Text version
MILWAUKEE
Job Corps Center Milwaukee, WI
Facility Planning Report Volume II
Supporting Data
Final March 2016
Department of Labor/ Office of Job Corps
MILWAUKEE
Job Corps Center Milwaukee, WI
Facility Planning Report Volume II
Supporting Data
Final March 2016
Campus Yard between Dormitories and Gymnasium/Recreation Buildings
VOLUME II - SUPPORTING DATA
EXECUTIVE SUMMARY
1.0 SITE LAYOUT AND PLANS
• Location Map
• Exisiting Site Plan
2.0 DESCRIPTIONS
• Buildings and Structures
• Space Utilization By Function
• NSF by Building
• Environmental Management Report
• Asbestos Report
• Radon Report
• Site Descriptions
• Building Descriptions
3.0 DEFICIENCIES
APPENDICES - CORRESPONDENCE AND REPORTS
Appendix A.
• Center Review Meeting Minutes
• Survey Brief
• Student Questionnaire
Appendix B.
• Life Safety Defi ciencies and List
Appendix C.
• O&M Defi ciencies List
Appendix D.
• Active Warranty List
Executive Summary
The facility survey for the Grafton JCC was completed July 13, 2015 – July 17, 2015.
The information presented in Volume II, Supporting Data, represents the current status of the campus.
The information includes the following:
Existing site layout Overall status of existing building and structures Space utilization by building and function compared to recommended standards Status of environmental elements of the Center’s operations Details on the site and buildings and structures based on architectural, electrical, and mechanical survey and supporting documentation Presentation of the status of historical deficiencies and compilation of deficiencies documented through this survey Supporting documentation, as presented in the appendices of the center review meeting; survey brief and student questionnaire; life safety IA/IIA transmittal;
active warranties; and Federal Real Property Council (FRPC) Measures Matrix
Section 1.0 of this volume addresses site layout and plans while Section 2.0 presents details on the buildings and structures. Section 3.0 presents historic deficiencies and their status as well as new ones identified in this survey. The appendices provide additional information as noted below:
Appendix A. Survey Brief Questionnaire Appendix B. Life Safety Deficiencies and List Appendix C. O&M Deficiencies List Appendix D. Active Warranty Report Appendix E. FRPC Performance Measures Matrix
EXECUTIVE SUMMARY
1.0 - Site Layout and Plans
MILWAUKEE
JOB CORPS CENTER
MILWAUKEE, WISCONSIN
MILWAUKEE
JCC
10 MI50
2.0 - Descriptions
BUILDINGS AND STRUCTURES
00513 MILWAUKEE 03/30/2016
1Page: of Date:
0100 - WELCOME CENTER
0101 - ADMINISTRATION/WELLNESS
CENTER
0102 - STUDENT SERVICES
0103 - EDUCATION/MAINTENANCE
0104 - CAFETERIA/WAREHOUSE
0105 - WOMEN'S DORMITORY
0106 - MEN'S DORMITORY
0107 - GYMNASIUM/RECREATION
B - MASONRY MATERIALS BIN (12Ft x 24Ft) C - MASONRY MATERIALS BIN (12Ft x 12Ft)
Name GSF
1,427 11,735
9,658 42,494 13,973 26,679 27,401 21,035
Active Active
Active Active Active Active Active Active Active
Active
StatusType
Building Building
Building Building Building Building Building Building Structure
Structure
Use Group Built Flrs Const
B B
B B A-2 R-2 R-2 A-3 Storage
Storage
Good Good
Good Good Good Good Good Good Good
Good
ConditionAsset Number
0051300004 0051300005
0051300006 0051300007 0051300008 0051300009 0051300010 0051300011 0051300013
0051300014
8 154,402
2 432
10 154,834
Buildings
Structures
Total
GSF
GSF
GSF
Summary
03/30/2016
Space Utilization By Function 00513 Milwaukee Page: 1 of Date:
HOUSING
EDUCATION
FOOD SERVICE
SUGGESTED
NSF/
ENROLLEE
SUGGESTED
TOTAL
NSF
ACTUAL
TOTAL
NSF
TYPE OF SPACE
SUB TOTAL
SUB TOTAL
SUB TOTAL
Resident Men Resident Women Total Residents
Residents 212 Non Residents 25
237Total Students
(212)
(237)
(237)
DIFFERENCE
22,896
17,880
1,896
34,983
28,168
2,590
Lounge Other Shower/Toilet Sleeping excl. SPD(72 rooms; 272 beds) Storage
Academic (237) Non-Academic
13 -- ACT (Off-Ctr) 20 -- Cement Masonry + 30 -- Manufacturing Technology + 30 -- Material Handler 30 -- Medical Office Support 80 -- Nursing Assistant + 24 -- Welding +
Vocational Theory (154)
Dining (2 Servings)
6,050 2,412 5,600
19,578 1,343
4,687 6,429
3,055 3,053 2,610
2,609 3,035
1,741
2,590
2,120 1,696 2,544
15,264 1,272
2,370 2,370
1,500 2,250 1,950
3,200 1,800
1,540
1,896
3,930
3,056 4,314
2,317 4,059
1,555
-591 1,235
Vocations
12,087
10,288
03/30/2016
Space Utilization By Function 00513 Milwaukee Page: 2 of Date:
RECREATION
MEDICAL/DENTAL
ADMINISTRATION
STORAGE/SUPPORT
VACANT
SUGGESTED
NSF/
ENROLLEE
SUGGESTED
TOTAL
NSF
ACTUAL
TOTAL
NSF
TYPE OF SPACE
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
TOTAL 272.46 64,572 99,654
(237)
(237)
(237)
(237)
(0)
DIFFERENCE
154,402
0.65
TOTAL GSF
NET TO GROSS RATIO
10,975
1,445
4,740
15,270
2,428
7,213
5,509
3,493
Aerobics/Exercise Arts & Crafts Gymnasium Learning Resource Center/Library Meeting Room Miscellaneous Recreation Recreation Hall Recreation Office Recreation Storage Snack Bar Theater Weight Room
Medical/Dental
Administration
Operations & Maintenance Warehouse
Vacant
6.10
7,248
1,315 1,509
2,428
7,213
2,635 2,874
3,493
1,445
1,896 2,844
7,248
1,315 1,509
2,473
3,493
RESIDENT
NON-RESIDENT
(212)
(25) 15
50 10,600
4,295
2,473
3,493
35,082
Net Square Footage By Building Date: 03/30/2016 Page: 1
Center: MILWAUKEE (00513) of 3
HOUSING
EDUCATION
Sleeping excl. SPD
Lounge
Storage
Shower/Toilet
Other
Academic
Vocational Theory (154)
Cement Masonry
Welding
Non-Academic
Nursing Assistant
Material Handler
Medical Office Support
Manufacturing Technology
Function Suggested
NSF
9,772 9,806
3,066 2,984
2,800 2,800
1,329 1,083
4,687
1,741
3,055
3,035
6,429
2,609
2,610
3,053
0105 - WOMEN'S DORMITORY
0106 - MEN'S DORMITORY
0106 - MEN'S DORMITORY
