01100_Summary.pdf
PDF 466 KB Posted
- Attached to
- Primary Waste Water Lagoon Cell Renovation Federal contract opportunity
- Solicitation number
- 17-102-SOL-00013
About this file
Draft Summary
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| Amendment_0002.pdf | ||
| Amendment_0001.pdf | ||
| SF1442.pdf | ||
| PAST_PERFORMANCE_SURVEY.pdf | ||
| CC_F86_SWPPP_Cover_Sheet.pdf | ||
| CC_F86_Lagoon_Plans_signed.pdf | ||
| Heavy_&_Highway_WD.pdf | ||
| CC_F86_SWPPP.pdf | ||
| CC_F86_SWPPP_Modification_Form.pdf | ||
| SF1442.pdf | ||
| CC_F86_Specifications_signed.pdf | ||
| Answers_to_Questions_for_Sources_Sought_Notice_17.pdf | ||
| CC_F86_Specifications_signed.pdf | ||
| CC_F86_Lagoon_Plans_signed.pdf | ||
| Sources_Sought_Questionnaire_slw_edits.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Great Plains Area Indian Health Service Revised 11/2014
Summary 01100-1
SECTION 01100 – SUMMARY
PART 1 - GENERAL
1.1 SUMMARY
A. The work to be performed under this contract shall consist of furnishing the following to perform the work outlined in these specifications and as indicated by Project Drawings:
1. tools
2. equipment
3. materials
4. labor
5. supplies
6. manufactured articles
7. all transportation to complete the work
8. temporary facilities
B. Location of Work: Fort Thompson Community, Crow Creek Sioux Tribe, Buffalo County, SD
C. Incidentals Items: All work, materials, and services not expressly listed as being provided by others or not expressly called for in the contract but are necessary for the completion of the work in good faith, shall be furnished, installed, and performed by the contractor.
1.2 SUMMARY OF WORK TO BE DONE BY CONTRACTOR
Contractor will renovate the primary lagoon cell according to the plans and specifications.
The work includes but is not limited to: stripping and grubbing 10 acres of the existing lagoon cell, excavation of 12,330 CY of the existing protective liner, installation of 1,100 tons of bentonite liner, installation of 8,220 CY of protective liner, removing and reinstalling 1,093 CY of lagoon cell rip rap, install 530 CY of new rip rap, replacing the existing piping, installing 2,800 LF of 25-ft wide geotextile, replacing the six (6) existing ballast weights, removal and installation of a splash pad and anchor block, , and any other appurtenances associated with the renovation of the primary wastewater lagoon cell located in the Fort Thompson area on the Crow Creek Indian Reservation.
1.3 ADDITIONAL INFORMATION
A. For information regarding the technical aspects of the project, contact the Contract Office Technical Representative provider:
Jason Petersen
Indian Health Service 420 S Garfield Ave, Suite 200 Pierre, SD 57501
DRAFT
Great Plains Area Indian Health Service Revised 11/2014
Summary 01100-2
Telephone: 605-224-1644
B. For information regarding contracting information, contact the Contract Manager for this project:
Connie Valandra
605-226-7567 115 4th Avenue SE Federal Building, Room 309
Aberdeen, SD 57401 Telephone: 605-226-7567
C. Comply with all Tribal regulations related to the completion of the work including the acquisition of necessary permits and the payment of Tribal taxes.
END OF SECTION