This is Addendum #6R (revised) for the Saginaw Correctional Facility Entrance Door Replacement and Masonry Repairs project (File No. 472/16419.APL) issued by the State of Michigan Department of Corrections. The project involves removal and replacement of existing hollow metal security doors and frames, aluminum entrances and storefront, automatic hollow metal sliding security gates, and masonry repairs to various facility buildings within the secured perimeter. The bid opening date is February 7, 2018 at 2:00 pm local time, with bids to be submitted electronically through the SIGMA VSS website. The project schedule indicates work will begin after March 28, 2018, with sliding security entrances to be completed within 30 days during facilities third work shift, and masonry repair work and entrance door replacement to start April 16, 2018 with completion by August 13, 2018.
The addendum revises several technical specifications including adding Section 083463 "Detention Doors and Frames" and deleting Section 084229 "Sliding Automatic Entrances." Door hardware sets are modified for doors 100-S1 through 100-S4, with detailed specifications for locking devices, manual release columns, electric key switches, door guides, and pulls. The project includes three deductive alternates: deletion of certain hollow metal door/frame replacements, deletion of masonry repairs to partial west elevation of Building 100, and removal/replacement of sliding detention door 100-S2. Current prevailing wage rates apply and are available through the SIGMA VSS system. A performance bond and payment bond are required for all bids over $50,000.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 16419 Addendum 4.pdf | ||
| Drawings.pdf | ||
| 16419 Addendum 1 R pgs 1-33.pdf | ||
| IMPORTANT NOTICE - SIGMA VSS 170830.pdf | ||
| 16419 Addendum 2.pdf | ||
| Advertisement.pdf | ||
| LEIN Form.pdf | ||
| 16419 Addendum 3.pdf | ||
| Specifications.pdf | ||
| Wage Rates (Updated).pdf | ||
| 16419 Addendum 5.pdf | ||
| 16419 Addendum 1 R pgs 34-67.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Saginaw Correctional Facility Addendum #6R Entrance Door Replacement and January 30, 2018 Masonry Repairs Page 1 of 5
ADDENDUM
Project Name: Saginaw Correctional Facility Addendum No: Six Revised (6R) Entrance Door Replacement and Masonry Repairs
SOM File Number: 472/16419.APL SOM Index No.: 46630 PIA Project Number: 17-134 Issue Date: January 30, 2018
Project Location: Freeland, Michigan .
To the Contract Documents for the requested Entrance Door Replacement and Masonry Repairs at Saginaw Correctional Facility. This Addendum forms a part of the above described Contract Documents and supersedes, supplements or clarifies parts thereof to the extent defined by the terms set forth in this Addendum.
Note:
Addendum #6, issued previously on January 25, 2016 is deleted in entirety.
This Addendum consists of five (5) typed pages and the following attachments:
Specifications / Project Manual o Bid Summary Form and Bid Schedules o Table of Contents
Drawings:
o A0-03 “SK-1” - Door Schedules, Frame and Door Types, Special Frame Details o A1-01 “SK-2” - Enlarged Door Area Floor Plans – Demo, Buildings 100, 200 o A3-01 “SK-3” - Enlarged Door Area Floor Plans – New, Buildings 100, 200 o E1-01 “SK-4” - Enlarged Door Area Power Plans – Demo o E3-01 “SK-5” - Enlarged Door Area Power Plans – New
PROJECT MANUAL / SPECIFICATIONS
Item # Description
Item SP-1 Bid Summary (revised, and reissued this addendum):
A. REVISE “Bid Summary and Bid Schedules” form as follows:
1. REVISE “ Bid Opening Date” to read:
February 7, 2018, at 2:00 pm local time.
Item SP-2 Table of Contents, (revised, and reissued this addendum):
A. REVISE Table of Contents “Division 8 - Openings” as follows:
1. ADD Section 083463 “Detention Doors and Frames”.
2. DELETE Section 084229 “Sliding Automatic Entrances”.
Masonry Repairs Page 2 of 5
Item SP-3 Section 00010 – Pre-Bid information, (revised but not reissued this addendum):
A. REVISE “Pre-Bid Information paragraph #1, “Invitation to Bid” as follows:
1. REVISE to read:
The State of Michigan as the Owner will receive bids electronically through the SIGMA VSS website at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService, for Department of Corrections Saginaw Correctional - Entrance Door Replacement and Masonry Repairs until 2:00 p.m., local time, on February 7, 2018.
B. REVISE “Pre-Bid Conference, paragraph #5, as follows:
1. REVISE “Contact Person, paragraph #8, as follows:
“Questions will be accepted until February 2, 2018 at 1:00 pm
Item SP-4 Section 00100 – Instructions to Bidders (revised but not reissued this addendum):
A. Paragraph 22, Contract Time, revise schedule to read as follows:
Project Schedule:
Pre-Bid Walk-Through Inspection October 25, 2017 1:00 P.M.
Second Pre-Bid Walk-thru December 6, 2017 1:00 P.M Last Date for Questions February 2, 2018 1:00 P.M.
Bid Due Date February 7, 2018 2:00 P.M Administrative Board of Contract Approval March 13, 2018 Executed Contract with Contractor March 28, 2018 Sliding Security Entrances Start (30 day completion) Anytime this winter/spring
(during facilities third work shift) Sliding Security Entrances Completed Start plus 30 days total Masonry Repair Work Starts (120 days Completion) April 16, 2018 Entrance Door Replacement Starts (120 days Completion) April 16, 2018 (Start date allows for submittal review and fabrication lead time.