0105 - WOMEN'S DORMITORY
0106 - MEN'S DORMITORY
0105 - WOMEN'S DORMITORY
0106 - MEN'S DORMITORY
0105 - WOMEN'S DORMITORY
0106 - MEN'S DORMITORY
0105 - WOMEN'S DORMITORY
0103 - EDUCATION/MAINTENANCE
0103 - EDUCATION/MAINTENANCE
0103 - EDUCATION/MAINTENANCE
0103 - EDUCATION/MAINTENANCE
0102 - STUDENT SERVICES
0103 - EDUCATION/MAINTENANCE
0103 - EDUCATION/MAINTENANCE
0103 - EDUCATION/MAINTENANCE
0103 - EDUCATION/MAINTENANCE
Bldg Name Actual NSF Difference
19,578
6,050
1,343
5,600
2,412
4,687
1,741
3,055
3,035
6,429
2,609
2,610
3,053
Sub Total:
Sub Total:
34,983
28,168
15,264
2,120
1,272
2,544
1,696
2,370
1,540
1,500
1,800
2,370
3,200
1,950
2,250
22,896
17,880
4,314
3,930
3,056
2,317
1,555
1,235
4,059
-591
12,087
10,288
36 rooms; 136 beds 36 rooms; 136 beds
Page: 2
Center: MILWAUKEE (00513) of 3
FOOD SERVICE
RECREATION
MEDICAL/DENTAL
Dining (2 Servings)
Recreation Hall
Snack Bar
Arts & Crafts
Gymnasium
Weight Room
Theater
Miscellaneous Recreation
Aerobics/Exercise
Meeting Room
Learning Resource Center/Lib
Recreation Storage
Recreation Office
Medical/Dental
Function Suggested
NSF
2,590
1,509
7,248
1,315
2,428
0104 - CAFETERIA/WAREHOUSE
0107 - GYMNASIUM/RECREATION
0107 - GYMNASIUM/RECREATION
0107 - GYMNASIUM/RECREATION
0107 - GYMNASIUM/RECREATION
0107 - GYMNASIUM/RECREATION
0107 - GYMNASIUM/RECREATION
0107 - GYMNASIUM/RECREATION
0107 - GYMNASIUM/RECREATION
0107 - GYMNASIUM/RECREATION
0107 - GYMNASIUM/RECREATION
0107 - GYMNASIUM/RECREATION
0107 - GYMNASIUM/RECREATION
0101 - ADMINISTRATION/WELLNESS CENTER
Bldg Name Actual NSF Difference
2,590
1,509
7,248
1,315
2,428
Sub Total:
Sub Total:
Sub Total:
2,590
15,270
2,428
1,896
1,445
1,896
10,975
1,445
4,295
Page: 3
Center: MILWAUKEE (00513) of 3
ADMINISTRATION
STORAGE/SUPPORT
VACANT
Administration
Warehouse
Operations & Maintenance
Vacant
Function Suggested
NSF
5,665
2,874
2,635
3,493
0100 - WELCOME CENTER
0101 - ADMINISTRATION/WELLNESS CENTER
0103 - EDUCATION/MAINTENANCE
0104 - CAFETERIA/WAREHOUSE
0103 - EDUCATION/MAINTENANCE
0103 - EDUCATION/MAINTENANCE
Bldg Name Actual NSF Difference
7,213
2,874
2,635
3,493
Sub Total:
Sub Total:
Sub Total:
7,213
5,509
3,493
4,740
2,844
1,896
4,740
4,740
2,473
3,493
2,473
3,493
Environmental Management Report
Center: MILWAUKEE (00513) Page: 1 Date: 03/30/2016 of 1
SOLID & HAZARDOUS WASTE MANAGEMENT (RCRA)
HAZARDOUS MATERIALS STORAGE (EPCRA)
N/A
No
PETROLEUM UNDERGROUND STORAGE TANKS (RCRA)
N/A0
PETROLEUM ABOVEGROUND STORAGE TANKS (CWA)
ASBESTOS AND PCB MANAGEMENT (TSCA)
AIR POLLUTION CONTROL (CAA)
None
Attainment
Solid Waste Disposal :
Hazardous Waste Generator :
Hazardous Waste ID :
Generator Classification :
Hazadous Materials Storage :
Hazardous Materials ID :
HazMat Storage Area :
HazMat Spill Response Plan :
Number of Regulated USTs :
Number of Un-regulated USTs :
Local Hazardous Use Permit :
LEPC Notification :
EPA Generator ID Number :
Hazardous Waste Disposal :
RCRA Compliance :
ID LocationFuel Type Capacity
Number of ASTs :
Asbestos Survey Date :
Asbestos Type :
Asbestos Coordinator :
Coordinator Training Date:
Custodial/Maintenance Training :
AHERA Regulated :
Management Plan Approval :
PCB Transformer Testing :
PCB Transformers :
PCB-Contaminated Transformers :
Transformers Labelled :
Regional Air Quality :
Permitted Air Pollution Source :
Source Description :
Yes
No N/A
Overfill Leak Corrosion
SPCC Plan Required : SPCC Plan Completed :
No N/A
No Survey Required due to Age of Buildings None
N/A No N/A No No
ID Fuel Type Capacity Location Overfill
Prevention Secondary ContainmentTank Status
Tank Status Prevention/Detection
Radon
Date: 03/30/2016Center : Milwaukee (00513) Page: 1 of 1
0100 - WELCOME CENTER
0101 - ADMINISTRATION/WELLNESS CENTER
0102 - STUDENT SERVICES
0103 - EDUCATION/MAINTENANCE
0104 - CAFETERIA/WAREHOUSE
0105 - WOMEN'S DORMITORY
0106 - MEN'S DORMITORY
0107 - GYMNASIUM/RECREATION
Bldg Name Test Date
No
No
No
No
No
No
No
No
Radon Testing
Test Result
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Mitigation Mitigation Date
RADON EXPLANATORY NOTES
The US Environmental Protection Agency (EPA) has established a radon action level of 4.0 picoCuries per liter (pCi/L). Occupied buildings with radon concentrations less than 4.0 pCi/L do not require radon mitigation; un-occupied buildings, or those buildings which are occupied only infrequently for brief periods of time, also do not require radon mitigation. Occupied buildings with radon concentrations greater than
4.0 pCi/L require radon mitigation and verification of radon reductions as soon as possible, with priority given to dormitories and student recreation buildings. Occupied buildings with radon concentrations greater than 20.0 pCi/L should be considered significant radon exposure hazards, and priority for mitigation should be given to buildings with these highly elevated radon concentrations.
Radon mitigation techniques include: (1) adjustment of the building HVAC system to create a positive pressure within the building; (2) sealing of foundation wall cracks, penetrations, or other openings;
(3) sealing crawlspace openings and sump pits; (4) installing an active subslab depressurization (ASD) system.
Site Description
Aerial photogrph of the Center and surroundings
Page: 1 Date: 03/30/2016 of 4
Comments:
Paving Type for Roads & Parking
Parking spaces are adequate throughout the Center. However, the asphalt roads throughout the Center have single line and alligator cracks. At the time of the July 2015 facility survey the Center was in the process of repairing some of the single line cracks in the asphalt roads. The areas with alligator cracks, if not repaired, will further deteriorate to become depressions in the road. A deficiency was written to address this issue.
