12 - SBT-3.pdf
PDF 586 KB Posted
- Attached to
- Amendment RFP 36C24820R0037 A00001 - Questions & Answers - Janitorial Services at VACHS, SBT, POPC, and MOPC
- Solicitation number
- 36C24820R0037
About this file
This document is a floor plan for a third floor patient bed building addition to an existing VA hospital in San Juan, Puerto Rico. The floor plan depicts the layout of the third floor including room dimensions, stairwells, smoke and fire partitions, and other relevant architectural details. Key areas on the third floor include patient rooms, nurses stations, support spaces, and stairwell access to other floors. The floor plan is labeled with a scale of 1/8 inch equal to 1 foot and includes a legend defining drawing conventions. Relevant details are provided in notes on the plan.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 36C24820R0037 A00001.pdf | ||
| S05 QA RFP 36C24820R0037.pdf | ||
| 13 - SBT-4.pdf | ||
| 15 - SBT-6.pdf | ||
| 5 - MOPC.pdf | ||
| 10 - SBT-1.pdf | ||
| JANITORIAL SERVICES PRICING SCHEDULE.xlsx | XLSX spreadsheet | |
| 6 - OPA- B.pdf | ||
| 8 - OPA-2.pdf | ||
| 17 - SBT-PH.pdf | ||
| 3 - MAIN 0-FLOOR.pdf | ||
| S02 RFP 36C24820R0037 JANITORIAL SERVICES (06-24-2020).pdf | ||
| 9 - POPC.pdf | ||
| 2 - CLC-2.pdf | ||
| 16 - SBT-B.pdf | ||
| 1 - CLC-1.pdf | ||
| 7 - OPA-1.pdf | ||
| 11 - SBT-2.pdf | ||
| 14 - SBT-5.pdf | ||
| 4 - MAIN 1-FLOOR.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S S
THIRD FLOOR PLAN
AF-103
EJ-6
NOTE 3
1B
NOTES:
SMOKE PARTITION
1-HOUR RATED FIRE & SMOKE PARTITION
1-HOUR RATED
2-HOUR RATED
DEPRESSED SLAB (SEE STRUC.)
2-HOUR RATED FIRE & SMOKE PARTITION
PARTITIONS
OVERALL PLAN LEGEND
THIRD FLOOR PLAN
SCALE: 1/8" = 1’-0"
AF-103
1 1
1B
1 1A
2 2
30% SUBMITTAL 08/2106
AF-501
AF-501
95% SUBMITTAL 10/09/06
2A
2B
1. SEE IF-601 FOR WALL TYPES.
2. SEE IF-611 FOR DOOR INFORMATION.
3. ALIGN FINISHED FACES.
NEW SUN SHADE
BELOW
NEW SUN SHADE
BELOW
FINAL SUBMITTAL 11/11/06
DZ, JH, OO
GW
RECORD DOCUMENT 12/25/09
o n e e ig h t h in c h o n e f o o t 1
B
A
C
D
E
F t h r e e in c h e s e f o o t o n e a d a lf in c h s e f o o t o n e in e f o o t t h r q u a r t e r s in e f o o t o a lf in e f o o t t h r e e e ig h t h s in e f o o t o q u a r t e r in e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
A
M
M
FA
G
EXISTING VA HOSPITAL
ADDITION
Office of
Facilities
Management
FULLY SPRINKLERED
SHEET TITLE PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBERSCALE PROJECT
NORTH
TRUE
NORTH
DATE
DRAWN
STAMPKEY PLANDATE
CHECKED
CONSULTANTS: PROJECT NAME
HEERY INTERNATIONAL, INC.
999 PEACHTREE STREET, NE
ATLANTA, GEORGIA 30309
0 8’ 16’
1/8" = 1’-0"
NEW
EQUIPMENT SYSTEMS PLANNING, INC.
DEARINGER CENTER
601 ANSON STREET, SUITE 101
SALEM, IN 47167
DEPARTMENT OF VETERANS AFFAIRS
NEW PATIENT BED BUILDING
SAN JUAN, PUERTO RICO
N/A
05181-01
ISSUES
EQUIPMENT SYSTEMS PLANNING, INC.
08/21/06
FINAL SUBMITTAL
A B C D E F G H J K L MA.8 K.8
3’-10" 2’-4"
6’-4"
1.2
1.3
F.3
27’-4"25’-0"25’-0"25’-0"25’-0""2
19’-8"2
10’-325’-0"25’-0"25’-0"25’-0"27’-4"
STAIR
S3-2
S3-1
S3-3
STAIR
155’-0"
111’-4"
1’-2"
5’-7"5’-8"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"5’-9"
16’-10"15’-6"
6’-6"
71’-6"
117’-4"
5’-9"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"5’-11"10’-0"
2’-4"
8"
5’-8"
"2
3’-3
5’-8"
"2
3’-3
5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 5’-9"
S3
FUTURE
S1S2
UP DN
DN
UP
RAILING
DN
P3 P4
P2P1
P5
FUTURE
"4
310"
S TT
10’-0"
3 4
12’-0"
SLOPE DOWN
33’-4"
4’-4"
33’-10"
UPDN
AF-401
AF-402
AF-403
AF-403
AF-401
F
3 10
S 83
F
1 10
F
3 10
5’-9" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 5’-9"
X
BALCONY
FLOOR OPENING, TYP.
SEE STRUCTURE
FLOOR OPENING, TYP.
SEE STRUCTURE
SEE STRUCTURAL DWGS. FOR
HOUSEKEEPING PAD
LOCATIONS AND DETAILS
AF-301
AF-201
AF-201
AF-201
AF-201
EXISTING ROOF
| References |
| gg_ab01, gg_ab01-0518101-ATL.dgn, Default |
| s_nsg01, C: |
| _HII_PRJ |
| new-job |
| s_nsg01-0518101-ATL.dgn, Default |
| s_ncp03, C: |
| _HII_PRJ |
| new-job |
| s_ncp03-0518101-ATL.dgn, Default |
| a_ncp03, C: |
| _HII_PRJ |
| new-job |
| a_ncp03-0518101-ATL.dgn, Default |
| a_dcp03, a_dcp03-0518101-ATL.dgn, Model |
| section marker, a_section marker.dgn, Default |
File details come from the government source that posted it. Updated .