01100_Summary.pdf

PDF 466 KB Posted

Attached to
Primary Waste Water Lagoon Cell Renovation Federal contract opportunity
Solicitation number
17-102-SOL-00013
Issued by
Department of Health and Human Services Indian Health Service

About this file

Draft Summary

View the file

Other files for this federal contract opportunity

Other files attached to Primary Waste Water Lagoon Cell Renovation, newest first.
File Type Posted
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
SF1442.pdf PDF
PAST_PERFORMANCE_SURVEY.pdf PDF
CC_F86_SWPPP_Cover_Sheet.pdf PDF
CC_F86_Lagoon_Plans_signed.pdf PDF
Heavy_&_Highway_WD.pdf PDF
CC_F86_SWPPP.pdf PDF
CC_F86_SWPPP_Modification_Form.pdf PDF
SF1442.pdf PDF
CC_F86_Specifications_signed.pdf PDF
Answers_to_Questions_for_Sources_Sought_Notice_17.pdf PDF
CC_F86_Specifications_signed.pdf PDF
CC_F86_Lagoon_Plans_signed.pdf PDF
Sources_Sought_Questionnaire_slw_edits.docx DOCX document
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Great Plains Area Indian Health Service Revised 11/2014

Summary 01100-1

SECTION 01100 – SUMMARY

PART 1 - GENERAL

1.1 SUMMARY

A. The work to be performed under this contract shall consist of furnishing the following to perform the work outlined in these specifications and as indicated by Project Drawings:

1. tools

2. equipment

3. materials

4. labor

5. supplies

6. manufactured articles

7. all transportation to complete the work

8. temporary facilities

B. Location of Work: Fort Thompson Community, Crow Creek Sioux Tribe, Buffalo County, SD

C. Incidentals Items: All work, materials, and services not expressly listed as being provided by others or not expressly called for in the contract but are necessary for the completion of the work in good faith, shall be furnished, installed, and performed by the contractor.

1.2 SUMMARY OF WORK TO BE DONE BY CONTRACTOR

Contractor will renovate the primary lagoon cell according to the plans and specifications.

The work includes but is not limited to: stripping and grubbing 10 acres of the existing lagoon cell, excavation of 12,330 CY of the existing protective liner, installation of 1,100 tons of bentonite liner, installation of 8,220 CY of protective liner, removing and reinstalling 1,093 CY of lagoon cell rip rap, install 530 CY of new rip rap, replacing the existing piping, installing 2,800 LF of 25-ft wide geotextile, replacing the six (6) existing ballast weights, removal and installation of a splash pad and anchor block, , and any other appurtenances associated with the renovation of the primary wastewater lagoon cell located in the Fort Thompson area on the Crow Creek Indian Reservation.

1.3 ADDITIONAL INFORMATION

A. For information regarding the technical aspects of the project, contact the Contract Office Technical Representative provider:

Jason Petersen

Indian Health Service 420 S Garfield Ave, Suite 200 Pierre, SD 57501

DRAFT

Great Plains Area Indian Health Service Revised 11/2014

Summary 01100-2

Telephone: 605-224-1644

B. For information regarding contracting information, contact the Contract Manager for this project:

Connie Valandra

605-226-7567 115 4th Avenue SE Federal Building, Room 309

Aberdeen, SD 57401 Telephone: 605-226-7567

C. Comply with all Tribal regulations related to the completion of the work including the acquisition of necessary permits and the payment of Tribal taxes.

END OF SECTION