Paving Type for Sidewalks
Asphalt Concrete
Comments:
Topography Buildings and Structures
Center is fully enclosed by fencing. The Center also has a frisbee golf course around the entire Center.
ROADS, PARKING & SIDEWALKS
Water Source Water Authority Service Meter On-Site Treatment Plant
1. Water System
Treatment Type Storage Type Storage Capacity(Gallons)
NoMasterCity of MilwaukeePublic Water Authority
None 0None
Each building has its own sub meter. Cafeteria is supplied with water softener system.Comments:
Fire Hydrants On-Site Water Supply Storage Capacity
(Gallons) Pressure Source FD Response Time
(Minutes)
Yes 0 3None Municipal
Number of Deficiencies = 3
Number of Deficiencies = 1
SITE FEATURES
UTILITIES
2. Fire Protection System
Buildings Structures8 2Gently Sloping
Surrounding
Outdoor Recreation
Light Industrial, Residential
Basketball, Field, Soft/Baseball, Volleyball Rail Road Tracks
Along east side of the site
Along three sides of the site
Entrance
Wrought Iron
Chain Link
Automatic Gate and Manual
Location Type
Maintenance Responsibility System Capacity Adequate System Condition
Center Center Yes Good
Separate Loop
No
Ownership Maintenance Responsibility System Capacity Adequate System Condition
Center Center Yes Good
Ownership
Roads & Parking Adequate Roads & Parking Condition Sidewalks Adequate Sidewalk Condition Yes Fair Yes Good
Fencing
Other Features
Page: 2 Date: 03/30/2016 of 4
Sewage Treatment Flow
Utility
Publicly Owned Treatment Works
Center
Gravity
Maintenance ResponsibilityOwnership
WE Energies
Comments: Heating and Cooling is provided by a geothermal heat pump system and four heating boilers. It consists of 60 bores under the north parking lot. Water flow is maintained in the system using primary/secondary pumping system using n+1 redundancy, two pumps in parallel flow and one in standby each with variable speed drives.
Heat pumps add or remove heat from the loop to maintain space temperature of areas they serve. Primary pumps are manufactured by Bell & Gossett, model 1510BFW10.25, with a capacity of 190 GPM and 100 feet of head each. The four gas-fired boilers are manufactured by Lockinvar; model KBN399, with a capacity of 383.9 MBH each. The three secondary circulating pumps are manufactured by Bell and Gosset, model 1510BFW12.125, with a capacity of 235 GPM and 145 feet of head each. The system circulates water in the range of 55 to 90 degrees fahrenheit to all water source heat pumps on the site.
3. Sanitary Sewer System/ Sewage Treatment Plant
5. Fuel Distribution System
6. Central Plant
System Capacity Adequate System Condition
Yes Good
4. Storm Water System
Drain Type On-Site Storm Water Management
Underground Retention Pond
Ownership Maintenance Responsibility System Capacity Adequate System Condition
Center Yes GoodCenter
Comments: All the storm water inlets around the Center drain into the large storm water retention pond which is located at the south end of the Center near Welcome Center Building100.
Gas Company Metering
Individual
Ownership Maintenance Responsibility System Capacity Adequate System Condition
Utility Utility Yes Good
Type Energy Source
Geothermal with Gas Boilers Natural Gas Building 101 thru 107 Bldgs Served
Ownership Maintenance Responsibility Plant Capacity Adequate Plant Condition
Center Center Yes Good
Page: 3 Date: 03/30/2016 of 4
Comments:
Electric Company PCB Trans.
Transformer Mounting Transformer Ownership
Systems Ownership Maintenance Responsibility
Wisconsin Electric (WE) Energies
The primary overhead service is brought to the Center from transmission lines along the west perimeter of the campus. The overhead lines transit to underground service which loops around the campus, starting from the northwest of the campus and connecting back to the overhead lines at the southwest of the Campus. The underground service feeds pad-mounted transformers with corresponding current transformer cabinets and secondary meters located behind each building served. Welcome Center Building 100 is subfed from Administration/ Wellness Center Building 101.
Pad Utility
Utility, Center Utility, Center
No
Comments:
Telephone Company
On-site Line Owner
Each building on Center is protected by an addressable central fire alarm control panel. The fire alarm system in each building on Center is connected to the central fire alarm control/annunciator panel located in the security office in Welcome Center Building 100. Direct Television (TV) satellite dishes are installed on the roof of all buildings except Welcome Center Building 100 and Administartion/Wellness Building 101.
AT&T
Maint. Responsibility
Center Utility, Center
IP Cameras, Welcome Center Building 100
UnknownCenterActive Underground, RegulatedSouth side of Cafeteria/Warehouse
Building 104
NoN/A
STORAGE TANKS
TypeStatus Location Owner Fuel Type Capacity (Gallons) Install Date
24.94/14.4 kV, 3-Phase, 4 Wire
120/208 Volt, 3-Phase, 4 WireUnderground
UndergroundPrimary Service
Secondary Service
Distribution Characteristics
ID
Reg.
Number of Deficiencies = 2
9. Electrical (Communication/Alarm/Security)
Cooking
Purpose
7. Electrical (Service)
Yes
Central
VOIP
System Capacity Adequate System Condition
GoodYes
Transformer Maint Resp
Utility
System Capacity Adequate System Condition
Yes Good
Generator
None
8. Electrical (Site Lighting)
Roadways Parking Walkways Building Outdoor Sports
Mounting
Control
Pole Pole Pole Pole, Building Sport Light
Lighting Control Panel Lighting Control Panel Lighting Control Panel Lighting Control Panel Lighting Control Panel
System Ownership Maintenance Responsibility System Capacity Adequate System Condition
Center Center Yes Good
Comments: The site lighting on Center is both pole and building mounted controlled by lighting control panels. All site lighting on Center is owned and maintained by the Center.
ATS MTS
No Yes
Number of Deficiencies = 2
Fire Alarm Security
Metering Individual
Page: 4 Date: 03/30/2016 of 4
ACCESSIBILITY
Yes
Comments:
NoNoNo
There are no historical preservation issues at the Milwaukee JCC. All eight (8) buildings were constructed in 2010.
No
Nationally Registered Site
Site Eligible for National Register
Located in Historic District
Archaeological Significance
Earthquake Risk Low Low LowLow LowIBC Low
LightningEarthquake Def. Authority Flooding Tornado Hurricane Forest
Fire
Accessible Parking: Accessible Slope:
Yes
Curb Cuts:
Yes
Ramps:
YesYes
Site Accessible Route:
GENERAL SITE CONDITION
Rating X Good Fair Poor
HISTORIC PRESERVATION
NATURAL HAZARDS
The site condition is not impacting the functional use of the facilities.
The site condition IS impacting the functional use of the facilities.
The site condition IS SIGNIFICANTLY impacting the functional use of the facilities.