Contractor to provide two crews for entrance door replacement work) Masonry Repair Work completed August 13, 2018 Entrance Door Replacement Completion August 13, 2018
Item SP-5 Section 01300 Submittals, (revised, but not reissued this addendum):
A. REVISE Section 01300 Submittals, “Shop Drawings” as follows:
1. ADD - Detention Doors and Frames Section 083463
2. DELETE Sliding Automatic Entrances. Section 084229
B. REVISE Section 01300 Submittals, “Samples” as follows:
1. ADD - Detention Doors and Frames Section 083463
2. DELETE Sliding Automatic Entrances. Section 084229
Item SP-6 Section 087100 - Door Hardware Schedule (revised, but not re-issued):
A. 3.8 - Door Hardware Sets, revise as follows:
1. REVISE Hardware Set #1.1, as follows:
https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService
Masonry Repairs Page 3 of 5
(Note: Bold Face / underlined text denotes revised hardware text):
Set: 1.1 Doors: 100-S1, 100-S2, 100-S4
1 EA Locking Device E1 – Rack Drive Willo or Equiv.
1 EA Manual Release Column w/ #10 Deadlock keyed two sides Willo or Equiv.
2 EA Electric Key Switch Both sides of door 1 EA Door Guide Wall Mtd. by Manuf. to HM Framing Willo or Equiv.
1 EA Door Guide Angle Mtd. to bott. of door Willo or Equiv.
1 EA Raised Pull 701 Door Operator Side 626 Port/Midwest
1 EA Recessed Pull 705 Opposite Side or Integral pull by door manufacturer
626 Port/Midwest
2. REVISE Hardware Set,#1.2 as follows:
(Note: Bold Face / underlined text denotes revised hardware text):
Set: 1.2 Doors: 100-S3
1 EA Locking Device E1 – Rack Drive Willo or Equiv.
1 EA Manual Release Column w/ #10 Deadlock keyed two sides Willo or Equiv.
1 EA Electric Key Switch One side of door 1 EA Door Guide Wall Mtd. by Manuf. to HM Framing Willo or Equiv.
1 EA Door Guide Angle Mtd. to bott. of door Willo or Equiv.
1 EA Raised Pull 701 Door Operator Side 626 Port/Midwest
1 EA Recessed Pull 705 Opposite Side or Integral pull by door manufacturer
626 Port/Midwest
Item SP-7 Appendix IV Prevailing Wage Rates (revised and reissued per this addendum):
A. REVISED “Prevailing Wage Rates” have been issued.as follows:
1. Current Prevailing Wage Rates have been issued and are available under a separate file (Wage
Rate (Updated).pdf) within the Sigma VSS system”, rather than reissuing them as they are already on the website.
https://www.openingsstudio.com/AAOS/AAOS/CutSheetViewer.jsp?IDS=135555360, https://www.openingsstudio.com/AAOS/AAOS/CutSheetViewer.jsp?IDS=135555360, Masonry Repairs Page 4 of 5
DRAWINGS
Architectural
Item Description
Item A-1 Drawing Sheet A0-03 Door Schedule, Frame and Door Types & Details (revised, and reissued this addendum per drawing Sheet “SK-1”):
A. REVISE Door / Opening Key Notes as follows and as indicated on attached Sheet “SK-1”:
1. REVISE Door / Opening Key Notes #6, 7, 8, 9, 10 and 11 as indicated.
2. ADD Door / Opening Key Notes #12 as indicated.
B. Revise Door / Opening Schedule as follows and as indicated on attached Sheet “SK-1”:
1. ADD Key Note #10 in Key Note column for Door # 100E as indicated.
2. DELETE Key Note #10 in Key Note column from Door # 100F as indicated.
3. REVISE to read Key Notes #2, 4, and 6 in Key Note column for Door # 100-S1 as indicated.
4. REVISE to read Key Notes #2, 4, 7 and 12 in Key Note column for Door # 100-S2 as indicated.
5. REVISE Door 100-S2 hardware set to read Set # 1.1 as indicated on attached Sheet “SK-1”.
6. REVISE Door 100-S3 hardware set to read Set # 1.2 as indicated on attached Sheet “SK-1”
7. REVISE Door 100-S4 hardware set to read Set # 1.1 as indicated on attached Sheet “SK-1”
Item A-2 Drawing Sheet A1-01 Enlarged Door Area Floor Plans – Demo- Bldgs 100, 200, (revised, but not reissued per this addendum):
A. Revise Enlarged Demo Floor Plans as follows:
1. ADD words “ALTERNATE #3” to “Detail 6B - Enlarged Demo Floor Plan - Door 100-S2”.
Item A-3 Drawing Sheet A1-01 Enlarged Door Area Floor Plans – Demo- Bldgs 100, 200, (revised, and reissued per this addendum per attached drawing Sheet “SK-2”):
A. Revise Enlarged Demo Floor Plans as follows:
1. REVISE “Demo Floor Plan – Legend” as indicated on attached Sheet “SK-2”
2. ADD “Detention Sliding Door Construction Phasing” as indicated on attached Sheet “SK-2”.
Item A-4 Drawing Sheet A3-01 Enlarged Door Area Floor Plans – New- Bldgs 100, 200, (revised, but not reissued per this addendum):
A. Revise Enlarged New Floor Plans as follows:
1. ADD words “ALTERNATE #3” to “Detail 6B - Enlarged New Floor Plan - Door 100-S2”.
Item A-5 Drawing Sheet A3-01 Enlarged Door Area Floor Plans – New - Bldgs 100, 200, (revised, and reissued this addendum per drawing Sheet “SK-3”):
