This is Addendum #6R (revised) for the Saginaw Correctional Facility Entrance Door Replacement and Masonry Repairs project (File No. 472/16419.APL) issued by the State of Michigan Department of Corrections. The project involves removal and replacement of existing hollow metal security doors and frames, aluminum entrances and storefront, automatic hollow metal sliding security gates, and masonry repairs to various facility buildings within the secured perimeter. The bid opening date is February 7, 2018 at 2:00 pm local time, with bids to be submitted electronically through the SIGMA VSS website. The project schedule indicates work will begin after March 28, 2018, with sliding security entrances to be completed within 30 days during facilities third work shift, and masonry repair work and entrance door replacement to start April 16, 2018 with completion by August 13, 2018.

The addendum revises several technical specifications including adding Section 083463 "Detention Doors and Frames" and deleting Section 084229 "Sliding Automatic Entrances." Door hardware sets are modified for doors 100-S1 through 100-S4, with detailed specifications for locking devices, manual release columns, electric key switches, door guides, and pulls. The project includes three deductive alternates: deletion of certain hollow metal door/frame replacements, deletion of masonry repairs to partial west elevation of Building 100, and removal/replacement of sliding detention door 100-S2. Current prevailing wage rates apply and are available through the SIGMA VSS system. A performance bond and payment bond are required for all bids over $50,000.

View the file

Other files

File Type Posted
16419 Addendum 4.pdf PDF
Drawings.pdf PDF
16419 Addendum 1 R pgs 1-33.pdf PDF
IMPORTANT NOTICE - SIGMA VSS 170830.pdf PDF
16419 Addendum 2.pdf PDF
Advertisement.pdf PDF
LEIN Form.pdf PDF
16419 Addendum 3.pdf PDF
Specifications.pdf PDF
Wage Rates (Updated).pdf PDF
16419 Addendum 5.pdf PDF
16419 Addendum 1 R pgs 34-67.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Saginaw Correctional Facility Addendum #6R Entrance Door Replacement and January 30, 2018 Masonry Repairs Page 1 of 5

ADDENDUM

Project Name: Saginaw Correctional Facility Addendum No: Six Revised (6R) Entrance Door Replacement and Masonry Repairs

SOM File Number: 472/16419.APL SOM Index No.: 46630 PIA Project Number: 17-134 Issue Date: January 30, 2018

Project Location: Freeland, Michigan .

To the Contract Documents for the requested Entrance Door Replacement and Masonry Repairs at Saginaw Correctional Facility. This Addendum forms a part of the above described Contract Documents and supersedes, supplements or clarifies parts thereof to the extent defined by the terms set forth in this Addendum.

Note:

Addendum #6, issued previously on January 25, 2016 is deleted in entirety.

This Addendum consists of five (5) typed pages and the following attachments:

Specifications / Project Manual o Bid Summary Form and Bid Schedules o Table of Contents

Drawings:

o A0-03 “SK-1” - Door Schedules, Frame and Door Types, Special Frame Details o A1-01 “SK-2” - Enlarged Door Area Floor Plans – Demo, Buildings 100, 200 o A3-01 “SK-3” - Enlarged Door Area Floor Plans – New, Buildings 100, 200 o E1-01 “SK-4” - Enlarged Door Area Power Plans – Demo o E3-01 “SK-5” - Enlarged Door Area Power Plans – New

PROJECT MANUAL / SPECIFICATIONS

Item # Description

Item SP-1 Bid Summary (revised, and reissued this addendum):

A. REVISE “Bid Summary and Bid Schedules” form as follows:

1. REVISE “ Bid Opening Date” to read:

February 7, 2018, at 2:00 pm local time.

Item SP-2 Table of Contents, (revised, and reissued this addendum):

A. REVISE Table of Contents “Division 8 - Openings” as follows:

1. ADD Section 083463 “Detention Doors and Frames”.

2. DELETE Section 084229 “Sliding Automatic Entrances”.

Masonry Repairs Page 2 of 5

Item SP-3 Section 00010 – Pre-Bid information, (revised but not reissued this addendum):

A. REVISE “Pre-Bid Information paragraph #1, “Invitation to Bid” as follows:

1. REVISE to read:

The State of Michigan as the Owner will receive bids electronically through the SIGMA VSS website at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService, for Department of Corrections Saginaw Correctional - Entrance Door Replacement and Masonry Repairs until 2:00 p.m., local time, on February 7, 2018.

B. REVISE “Pre-Bid Conference, paragraph #5, as follows:

1. REVISE “Contact Person, paragraph #8, as follows:

“Questions will be accepted until February 2, 2018 at 1:00 pm

Item SP-4 Section 00100 – Instructions to Bidders (revised but not reissued this addendum):

A. Paragraph 22, Contract Time, revise schedule to read as follows:

Project Schedule:

Pre-Bid Walk-Through Inspection October 25, 2017 1:00 P.M.

Second Pre-Bid Walk-thru December 6, 2017 1:00 P.M Last Date for Questions February 2, 2018 1:00 P.M.

Bid Due Date February 7, 2018 2:00 P.M Administrative Board of Contract Approval March 13, 2018 Executed Contract with Contractor March 28, 2018 Sliding Security Entrances Start (30 day completion) Anytime this winter/spring

(during facilities third work shift) Sliding Security Entrances Completed Start plus 30 days total Masonry Repair Work Starts (120 days Completion) April 16, 2018 Entrance Door Replacement Starts (120 days Completion) April 16, 2018 (Start date allows for submittal review and fabrication lead time.