Active Energy Use Reduction Program
Active Water Use Reduction Program
Approximate or Measured Waste Recycled
Use of School Dude or CMMS for Preventative Maintenance
Green Purchasing Policy Practiced
Site Stormwater Absorption Measures in Place
Center has Onsite Renewable Energy (PV or Wind)
Center has a Chartered Green Committee & Roster
Center Uses Green Cleaning Practices
SUSTAINABILITY
Yes
Yes
NO
Yes
Yes
Yes
Yes
Yes
26 %
Building Descriptions and Structures
BUILDING 100 - WELCOME CENTER
Building Descriptions
Page: 1 of 57
Building: 0100 - WELCOME CENTER
BUILDING ENVELOPE
Foundation RoofBuilding
Concrete Loadbearing Masonry Steel
Brick Masonry Concrete Corrugated Metal Panels Phenolic Panels System
Wall Roof Rigid Rigid
AccessibilityFeature
GSF NSF Year Built Use Group Historic Ownership #Floors
B 1,427 554 1 Owned 2010 Not Evaluated
Comments: Toilet rooms are designed and designated for severe weather shelter areas. A severe weather shelter sign is posted at the entrance of the designated toilet rooms.
REAL ESTATE
Access to Building
Ramps
Entrance
2nd Egress
Visual Alarm
Corridor/Aisle
Rooms
Stairs
Elevator
Restrooms
Drinking Fountain
Telephone
Yes
Yes
Yes
Yes
Yes
Yes
Yes
N/A
N/A
Yes
N/A
N/A
ACCESSIBILITY
Structural Systems1.
Exterior Walls2.
Insulation4.
Material
The condition and life expectancy of the roof is based on visual observation during the July 2015 Facility Survey.
Drainage Year Life
Type Area Served
EPDM
Metal
Interior Roof Drains
Gutters and Downspouts
Flat
Shed
Western half of building
Eastern half of building
Comments:
3. Roof
Entire Building
Area Served
Page: 2 of 57
Building: 0100 - WELCOME CENTER
INTERIOR FINISH
Carpet Ceramic Tile Vinyl Tile
CMU
Wood Unit - Metal Frame
Mechanical
Mechanical
Restroom
Janitor's Closet
Comments:
Comments:
EF-W-1 75 CFM, 115V/1p direct drive serve room 101. Manufactured by Cook
EF-W-2 75 CFM, 115V/1p direct drive serve room 106. Manufactured by Cook
Ventilation Area Served
VERTICAL CIRCULATION
None
Aluminum Unit - Aluminum Frame
Fixed - Aluminum Frame; Double Glazing;
Acoustical Tile Gypsum Board
Exhaust Ventilation
Exterior Doors5.
Windows6.
Floors1.
Interior Walls2.
3.
Interior Doors4.
Heat Source
Heat Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
EDH-W-1 Electric duct heater Carrier model 0FCIII114, 4.0 kW 208V/1p 365 CFM is controlled by wall mounted thermostat iin the control room. There is a wall mounted unit heater at the south-east entrance door..
Comments:
HVAC
Heat1. Number of Deficiencies = 1
Electric Resistance
Single Duct None Direct Digital Control (DDC)
Mechanical None Lounge
Ventilation2.
Ceilings
Page: 3 of 57
Building: 0100 - WELCOME CENTER
Water heating is by two instantaneous electric water heaters one is located in the rest room and the other is located in the janitor's closet.
Comments:
PVC None PVC
Drinking Fountain Lavatory Mop Sink Wall Hydrant Water Closet (Tank)
None
None None ABC Type Fire Extinguisher
Copper Copper Tankless Electric None No
Hot Water Cold Water Water Heater Water Treatment HW Storage Tank
Grease InterceptorWaste / Vent Interior Storm
Split Direct Expansion (Air
Source)
Single Duct None Electronic Mechanical None Entire Building
Sprinkler System Stand Pipe System Fire Suppression
PLUMBING
FC-W-1 DX fan coil ( Carrier model FE4ANFOO2, SN 0909A8F973), 17.3 mbh gross cooling with 8.1 kW electric heat 208V/1p. Condensing unit ACCU-W-1 (Carrier model 25HPA51BA300, SN 2106E13736)) 17.0 mbh gross 208V/1p and 13.00 minimum EER, R410A. The unit, when running, provide 150 cfm of oustide air thru wall vent that provide makeup air for exhaust and ventilation requirements.
Comments:
System Type
Air Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation Area
Served
Water Distribution1.
Sanitary Distribution2.
Fixtures3.
Fuel Distribution4.
FIRE PROTECTION
3. Air Conditioning
Page: 4 of 57
Building: 0100 - WELCOME CENTER
Comments: Underground service for the 150A main branch panel in this building is provided from a 150A breaker in the 400A main distribution panel (MDP), located in the electrical room of the Administration/Wellness Center Building 100. A meter is located on the outside of this Building.
FIRE ALARM
Comments: The fire alarm control/annunciator panel is a Simplex 4100U unit located in the Security Staff area. This panel is the central fire alarm panel that monitors all other panels on Center.
Comments: This building houses the monitor for all cameras on the Center. All cameras on Center are connected to the network. This building also houses the wireless public address system.
Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices
Central Annunciator Panel Smoke Detector
Connected to Main System Color Monitor Connected to Main System None
Telephone Security Public Address Television
Comments: Recorded footcandle levels include natural light contribution.
Compact Fluorescent Comments: Exterior lighting is controlled by a lighting control panel.
T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
Offices
Reception
Toilets
Storage Rooms
Area Recommended Recorded Light Type
None None
Main Branch Panel 120/208V, 3-Phase, 4 Wire Branch Panel Only GFCI, Switches
Emergency Exit
ELECTRICAL SERVICES Number of Deficiencies = 1
Exterior Lighting1.
Interior Lighting2.
Emergency /Exit Lighting3.
COMMUNICATION
Electric Water Gas Yes N/AZone
BUILDING UTILITY METERING
Type Location
CARBON MONOXIDE DETECTION
LIGHTING
Detection Required No
Number of Deficiencies = 0
Page: 5 of 57
Building: 0100 - WELCOME CENTER
GENERAL BUILDING CONDITION
Rating X Good
Fair Poor
The facility condition is not impacting the functional use of the facility.
The facility condition IS impacting the functional use of the facility.
The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.
Structure: Good Exterior: Good Interior: Good Mechanical: Good Electrical: Good
IMPAIRMENT
Potentially Impaired
DOL Responded
DOL Determination
Potential Impaired Comments DOL Determination Discussion/Comments
BUILDING 101 - ADMINISTRATION/WELLNESS CENTER
Page: 6 of 57
Building: 0101 - ADMINISTRATION/WELLNESS CENTER
BUILDING ENVELOPE
Foundation RoofBuilding
Concrete Loadbearing Masonry Steel
Brick Masonry Concrete Corrugated Metal Phenolic Panel System
Wall Roof Rigid Rigid
Aluminum Units - Aluminum Frame Metal Unit - Metal Frame
AccessibilityFeature
GSF NSF Year Built Use Group Historic Ownership #Floors
B 11,735 8,093 1 Owned 2010 Not Evaluated
Comments: Toilet rooms are designed and designated for severe weather shelter areas. A severe weather shelter sign is posted at the entrance of the designated toilet rooms.