A. Revise Enlarged New Floor Plans as follows:
1. REVISE “New Floor Plan – Legend” as indicated on attached Sheet “SK-3”
2. ADD “Detention Sliding Door Construction Phasing” as indicated on attached Sheet “SK-3”.
Masonry Repairs Page 5 of 5
Electrical
Item Description
Item E-1 Drawing Sheet E1-01 Enlarged Door Area Power Plans – Demo (revised, but not reissued per this addendum:
A. Revise Enlarged Door Area Power Plans – Demo as follows:
1. ADD words “ALTERNATE #3” to “Detail 2B - Enlarged Electrical Demo Plan - Door 100-S2”.
Item E-2 Drawing Sheet E1-01 Enlarged Door Area Power Plans – Demo, (revised, and reissued per this addendum per attached drawing Sheet “SK-4”):
A. Revise Enlarged Demo Electrical Power Plan Key Notes as follows:
1. REVISE Demo Power Plan Key Notes #6, 7, 8, 9, 10 and 11 as indicated on sheet “SK-4”
B. ADD “Detention Sliding Door Construction Phasing” as indicated on attached Sheet “SK-4”.
Item E-3 Drawing Sheet E3-01 Enlarged Door Area Power Plans – New (revised, but not reissued per this addendum:
A. Revise Enlarged Door Area Power Plans – New as follows:
1. ADD words “ALTERNATE #3” to “Detail 2B - Enlarged Electrical New Plan - Door 100-S2”.
Item E-4 Drawing Sheet E3-01 Enlarged Door Area Power Plans – New, (revised, and reissued per this addendum per attached drawing Sheet “SK-5”):
A. Revise Enlarged New Electrical Power Plan Key Notes as follows:
1. REVISE New Power Plan Key Notes #2, 3, 6, 7, 8, 9, 10 and 11 as indicated on sheet “SK-5”
B. ADD “Detention Sliding Door Construction Phasing” as indicated on attached Sheet “SK-5”.
**END OF ADDENDUM**
Bidding and Contract Document (R 6/16) Project Name: SCF-Entrance Door Replacement & Masonry Repairs – File No. 472/16419.APL
BID SUMMARY
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
3111 W. St. Joseph Street Lansing, Michigan 48917
Bids must be submitted electronically through the SIGMA VSS website at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService
FILE NUMBER
472/16419
INDEX NUMBER
46630
DEPARTMENT/AGENCY
Department of Corrections-Saginaw Correctional Facility
CONTRACT TIME(S)
See Section 00100 Instructions to Bidders (Paragraph 22)
PROJECT NAME
Department of Corrections Saginaw Correctional facility Entrance Door Replacement and Masonry Repairs
LOCATION
Saginaw Correctional Facility
BID OPENING DATE
FEBRUARY 7, 2018 at 2:00 pm Local Time
FOR AN EXAMINATION OF THE SITE CONTACT:
Ed LaPlante, Facility Manager Saginaw Correctional Facility 989-695-9880
SEE SECTION 00100 INSTRUCTIONS TO BIDDERS AND SECTION 00700 GENERAL CONDITIONS PROVIDED WITH THE BIDDING DOCUMENTS.
BID: WE PROPOSE TO FURNISH, PERFORM AND COMPLETE THE ENTIRE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS IN
CONSIDERATION OF THE BID PRICE (S) STATED BELOW.
FIRM NAME AND COMPLETE ADDRESS TELEPHONE NUMBER and E-MAIL ADDRESS
□ Qualified Disabled Veteran
FEDERAL I.D. NUMBER
(protected information required for processing payments)
BIDDER'S SIGNATURE AND TITLE DATE
WITNESS' SIGNATURE DATE
By signing this bid above, bidder certifies their enclosed Qualified Disabled Veteran and Michigan-Based Business Certifications.
BASE BID FROM BID SCHEDULE (Include specified Allowances):
________________________________________________________________________Dollars $____________________ (use words) (in figures)
Alternate-1: (Subtract) ______________________________________________________ Dollars $ ____________________ (use words) (in figures)
Alternate-2: (Subtract) ______________________________________________________ Dollars $ ____________________
Alternate-3: (Subtract) ______________________________________________________ Dollars $ ____________________ (use words) (in figures)
Builders Risk Insurance is NOT provided by the State of Michigan. (See Section 00700, No. 3, Paragraph 3.4.)
A PERFORMANCE BOND AND A PAYMENT BOND ARE REQUIRED FOR ALL BIDS OVER $50,000.00. EACH BID MUST BE ACCOMPANIED
BY A FIVE (5) PERCENT BID GUARANTEE.
BIDDERS ARE ALSO CAUTIONED TO FAMILIARIZE THEMSELVES WITH ALL OF THE OTHER CONDITIONS OF THE CONTRACT.
Project Scope of Work:
Removal and Replacement of existing hollow metal security doors and frames, aluminum entrances and storefront, and automatic hollow metal sliding security gates. Additional work includes masonry repairs to various facility buildings. All work is within the Saginaw Correctional Facility secured perimeter of Program buildings and Housing units. Door replacement work includes new door hardware and installation of new and salvaged hardware components including remote control and door monitoring devices, new security glazing, removal/replacement and refinishing of floor and wall finishes, interior and exterior painting. Masonry repair scope of work includes tuckpointing, crack repair, brick removal and replacement, expansion joint removal and replacement, new expansion joint construction, sealants, and flashings.
.The Bidder must figure its Base Bid on the specified, or Addendum-approved, materials and equipment only. No “or equal” or substitution proposals will be permitted after Bid opening, except as provided in the General Conditions.
Bidding and Contract Document (R 6/16) Project Name: SCF-Entrance Door Replacement & Masonry Repairs – File No. 472/16419.APL
Addenda: Bidder acknowledges receipt of following Addenda:
No. ____ dated: _________; No. ____ dated: _________; No. ____ dated: _________;
No. ____ dated: _________; No. ____ dated: _________; No. ____ dated: _________.
