10 - SBT-1.pdf
PDF 788 KB Posted
- Attached to
- Amendment RFP 36C24820R0037 A00001 - Questions & Answers - Janitorial Services at VACHS, SBT, POPC, and MOPC
- Solicitation number
- 36C24820R0037
About this file
This is a request for proposal for janitorial services at four Department of Veterans Affairs medical facilities in Puerto Rico. The solicitation seeks offers for cleaning and maintenance services at the Veterans Affairs Caribbean Healthcare System in San Juan, the Ponce Outpatient Clinic, the Mayaguez Outpatient Clinic, and the Arecibo Community Based Outpatient Clinic. Offerors must provide all labor, supervision, equipment, materials and supplies necessary to perform daily, weekly, monthly and annual cleaning tasks. The contract term is one base year with four one-year options and has a small business set-aside designation. Proposals are due by February 4th, 2022 and the agency anticipates making an award by March 18th, 2022. Pricing will be fixed-price for the base and option years. The incumbent contractors are identified for information purposes only.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT 36C24820R0037 A00001.pdf | ||
| S05 QA RFP 36C24820R0037.pdf | ||
| 13 - SBT-4.pdf | ||
| 15 - SBT-6.pdf | ||
| 5 - MOPC.pdf | ||
| JANITORIAL SERVICES PRICING SCHEDULE.xlsx | XLSX spreadsheet | |
| 6 - OPA- B.pdf | ||
| 8 - OPA-2.pdf | ||
| 17 - SBT-PH.pdf | ||
| 3 - MAIN 0-FLOOR.pdf | ||
| S02 RFP 36C24820R0037 JANITORIAL SERVICES (06-24-2020).pdf | ||
| 9 - POPC.pdf | ||
| 2 - CLC-2.pdf | ||
| 16 - SBT-B.pdf | ||
| 1 - CLC-1.pdf | ||
| 7 - OPA-1.pdf | ||
| 11 - SBT-2.pdf | ||
| 14 - SBT-5.pdf | ||
| 4 - MAIN 1-FLOOR.pdf | ||
| 12 - SBT-3.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S S
B-146a
C-125b C-126a
C-139a C-139b
C-139g C-135c
C-135d
B-147a
113.20n.s.f.
87.65n.s.f.
357.90n.s.f.
126.98n.s.f.
52.91n.s.f.
114.63n.s.f.141.75n.s.f.
242.96n.s.f.
BATHROOM ADMINISTRATION
SPACE
CLINIC
ROOM
EXAM
TOILET
OFFICE CHIEF
OF FISCAL
COHERENCE ROOM
BUDGET ADM.
CHIEF
V A OV A OV A O V A O V A O V A O V A O V A O
FIRST FLOOR PLAN
AF-101
08/21/06
EJ-4
EJ-2
EJ-1EJ-1
1B
1B
EJ-3
NOTE 38’-0"
"4
1’-1
NOTE 4
NOTE 6
EJ-2
NOTE 6
NOTES:
NOTE 5
SMOKE PARTITION
1-HOUR RATED FIRE & SMOKE PARTITION
1-HOUR RATED
2-HOUR RATED
DEPRESSED SLAB (SEE STRUC.)
2-HOUR RATED FIRE & SMOKE PARTITION
PARTITIONS
OVERALL PLAN LEGEND
30% SUBMITTAL
FIRST FLOOR PLAN
SCALE: 1/8" = 1’-0"
AF-101
NOTE 6
MECH. PIPES
1 1
1A
AF-501
AF-501
2B
2A
AF-406
1A
F Je
10’-0"
EJ-3
95% SUBMITTAL 10/09/06
1. SEE IF-601 FOR WALL TYPES.
2. SEE IF-611 FOR DOOR INFORMATION.
3. ALIGN FINISHED FACES.
4. ALIGN FACE OF WALL WITH COLUMN GRID.
5. ALIGN TOP OF NEW BASEMENT FLOOR SLAB WITH
TOP OF EXISTING BASEMENT FLOOR SLAB. ALIGN
TOP OF NEW FIRST FLOOR SLAB WITH TOP OF EXISTING
FIRST FLOOR SLAB. FIELD VERIFY EXISTING SLAB ELEVATIONS.
6. RECESSED WALK-OFF MAT. BASIS OF DESIGN: KADEE INDUSTRIES
MODELKD98, SSS CLEAN TREAD, 1 1/8" ROLL-UP STAINLESS
STEEL RAIL HINGED MATERIAL (TYPE 304 STAINLESS STEEL).
REFER TO MANUFACTURER’S STANDARD SPECOFOCATIONS.