REAL ESTATE
Access to Building
Ramps
Entrance
2nd Egress
Visual Alarm
Corridor/Aisle
Rooms
Stairs
Elevator
Restrooms
Drinking Fountain
Telephone
Yes
Yes
Yes
Yes
Yes
Yes
Yes
N/A
N/A
Yes
Yes
N/A
ACCESSIBILITY
Structural Systems1.
Exterior Walls2.
Insulation4.
Exterior Doors5.
Material
There are overflow scuppers on the roof to assist with drainage.
Drainage Year Life
Type Area Served
EPDM Interior Roof Drains 2010 15 Flat Entire Building
Comments:
3. Roof
Page: 7 of 57
Building: 0101 - ADMINISTRATION/WELLNESS CENTER
INTERIOR FINISH
Carpet Ceramic Tile Concrete Vinyl Tile
CMU Ceramic Tile Drywall
Wood Unit - Metal Frame
VERTICAL CIRCULATION
None
Fixed - Aluminum Frame; Double Glazing;
Acoustical Tile Exposed Structure Gypsum Board
Windows6.
Floors1.
Interior Walls2.
3.
Interior Doors4.
Heat Source
Heat Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
Heat pumps with extended range deliver cooled/heated forced air to the building using the geothermal system secondary water loop through units HPU-A-1 thru 4, manufactured by AQUARIUS model AP025-1HZC, AP025-1HZC, AP049-1HZC and AP049-1HZC respectively. Air temperature supplied by these units is controlled by temperature sensors installed in return air ducts.
Comments:
HVAC
Heat1. Number of Deficiencies = 1
Packaged Heat Pump (Water
Source)
Single Duct Two-Pipe Direct Digital Control (DDC)
Mechanical Heat Recovery Entire Building
Page: 8 of 57
Building: 0101 - ADMINISTRATION/WELLNESS CENTER
Mechanical
Mechanical
Mechanical
Entire Building
Mechanical Room
Electrical Room
Comments:
Comments:
Comments:
An energy recovery unit ERV-A-1 serves this entire building by exhausting air from the building and bringing in fresh air from the outside, while transferring heating or cooling energy from the exhaust air to the fresh air. The fresh air from the ERV-A-1 is ducted into the return of HVAC air distribution system, units HPU-A-1 thru 4. ERV-A-1 is manufactured by GREENHECK, model ERV-3615-15-B-ES, with a supply fan having a capacity of 1055 CFM and an exhaust fan having a capacity of 1055 CFM (980 CFM actual exhaust)
Exhaust fan EF-A-1 serves Mechanical Room 108. EF-A-1 is manufactured by Faco, with a supply fan capacity of 125 CFM and characteristics: 129W, 115V, single phase, direct drive.
Exhaust fan EF-A-2 serves Electrical Room 109. EF-A-2 is manufactured by Cook with a supply fan capacity of 40 CFM and characteristics: 38W, 115V, single phase, direct drive.
Ventilation Area Served
Packaged Heat Pump (Water
Source)
Split Direct Expansion (Air
Source)
Single Duct
Single Duct
Two-Pipe
None
Direct Digital Control (DDC)
Electronic
Mechanical
Natural
Heat Recovery
None
Entire Building
Electronic Equipment
Room
Exhaust Ventilation
Heat pumps with extended range deliver cooled/heated forced air to the building using the geothermal system secondary water loop through units HPU-A-1 thru 4, manufactured by AQUARIUS model AP025-1HZC, AP025-1HZC, AP049-1HZC and AP049-1HZC respectively. Air temperature supplied by these units is controlled by temperature sensors installed in return air ducts.
A 4 ton split-system which consists of a condensing unit, ACCU-A-1 with a capacity of 42 MBH, and an indoor fan-coil unit, ACU-A-1, with a supply fan capacity of 950 CFM, serves Computer Room 155.
The fan-coil unit is manufactured by Mitsubishi, model PLAA42BA.
Comments:
Comments:
Ventilation2.
System Type
Air Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation Area
Served
Page: 9 of 57
Building: 0101 - ADMINISTRATION/WELLNESS CENTER
This building also has electric instantaneous water heaters.Comments:
PVC None PVC
Drinking Fountain Lavatory Mop Sink Shower Sink Wall Hydrant Water Closet (Flush Valve) Waterless Urinal
Gas (Natural)
Comments:
None None ABC Type Fire Extinguisher
Comments: Electrical service to this building is provided from a utility-owned pad-mounted 150 kVA transformer, located north of the building and terminates in a 400A main distribution panel (MDP), located in the electrical room. The MDP is protected by a factory-installed 250 kA transient surge suppression (TVSS) module. The MDP feeds panelboards in the building and also provides 150A service to the Welcome Center. A meter is located on the building near the transformer.
Copper Copper Gas-Fired None No
Hot Water Cold Water Water Heater Water Treatment HW Storage Tank
Grease InterceptorWaste / Vent Interior Storm
Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices
Compact Fluorescent Comments: Exterior lighting is controlled by a lighting control panel.
Main Distribution Panel 120/208V, 3-Phase, 4 Wire Branch Panel & Panelboard Receptacles, GFCI, Switches
Sprinkler System Stand Pipe System Fire Suppression
PLUMBING
Water Distribution1.
Sanitary Distribution2. Number of Deficiencies = 1
Fixtures3.
Fuel Distribution4.
FIRE PROTECTION
ELECTRICAL SERVICES Number of Deficiencies = 1
Exterior Lighting1.
Natural gas water heaters WH-A-1 AO Smith MODEL BTH120100 with circulting pump PWH-A-A B&G 1032571000
LIGHTING
Page: 10 of 57
Building: 0101 - ADMINISTRATION/WELLNESS CENTER
FIRE ALARM
Comments: The fire alarm control/annunciator panel is a Simplex 4100U unit located in the vestibule. The building fire alarm system is monitored by the central fire alarm control/annunciator panel in Welcome Center Building 100.
Comments: The CCTV cameras in this building are monitored from the Welcome Center Building 100. The public address system is a wireless connection to Welcome Center Building 100.
Audible Alarm Control/Annunciator Panel Magnetic Door Holder Manual Pull Station Smoke Detector Visual Alarm
Connected to Main System Closed Circuit TV Connected to Main System None
Telephone Security Public Address Television
Comments: Recorded footcandle levels include natural light contribution. A lighting control relay panel is located in Storage Room 102.
T5 - Fluorescent
T5 - Fluorescent & CFL
T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
Offices
Conference Rooms
Corridors & Stairs
Equipment Rooms (Elec/Mech)
Lounges
Toilets
Storage Rooms
Medical/Dental
Wards (Patient)
Area Recommended Recorded Light Type
Battery Backup Battery Backup
Emergency Exit
Interior Lighting2.
Emergency /Exit Lighting3.
COMMUNICATION
Electric Water Gas Yes YesZone
BUILDING UTILITY METERING
Type Location There is no plausible means by which harmful levels of CO could enter sleeping rooms.
CARBON MONOXIDE DETECTION
Detection Required
Page: 11 of 57
Building: 0101 - ADMINISTRATION/WELLNESS CENTER
GENERAL BUILDING CONDITION
Rating X Good
Fair Poor
The facility condition is not impacting the functional use of the facility.
The facility condition IS impacting the functional use of the facility.