Contractor to provide two crews for entrance door replacement work) Masonry Repair Work completed August 13, 2018 Entrance Door Replacement Completion August 13, 2018

Item SP-5 Section 01300 Submittals, (revised, but not reissued this addendum):

A. REVISE Section 01300 Submittals, “Shop Drawings” as follows:

1. ADD - Detention Doors and Frames Section 083463

2. DELETE Sliding Automatic Entrances. Section 084229

B. REVISE Section 01300 Submittals, “Samples” as follows:

1. ADD - Detention Doors and Frames Section 083463

2. DELETE Sliding Automatic Entrances. Section 084229

Item SP-6 Section 087100 - Door Hardware Schedule (revised, but not re-issued):

A. 3.8 - Door Hardware Sets, revise as follows:

1. REVISE Hardware Set #1.1, as follows:

https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService

Masonry Repairs Page 3 of 5

(Note: Bold Face / underlined text denotes revised hardware text):

Set: 1.1 Doors: 100-S1, 100-S2, 100-S4

1 EA Locking Device E1 – Rack Drive Willo or Equiv.

1 EA Manual Release Column w/ #10 Deadlock keyed two sides Willo or Equiv.

2 EA Electric Key Switch Both sides of door 1 EA Door Guide Wall Mtd. by Manuf. to HM Framing Willo or Equiv.

1 EA Door Guide Angle Mtd. to bott. of door Willo or Equiv.

1 EA Raised Pull 701 Door Operator Side 626 Port/Midwest

1 EA Recessed Pull 705 Opposite Side or Integral pull by door manufacturer

626 Port/Midwest

2. REVISE Hardware Set,#1.2 as follows:

(Note: Bold Face / underlined text denotes revised hardware text):

Set: 1.2 Doors: 100-S3

1 EA Locking Device E1 – Rack Drive Willo or Equiv.

1 EA Manual Release Column w/ #10 Deadlock keyed two sides Willo or Equiv.

1 EA Electric Key Switch One side of door 1 EA Door Guide Wall Mtd. by Manuf. to HM Framing Willo or Equiv.

1 EA Door Guide Angle Mtd. to bott. of door Willo or Equiv.

1 EA Raised Pull 701 Door Operator Side 626 Port/Midwest

1 EA Recessed Pull 705 Opposite Side or Integral pull by door manufacturer

626 Port/Midwest

Item SP-7 Appendix IV Prevailing Wage Rates (revised and reissued per this addendum):

A. REVISED “Prevailing Wage Rates” have been issued.as follows:

1. Current Prevailing Wage Rates have been issued and are available under a separate file (Wage

Rate (Updated).pdf) within the Sigma VSS system”, rather than reissuing them as they are already on the website.

https://www.openingsstudio.com/AAOS/AAOS/CutSheetViewer.jsp?IDS=135555360, https://www.openingsstudio.com/AAOS/AAOS/CutSheetViewer.jsp?IDS=135555360, Masonry Repairs Page 4 of 5

DRAWINGS

Architectural

Item Description

Item A-1 Drawing Sheet A0-03 Door Schedule, Frame and Door Types & Details (revised, and reissued this addendum per drawing Sheet “SK-1”):

A. REVISE Door / Opening Key Notes as follows and as indicated on attached Sheet “SK-1”:

1. REVISE Door / Opening Key Notes #6, 7, 8, 9, 10 and 11 as indicated.

2. ADD Door / Opening Key Notes #12 as indicated.

B. Revise Door / Opening Schedule as follows and as indicated on attached Sheet “SK-1”:

1. ADD Key Note #10 in Key Note column for Door # 100E as indicated.

2. DELETE Key Note #10 in Key Note column from Door # 100F as indicated.

3. REVISE to read Key Notes #2, 4, and 6 in Key Note column for Door # 100-S1 as indicated.

4. REVISE to read Key Notes #2, 4, 7 and 12 in Key Note column for Door # 100-S2 as indicated.

5. REVISE Door 100-S2 hardware set to read Set # 1.1 as indicated on attached Sheet “SK-1”.

6. REVISE Door 100-S3 hardware set to read Set # 1.2 as indicated on attached Sheet “SK-1”

7. REVISE Door 100-S4 hardware set to read Set # 1.1 as indicated on attached Sheet “SK-1”

Item A-2 Drawing Sheet A1-01 Enlarged Door Area Floor Plans – Demo- Bldgs 100, 200, (revised, but not reissued per this addendum):

A. Revise Enlarged Demo Floor Plans as follows:

1. ADD words “ALTERNATE #3” to “Detail 6B - Enlarged Demo Floor Plan - Door 100-S2”.

Item A-3 Drawing Sheet A1-01 Enlarged Door Area Floor Plans – Demo- Bldgs 100, 200, (revised, and reissued per this addendum per attached drawing Sheet “SK-2”):

A. Revise Enlarged Demo Floor Plans as follows:

1. REVISE “Demo Floor Plan – Legend” as indicated on attached Sheet “SK-2”

2. ADD “Detention Sliding Door Construction Phasing” as indicated on attached Sheet “SK-2”.

Item A-4 Drawing Sheet A3-01 Enlarged Door Area Floor Plans – New- Bldgs 100, 200, (revised, but not reissued per this addendum):

A. Revise Enlarged New Floor Plans as follows:

1. ADD words “ALTERNATE #3” to “Detail 6B - Enlarged New Floor Plan - Door 100-S2”.

Item A-5 Drawing Sheet A3-01 Enlarged Door Area Floor Plans – New - Bldgs 100, 200, (revised, and reissued this addendum per drawing Sheet “SK-3”):

A. Revise Enlarged New Floor Plans as follows:

1. REVISE “New Floor Plan – Legend” as indicated on attached Sheet “SK-3”

2. ADD “Detention Sliding Door Construction Phasing” as indicated on attached Sheet “SK-3”.

Masonry Repairs Page 5 of 5

Electrical

Item Description

Item E-1 Drawing Sheet E1-01 Enlarged Door Area Power Plans – Demo (revised, but not reissued per this addendum:

A. Revise Enlarged Door Area Power Plans – Demo as follows:

1. ADD words “ALTERNATE #3” to “Detail 2B - Enlarged Electrical Demo Plan - Door 100-S2”.

Item E-2 Drawing Sheet E1-01 Enlarged Door Area Power Plans – Demo, (revised, and reissued per this addendum per attached drawing Sheet “SK-4”):

A. Revise Enlarged Demo Electrical Power Plan Key Notes as follows:

1. REVISE Demo Power Plan Key Notes #6, 7, 8, 9, 10 and 11 as indicated on sheet “SK-4”

B. ADD “Detention Sliding Door Construction Phasing” as indicated on attached Sheet “SK-4”.

Item E-3 Drawing Sheet E3-01 Enlarged Door Area Power Plans – New (revised, but not reissued per this addendum:

A. Revise Enlarged Door Area Power Plans – New as follows:

1. ADD words “ALTERNATE #3” to “Detail 2B - Enlarged Electrical New Plan - Door 100-S2”.

Item E-4 Drawing Sheet E3-01 Enlarged Door Area Power Plans – New, (revised, and reissued per this addendum per attached drawing Sheet “SK-5”):

A. Revise Enlarged New Electrical Power Plan Key Notes as follows:

1. REVISE New Power Plan Key Notes #2, 3, 6, 7, 8, 9, 10 and 11 as indicated on sheet “SK-5”

B. ADD “Detention Sliding Door Construction Phasing” as indicated on attached Sheet “SK-5”.

**END OF ADDENDUM**

Bidding and Contract Document (R 6/16) Project Name: SCF-Entrance Door Replacement & Masonry Repairs – File No. 472/16419.APL

BID SUMMARY

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE FACILITIES ADMINISTRATION

DESIGN AND CONSTRUCTION DIVISION

3111 W. St. Joseph Street Lansing, Michigan 48917

Bids must be submitted electronically through the SIGMA VSS website at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService

FILE NUMBER

472/16419

INDEX NUMBER

46630

DEPARTMENT/AGENCY

Department of Corrections-Saginaw Correctional Facility

CONTRACT TIME(S)

See Section 00100 Instructions to Bidders (Paragraph 22)

PROJECT NAME

Department of Corrections Saginaw Correctional facility Entrance Door Replacement and Masonry Repairs

LOCATION

Saginaw Correctional Facility

BID OPENING DATE

FEBRUARY 7, 2018 at 2:00 pm Local Time

FOR AN EXAMINATION OF THE SITE CONTACT:

Ed LaPlante, Facility Manager Saginaw Correctional Facility 989-695-9880

SEE SECTION 00100 INSTRUCTIONS TO BIDDERS AND SECTION 00700 GENERAL CONDITIONS PROVIDED WITH THE BIDDING DOCUMENTS.

BID: WE PROPOSE TO FURNISH, PERFORM AND COMPLETE THE ENTIRE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS IN

CONSIDERATION OF THE BID PRICE (S) STATED BELOW.

FIRM NAME AND COMPLETE ADDRESS TELEPHONE NUMBER and E-MAIL ADDRESS

□ Qualified Disabled Veteran

FEDERAL I.D. NUMBER

(protected information required for processing payments)

BIDDER'S SIGNATURE AND TITLE DATE

WITNESS' SIGNATURE DATE

By signing this bid above, bidder certifies their enclosed Qualified Disabled Veteran and Michigan-Based Business Certifications.

BASE BID FROM BID SCHEDULE (Include specified Allowances):

________________________________________________________________________Dollars $____________________ (use words) (in figures)

Alternate-1: (Subtract) ______________________________________________________ Dollars $ ____________________ (use words) (in figures)

Alternate-2: (Subtract) ______________________________________________________ Dollars $ ____________________

Alternate-3: (Subtract) ______________________________________________________ Dollars $ ____________________ (use words) (in figures)

Builders Risk Insurance is NOT provided by the State of Michigan. (See Section 00700, No. 3, Paragraph 3.4.)

A PERFORMANCE BOND AND A PAYMENT BOND ARE REQUIRED FOR ALL BIDS OVER $50,000.00. EACH BID MUST BE ACCOMPANIED

BY A FIVE (5) PERCENT BID GUARANTEE.

BIDDERS ARE ALSO CAUTIONED TO FAMILIARIZE THEMSELVES WITH ALL OF THE OTHER CONDITIONS OF THE CONTRACT.

Project Scope of Work:

Removal and Replacement of existing hollow metal security doors and frames, aluminum entrances and storefront, and automatic hollow metal sliding security gates. Additional work includes masonry repairs to various facility buildings. All work is within the Saginaw Correctional Facility secured perimeter of Program buildings and Housing units. Door replacement work includes new door hardware and installation of new and salvaged hardware components including remote control and door monitoring devices, new security glazing, removal/replacement and refinishing of floor and wall finishes, interior and exterior painting. Masonry repair scope of work includes tuckpointing, crack repair, brick removal and replacement, expansion joint removal and replacement, new expansion joint construction, sealants, and flashings.

.The Bidder must figure its Base Bid on the specified, or Addendum-approved, materials and equipment only. No “or equal” or substitution proposals will be permitted after Bid opening, except as provided in the General Conditions.

Bidding and Contract Document (R 6/16) Project Name: SCF-Entrance Door Replacement & Masonry Repairs – File No. 472/16419.APL

Addenda: Bidder acknowledges receipt of following Addenda:

No. ____ dated: _________; No. ____ dated: _________; No. ____ dated: _________;

No. ____ dated: _________; No. ____ dated: _________; No. ____ dated: _________.