FIRM NAME TELEPHONE NUMBER and E-MAIL ADDRESS
BID SCHEDULE
A. Base Bid Schedule - The Bidder will complete the Work and accept as full payment for the Work items listed including the following Prices and/or Item Bid Prices, as applicable:
1. Base Bid (Labor & Material for all work including selective demolition, flashings, masonry repairs, entrance door replacement, sliding security gates, door hardware, glazing, finishes, painting and electrical”):
_______________________________________________________________________ Dollars $___________________
2. Section 01020 “ Allowances”
1.1 019000 “Quantity Allowances”
Allowance Unit Allowance Bid Description Allowance Item No. Quantity Price (Bidder to write allowance price in words) Price____ .
No.1 200 SQ. FT. x ______/S.F = ___________________________________________ $_______.___
(IN FIGURES) (USE WORDS) (IN FIGURES)
No.2 100 SQ. FT. x ______/S.F = ___________________________________________ $_______.___
(IN FIGURES) (USE WORDS) (IN FIGURES)
No.3 100 LIN. FT. x ______/L.F = ___________________________________________ $_______.___
(IN FIGURES) (USE WORDS) (IN FIGURES)
No.4 100 LIN. FT. x ______/L.F = ___________________________________________ $_______.___
(IN FIGURES) (USE WORDS) (IN FIGURES)
No.5 100 LIN. FT. x ______/L.F = ___________________________________________ $_______.___
(IN FIGURES) (USE WORDS) (IN FIGURES)
1.2 Provisional / Contingency Allowance……………………………………………………………….$ 50,000.00
TOTAL BASE BID (Sum of all Item Bid Prices above for all Base Bid Items including Allowances):
_______________________________________________________________________ Dollars $________________ . __
Bidding and Contract Document (R 6/16) Project Name: SCF-Entrance Door Replacement & Masonry Repairs – File No. 472/16419.APL
FIRM NAME TELEPHONE NUMBER and E-MAIL ADDRESS
BID SCHEDULE (continued)
B. Section 019500 Unit Prices
Schedule of Unit Prices - The Bidder will complete (or deduct from the Contract) the parts of the Work designated by the Unit Prices that follow and accept in full payment (or allow in full credit) for those parts of the Work the following Item Bid Prices:
Unit Price Description Unit Item No. (Bidder to write Unit Price in words) Price
No.1 ____________________________________________/ S.F. ______/ S.F.
(USE WORDS) (in figures)
No.2 ____________________________________________/ S.F. ______/ S.F.
No.3 ____________________________________________/ L.F. ______/ L.F.
No.4 ____________________________________________/ L.F. ______/ L.F.
No.5 ____________________________________________/ L.F. ______/ L.F.
C. Section 01030 Alternates
1. Schedule of Alternates - The Bidder will complete (or deduct from the Contract) the parts of the Work designated by the Alternates that follow and accept in full payment (or allow in full credit) for those parts of the Work the following Item Bid Prices:
Alternate-1 Description: Labor and Material for Deletion of Hollow Metal Door / Frame Removal and Replacement of doors 200K,200L, 200M, 200N, 300A, 800B, 900A:
Item Bid Item No. (Bidder to write Alternate price in words) Price
____1_____ _____________________________________________________________________ Deduct ___________.___ (USE WORDS) (in figures) (in figures)
Alternate-2 Description: Labor and Material for Deletion of Masonry and Flashing Repairs to Partial West Elevation of
Building 100:
Item No. (Bidder to write Alternate price in words) Price
____2_____ _____________________________________________________________________ Deduct ___________.___
Alternate-3 Description: Labor and Material for Removal and Replacement of Sliding Detention Door 100-S2
Item No. (Bidder to write Alternate price in words) Price
____3_____ _____________________________________________________________________ Deduct ___________.___
The Bidder further acknowledges and agrees that the separate prices bid on this “Schedule of Alternates,” where they are applicable and deemed acceptable by the Owner, will be used if incorporated into the Contract when the Owner issues the Notice of Award.
Bidding and Contract Document (R 6/16) Project Name: SCF-Entrance Door Replacement & Masonry Repairs – File No. 472/16419.APL
TABLE OF CONTENTS
CONTRACT FORMS
BID SUMMARY FORM
BID SCHEDULE