The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.
Structure: Good Exterior: Good Interior: Good Mechanical: Good Electrical: Good
IMPAIRMENT
Potentially Impaired
DOL Responded
BUILDING 102 - STUDENT SERVICES
Page: 12 of 57
Building: 0102 - STUDENT SERVICES
BUILDING ENVELOPE
Foundation RoofBuilding
Concrete Metal Steel
Brick Masonry CMU Masonry Corrugated Metal Phenolic Panel System
AccessibilityFeature
GSF NSF Year Built Use Group Historic Ownership #Floors
B 9,658 6,429 1 Owned 2010 Not Evaluated
Comments: There are enclosed straight run egress stairs located on the east side of the building which access the emergency exit door. The stair landing is designed as an area of refuge for persons with physical limitations. If the person requires assistance with exiting the building there is a rescue assistance button on the wall at the landing that will signal at the Welcome Center Building 100.
Toilet rooms are designed and designated for severe weather shelter areas. A severe weather shelter sign is posted at the entrance of the designated toilet rooms.
REAL ESTATE
Access to Building
Ramps
Entrance
2nd Egress
Visual Alarm
Corridor/Aisle
Rooms
Stairs
Elevator
Restrooms
Drinking Fountain
Telephone
Yes
Yes
Yes
Yes
Yes
Yes
Yes
N/A
N/A
Yes
Yes
N/A
ACCESSIBILITY
Structural Systems1.
Exterior Walls2.
Material
There are overflow scuppers on the roof to assist with drainage. The condition and life expectancy of the roof is based on visual observation during the July 2015 Facility Survey.
Drainage Year Life
Type Area Served
EPDM
Metal
Interior Roof Drains
Gutters and Downspouts
Flat
Shed
Southern half of builing
Northern half of building
Comments:
3. Roof
Page: 13 of 57
Building: 0102 - STUDENT SERVICES
Wall Roof Rigid Rigid
Comments: There are clerestory windows that provide natural light to the corridor.
INTERIOR FINISH
Carpet Ceramic Tile Vinyl Tile
CMU Drywall
Wood Unit - Metal Frame
VERTICAL CIRCULATION
None
Aluminum - Aluminum Frame Metal Unit - Metal Frame
Fixed - Aluminum Frame; Double Glazing;
Acoustical Tile Exposed Structure Metal Acoustical Panels
Insulation4.
Exterior Doors5.
Windows6.
Floors1.
Interior Walls2.
3.
Interior Doors4.
Page: 14 of 57
Building: 0102 - STUDENT SERVICES
Mechanical
Mechanical
Mechanical
Entire Building
Electrical Room
Mechanical Room
Comments:
Comments:
Comments:
An energy recovery unit ERV-S-1 serves this entire building by exhausting air from the building and bringing in fresh air from the outside, while transferring heating or cooling energy from the exhaust air to the fresh air. The fresh air from the ERV-A-1 is ducted into the return air of the HVAC air distribution system, units HPU-S-1 thru 4. ERV-S-1 is manufactured by GreenHeck, model ERV-361S-15-B-ES, with a supply fan with a capacity of 650 CFM and an exhaust fan with a capacity of 650 CFM.
Exhaust fan EF-S-1 serves Electrical Room 113. EF-S-1 is manufactured by Cook, with a supply fan capacity of 40 CFM and characteristics: 54W, 115V, single phase, direct drive.
Exhaust fan EF-S-2 serves Mechanical Room 112. EF-S-2 is manufactured by Cook, with a supply fan capacity of 40 CFM and characteristics: 54W, 115V, single phase, direct drive.
Ventilation Area Served
Packaged Heat Pump (Water
Source)
Single Duct Two-Pipe Direct Digital Control (DDC)
Mechanical Heat Recovery Entire Building
Exhaust Ventilation
Heat pumps with extended range deliver cooled/heated forced air to the building using the geothermal system secondary water loop through units HPU-S-1 thru 4 are manufactured by Florida Heat Pump (FHP), model AP049-1HZC, AP049-1HZC, AP075-1HZC & SG119120 respectively.
Comments:
Heat Source
Heat Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
Heating is provided by a geothermal heat pump system. The geothermal system consists of 60 borefields with three end suction pumps that have variable frequency drives. These three pumps are manufactured by Bell & Gossett, model 1510BFW10.25, with a capacity of 190 gpm and 100 feet of head each. Four gas-fired boilers, manufactured by Lockinvar, model KBN399, with a capacity of
383.9 MBH each. The four boilers have a total of three circulating pumps, manufactured by Bell & Gosset, model 1510BFW12.125, with a capacity of 235 gpm and 145 feet of head each. These pumps distribute water to the Center that allows the heat pumps in this building to deliver warm air.
The heat pumps that serve this building are HPU-S-1 through 4, manufactured by Florida Heat Pump (FHP), model AP049-1HZC, AP049-1HZC, AP075-1HZC & SG119120 respectively.
Comments:
HVAC
Heat1. Number of Deficiencies = 1
Packaged Heat Pump (Water
Source)
Single Duct Two-Pipe Direct Digital Control (DDC)
Mechanical Heat Recovery Entire Building
Ventilation2.
System Type
Air Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation Area
Page: 15 of 57
Building: 0102 - STUDENT SERVICES
PVC None PVC
Drinking Fountain Lavatory Mop Sink Multi-Compartment Sink Wall Hydrant Water Closet (Flush Valve) Waterless Urinal
None
None None ABC Type Fire Extinguisher
Comments: Electrical service to this building is provided from a 75 kVA utility owned pad-mounted transformer, located south of the building and terminates in a 400A main distribution panel (MDP), located in the electrical room. The MDP is protected by a factory-installed 250 kA transient surge suppression (TVSS) module. A meter is located on the building near the transformer.
Copper Copper Gas-Fired None No
Hot Water Cold Water Water Heater Water Treatment HW Storage Tank
Grease InterceptorWaste / Vent Interior Storm
Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices
Compact Fluorescent Comments: Exterior lighting is controlled by a lighting control panel.
Main Distribution Panel 120/208V, 3-Phase, 4 Wire Panelboard Receptacles, GFCI, Switches
Sprinkler System Stand Pipe System Fire Suppression
PLUMBING
Water Distribution1.
Sanitary Distribution2.
Fixtures3.
Fuel Distribution4.
FIRE PROTECTION
ELECTRICAL SERVICES
Exterior Lighting1.
Page: 16 of 57
Building: 0102 - STUDENT SERVICES
FIRE ALARM
Comments: The fire alarm control/annunciator panel is a Simplex 4100U unit located in the vestibule. The building fire alarm system is monitored by the central fire alarm control/annunciator panel in Welcome Center Building 100.
Comments: The cameras in this building are monitored from Welcome Center Building 100. The public address system is a wireless connection to Welcome Center Building 100.
Audible Alarm Control/Annunciator Panel Magnetic Door Holder Manual Pull Station Smoke Detector Visual Alarm
Connected to Main System Closed Circuit TV Connected to Main System Satellite Dish
Telephone Security Public Address Television
Comments: Recorded footcandle levels include natural light contribution. A lighting control relay panel is located in electrical room 113.
