About this file

This document is a floor plan for a third floor patient bed building addition to an existing VA hospital in San Juan, Puerto Rico. The floor plan depicts the layout of the third floor including room dimensions, stairwells, smoke and fire partitions, and other relevant architectural details. Key areas on the third floor include patient rooms, nurses stations, support spaces, and stairwell access to other floors. The floor plan is labeled with a scale of 1/8 inch equal to 1 foot and includes a legend defining drawing conventions. Relevant details are provided in notes on the plan.

View the file

Other files

File Type Posted
AMENDMENT 36C24820R0037 A00001.pdf PDF
S05 QA RFP 36C24820R0037.pdf PDF
13 - SBT-4.pdf PDF
15 - SBT-6.pdf PDF
5 - MOPC.pdf PDF
10 - SBT-1.pdf PDF
JANITORIAL SERVICES PRICING SCHEDULE.xlsx XLSX spreadsheet
6 - OPA- B.pdf PDF
8 - OPA-2.pdf PDF
17 - SBT-PH.pdf PDF
3 - MAIN 0-FLOOR.pdf PDF
S02 RFP 36C24820R0037 JANITORIAL SERVICES (06-24-2020).pdf PDF
9 - POPC.pdf PDF
2 - CLC-2.pdf PDF
16 - SBT-B.pdf PDF
1 - CLC-1.pdf PDF
7 - OPA-1.pdf PDF
11 - SBT-2.pdf PDF
14 - SBT-5.pdf PDF
4 - MAIN 1-FLOOR.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S S

THIRD FLOOR PLAN

AF-103

EJ-6

NOTE 3

1B

NOTES:

SMOKE PARTITION

1-HOUR RATED FIRE & SMOKE PARTITION

1-HOUR RATED

2-HOUR RATED

DEPRESSED SLAB (SEE STRUC.)

2-HOUR RATED FIRE & SMOKE PARTITION

PARTITIONS

OVERALL PLAN LEGEND

THIRD FLOOR PLAN

SCALE: 1/8" = 1’-0"

AF-103

1 1

1B

1 1A

2 2

30% SUBMITTAL 08/2106

AF-501

AF-501

95% SUBMITTAL 10/09/06

2A

2B

1. SEE IF-601 FOR WALL TYPES.

2. SEE IF-611 FOR DOOR INFORMATION.

3. ALIGN FINISHED FACES.

NEW SUN SHADE

BELOW

NEW SUN SHADE

BELOW

FINAL SUBMITTAL 11/11/06

DZ, JH, OO

GW

RECORD DOCUMENT 12/25/09

o n e e ig h t h in c h o n e f o o t 1

B

A

C

D

E

F t h r e e in c h e s e f o o t o n e a d a lf in c h s e f o o t o n e in e f o o t t h r q u a r t e r s in e f o o t o a lf in e f o o t t h r e e e ig h t h s in e f o o t o q u a r t e r in e f o o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

A

M

M

FA

G

EXISTING VA HOSPITAL

ADDITION

Office of

Facilities

Management

FULLY SPRINKLERED

SHEET TITLE PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBERSCALE PROJECT

NORTH

TRUE

NORTH

DATE

DRAWN

STAMPKEY PLANDATE

CHECKED

CONSULTANTS: PROJECT NAME

HEERY INTERNATIONAL, INC.

999 PEACHTREE STREET, NE

ATLANTA, GEORGIA 30309

0 8’ 16’

1/8" = 1’-0"

NEW

EQUIPMENT SYSTEMS PLANNING, INC.

DEARINGER CENTER

601 ANSON STREET, SUITE 101

SALEM, IN 47167

DEPARTMENT OF VETERANS AFFAIRS

NEW PATIENT BED BUILDING

SAN JUAN, PUERTO RICO

N/A

05181-01

ISSUES

EQUIPMENT SYSTEMS PLANNING, INC.

08/21/06

FINAL SUBMITTAL

A B C D E F G H J K L MA.8 K.8

3’-10" 2’-4"

6’-4"

1.2

1.3

F.3

27’-4"25’-0"25’-0"25’-0"25’-0""2

19’-8"2

10’-325’-0"25’-0"25’-0"25’-0"27’-4"

STAIR

S3-2

S3-1

S3-3

STAIR

155’-0"

111’-4"

1’-2"

5’-7"5’-8"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"5’-9"

16’-10"15’-6"

6’-6"

71’-6"

117’-4"

5’-9"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"5’-11"10’-0"

2’-4"

8"

5’-8"

"2

3’-3

5’-8"

"2

3’-3

5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 5’-9"

S3

FUTURE

S1S2

UP DN

DN

UP

RAILING

DN

P3 P4

P2P1

P5

FUTURE

"4

310"

S TT

10’-0"

3 4

12’-0"

SLOPE DOWN

33’-4"

4’-4"

33’-10"

UPDN

AF-401

AF-402

AF-403

AF-403

AF-401

F

3 10

S 83

F

1 10

F

3 10

5’-9" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 5’-9"

X

BALCONY

FLOOR OPENING, TYP.

SEE STRUCTURE

FLOOR OPENING, TYP.

SEE STRUCTURE

SEE STRUCTURAL DWGS. FOR

HOUSEKEEPING PAD

LOCATIONS AND DETAILS

AF-301

AF-201

AF-201

AF-201

AF-201

EXISTING ROOF

References
gg_ab01, gg_ab01-0518101-ATL.dgn, Default
s_nsg01, C:
_HII_PRJ
new-job
s_nsg01-0518101-ATL.dgn, Default
s_ncp03, C:
_HII_PRJ
new-job
s_ncp03-0518101-ATL.dgn, Default
a_ncp03, C:
_HII_PRJ
new-job
a_ncp03-0518101-ATL.dgn, Default
a_dcp03, a_dcp03-0518101-ATL.dgn, Model
section marker, a_section marker.dgn, Default

File details come from the government source that posted it. Updated .