FIRM NAME TELEPHONE NUMBER and E-MAIL ADDRESS

BID SCHEDULE

A. Base Bid Schedule - The Bidder will complete the Work and accept as full payment for the Work items listed including the following Prices and/or Item Bid Prices, as applicable:

1. Base Bid (Labor & Material for all work including selective demolition, flashings, masonry repairs, entrance door replacement, sliding security gates, door hardware, glazing, finishes, painting and electrical”):

_______________________________________________________________________ Dollars $___________________

2. Section 01020 “ Allowances”

1.1 019000 “Quantity Allowances”

Allowance Unit Allowance Bid Description Allowance Item No. Quantity Price (Bidder to write allowance price in words) Price____ .

No.1 200 SQ. FT. x ______/S.F = ___________________________________________ $_______.___

(IN FIGURES) (USE WORDS) (IN FIGURES)

No.2 100 SQ. FT. x ______/S.F = ___________________________________________ $_______.___

(IN FIGURES) (USE WORDS) (IN FIGURES)

No.3 100 LIN. FT. x ______/L.F = ___________________________________________ $_______.___

(IN FIGURES) (USE WORDS) (IN FIGURES)

No.4 100 LIN. FT. x ______/L.F = ___________________________________________ $_______.___

(IN FIGURES) (USE WORDS) (IN FIGURES)

No.5 100 LIN. FT. x ______/L.F = ___________________________________________ $_______.___

(IN FIGURES) (USE WORDS) (IN FIGURES)

1.2 Provisional / Contingency Allowance……………………………………………………………….$ 50,000.00

TOTAL BASE BID (Sum of all Item Bid Prices above for all Base Bid Items including Allowances):

_______________________________________________________________________ Dollars $________________ . __

Bidding and Contract Document (R 6/16) Project Name: SCF-Entrance Door Replacement & Masonry Repairs – File No. 472/16419.APL

FIRM NAME TELEPHONE NUMBER and E-MAIL ADDRESS

BID SCHEDULE (continued)

B. Section 019500 Unit Prices

Schedule of Unit Prices - The Bidder will complete (or deduct from the Contract) the parts of the Work designated by the Unit Prices that follow and accept in full payment (or allow in full credit) for those parts of the Work the following Item Bid Prices:

Unit Price Description Unit Item No. (Bidder to write Unit Price in words) Price

No.1 ____________________________________________/ S.F. ______/ S.F.

(USE WORDS) (in figures)

No.2 ____________________________________________/ S.F. ______/ S.F.

No.3 ____________________________________________/ L.F. ______/ L.F.

No.4 ____________________________________________/ L.F. ______/ L.F.

No.5 ____________________________________________/ L.F. ______/ L.F.

C. Section 01030 Alternates

1. Schedule of Alternates - The Bidder will complete (or deduct from the Contract) the parts of the Work designated by the Alternates that follow and accept in full payment (or allow in full credit) for those parts of the Work the following Item Bid Prices:

Alternate-1 Description: Labor and Material for Deletion of Hollow Metal Door / Frame Removal and Replacement of doors 200K,200L, 200M, 200N, 300A, 800B, 900A:

Item Bid Item No. (Bidder to write Alternate price in words) Price

____1_____ _____________________________________________________________________ Deduct ___________.___ (USE WORDS) (in figures) (in figures)

Alternate-2 Description: Labor and Material for Deletion of Masonry and Flashing Repairs to Partial West Elevation of

Building 100:

Item No. (Bidder to write Alternate price in words) Price

____2_____ _____________________________________________________________________ Deduct ___________.___

Alternate-3 Description: Labor and Material for Removal and Replacement of Sliding Detention Door 100-S2

Item No. (Bidder to write Alternate price in words) Price

____3_____ _____________________________________________________________________ Deduct ___________.___

The Bidder further acknowledges and agrees that the separate prices bid on this “Schedule of Alternates,” where they are applicable and deemed acceptable by the Owner, will be used if incorporated into the Contract when the Owner issues the Notice of Award.

Bidding and Contract Document (R 6/16) Project Name: SCF-Entrance Door Replacement & Masonry Repairs – File No. 472/16419.APL

TABLE OF CONTENTS

CONTRACT FORMS

BID SUMMARY FORM

BID SCHEDULE

QUALIFIED DISABLED VETERAN (QDV) BUSINESS REPRESENTATION

CERTIFICATION OF A MICHIGAN BASED BUSINESS

BID BOND

POST-BID SUBMITTALS

PERFORMANCE BOND

PAYMENT BOND

TABLE OF CONTENTS TC-1 thru TC-3

DIVISION 00 BIDDING REQUIREMENTS AND CONTRACT CONDITIONS

SECTION TITLE PAGES THRU

00010 PRE-BID INFORMATION 00-1

00100 INSTRUCTIONS TO BIDDERS 00-2 thru 00-6

00120 SUPPLEMENTARY INSTRUCTIONS 00-6

00200 INFORMATION TO BIDDERS 00-6

00700 GENERAL CONDITIONS 00-7 thru 00-18

00750 SPECIAL WORKING CONDITIONS 00-18

00800 SUPPLEMENTARY CONDITIONS 00-18

00850 WAGE DETERMINATION SCHEDULE 00-19

00900 ADDENDA 00-19

DIVISION 01 - GENERAL REQUIREMENTS

01010 SUMMARY OF WORK 01-1

01020 ALLOWANCES 01-1

01025 MEASUREMENT AND PAYMENT 01-1

01030 ALTERNATES 01-2

01040 COORDINATION 01-2

01050 FIELD ENGINEERING 01-2

01060 REGULATORY REQUIREMENTS 01-2 thru 01-4 01090 REFERENCES 01-4 thru 01-5

01100 PROJECT PROCEDURES 01-5

01200 PROJECT MEETINGS 01-5

01300 SUBMITTALS 01-5 thru 01-7

01400 QUALITY CONTROL 01-7

01500 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS 01-7

01600 MATERIAL AND EQUIPMENT 01-7 thru 01-8

01650 FACILITY START-UP 01-8

01700 CONTRACT CLOSE-OUT 01-8

01800 MAINTENANCE 01-9

012500 SUBSTITUTION PROCEDURES 1 thru 3 013100 PROJECT MANAGEMENT AND COORDINATION 1 thru 6 013300 SUBMITTAL PROCEDURES 1 thru 8 013516 ALTERATION PROJECT PROCEDURES 1 thru 6 014000 QUALITY REQUIREMENTS 1 thru 6 014200 REFERENCES 1 thru 10 016000 PRODUCT REQUIREMENTS 1 thru 4