T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
Offices
Corridors & Stairs
Equipment Rooms (Elec/Mech)
Lounges
Toilets
Storage Rooms
Classrooms
Area Recommended Recorded Light Type
Battery Backup Battery Backup
Emergency Exit
GENERAL BUILDING CONDITION
Rating X Good
Fair Poor
Interior Lighting2.
Emergency /Exit Lighting3.
COMMUNICATION
The facility condition is not impacting the functional use of the facility.
The facility condition IS impacting the functional use of the facility.
The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.
Electric Water Gas Yes N/AYes
BUILDING UTILITY METERING
Structure: Good Exterior: Good Interior: Good Mechanical: Good Electrical: Good
Type Location
CARBON MONOXIDE DETECTION
Detection Required
Page: 17 of 57
Building: 0102 - STUDENT SERVICES
IMPAIRMENT
Potentially Impaired
DOL Responded
BUILDING 103 - EDUCATION/MAINTENANCE
Page: 18 of 57
Building: 0103 - EDUCATION/MAINTENANCE
BUILDING ENVELOPE
Foundation RoofBuilding
Concrete Loadbearing Masonry Steel
Brick Masonry CMU Masonry Corrugated Metal Panels Phenolic Panel System
Wall Roof Rigid Rigid
AccessibilityFeature
GSF NSF Year Built Use Group Historic Ownership #Floors
B 42,494 28,861 1 Owned 2010 Not Evaluated
Comments: Toilet rooms are designed and designated for severe weather shelter areas. A severe weather shelter sign is posted at the entrance of the designated toilet rooms.
REAL ESTATE
Access to Building
Ramps
Entrance
2nd Egress
Visual Alarm
Corridor/Aisle
Rooms
Stairs
Elevator
Restrooms
Drinking Fountain
Telephone
Yes
Yes
Yes
Yes
Yes
Yes
Yes
N/A
N/A
Yes
Yes
N/A
ACCESSIBILITY
Structural Systems1.
Exterior Walls2.
Insulation4.
Material
There are overflow scuppers on the roof to assist with drainage. The condition and life expectancy of the roof is based on visual observation during the July 2015 Facility Survey.
Drainage Year Life
Type Area Served
EPDM
Metal
Interior Roof Drains
Surface Run-off
Flat
Shed
The southern half of building
Northern half of roof
Comments:
3. Roof
Page: 19 of 57
Building: 0103 - EDUCATION/MAINTENANCE
Comments: There are fixed rated wire safety glass and clerestory windows in the corridor.
INTERIOR FINISH
Carpet Ceramic Tile Concrete Vinyl Tile
CMU Ceramic Tile Drywall
Aluminum - Aluminum Frame Metal Unit - Metal Frame
VERTICAL CIRCULATION
None
Aluminum - Aluminum Frame Metal Unit - Metal Frame
Fixed - Aluminum Frame; Double Glazing; Fixed - Metal Frame; Double Glazing;
Acoustical Tile Exposed Structure Gypsum Board Wood Planks
Exterior Doors5.
Windows6.
Floors1.
Interior Walls2.
3.
Page: 20 of 57
Building: 0103 - EDUCATION/MAINTENANCE
Heat Source
Heat Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
AT-E-2 60 mbh output gas fired unit heater; 7000 CFM propeller fan with 500 CFM induced outside air, 208V/3p, 2"TA 30%.Johnson/Arizon model AR05.5SAA-1-FG-1, SN 1-30-09-21064-AT-E-2
AT-E-3 60 mbh output gas fired unit heater; 7000 CFM propeller fan with 500 CFM induced outside air, 208V/3p, 2"TA 30%.Johnson/Arizon model AR05.5SAA-1-FG-1, SN 1-30-09-21064-AT-E-3
AT-E-4 228.7 mbh output gas fired unit heater; 7000 CFM propeller fan with 2500 CFM induced outside air, 208V/3p, 2"TA 30%. Johnson/Arizon model AR05.5SAA-1-FG-1, SN 1-30-09-21064-AT-E-
AT-E-5 228.4 mbh output gas fired unit heater; 7000 CFM propeller fan with 2500 CFM induced outside air, 208V/3p, 2"TA 30%. Johnson/Arizon model AR05.5SAA-1-FG-F, SN 1-30-09-21064-AT-E-
AT-E-6 148.3 mbh output gas fired unit heater; 7000 CFM propeller fan with 1500 CFM induced outside air, 208V/3p, 2"TA 30%. Johnson/Arizon model AR05.5SAA-1-FG-F, SN 1-30-09-21064-AT-E-
B-E-1,2,3 & 4 in Mechanical room 100D; Building supplementary water heating system consists of 4 water boilers. Each natural gas boiler is capable of providing 384 mbh net output, 120V-1p. The system includes 3 primary pumps and 3 secondary pumps with variable frequency drives. The system has an additional pump for corridor in-floor heating zone1 which is tapped directly off the supplementary boilers.
Comments:
Comments:
Comments:
Comments:
Comments:
Comments:
HVAC
Heat1.
Gas-Fired Packaged
Gas-Fired Packaged
Gas-Fired Packaged
Gas-Fired Packaged
Gas-Fired Packaged
Gas-Fired Packaged
Gas-Fired Hot Water Boiler
None
None
None
None
None
None
Geothermal Secondary
Loop
None
None
None
None
None
None
Electronic
Electronic
Electronic
Electronic
Electronic
Electronic
Direct Digital Control (DDC)
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
None
None
None
None
None
None
None
Shop Area
Shop Area
Shop Area
Shop Area
Shop Area
Shop Area
Page: 21 of 57
Building: 0103 - EDUCATION/MAINTENANCE
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Entire Building
Mechanical Room
Electric Room
Equipment Room
Shop Area
Welding Booths
Battery Room
Comments:
Comments:
Comments:
Comments:
Comments:
Comments:
Comments:
Two energy recovery units ERV-E-1 and ERV-E-2 serve this entire building by exhausting air from the building and bringing in fresh air from the outside, while transferring heating or cooling energy from the exhaust air to the fresh air. The fresh air from the ERV-E-1 and ERV-E-2 is ducted into the HVAC air distribution system. ERV-E-1 serves units HPU-E-1, 6 and7 and ERV-E-2 serves units HPU-E-2 thru 5. ERV-E-1 is manufactured by GreenHeck, model ERV-361S-15-B-ES, with a supply fan capacity of 900 CFM and an exhaust fan capacity of 900 CFM. ERV-E-2 is manufactured by GreenHeck, model ERV-361H-30-B-ES, with a supply fan capacity of 1245 CFM and an exhaust fan capacity of 1245
CFM.
Exhaust fan EF-E-1 serves Mech Room 106. EF-E-1 is manufactured by Cook, model 135ACE135CI0D, with a supply fan capacity of 1081 CFM and characteristics: 1/4HP, 115V, single phase, direct drive.
Exhaust fan EF-E-2 serves Electrical Room 106A. EF-E-2 is manufactured by Cook with a supply fan capacity of 230 CFM and characteristics: 135W, 115V, single phase, direct drive.
