17 - SBT-PH.pdf
PDF 781 KB Posted
- Attached to
- Amendment RFP 36C24820R0037 A00001 - Questions & Answers - Janitorial Services at VACHS, SBT, POPC, and MOPC
- Solicitation number
- 36C24820R0037
About this file
This document consists of an architectural floor plan for a penthouse addition and a related federal contract opportunity solicitation for janitorial services. The floor plan depicts the layout and dimensions for mechanical spaces on the penthouse level of a new patient bed building addition. The solicitation seeks proposals for janitorial services at four Department of Veterans Affairs medical facilities in Puerto Rico, with an anticipated award date in the first quarter of 2023. Required services include cleaning, trash removal, and restroom maintenance to be provided five days a week. Proposers are directed to thoroughly review all attached documents including the floor plan, which does not appear to be directly relevant to the janitorial services solicited.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 36C24820R0037 A00001.pdf | ||
| S05 QA RFP 36C24820R0037.pdf | ||
| 13 - SBT-4.pdf | ||
| 15 - SBT-6.pdf | ||
| 5 - MOPC.pdf | ||
| 10 - SBT-1.pdf | ||
| JANITORIAL SERVICES PRICING SCHEDULE.xlsx | XLSX spreadsheet | |
| 6 - OPA- B.pdf | ||
| 8 - OPA-2.pdf | ||
| 3 - MAIN 0-FLOOR.pdf | ||
| S02 RFP 36C24820R0037 JANITORIAL SERVICES (06-24-2020).pdf | ||
| 9 - POPC.pdf | ||
| 2 - CLC-2.pdf | ||
| 16 - SBT-B.pdf | ||
| 1 - CLC-1.pdf | ||
| 7 - OPA-1.pdf | ||
| 11 - SBT-2.pdf | ||
| 14 - SBT-5.pdf | ||
| 4 - MAIN 1-FLOOR.pdf | ||
| 12 - SBT-3.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PENTHOUSE FLOOR PLAN
AF-107
FLOOR OPENING, TYP.
SEE STRUCTURE
08/21/06
NOTE 3
NOTE 3
NOTE 3
NOTE 3,
TYP.
TAPER INSULATION TO SLOPE TOWARD ROOF DRAIN @ 14"/FT. MIN., TYPICAL
1B
1B
NOTES:
NOTE 32
AF-301
AF-301
AF-511
AF-511
AF-311
AF-311
TYP.
UPPER ELEVATOR MACHINE ROOM
SCALE: 1/8" = 1’-0"
AF-107
PENTHOUSE FLOOR PLAN
SCALE: 1/8" = 1’-0"
AF-107
33B
1A
3B 2
1 1
5H
30% SUBMITTAL
NOTE 3
AF-521
TYP.
AF-521
TYP.
95% SUBMITTAL 10/09/06
2B
AF-521
FINAL SUBMITTAL 11/11/06
DZ, JH, OO
GW
NOTE 7
NOTE 7
NOTE 7NOTE 7
REVISION #11 02/14/07
MECHANICAL
EQUIPMENT,
SEE "MH"
DRAWINGS
2 REVISION #2 04/17/07
1. SEE IF-601 FOR WALL TYPES.
2. SEE IF-611 FOR DOOR INFORMATION.
3. ALIGN FINISHED FACES.
4. SEE PL-107 FOR FLOOR DRAINS AND ROOF DRAINS.
5. SEE SF-107 FOR HOUSEKEEPING PADS
6. SEE STRUCTURAL DRAWINGS FOR WALL THICKNESSES.
7. CONTAINMENT CURB - SEE STRUCTURAL DRAWINGS
8. SHIPS LADDER SHALL BE ROYALITE MODEL SLL60
OR EQUAL, ALUMINUM, 60 MAX. MUST COMPLY WITH
REQUIREMENTS OF ASME A17.1.
REVISION #4 04/15/083
REVISION #5 05/26/084
5 REVISION #6
07/04/08
RECORD DOCUMENT 12/25/09
o n e e ig h t h in c h o n e f o o t 1
B
A
C
D
E
F t h r e e in c h e s e f o o t o n e a d a lf in c h s e f o o t o n e in e f o o t t h r q u a r t e r s in e f o o t o a lf in e f o o t t h r e e e ig h t h s in e f o o t o q u a r t e r in e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
A
M
M
FA
G
EXISTING VA HOSPITAL
ADDITION
Office of
Facilities
Management
FULLY SPRINKLERED
SHEET TITLE PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBERSCALE PROJECT
NORTH
TRUE
NORTH
DATE
DRAWN
STAMPKEY PLANDATE
CHECKED
CONSULTANTS: PROJECT NAME
HEERY INTERNATIONAL, INC.
999 PEACHTREE STREET, NE
ATLANTA, GEORGIA 30309
0 8’ 16’
1/8" = 1’-0"
NEW
EQUIPMENT SYSTEMS PLANNING, INC.