QUALIFIED DISABLED VETERAN (QDV) BUSINESS REPRESENTATION
CERTIFICATION OF A MICHIGAN BASED BUSINESS
BID BOND
POST-BID SUBMITTALS
PERFORMANCE BOND
PAYMENT BOND
TABLE OF CONTENTS TC-1 thru TC-3
DIVISION 00 BIDDING REQUIREMENTS AND CONTRACT CONDITIONS
SECTION TITLE PAGES THRU
00010 PRE-BID INFORMATION 00-1
00100 INSTRUCTIONS TO BIDDERS 00-2 thru 00-6
00120 SUPPLEMENTARY INSTRUCTIONS 00-6
00200 INFORMATION TO BIDDERS 00-6
00700 GENERAL CONDITIONS 00-7 thru 00-18
00750 SPECIAL WORKING CONDITIONS 00-18
00800 SUPPLEMENTARY CONDITIONS 00-18
00850 WAGE DETERMINATION SCHEDULE 00-19
00900 ADDENDA 00-19
DIVISION 01 - GENERAL REQUIREMENTS
01010 SUMMARY OF WORK 01-1
01020 ALLOWANCES 01-1
01025 MEASUREMENT AND PAYMENT 01-1
01030 ALTERNATES 01-2
01040 COORDINATION 01-2
01050 FIELD ENGINEERING 01-2
01060 REGULATORY REQUIREMENTS 01-2 thru 01-4 01090 REFERENCES 01-4 thru 01-5
01100 PROJECT PROCEDURES 01-5
01200 PROJECT MEETINGS 01-5
01300 SUBMITTALS 01-5 thru 01-7
01400 QUALITY CONTROL 01-7
01500 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS 01-7
01600 MATERIAL AND EQUIPMENT 01-7 thru 01-8
01650 FACILITY START-UP 01-8
01700 CONTRACT CLOSE-OUT 01-8
01800 MAINTENANCE 01-9
012500 SUBSTITUTION PROCEDURES 1 thru 3 013100 PROJECT MANAGEMENT AND COORDINATION 1 thru 6 013300 SUBMITTAL PROCEDURES 1 thru 8 013516 ALTERATION PROJECT PROCEDURES 1 thru 6 014000 QUALITY REQUIREMENTS 1 thru 6 014200 REFERENCES 1 thru 10 016000 PRODUCT REQUIREMENTS 1 thru 4
TC-1
Bidding and Contract Document (R 6/16) Project Name: SCF-Entrance Door Replacement & Masonry Repairs – File No. 472/16419.APL
017300 EXECUTION 1 thru 6 017700 CLOSEOUT PROCEDURES 1 thru 4 017823 OPERATION AND MAINTENANCE DATA 1 thru 7 017839 PROJECT RECORD DOCUMENTS 1 thru 2 017900 DEMONSTRATION AND TRAINING 1 thru 4 019000 ALLOWANCES 1 thru 2 019500 UNIT PRICES 1 thru 2
DIVISION 02 – EXISTING CONDITIONS
024119 SELECTIVE DEMOLITION 1 thru 4
DIVISION 03 – CONCRETE
033000 CAST IN PLACE CONCRETE 1 thru 12
DIVISION 04 – MASONRY
040120.63 BRICK MASONRY REPAIR 1 thru 12
040120.64 BRICK MASONRY REPOINTING 1 thru 8
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
076200 SHEET METAL FLASHING AND TRIM 1 thru 6 079200 JOINT SEALANTS 1 thru 4
DIVISION 08 – OPENINGS
081113 HOLLOW METAL DOORS, FRAMES 1 thru 8 083463 DETENTION DOORS AND FRAMES 1 thru 13 084113 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 1 thru 8 087100 DOOR HARDWARE 1 thru 20 088000 GLAZING 1 thru 6 088853 SECURITY GLAZING 1 thru 8
DIVISION 09 – FINISHES
093000 TILING 1 thru 4 096513 RESILIENT BASE AND ACCESSORIES 1 thru 4 096519 RESILIENT TILE 1 thru 4 099113 EXTERIOR PAINT 1 thru 4 099123 INTERIOR PAINT 1 thru 6
DIVISION 26 – ELECTRICAL
260500 BASIC ELECTRICAL REQUIREMENTS 1 thru 5
260519 LOW VOLTAGE, ELECTRICAL POWER CONDUCTORS AND CABLES 8
260534 CONDUITS 4
260537 BOXES 2
APPENDICIES
APPENDIX I – GLOSSARY
APPENDIX II – SPECIAL WORKING CONDITIONS
LIEN REQUEST FORM
APPENDIX III – SPECIAL PROJECT PROCEDURES
APPENDIX IV – PREVAILING WAGE RATES
TC-2
Bidding and Contract Document (R 6/16) Project Name: SCF-Entrance Door Replacement & Masonry Repairs – File No. 472/16419.APL
DRAWINGS - BOUND SEPARATELY
TITLE SHEET No.
COVER SHEET - ENTRANCE DOOR REPLACEMENT AND MASONRY REPAIRS A0-00
ARCHITECTURAL
GENERAL PROJECT INFORMATION A0-01
COMPOSITE CAMPUS PLAN A0-02
DOOR & FRAME SCHEDULES, TYPES, AND DETAILS A0-03
OPENING DETAILS A0-04
OPENING DETAILS A0-05
ENLARGED DOOR AREA FLOOR PLANS - DEMO - BUILDINGS 100, 200 A1-01
ENLARGED DOOR AREA FLOOR PLANS - DEMO
BUILDINGS 300, 400, 500, 700, 800, 900, 1100, 1200
A1-02
ENLARGED DOOR AREA FLOOR PLANS - NEW - BUILDINGS 100, 200 A3-01
ENLARGED DOOR AREA FLOOR PLANS - NEW –
BUILDINGS 300, 400, 500, 700, 800, 900, 1100, 1200
A3-02
EXTERIOR ELEVATIONS, MASONRY REPAIRS - BUILDING 100 A5-01
EXTERIOR ELEVATIONS, MASONRY REPAIRS - BUILDING 300 A5-02
EXTERIOR ELEVATIONS, MASONRY REPAIRS - BUILDING 800 AND 900 A5-03
EXTERIOR ELEVATIONS, MASONRY REPAIRS - BUILDING 1100 A5-04
WALL SECTIONS AND DETAILS A6-01
ELECTRICAL
COMPOSITE CAMPUS ELECTRICAL PLAN
E0-02
ENLARGED DOOR AREA FLOOR PLANS – ELECTRICAL DEMO –
BUILDINGS 100, 200, 500, 700, 800, 900, and 1200
E1-01
ENLARGED DOOR AREA FLOOR PLANS – ELECTRICAL NEW –
BUILDINGS 100, 200, 500, 700, 800, 900, and 1200
E3-01
TC-3
Door / Opening Schedule - Main Level
DOOR NO.