Exhaust fan EF-E-3 serves Lawn Equipment Storage Room 105A. EF-E-3 is manufactured by Cook with a supply fan capacity of 680 CFM and characteristics: 350W, 115V, single phase, direct drive.
Exhaust fan EF-E-4 serves Block Saw Room 103E. EF-E-4 is manufactured by Cook with a supply fan capacity of 680 CFM and characteristics: 350W, 115V, single phase, direct drive.
Exhaust fans EF-E-5 and EF-E-6 serve Welding Room 102. EF-E-5 and EF-E-6 are manufactured by Cook, with a supply fan capacity of 2500 CFM each and characteristics: 1HP, 208V, three phase, direct drive.
Exhaust fan EF-E-7 serves the battery charging area in Manufacturing Room 100. EF-E-7 is manufactured by Cook with a supply fan capacity of 1500 CFM and characteristics: 1/2HP, 115V, single phase, direct drive.
Ventilation Area ServedExhaust Ventilation
Page: 22 of 57
Building: 0103 - EDUCATION/MAINTENANCE
Packaged Heat Pump (Water
Source)
Packaged Heat Pump (Water
Source)
Packaged Heat Pump (Water
Source)
Packaged Heat Pump (Water
Source)
Packaged Heat Pump (Water
Source)
Packaged Heat Pump (Water
Source)
Packaged Heat Pump (Water
Source)
Single Duct
Single Duct
Single Duct
Single Duct
Single Duct
Single Duct
Single Duct
Two-Pipe
Two-Pipe
Two-Pipe
Two-Pipe
Two-Pipe
Two-Pipe
Two-Pipe
Direct Digital Control (DDC)
Direct Digital Control (DDC)
Direct Digital Control (DDC)
Direct Digital Control (DDC)
Direct Digital Control (DDC)
Direct Digital Control (DDC)
Direct Digital Control (DDC)
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Mechanical
Heat Recovery
Heat Recovery
Heat Recovery
Heat Recovery
Heat Recovery
Heat Recovery
Heat Recovery
Classrooms and Offices
Classrooms and Offices
Classrooms and Offices
Classrooms and Offices
Classrooms and Offices
Classrooms and Offices
Classrooms and Offices
Heat pumps with extended range deliver cooled/heated forced air to the building using the geothermal system secondary water loop thru units HPU-E-1. Manufactured by FHP, model AP025- 1HZC. Unit supply air temperature is controlled using temperature sensor installed in return air duct.
HPU-E-1, 2.0 Ton water source HP 21.3/29.9 mbh clg/24.6 mbh htg, 13 gpm
Heat pumps with extended range deliver cooled/heated forced air to the building using the geothermal system secondary water loop thru units HPU-E- 2. Manufactured by FHP, model AP035- 1HZC. Unit supply air temperature is controlled using temperature sensor installed in return air duct.
HPU-E-2, 3.0 Ton water source HP 28.0/39.0 mbh clg/33.1 mbh htg, 13 gpm
Heat pumps with extended range deliver cooled/heated forced air to the building using the geothermal system secondary water loop thru units HPU-E-3. Manufactured by FHP, model AP035- 1HZC. Unit supply air temperature is controlled using temperature sensor installed in return air duct.
HPU-E-3, 3.0 Ton water source HP 31.2/40.6 mbh clg/31.9 mbh htg, 13 gpm
Heat pumps with extended range deliver cooled/heated forced air to the building using the geothermal system secondary water loop thru units HPU-E-4. Manufactured by FHP, model AP049- 1HZC. Unit supply air temperature is controlled using temperature sensor installed in return air duct.
HPU-E-4, 4.0 Ton water source HP 34.1/51.0 mbh clg/46.1 mbh htg, 15 gpm
Heat pumps with extended range deliver cooled/heated forced air to the building using the geothermal system secondary water loop thru units HPU-E-5. Manufactured by FHP, model AP049- 1HZC. Unit supply air temperature is controlled using temperature sensor installed in return air duct.
HPU-E-5, 4.0 Ton water source HP 34.2/51.0 mbh clg/45.1 mbh htg, 15 gpm
Heat pumps with extended range deliver cooled/heated forced air to the building using the geothermal system secondary water loop thru units HPU-E-6. Manufactured by FHP, model AP025- 1HZC. Unit supply air temperature is controlled using temperature sensor installed in return air duct.
HPU-E-6, 2.0 Ton water source HP 20.8/27.9 mbh clg/23.2 mbh htg, 8 gpm
Heat pumps with extended range deliver cooled/heated forced air to the building using the geothermal system secondary water loop thru units HPU-E-7. Manufactured by FHP, model AP061- 1HZC. Unit supply air temperature is controlled using temperature sensor installed in return air duct.
HPU-E-7, 5.0Ton water source HP 50.1/67.5 mbh clg/56.6 mbh htg, 16 gpm
Comments:
Comments:
Comments:
Comments:
Comments:
Comments:
Comments:
System Type
Air Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation Area
Page: 23 of 57
Building: 0103 - EDUCATION/MAINTENANCE some Lavs with instantaneous electric heatersComments:
PVC None PVC
Drinking Fountain Fixed Emergency Eyewash Hose Bibb Lavatory Mop Sink Wall Hydrant Water Closet (Flush Valve) Water Closet (Tank) Waterless Urinal
Gas (Natural)
None None ABC Type Fire Extinguisher
Copper Copper Gas-Fired None No
Hot Water Cold Water Water Heater Water Treatment HW Storage Tank
Grease InterceptorWaste / Vent Interior Storm
Packaged Heat Pump (Water
Source)
Single Duct Two-Pipe Direct Digital Control (DDC)
Mechanical Heat Recovery Classrooms and Offices
Sprinkler System Stand Pipe System Fire Suppression
PLUMBING
Heat pumps with extended range deliver cooled/heated forced air to the building using the geothermal system secondary water loop thru units HPU-E-8. Manufactured by FHP, model AP061- 1HZC. Unit supply air temperature is controlled using temperature sensor installed in return air duct.
HPU-E-8, 5.0 Ton water source HP 51.9/66.4 mbh clg/57.3 mbh htg, 16 gpm
Comments:
Water Distribution1.
Sanitary Distribution2. Number of Deficiencies = 1
Fixtures3.
Fuel Distribution4.
Page: 24 of 57
Building: 0103 - EDUCATION/MAINTENANCE
Comments: Electrical service to this building is provided from a utility owned 500 kVA pad-mounted transformer, located west of the building and terminates in a 1600A main switchboard, located in the electrical room.
The MDP is protected by a factory-installed 250 kA transient surge suppression (TVSS) module. A meter is located on the building near the transformer.
FIRE ALARM
Comments: The fire alarm control/annunciator panel is a Simplex 4100U unit located in the vestibule. The building fire alarm system is monitored by the central fire alarm control/annunciator panel in Welcome Center Building 100.
Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices
Audible Alarm Control/Annunciator Panel Magnetic Door Holder Manual Pull Station Smoke Detector Visual Alarm
Comments: Recorded footcandle levels include natural light contribution. There are two lighting control relay panels in this building, located in Electrical Room 106A and Student Commons Room 128C.
Compact Fluorescent Comments: Exterior lighting is controlled by a lighting control panel.
T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
T5 - Fluorescent
O…