COORDINATE SLAB DEPRESSION WITH MAT AND FLOOR FINISH.
SEE SHEET AF-403 FOR DIMENSIONS.
1B
1B
FINAL SUBMITTAL 11/11/06
DZ, JH, OO
GW
1 REVISION #2 04/17/07
SLAB DEPRESSION, TYP.
SEE SF-101
REVISION #3 05/13/07 2
2 2
RECORD DOCUMENT 12/25/09
o n e e ig h t h in c h o n e f o o t 1
B
A
C
D
E
F t h r e e in c h e s e f o o t o n e a d a lf in c h s e f o o t o n e in e f o o t t h r q u a r t e r s in e f o o t o a lf in e f o o t t h r e e e ig h t h s in e f o o t o q u a r t e r in e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
A
M
M
FA
G
EXISTING VA HOSPITAL
ADDITION
Office of
Facilities
Management
FULLY SPRINKLERED
SHEET TITLE PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBERSCALE PROJECT
NORTH
TRUE
NORTH
DATE
DRAWN
STAMPKEY PLANDATE
CHECKED
CONSULTANTS: PROJECT NAME
HEERY INTERNATIONAL, INC.
999 PEACHTREE STREET, NE
ATLANTA, GEORGIA 30309
0 8’ 16’
1/8" = 1’-0"
NEW
EQUIPMENT SYSTEMS PLANNING, INC.
DEARINGER CENTER
601 ANSON STREET, SUITE 101
SALEM, IN 47167
DEPARTMENT OF VETERANS AFFAIRS
NEW PATIENT BED BUILDING
SAN JUAN, PUERTO RICO
N/A
05181-01
ISSUES
EQUIPMENT SYSTEMS PLANNING, INC.
08/21/06
FINAL SUBMITTAL
A B C D E F G H J K L MA.8 K.8
3’-10" 2’-4"
6’-4"
1.2
1.3
F.3
27’-4"25’-0"25’-0"25’-0"25’-0""2
19’-8"2
10’-325’-0"25’-0"25’-0"25’-0"27’-4"
C1
Cd
Cc
Cb
Ca
S1-3
STAIR
S1-2
S1-1
P1 P2
P5
FUTURE
P4P3
7’-2"17’-4"7’-3"5’-8"19’-4"5’-8"6’-2"6’-5"30’-8"
6’-6"
22’-6"9’-10"
3’-4"
S3
FUTURE
10’-0" 10"
DN
UP
DN
5’-11" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8"
6’-10"
5’-8"
6’-10" 5’-8" 6’-10" 5’-8" 6’-10" 5’-8" 5’-4" 6’-5" 19’-0"
UP
UP
8" 8"
8" 8"
X
S TT
UU
S
S TT
S TT
Z1
S
S
RAILING ON
TOP OF WALL
5’-4"
5’-0"
AF-402
AF-403
AF-401
AF-404
AF-401
AF-403
AF-403
AF-401
AF-403
NEW SUNSHADE
16’-0" 71’-6" 6"
TT
SS
TT
F
5’-9"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"6’-10"5’-8"8’-7"10’-0"2’-4"
5’-9"5’-8"19’-4"5’-8"6’-10"5’-8"19’-4"5’-8"6’-10"5’-8"19’-4"5’-8"6’-10"5’-8"5’-9"
LINE OF
BALCONY
ABOVE
SS
"4
1’-1
8’-0"
"8
1’-5
9’-0" "8
10’-5 10’-0"
EQ.EQ.
TT,P
NEW SUN SHADE
TT,P
C1-2A
VESTIBULE
ACCESS TO STORAGE TANK,
SEE CIVIL DRAWINGS
FOR MANHOLE DETAIL
4’- 0"
S1S2
EXISTING FIRE DEPT.
CONNECTION TO BE
RELOCATED. SEE CU-101.
TT,P
AF-301
AF-201
AF-201
AF-201
AF-201
| References |
| gg_ab01, gg_ab01-0518101-ATL.dgn, Default |
| s_nsg01, C: |
| _HII_PRJ |
| new-job |
| s_nsg01-0518101-ATL.dgn, Default |
| s_ncp01, C: |
| _HII_PRJ |
| new-job |
| s_ncp01-0518101-ATL.dgn, Default |
| a_ncp01, C: |
| _HII_PRJ |
| new-job |
| a_ncp01-0518101-ATL.dgn, Default |
| dcp0b, a_dcp01-0518101-ATL.dgn, Default |
| a_section marker.dgn, Default |
| c_nsp01-0518101-ATL.dgn |
File details come from the government source that posted it. Updated .