DOOR / OPENING SIZE (W X H)
(CONTRACTOR TO VERIFY DOOR
SIZE IF OPENING IS EXISTING)
DOOR FRAME FRAME
DEPTH
DETAILS
SEE SHEETS A0-04 & A0-05
WALL
THICKNESS
FIELD VERIFY
HDWR
SET
DOOR / OPENING
KEY NOTES
TYPE MATERIAL FINISH TYPE MATERIAL FINISH HEAD JAMB THRES. / SILL
100A-1 3'-4" X 6'-10" F ALUM. PREFIN. F12 ALUM. PREFIN. 6 1/2" D19/ D20 D21 / D22 T1 / D23 14 2.0
100A-2 3'-4" X 6'-10" F ALUM PREFIN
SAME AS
100A-1
- - - - 6 1/2" D19 / D20 D21 / D22 T1 / D23 14 2.0
100B-1 3'-4" X 7'-2" F ALUM. PREFIN. F12 ALUM. PREFIN. 6 1/2" D24 / D25 D22 / D26 D27 6 3.0
100B-2 3'-4" x 7'-2" F ALUM PREFIN
SAME AS
100B-1
- - - - 6 1/2" D24 / D25 D22 / D26 D27 6 3.0
100C 3'-2" X 6'-10" E HM PNT-1 F1 HM PNT-1 10 D1 D2 T1 14 7.0
100D 3'-0" X 6'-10" B HM PNT-1 F1 HM PNT-1 10 D1 D2 T2 14 8.0
100E EXISTING TO REMAIN - - - - - - - - - - - - - - - - - - - - - - - - 10
100F EXISTING TO REMAIN - - - - - - - - - - - - - - - - - - - - - - - -
100G EXISTING TO REMAIN - - - - - - - - - - - - - - - - - - - - - - - - 11
100S1 3'-6" CLEAR (6'-4" X 8'-0" M.O.) G HM PNT-1 F13 HM PNT-1 8" D43 D33 / D37 D31 / D32 8" 1.1 2, 4, 6
100S2 3'-6" CLEAR (6'-4" X 8'-0" M.O.) G HM PNT-1 F13 HM PNT-1 8" D43 D33 / D37 D31 / D32 8" / 12" 1.1 2, 4, 7, 12
100S3 3'-6" CLEAR (6'-4" X 8'-0" M.O.) G HM PNT-1 F13 HM PNT-1 8" D43 D37 / D36 D31 / D32 8 1.2 2, 4, 8
100S4 3'-6" CLEAR (6'-4" x 8'-0" M.O.) G HM PNT-1 F13 HM PNT-1 8" D43 D34 / D37 D31 / D32 8" / 12" 1.1 2, 4, 9
Door/ Opening Key Notes:
1. DEDUCT ALTERNATE NO. 1
2. FABRICATE CUSTOM HOLLOW METAL DOOR FRAME ASSEMBLY.
3. REINSTALL SALVAGED ELECTRO-MECHANICAL LOCK IN DOOR FRAME. REFER TO HARDWARE SCHEDULE IN SPECS.
4. SLIDING SECURITY ENTRANCE GATE HARDWARE WITH HOLLOW METAL DOOR.
5. REMOVABLE MULLION
6. INTERLOCK DOOR #1 (100-S1) WITH DOORS #2 AND #3 (100-S2, 100-S3)
7. INTERLOCK DOOR #2 (100-S2) WITH DOORS #1 AND #3 (100-S1, 100-S3)
8. INTERLOCK DOOR #3 (100-S3) WITH DOORS #1, #2 AND #4 (100-S1, 100-S2, AND 100-S4)
9. INTERLOCK DOOR #4 (100-S4) WITH DOORS #3 (100-S3) AND EXISTING DOORS 100E AND 100G
10. INTERLOCK DOOR 100E WITH DOORS #4 (100-S4) AND 100G
11. INTERLOCK DOOR 100G WITH DOORS #4 (100-S4) AND 100E
12. DEDUCT ALTERNATE #3
ADDENDUM
-6R
SK-1
A 0-03
01/30/2018
10/10/2017 pdf pdf 17-134
M asonry R epairs E ntrance D oor R eplacem ent and
S aginaw
C orrectional Facility
DEMO FLOOR PLAN - LEGEND:
EXISTING WALL
EXISTING
SIDELIGHT FRAME
& GLAZING
EXISTING DOOR /
FRAME
EXISTING SIDELIGHT
FRAME & GLAZING TO
BE REMOVED
EXISTING DOOR / FRAME
TO BE REMOVED
EXISTING FLOOR FINISHES
TO BE REMOVED
EXISTING CONCRETE SILL
SECTION TO BE REMOVED
EXISTING SLIDING DOOR &
FRAME TO BE REMOVED
DETENTION SLIDING DOOR CONSTRUCTION PHASING:
NOTE: ALL WORK PERFORMED DURING THIRD SHIFT:
A. DOOR 1 (100-S1)
A.1. REMOVE, REPLACE, AND MAKE OPERATIONAL
A.2. DOOR 1 WORK TO BE COMPLETED PRIOR TO REMOVAL AND
REPLACEMENT OF DOOR 3
A.3. WORK DURATION (1 DAY)
B. DOOR 3 (100-S3)
B.1. REMOVE, REPLACE, AND MAKE OPERATIONAL
B.2. DOOR 3 WORK TO BE COMPLETED PRIOR TO REMOVAL AND
REPLACEMENT OF DOOR 4
B.3. WORK DURATION (1 )
C. DOOR 4 (100-S4)
C.1. REMOVE, REPLACE, AND MAKE OPERATIONAL
C.2. DOOR 4 WORK TO COMPLETED PRIOR TO REMOVAL AND REPLACEMENT
OF DOOR 2.