TC-1

Bidding and Contract Document (R 6/16) Project Name: SCF-Entrance Door Replacement & Masonry Repairs – File No. 472/16419.APL

017300 EXECUTION 1 thru 6 017700 CLOSEOUT PROCEDURES 1 thru 4 017823 OPERATION AND MAINTENANCE DATA 1 thru 7 017839 PROJECT RECORD DOCUMENTS 1 thru 2 017900 DEMONSTRATION AND TRAINING 1 thru 4 019000 ALLOWANCES 1 thru 2 019500 UNIT PRICES 1 thru 2

DIVISION 02 – EXISTING CONDITIONS

024119 SELECTIVE DEMOLITION 1 thru 4

DIVISION 03 – CONCRETE

033000 CAST IN PLACE CONCRETE 1 thru 12

DIVISION 04 – MASONRY

040120.63 BRICK MASONRY REPAIR 1 thru 12

040120.64 BRICK MASONRY REPOINTING 1 thru 8

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

076200 SHEET METAL FLASHING AND TRIM 1 thru 6 079200 JOINT SEALANTS 1 thru 4

DIVISION 08 – OPENINGS

081113 HOLLOW METAL DOORS, FRAMES 1 thru 8 083463 DETENTION DOORS AND FRAMES 1 thru 13 084113 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 1 thru 8 087100 DOOR HARDWARE 1 thru 20 088000 GLAZING 1 thru 6 088853 SECURITY GLAZING 1 thru 8

DIVISION 09 – FINISHES

093000 TILING 1 thru 4 096513 RESILIENT BASE AND ACCESSORIES 1 thru 4 096519 RESILIENT TILE 1 thru 4 099113 EXTERIOR PAINT 1 thru 4 099123 INTERIOR PAINT 1 thru 6

DIVISION 26 – ELECTRICAL

260500 BASIC ELECTRICAL REQUIREMENTS 1 thru 5

260519 LOW VOLTAGE, ELECTRICAL POWER CONDUCTORS AND CABLES 8

260534 CONDUITS 4

260537 BOXES 2

APPENDICIES

APPENDIX I – GLOSSARY

APPENDIX II – SPECIAL WORKING CONDITIONS

LIEN REQUEST FORM

APPENDIX III – SPECIAL PROJECT PROCEDURES

APPENDIX IV – PREVAILING WAGE RATES

TC-2

Bidding and Contract Document (R 6/16) Project Name: SCF-Entrance Door Replacement & Masonry Repairs – File No. 472/16419.APL

DRAWINGS - BOUND SEPARATELY

TITLE SHEET No.

COVER SHEET - ENTRANCE DOOR REPLACEMENT AND MASONRY REPAIRS A0-00

ARCHITECTURAL

GENERAL PROJECT INFORMATION A0-01

COMPOSITE CAMPUS PLAN A0-02

DOOR & FRAME SCHEDULES, TYPES, AND DETAILS A0-03

OPENING DETAILS A0-04

OPENING DETAILS A0-05

ENLARGED DOOR AREA FLOOR PLANS - DEMO - BUILDINGS 100, 200 A1-01

ENLARGED DOOR AREA FLOOR PLANS - DEMO

BUILDINGS 300, 400, 500, 700, 800, 900, 1100, 1200

A1-02

ENLARGED DOOR AREA FLOOR PLANS - NEW - BUILDINGS 100, 200 A3-01

ENLARGED DOOR AREA FLOOR PLANS - NEW –

BUILDINGS 300, 400, 500, 700, 800, 900, 1100, 1200

A3-02

EXTERIOR ELEVATIONS, MASONRY REPAIRS - BUILDING 100 A5-01

EXTERIOR ELEVATIONS, MASONRY REPAIRS - BUILDING 300 A5-02

EXTERIOR ELEVATIONS, MASONRY REPAIRS - BUILDING 800 AND 900 A5-03

EXTERIOR ELEVATIONS, MASONRY REPAIRS - BUILDING 1100 A5-04

WALL SECTIONS AND DETAILS A6-01

ELECTRICAL

COMPOSITE CAMPUS ELECTRICAL PLAN

E0-02

ENLARGED DOOR AREA FLOOR PLANS – ELECTRICAL DEMO –

BUILDINGS 100, 200, 500, 700, 800, 900, and 1200

E1-01

ENLARGED DOOR AREA FLOOR PLANS – ELECTRICAL NEW –

BUILDINGS 100, 200, 500, 700, 800, 900, and 1200

E3-01

TC-3

Door / Opening Schedule - Main Level

DOOR NO.

