Amendment_0004.pdf
PDF 20 KB Posted
- Attached to
- Primary Waste Water Lagoon Cell Renovation Federal contract opportunity
- Solicitation number
- 17-102-SOL-00013
About this file
Amendment 0004 (Please remember to acknowledge all amendments with your proposal)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0003.pdf | ||
| Amendment_0002.pdf | ||
| Amendment_0001.pdf | ||
| SF1442.pdf | ||
| CC_F86_SWPPP_Cover_Sheet.pdf | ||
| PAST_PERFORMANCE_SURVEY.pdf | ||
| CC_F86_Lagoon_Plans_signed.pdf | ||
| Heavy_&_Highway_WD.pdf | ||
| CC_F86_SWPPP.pdf | ||
| CC_F86_SWPPP_Modification_Form.pdf | ||
| SF1442.pdf | ||
| CC_F86_Specifications_signed.pdf | ||
| Answers_to_Questions_for_Sources_Sought_Notice_17.pdf | ||
| Sources_Sought_Questionnaire_slw_edits.docx | DOCX document | |
| CC_F86_Specifications_signed.pdf | ||
| CC_F86_Lagoon_Plans_signed.pdf | ||
| 01100_Summary.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name and Title of Signer (Type or Print) 16A. Name and title of Contracting Officer (Type or Print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States of America
(Signature of Contracting Officer)
16C. Date Signed
(Signature of person authorized to sign)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITIONS UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. Contract ID Code Page of Pages
1 2
2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No. (if applicable)
AMENDMENT 0004 February 15, 2017 To Be Determined
6. Issued By Code 7. Administered By (If other than Item 6) Code SEE BLOCK 6 Indian Health Service Department of Engineering Services-Seattle
701 5th Ave, Suite 1600 Seattle, WA 98104
8. Name and Address of Contractor (No., Street, County, and Zip Code) (X) 9A. Amendment of Solicitation No.
X
17-102-SOL-00013
9B. Date (See Item 11)
February 8, 2017 10A. Modification of Contract/Order No.
10B. Date (See Item 13)
Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended X is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-
MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT
IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (if required)
1. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.
B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)
Set fourth item 14, pursuant to the authority of FAR 43.103 (b)
C. This supplemental agreement is entered into pursuant to authority of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SUMMARY OF CHANGES:
The purpose of this amendment is to:
1. Respond to pre-proposal inquiries (PPI);
END SUMMARY OF CHANGES
17-102-SOL-00013, Amendment 0004
1. Responses to pre-proposal inquiries are as follows:
Question No. 7
Water Compaction Fee
QUESTION: Will there be a charge for water for compaction?
ANSWER: The Crow Creek Sioux reservation Tribal Council should be contacted for information regarding fees or charges for water compaction. There is a flush hydrant with untreated water near the water treatment plant in Fort Thompson that can be utilized for compaction operations.
Question No. 8
TERO
QUESTION: Will TERO fees be waived?
ANSWER: Crow Creek TERO collects on the TERO fees for work done on the Crow Creek Reservation. Offerors shall contact the Tribal TERO office for clarification on what TERO taxes need to be paid.
Question No. 9
Taxes
QUESTION: What taxes will be collected for the work?
ANSWER: Contractors are responsible to pay any required taxes. Tax questions should be directed to the federal and state agencies responsible for tax collection, such as South Dakota State or other taxing agencies for clarification on what taxes need to be paid.
Question No. 10
Lagoon Overgrowth
QUESTION: Can the overgrowth in the lagoon be burned?
ANSWER: A controlled burn to remove overgrowth as part of their site clearing operations is acceptable, but should only take place within the boundaries of the rip-rap in the primary lagoon cell. If offerors choose this option, it shall be coordinated with the Fort Thompson Fire Department and any other required entities.
All other terms, conditions, and requirements remain unchanged.
File details come from the government source that posted it. Updated .