C.3. WORK DURATION (1 DAY)
D. DOOR 2 (100-S2 - ALTERNATE #3)
D.1. REMOVE, REPLACE, AND MAKE OPERATIONAL
D.2. WORK DURATION (1 DAY)
E. COMPLETE INSTALLATION OF FINISH MATERIALS AND PAINTING
PROJECT NUMBER:
PROJECT NAME:PARTNERS in Architecture, PLC 96 Macomb Place
Mount Clemens, MI 48043
(p) 586 469 3600
(f) 586 469 3607
REV:
DATE:
CHECKED BY:
DRAWN BY:
DRAWING NO:
DRAWING REF.:
DOC. ISSUE:
ADDENDUM-6R
SK-2
A1-01 01/30/2018
10/10/2017 pdf pdf17-134
Masonry Repairs Entrance Door Replacement and Saginaw Correctional Facility
NEW FLOOR PLAN - LEGEND:
NEW SIDELIGHT
FRAME & GLAZING
NEW DOOR / FRAME
FLOOR AND WALL BASE TO
BE PATCHED WHERE
EXISTING FLOOR FINISH
WAS REMOVED / DAMAGED
EXISTING WALL
TO REMAIN
EXISTING SIDELIGHT
FRAME & GLAZING
EXISTING DOOR /
FRAME
NEW CONCRETE SILL
SECTION
NEW SLIDING DOOR &
FRAME TO BE INSTALLED
DETENTION SLIDING DOOR CONSTRUCTION PHASING:
PROJECT NUMBER:
PROJECT NAME:PARTNERS in Architecture, PLC 96 Macomb Place
Mount Clemens, MI 48043
(p) 586 469 3600
(f) 586 469 3607
REV:
DATE:
CHECKED BY:
DRAWN BY:
DRAWING NO:
DRAWING REF.:
DOC. ISSUE:
ADDENDUM-6R
SK-3
A3-01 01/30/2018
10/10/2017 pdf pdf17-134
Masonry Repairs Entrance Door Replacement and Saginaw Correctional Facility
NOTE: ALL WORK PERFORMED DURING THIRD SHIFT:
A. DOOR 1 (100-S1)
A.1. REMOVE, REPLACE, AND MAKE OPERATIONAL
A.2. DOOR 1 WORK TO BE COMPLETED PRIOR TO REMOVAL AND
REPLACEMENT OF DOOR 3
A.3. WORK DURATION (1 DAY)
B. DOOR 3 (100-S3)
B.1. REMOVE, REPLACE, AND MAKE OPERATIONAL
B.2. DOOR 3 WORK TO BE COMPLETED PRIOR TO REMOVAL AND
REPLACEMENT OF DOOR 4
B.3. WORK DURATION (1 )
C. DOOR 4 (100-S4)
C.1. REMOVE, REPLACE, AND MAKE OPERATIONAL
C.2. DOOR 4 WORK TO COMPLETED PRIOR TO REMOVAL AND REPLACEMENT
OF DOOR 2.
C.3. WORK DURATION (1 DAY)
D. DOOR 2 (100-S2 - ALTERNATE #3)
D.1. REMOVE, REPLACE, AND MAKE OPERATIONAL
D.2. WORK DURATION (1 DAY)
E. COMPLETE INSTALLATION OF FINISH MATERIALS AND PAINTING
DEMO ELECTRICAL POWER PLAN - KEY NOTES:
VERIFY 24V. CIRCUIT TO EXISTING ELECTRO-MECHANICAL DETENTION LOCK IN
DOOR FRAME. DISCONNECT EXISTING 24V. ELECTRICAL POWER AT EXISTING
ELECTRO-MECHANICAL DETENTION LOCK. PULL WIRE BACK, AND PREP FOR
RE-USE AND RECONNECTION TO REINSTALLED ELECTRO-MECHANICAL DETENTION
LOCK IN NEW DOOR FRAME.
VERIFY 24V. CIRCUIT TO EXISTING DETENTION LOCK IN EXISTING SLIDING DOOR
FRAME. DISCONNECT EXISTING 24V. ELECTRICAL POWER AT EXISTING LOCK.
PULL WIRE BACK, AND PREP FOR RE-USE AND RECONNECTION TO NEW DETENTION
LOCK IN NEW SLIDING SECURITY ENTRANCE DOOR FRAME.
VERIFY 120V. CIRCUIT TO EXISTING SLIDING SECURITY ENTRANCE MOTOR
OPERATOR IN DOOR FRAME. DISCONNECT EXISTING 120V. ELECTRICAL POWER AT
MOTOR OPERATOR. PULL WIRE BACK, AND PREP FOR RE-USE AND RECONNECTION
TO NEW MOTOR OPERATOR IN NEW SLIDING SECURITY ENTRANCE DOOR FRAME.
EXISTING HOLLOW METAL DOOR AND FRAME TO BE REMOVED. REFER TO
ARCHITECTURAL
EXISTING SLIDING SECURITY ENTRANCE DOOR AND FRAME TO BE REMOVED.
REFER TO ARCHITECTURAL
DOOR 100-S1 INTERLOCKED WITH DOOR 100-S2, 100-S3
DOOR 100-S2 INTERLOCKED WITH DOOR 100-S1, 100-S3
DOOR 100-S3 INTERLOCKED WITH DOORS 100-S1, 100-S2, 100-S4
DOOR 100-S4 INTERLOCKED WITH DOOR 100-S3, 100E, 100G
DOOR 100E INTERLOCKED WITH DOORS 100-S4, AND 100G
DOOR 100G INTERLOCKED WITH DOORS 100-S4, AND 100E
PROJECT NUMBER:
PROJECT NAME:PARTNERS in Architecture, PLC 96 Macomb Place
Mount Clemens, MI 48043
(p) 586 469 3600
(f) 586 469 3607
REV:
DATE:
CHECKED BY:
DRAWN BY:
DRAWING NO:
DRAWING REF.:
DOC. ISSUE:
ADDENDUM-6R
SK-4
E1-01 01/30/2018
10/10/2017 pdf pdf17-134
Masonry Repairs Entrance Door Replacement and Saginaw Correctional Facility
DETENTION SLIDING DOOR CONSTRUCTION PHASING:
NOTE: ALL WORK PERFORMED DURING THIRD SHIFT:
A. DOOR 1 (100-S1)
A.1. REMOVE, REPLACE, AND MAKE OPERATIONAL
A.2. DOOR 1 WORK TO BE COMPLETED PRIOR TO REMOVAL AND
REPLACEMENT OF DOOR 3
A.3. WORK DURATION (1 DAY)
B. DOOR 3 (100-S3)
B.1. REMOVE, REPLACE, AND MAKE OPERATIONAL
B.2. DOOR 3 WORK TO BE COMPLETED PRIOR TO REMOVAL AND
REPLACEMENT OF DOOR 4
B.3. WORK DURATION (1 DAY)
C. DOOR 4 (100-S4)
C.1. REMOVE, REPLACE, AND MAKE OPERATIONAL
C.2. DOOR 4 WORK TO COMPLETED PRIOR TO REMOVAL AND REPLACEMENT
OF DOOR 2.