DOOR / OPENING SIZE (W X H)

(CONTRACTOR TO VERIFY DOOR

SIZE IF OPENING IS EXISTING)

DOOR FRAME FRAME

DEPTH

DETAILS

SEE SHEETS A0-04 & A0-05

WALL

THICKNESS

FIELD VERIFY

HDWR

SET

DOOR / OPENING

KEY NOTES

TYPE MATERIAL FINISH TYPE MATERIAL FINISH HEAD JAMB THRES. / SILL

100A-1 3'-4" X 6'-10" F ALUM. PREFIN. F12 ALUM. PREFIN. 6 1/2" D19/ D20 D21 / D22 T1 / D23 14 2.0

100A-2 3'-4" X 6'-10" F ALUM PREFIN

SAME AS

100A-1

- - - - 6 1/2" D19 / D20 D21 / D22 T1 / D23 14 2.0

100B-1 3'-4" X 7'-2" F ALUM. PREFIN. F12 ALUM. PREFIN. 6 1/2" D24 / D25 D22 / D26 D27 6 3.0

100B-2 3'-4" x 7'-2" F ALUM PREFIN

SAME AS

100B-1

- - - - 6 1/2" D24 / D25 D22 / D26 D27 6 3.0

100C 3'-2" X 6'-10" E HM PNT-1 F1 HM PNT-1 10 D1 D2 T1 14 7.0

100D 3'-0" X 6'-10" B HM PNT-1 F1 HM PNT-1 10 D1 D2 T2 14 8.0

100E EXISTING TO REMAIN - - - - - - - - - - - - - - - - - - - - - - - - 10

100F EXISTING TO REMAIN - - - - - - - - - - - - - - - - - - - - - - - -

100G EXISTING TO REMAIN - - - - - - - - - - - - - - - - - - - - - - - - 11

100S1 3'-6" CLEAR (6'-4" X 8'-0" M.O.) G HM PNT-1 F13 HM PNT-1 8" D43 D33 / D37 D31 / D32 8" 1.1 2, 4, 6

100S2 3'-6" CLEAR (6'-4" X 8'-0" M.O.) G HM PNT-1 F13 HM PNT-1 8" D43 D33 / D37 D31 / D32 8" / 12" 1.1 2, 4, 7, 12

100S3 3'-6" CLEAR (6'-4" X 8'-0" M.O.) G HM PNT-1 F13 HM PNT-1 8" D43 D37 / D36 D31 / D32 8 1.2 2, 4, 8

100S4 3'-6" CLEAR (6'-4" x 8'-0" M.O.) G HM PNT-1 F13 HM PNT-1 8" D43 D34 / D37 D31 / D32 8" / 12" 1.1 2, 4, 9

Door/ Opening Key Notes:

1. DEDUCT ALTERNATE NO. 1

2. FABRICATE CUSTOM HOLLOW METAL DOOR FRAME ASSEMBLY.

3. REINSTALL SALVAGED ELECTRO-MECHANICAL LOCK IN DOOR FRAME. REFER TO HARDWARE SCHEDULE IN SPECS.

4. SLIDING SECURITY ENTRANCE GATE HARDWARE WITH HOLLOW METAL DOOR.

5. REMOVABLE MULLION

6. INTERLOCK DOOR #1 (100-S1) WITH DOORS #2 AND #3 (100-S2, 100-S3)

7. INTERLOCK DOOR #2 (100-S2) WITH DOORS #1 AND #3 (100-S1, 100-S3)

8. INTERLOCK DOOR #3 (100-S3) WITH DOORS #1, #2 AND #4 (100-S1, 100-S2, AND 100-S4)

9. INTERLOCK DOOR #4 (100-S4) WITH DOORS #3 (100-S3) AND EXISTING DOORS 100E AND 100G

10. INTERLOCK DOOR 100E WITH DOORS #4 (100-S4) AND 100G

11. INTERLOCK DOOR 100G WITH DOORS #4 (100-S4) AND 100E

12. DEDUCT ALTERNATE #3

ADDENDUM

-6R

SK-1

A 0-03

01/30/2018

10/10/2017 pdf pdf 17-134

M asonry R epairs E ntrance D oor R eplacem ent and

S aginaw

C orrectional Facility

DEMO FLOOR PLAN - LEGEND:

EXISTING WALL

EXISTING

SIDELIGHT FRAME

& GLAZING

EXISTING DOOR /

FRAME

EXISTING SIDELIGHT

FRAME & GLAZING TO

BE REMOVED

EXISTING DOOR / FRAME

TO BE REMOVED

EXISTING FLOOR FINISHES

TO BE REMOVED

EXISTING CONCRETE SILL

SECTION TO BE REMOVED

EXISTING SLIDING DOOR &

FRAME TO BE REMOVED

DETENTION SLIDING DOOR CONSTRUCTION PHASING:

NOTE: ALL WORK PERFORMED DURING THIRD SHIFT:

A. DOOR 1 (100-S1)

A.1. REMOVE, REPLACE, AND MAKE OPERATIONAL

A.2. DOOR 1 WORK TO BE COMPLETED PRIOR TO REMOVAL AND

REPLACEMENT OF DOOR 3

A.3. WORK DURATION (1 DAY)

B. DOOR 3 (100-S3)

B.1. REMOVE, REPLACE, AND MAKE OPERATIONAL

B.2. DOOR 3 WORK TO BE COMPLETED PRIOR TO REMOVAL AND

REPLACEMENT OF DOOR 4

B.3. WORK DURATION (1 )

C. DOOR 4 (100-S4)

C.1. REMOVE, REPLACE, AND MAKE OPERATIONAL

C.2. DOOR 4 WORK TO COMPLETED PRIOR TO REMOVAL AND REPLACEMENT

OF DOOR 2.

