About this file

This document is a floor plan for a fifth floor renovation project at a Department of Veterans Affairs medical facility in Puerto Rico. The floor plan shows the layout of the fifth floor, including dimensions of rooms and corridors. Key areas include stairwells, future patient rooms, existing patient rooms to remain, balconies, and other clinical support spaces. Renovation details such as wall types, door information, and sprinkler notes are indicated on the plan. The project number, dates, and design team members are also provided on the sheet.

View the file

Other files

File Type Posted
AMENDMENT 36C24820R0037 A00001.pdf PDF
S05 QA RFP 36C24820R0037.pdf PDF
13 - SBT-4.pdf PDF
15 - SBT-6.pdf PDF
5 - MOPC.pdf PDF
10 - SBT-1.pdf PDF
JANITORIAL SERVICES PRICING SCHEDULE.xlsx XLSX spreadsheet
6 - OPA- B.pdf PDF
8 - OPA-2.pdf PDF
17 - SBT-PH.pdf PDF
3 - MAIN 0-FLOOR.pdf PDF
S02 RFP 36C24820R0037 JANITORIAL SERVICES (06-24-2020).pdf PDF
9 - POPC.pdf PDF
2 - CLC-2.pdf PDF
16 - SBT-B.pdf PDF
1 - CLC-1.pdf PDF
7 - OPA-1.pdf PDF
11 - SBT-2.pdf PDF
4 - MAIN 1-FLOOR.pdf PDF
12 - SBT-3.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S S

FIFTH FLOOR PLAN

AF-105

08/21/06

NOTE 3

1B

NOTES:

30% SUBMITTAL

FIFTH FLOOR PLAN

SCALE: 1/8" = 1’-0"

AF-105

1 1A

2 2

2 2

1. SEE IF-601 FOR WALL TYPES.

2. SEE IF-611 FOR DOOR INFORMATION.

3. ALIGN FINISHED FACES.

1B

AF-501

AF-501

95% SUBMITTAL 10/09/06

2A

2B

FINAL SUBMITTAL 11/11/06

DZ, JH, OO

GW

RECORD DOCUMENT 12/25/09

o n e e ig h t h in c h o n e f o o t 1

B

A

C

D

E

F t h r e e in c h e s e f o o t o n e a d a lf in c h s e f o o t o n e in e f o o t t h r q u a r t e r s in e f o o t o a lf in e f o o t t h r e e e ig h t h s in e f o o t o q u a r t e r in e f o o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

A

M

M

FA

G

EXISTING VA HOSPITAL

ADDITION

Office of

Facilities

Management

FULLY SPRINKLERED

SHEET TITLE PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBERSCALE PROJECT

NORTH

TRUE

NORTH

DATE

DRAWN

STAMPKEY PLANDATE

CHECKED

CONSULTANTS: PROJECT NAME

HEERY INTERNATIONAL, INC.

999 PEACHTREE STREET, NE

ATLANTA, GEORGIA 30309

0 8’ 16’

1/8" = 1’-0"

NEW

EQUIPMENT SYSTEMS PLANNING, INC.

DEARINGER CENTER

601 ANSON STREET, SUITE 101

SALEM, IN 47167

DEPARTMENT OF VETERANS AFFAIRS

NEW PATIENT BED BUILDING

SAN JUAN, PUERTO RICO

N/A

05181-01

ISSUES

EQUIPMENT SYSTEMS PLANNING, INC.

08/21/06

FINAL SUBMITTAL

A B C D E F G H J K L MA.8 K.8

3’-10" 2’-4"

6’-4"

1.2

1.3

F.3

27’-4"25’-0"25’-0"25’-0"25’-0""2

19’-8"2

10’-325’-0"25’-0"25’-0"25’-0"27’-4"

STAIR

S5-2

S5-1

S5-3

1’-2"

5’-7"5’-8"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"5’-9"

16’-10"15’-6"

71’-6"

6’-6"

5’-9"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"5’-9"

117’-4"

5’-9"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"5’-11"10’-0"

5’-9"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"

"2

3’-3

5’-8"

"2

3’-3

5’-8"8"

S3

FUTURE

P3 P4 P5

FUTURE

P1 P2

32’-0"5’-8"33’-10"

10"

"4

S1S2

UP

DN

10’-0"

S TT

RAILING

SLOPE DOWN

12’-0"

UP DN

UPDN

AF-402

AF-403

AF-403

AF-401

AF-401

F

1 10

S 83

F

3 10

F

3 10

SIM.

BALCONY

FLOOR OPENING, TYP.

SEE STRUCTURE

FLOOR OPENING, TYP.

SEE STRUCTURE

AF-301

AF-201

AF-201

AF-201

AF-201

References
gg_ab01, gg_ab01-0518101-ATL.dgn, Default
s_nsg01, C:
_HII_PRJ
new-job
s_nsg01-0518101-ATL.dgn, Default
s_ncp05, C:
_HII_PRJ
new-job
s_ncp05-0518101-ATL.dgn, Default
a_ncp05, C:
_HII_PRJ
new-job
a_ncp05-0518101-ATL.dgn, Default

section marker, a_section marker.dgn, Default

File details come from the government source that posted it. Updated .