C.3. WORK DURATION (1 DAY)
D. DOOR 2 (100-S2 - ALTERNATE #3)
D.1. REMOVE, REPLACE, AND MAKE OPERATIONAL
NEW ELECTRICAL POWER PLAN - KEY NOTES:
RE-CONNECT 24V. ELECTRICAL POWER TO RE-INSTALLED ELECTRO-MECHANICAL
DETENTION LOCK IN NEW DOOR FRAME. PROVIDE NEW CONDUIT IN FRAME
ASSEMBLY AS REQUIRED.
RE-CONNECT 24V. ELECTRICAL POWER TO NEW DETENTION LOCK IN SLIDING
SECURITY ENTRANCE DOOR FRAME. PROVIDE NEW CONDUIT / WIRE AS REQUIRED.
RE-CONNECT 120V. ELECTRICAL POWER TO NEW SLIDING SECURITY ENTRANCE
MOTOR OPERATOR IN DOOR HEADER. PROVIDE NEW CONDUIT / WIRE AS REQUIRED.
NEW HOLLOW METAL DOOR AND FRAME. REFER TO ARCHITECTURAL.
NEW SLIDING SECURITY ENTRANCE DOOR. REFER TO ARCHITECTURAL.
RECONNECT CONTROL WIRING TO INTERLOCK DOOR 100-S1 WITH DOOR 100-S2,
100-S3
RECONNECT CONTROL WIRING TO INTERLOCK DOOR 100-S2 WITH DOOR 100-S1,
100-S3
RECONNECT CONTROL WIRING TO INTERLOCK DOOR 100-S3 WITH DOOR 100-S1,
100-S2, 100-S4
RECONNECT CONTROL WIRING TO INTERLOCK DOOR 100S-4 WITH DOORS 100-S3,
100E AND 100G
MAINTAIN / RECONNECT CONTROL WIRING TO INTERLOCK DOOR 100 E WITH DOORS
100-S4, AND 100G
MAINTAIN / RECONNECT CONTROL WIRING TO INTERLOCK DOOR 100G WITH DOORS
100-S4, AND 100E
PROJECT NUMBER:
PROJECT NAME:PARTNERS in Architecture, PLC 96 Macomb Place
Mount Clemens, MI 48043
(p) 586 469 3600
(f) 586 469 3607
REV:
DATE:
CHECKED BY:
DRAWN BY:
DRAWING NO:
DRAWING REF.:
DOC. ISSUE:
ADDENDUM-6R
SK-5
E3-01 01/30/2018
10/10/2017 pdf pdf17-134
Masonry Repairs Entrance Door Replacement and Saginaw Correctional Facility
DETENTION SLIDING DOOR CONSTRUCTION PHASING:
NOTE: ALL WORK PERFORMED DURING THIRD SHIFT:
A. DOOR 1 (100-S1)
A.1. REMOVE, REPLACE, AND MAKE OPERATIONAL
A.2. DOOR 1 WORK TO BE COMPLETED PRIOR TO REMOVAL AND
REPLACEMENT OF DOOR 3
A.3. WORK DURATION (1 DAY)
B. DOOR 3 (100-S3)
B.1. REMOVE, REPLACE, AND MAKE OPERATIONAL
B.2. DOOR 3 WORK TO BE COMPLETED PRIOR TO REMOVAL AND
REPLACEMENT OF DOOR 4
B.3. WORK DURATION (1 DAY)
C. DOOR 4 (100-S4)
C.1. REMOVE, REPLACE, AND MAKE OPERATIONAL
C.2. DOOR 4 WORK TO COMPLETED PRIOR TO REMOVAL AND REPLACEMENT
OF DOOR 2.
C.3. WORK DURATION (1 DAY)
D. DOOR 2 (100-S2 - ALTERNATE #3)
D.1. REMOVE, REPLACE, AND MAKE OPERATIONAL
| ADDENDUM-06R Write Up |
| Document1 |
| Bid Summary & Schedules |
| DCSpec_Rev__6-16_528116_7_SCF-2018-0130 2 |
| DCSpec_Rev__6-16_528116_7_SCF-2018-0130 3 |
| DCSpec_Rev__6-16_528116_7_SCF-2018-0130 4 |
| Table of Contents |
| DCSpec_Rev__6-16_528116_7_SCF-2018-0130 10 |
| DCSpec_Rev__6-16_528116_7_SCF-2018-0130 11 |
| DCSpec_Rev__6-16_528116_7_SCF-2018-0130 12 |
| Addendum-6R Drawings |
| A0-03-Door & Frame Schedules, Types, Details-A0-03 (SK-1) |
| A1-01_Enlarged Floor Plans-Demo-Bldgs-100-200-A1-01 (SK-2) |
| A3-01_Enlarged Floor Plans-Bldgs-100-200-A3-01 (SK-3) |
| E1-01_Enlarged Elec Power Demo Plans-Bldgs-100-200-500-700-800-900-1200-E1-01 (SK-4) |
| E3-01_Enlarged Elec Power Plans-Bldgs-100-200-500-700-800-900-1200-E3-01 (SK-5) |
File details come from the government source that posted it. Updated .