C.3. WORK DURATION (1 DAY)

D. DOOR 2 (100-S2 - ALTERNATE #3)

D.1. REMOVE, REPLACE, AND MAKE OPERATIONAL

D.2. WORK DURATION (1 DAY)

E. COMPLETE INSTALLATION OF FINISH MATERIALS AND PAINTING

PROJECT NUMBER:

PROJECT NAME:PARTNERS in Architecture, PLC 96 Macomb Place

Mount Clemens, MI 48043

(p) 586 469 3600

(f) 586 469 3607

REV:

DATE:

CHECKED BY:

DRAWN BY:

DRAWING NO:

DRAWING REF.:

DOC. ISSUE:

ADDENDUM-6R

SK-2

A1-01 01/30/2018

10/10/2017 pdf pdf17-134

Masonry Repairs Entrance Door Replacement and Saginaw Correctional Facility

NEW FLOOR PLAN - LEGEND:

NEW SIDELIGHT

FRAME & GLAZING

NEW DOOR / FRAME

FLOOR AND WALL BASE TO

BE PATCHED WHERE

EXISTING FLOOR FINISH

WAS REMOVED / DAMAGED

EXISTING WALL

TO REMAIN

EXISTING SIDELIGHT

FRAME & GLAZING

EXISTING DOOR /

FRAME

NEW CONCRETE SILL

SECTION

NEW SLIDING DOOR &

FRAME TO BE INSTALLED

DETENTION SLIDING DOOR CONSTRUCTION PHASING:

PROJECT NUMBER:

PROJECT NAME:PARTNERS in Architecture, PLC 96 Macomb Place

Mount Clemens, MI 48043

(p) 586 469 3600

(f) 586 469 3607

REV:

DATE:

CHECKED BY:

DRAWN BY:

DRAWING NO:

DRAWING REF.:

DOC. ISSUE:

ADDENDUM-6R

SK-3

A3-01 01/30/2018

10/10/2017 pdf pdf17-134

Masonry Repairs Entrance Door Replacement and Saginaw Correctional Facility

NOTE: ALL WORK PERFORMED DURING THIRD SHIFT:

A. DOOR 1 (100-S1)

A.1. REMOVE, REPLACE, AND MAKE OPERATIONAL

A.2. DOOR 1 WORK TO BE COMPLETED PRIOR TO REMOVAL AND

REPLACEMENT OF DOOR 3

A.3. WORK DURATION (1 DAY)

B. DOOR 3 (100-S3)

B.1. REMOVE, REPLACE, AND MAKE OPERATIONAL

B.2. DOOR 3 WORK TO BE COMPLETED PRIOR TO REMOVAL AND

REPLACEMENT OF DOOR 4

B.3. WORK DURATION (1 )

C. DOOR 4 (100-S4)

C.1. REMOVE, REPLACE, AND MAKE OPERATIONAL

C.2. DOOR 4 WORK TO COMPLETED PRIOR TO REMOVAL AND REPLACEMENT

OF DOOR 2.

C.3. WORK DURATION (1 DAY)

D. DOOR 2 (100-S2 - ALTERNATE #3)

D.1. REMOVE, REPLACE, AND MAKE OPERATIONAL

D.2. WORK DURATION (1 DAY)

E. COMPLETE INSTALLATION OF FINISH MATERIALS AND PAINTING

DEMO ELECTRICAL POWER PLAN - KEY NOTES:

VERIFY 24V. CIRCUIT TO EXISTING ELECTRO-MECHANICAL DETENTION LOCK IN

DOOR FRAME. DISCONNECT EXISTING 24V. ELECTRICAL POWER AT EXISTING

ELECTRO-MECHANICAL DETENTION LOCK. PULL WIRE BACK, AND PREP FOR

RE-USE AND RECONNECTION TO REINSTALLED ELECTRO-MECHANICAL DETENTION

LOCK IN NEW DOOR FRAME.

VERIFY 24V. CIRCUIT TO EXISTING DETENTION LOCK IN EXISTING SLIDING DOOR

FRAME. DISCONNECT EXISTING 24V. ELECTRICAL POWER AT EXISTING LOCK.

PULL WIRE BACK, AND PREP FOR RE-USE AND RECONNECTION TO NEW DETENTION

LOCK IN NEW SLIDING SECURITY ENTRANCE DOOR FRAME.

VERIFY 120V. CIRCUIT TO EXISTING SLIDING SECURITY ENTRANCE MOTOR

OPERATOR IN DOOR FRAME. DISCONNECT EXISTING 120V. ELECTRICAL POWER AT

MOTOR OPERATOR. PULL WIRE BACK, AND PREP FOR RE-USE AND RECONNECTION

TO NEW MOTOR OPERATOR IN NEW SLIDING SECURITY ENTRANCE DOOR FRAME.

EXISTING HOLLOW METAL DOOR AND FRAME TO BE REMOVED. REFER TO

ARCHITECTURAL

EXISTING SLIDING SECURITY ENTRANCE DOOR AND FRAME TO BE REMOVED.

REFER TO ARCHITECTURAL

DOOR 100-S1 INTERLOCKED WITH DOOR 100-S2, 100-S3

DOOR 100-S2 INTERLOCKED WITH DOOR 100-S1, 100-S3

DOOR 100-S3 INTERLOCKED WITH DOORS 100-S1, 100-S2, 100-S4

DOOR 100-S4 INTERLOCKED WITH DOOR 100-S3, 100E, 100G

DOOR 100E INTERLOCKED WITH DOORS 100-S4, AND 100G

DOOR 100G INTERLOCKED WITH DOORS 100-S4, AND 100E

PROJECT NUMBER:

PROJECT NAME:PARTNERS in Architecture, PLC 96 Macomb Place

Mount Clemens, MI 48043

(p) 586 469 3600

(f) 586 469 3607

REV:

DATE:

CHECKED BY:

DRAWN BY:

DRAWING NO:

DRAWING REF.:

DOC. ISSUE:

ADDENDUM-6R

SK-4

E1-01 01/30/2018

10/10/2017 pdf pdf17-134

Masonry Repairs Entrance Door Replacement and Saginaw Correctional Facility

DETENTION SLIDING DOOR CONSTRUCTION PHASING:

NOTE: ALL WORK PERFORMED DURING THIRD SHIFT:

A. DOOR 1 (100-S1)

A.1. REMOVE, REPLACE, AND MAKE OPERATIONAL

A.2. DOOR 1 WORK TO BE COMPLETED PRIOR TO REMOVAL AND

REPLACEMENT OF DOOR 3

A.3. WORK DURATION (1 DAY)

B. DOOR 3 (100-S3)

B.1. REMOVE, REPLACE, AND MAKE OPERATIONAL

B.2. DOOR 3 WORK TO BE COMPLETED PRIOR TO REMOVAL AND

REPLACEMENT OF DOOR 4

B.3. WORK DURATION (1 DAY)

C. DOOR 4 (100-S4)

C.1. REMOVE, REPLACE, AND MAKE OPERATIONAL

C.2. DOOR 4 WORK TO COMPLETED PRIOR TO REMOVAL AND REPLACEMENT

OF DOOR 2.

