CC_F86_SWPPP_Cover_Sheet.pdf

PDF 14 KB Posted

Attached to
Primary Waste Water Lagoon Cell Renovation Federal contract opportunity
Solicitation number
17-102-SOL-00013
Issued by
Department of Health and Human Services Indian Health Service

About this file

Attachment 4: Storm Water Pollution Prevention Plan Cover Sheet

View the file

Other files for this federal contract opportunity

Other files attached to Primary Waste Water Lagoon Cell Renovation, newest first.
File Type Posted
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
SF1442.pdf PDF
CC_F86_Lagoon_Plans_signed.pdf PDF
Heavy_&_Highway_WD.pdf PDF
CC_F86_SWPPP.pdf PDF
CC_F86_SWPPP_Modification_Form.pdf PDF
SF1442.pdf PDF
CC_F86_Specifications_signed.pdf PDF
PAST_PERFORMANCE_SURVEY.pdf PDF
Answers_to_Questions_for_Sources_Sought_Notice_17.pdf PDF
CC_F86_Specifications_signed.pdf PDF
CC_F86_Lagoon_Plans_signed.pdf PDF
01100_Summary.pdf PDF
Sources_Sought_Questionnaire_slw_edits.docx DOCX document
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STORM WATER POLLUTION PREVENTION PLAN

Aberdeen Area Indian Health Service Sanitation Facilities Construction

Project AB-16-F86

Date: January 12, 2017

Project Name: Fort Thompson Primary Lagoon Cell Renovation

Project Location: Located 1.5 miles east of the community of Fort Thompson, Crow Creek Reservation, South Dakota

Project Engineer: IHS Engineer

Name: Noah Buikema Address: 420 S. Garfield, Pierre, SD 57501 Telephone #: (605) 224-1644

Project Supervision: Pierre District Engineer

Name: Michael Boland, P.E.

Address: 420 S. Garfield, Pierre, SD 57501 Telephone #: (605) 224-1644

Project Description: Construction of the following sanitation facilities:

Contractor will renovate the primary lagoon cell according to the plans and specifications. The work includes but is not limited to: stripping and grubbing 10 acres of the existing lagoon cell floor and berms, excavation of 12,732 CY of the existing protective liner, 575 CY of over excavation (if needed), installation of 1,143 tons of bentonite liner, installation of 8,220 CY of protective cover, removing and reinstalling of 1,093 CY of existing lagoon cell rip rap, installation of 530 CY of new rip rap, replacing the existing piping, installing 2,800 LF of 25-ft wide geotextile, replacing the six (6) existing ballast weights, removal and installation of an inlet splash pad and outlet pad, and any other appurtenances associated with the renovation of the primary wastewater lagoon cell located in the Fort Thompson area on the Crow Creek Indian Reservation.

Estimated construction time for the project (duration or dates): One hundred fifty

(150) calendar days from contract Notice To Proceed.