DEARINGER CENTER
601 ANSON STREET, SUITE 101
SALEM, IN 47167
DEPARTMENT OF VETERANS AFFAIRS
NEW PATIENT BED BUILDING
SAN JUAN, PUERTO RICO
N/A
05181-01
ISSUES
EQUIPMENT SYSTEMS PLANNING, INC.
08/21/06
FINAL SUBMITTAL
A B C D E F G H J K L MA.8 K.8
3’-10" 2’-4"
6’-4"
1.2
1.3
F.3
27’-4"25’-0"25’-0"25’-0"25’-0""2
19’-8"2
10’-325’-0"25’-0"25’-0"25’-0"27’-4"
S7-3
STAIR
S7-1
S7-2
PH-6
SWITCHGEAR ROOM
EMERGENCY
PH-2
SWITCHGEAR ROOM
CPH-1
CORRIDOR
PH-1
ELEVATOR
MACHINE ROOM
DN
ELEVATOR SHAFT
BELOW
54’-4"
71’-6"
12’-10"
67’-4"6’-0"
6’-6"
69’-4"
155’-0"2’-4"
31’-4"
5’-6"
RD
RD
RD
RD RD RD RD
RD
76’-8"
SCUPPER
SCUPPER SCUPPER
SCUPPER
4’-6"
4’-6"
TYP.
T Y
P
10"
"4
DN
DN
UP
6’-10"
1’-11"
1’-10"
4’-4"
2’-0"
TYP.
2’-0"
TYP.
RD
2’-0"
TYP.
2’-0"
TYP.
10"
7’-2" 9’-0" 9’-10" 21’-4" 2’-8" 6’-4" 18’-8"
DN
3 4
SS28
1 4
S 43
S 2
ELEVATOR SHAFT
BELOW
1 10
S 13
ELEVATOR SHAFT
BELOW
10’-0"
LOUVER
S 83
NOTE 4
CAGE
LADDER
COOLING TOWER,
SEE MH-107
1 8
S1
"6
DN
AF-402
AF-403
AF-401
AF-401
PH-3
MECHANICAL ROOM
4’-6"
UPPER ELEVATOR MACHINE
ROOM ABOVE
PH-4
CONTROL ROOM
S 13
3 10
F
F
1 10
F
CL
" 1
ALIGN
FEC
FE
FE
FEC
FEC
FE
FE
FE
FEC
12" WIDE X 8" DEEP
SCUPPER, TYP.
12" WIDE X 8" DEEP
SCUPPER, TYP.
129’-8"
25’-0"12’-0"11’-0"16’-0"4’-6"10"
COOLING TOWER
SUPPORT, TYP.
SEE SS-504
12" WIDE X
8" DEEP
SCUPPER, TYP.
COOLING TOWER
SUPPORT, TYP.
SEE SS-504
FLOOR OPENING, TYP.
SEE STRUCTURE
8’-10"9’-0"9’-10"21’-4" 4’-8"
6’-4"15’-0" 2’-8"
21’-4"4’-4"25’-0"5’-6"19’-0"
2’-2"
10"
3’-8" 29’-8" 1’-4"
UPSHIPS LADDER
SEE NOTE 8
BASE FLASHING AND
STUCCO FINISH ON
ALL FACES OF WALL
1 10
Z-3,Z-3
3’-6"
7’-0"
2’-0"
12’-0"42’-0"
PH-7
MACHINE ROOM
40’-10"
UPPER ELEVATOR
ELEVATOR
SHAFT
BELOW
OPEN TO BELOW
GUARD
RAIL
F G
10’-0"
1.2
1.3
OPENING IN
RAIL
10"
1’-0"6’-0" 6’-0" 6’-0" 6’-0" 6’-0" 6’-0"
2’-3"
3"
SHIPS LADDER
SEE NOTE 8
AF-301
AF-201
AF-201
AF-201
AF-201
| References |
| gg_ab01, gg_ab01-0518101-ATL.dgn, Default |
| s_nsg01, C: |
| _HII_PRJ |
| new-job |
| s_nsg01-0518101-ATL.dgn, Default |
| s_ncp07, C: |
| _HII_PRJ |
| new-job |
| s_ncp07-0518101-ATL.dgn, Default |
| a_ncp07, C: |
| _HII_PRJ |
| new-job |
| a_ncp07-0518101-ATL.dgn, Default |
| a_nfp07, C: |
| _HII_PRJ |
| new-job |
| a_nfp07-0518101-ATL.dgn, Default |
| i_nup07, C: |
| _HII_PRJ |
| new-job |
| i_nup07-0518101-ATL.dgn, Default |
| a_ncp07m, a_ncp07m-0518101-ATL.dgn, Default |
| section, a_section marker.dgn, Default |
| m_nhp07-0518101-ATL.dgn, Default |
File details come from the government source that posted it. Updated .