C.3. WORK DURATION (1 DAY)

D. DOOR 2 (100-S2 - ALTERNATE #3)

D.1. REMOVE, REPLACE, AND MAKE OPERATIONAL

NEW ELECTRICAL POWER PLAN - KEY NOTES:

RE-CONNECT 24V. ELECTRICAL POWER TO RE-INSTALLED ELECTRO-MECHANICAL

DETENTION LOCK IN NEW DOOR FRAME. PROVIDE NEW CONDUIT IN FRAME

ASSEMBLY AS REQUIRED.

RE-CONNECT 24V. ELECTRICAL POWER TO NEW DETENTION LOCK IN SLIDING

SECURITY ENTRANCE DOOR FRAME. PROVIDE NEW CONDUIT / WIRE AS REQUIRED.

RE-CONNECT 120V. ELECTRICAL POWER TO NEW SLIDING SECURITY ENTRANCE

MOTOR OPERATOR IN DOOR HEADER. PROVIDE NEW CONDUIT / WIRE AS REQUIRED.

NEW HOLLOW METAL DOOR AND FRAME. REFER TO ARCHITECTURAL.

NEW SLIDING SECURITY ENTRANCE DOOR. REFER TO ARCHITECTURAL.

RECONNECT CONTROL WIRING TO INTERLOCK DOOR 100-S1 WITH DOOR 100-S2,

100-S3

RECONNECT CONTROL WIRING TO INTERLOCK DOOR 100-S2 WITH DOOR 100-S1,

100-S3

RECONNECT CONTROL WIRING TO INTERLOCK DOOR 100-S3 WITH DOOR 100-S1,

100-S2, 100-S4

RECONNECT CONTROL WIRING TO INTERLOCK DOOR 100S-4 WITH DOORS 100-S3,

100E AND 100G

MAINTAIN / RECONNECT CONTROL WIRING TO INTERLOCK DOOR 100 E WITH DOORS

100-S4, AND 100G

MAINTAIN / RECONNECT CONTROL WIRING TO INTERLOCK DOOR 100G WITH DOORS

100-S4, AND 100E

PROJECT NUMBER:

PROJECT NAME:PARTNERS in Architecture, PLC 96 Macomb Place

Mount Clemens, MI 48043

(p) 586 469 3600

(f) 586 469 3607

REV:

DATE:

CHECKED BY:

DRAWN BY:

DRAWING NO:

DRAWING REF.:

DOC. ISSUE:

ADDENDUM-6R

SK-5

E3-01 01/30/2018

10/10/2017 pdf pdf17-134

Masonry Repairs Entrance Door Replacement and Saginaw Correctional Facility

DETENTION SLIDING DOOR CONSTRUCTION PHASING:

NOTE: ALL WORK PERFORMED DURING THIRD SHIFT:

A. DOOR 1 (100-S1)

A.1. REMOVE, REPLACE, AND MAKE OPERATIONAL

A.2. DOOR 1 WORK TO BE COMPLETED PRIOR TO REMOVAL AND

REPLACEMENT OF DOOR 3

A.3. WORK DURATION (1 DAY)

B. DOOR 3 (100-S3)

B.1. REMOVE, REPLACE, AND MAKE OPERATIONAL

B.2. DOOR 3 WORK TO BE COMPLETED PRIOR TO REMOVAL AND

REPLACEMENT OF DOOR 4

B.3. WORK DURATION (1 DAY)

C. DOOR 4 (100-S4)

C.1. REMOVE, REPLACE, AND MAKE OPERATIONAL

C.2. DOOR 4 WORK TO COMPLETED PRIOR TO REMOVAL AND REPLACEMENT

OF DOOR 2.

C.3. WORK DURATION (1 DAY)

D. DOOR 2 (100-S2 - ALTERNATE #3)

D.1. REMOVE, REPLACE, AND MAKE OPERATIONAL

ADDENDUM-06R Write Up
Document1
Bid Summary & Schedules
DCSpec_Rev__6-16_528116_7_SCF-2018-0130 2
DCSpec_Rev__6-16_528116_7_SCF-2018-0130 3
DCSpec_Rev__6-16_528116_7_SCF-2018-0130 4
Table of Contents
DCSpec_Rev__6-16_528116_7_SCF-2018-0130 10
DCSpec_Rev__6-16_528116_7_SCF-2018-0130 11
DCSpec_Rev__6-16_528116_7_SCF-2018-0130 12
Addendum-6R Drawings
A0-03-Door & Frame Schedules, Types, Details-A0-03 (SK-1)
A1-01_Enlarged Floor Plans-Demo-Bldgs-100-200-A1-01 (SK-2)
A3-01_Enlarged Floor Plans-Bldgs-100-200-A3-01 (SK-3)
E1-01_Enlarged Elec Power Demo Plans-Bldgs-100-200-500-700-800-900-1200-E1-01 (SK-4)
E3-01_Enlarged Elec Power Plans-Bldgs-100-200-500-700-800-900-1200-E3-01 (SK-5)