: 420 S. Garfield, Pierre, SD 57501 Telephone #: (605) 224-1644
Project Supervision: Pierre District Engineer
Name: Michael Boland, P.E.
Address: 420 S. Garfield, Pierre, SD 57501 Telephone #: (605) 224-1644
Project Description: Construction of the following sanitation facilities:
Contractor will renovate the primary lagoon cell according to the plans and specifications. The work includes but is not limited to: stripping and grubbing 10 acres of the existing lagoon cell floor and berms, excavation of 12,732 CY of the existing protective liner, 575 CY of over excavation (if needed), installation of 1,143 tons of bentonite liner, installation of 8,220 CY of protective cover, removing and reinstalling of 1,093 CY of existing lagoon cell rip rap, installation of 530 CY of new rip rap, replacing the existing piping, installing 2,800 LF of 25-ft wide geotextile, replacing the six (6) existing ballast weights, removal and installation of an inlet splash pad and outlet pad, and any other appurtenances associated with the renovation of the primary wastewater lagoon cell located in the Fort Thompson area on the Crow Creek Indian Reservation.
Estimated construction time for the project (duration or dates): One hundred fifty
(150) calendar days from contract Notice To Proceed.