Ramey_Trades_Expansion_Project_-_Solicitation_No._DOL-ETA-18-R-00030.pdf
PDF 4 MB Posted
- Solicitation number
- 1630DC-18-R-00030
About this file
Solicitation 1630DC-18-R-00030
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Cost_Proposal_Template.xlsx | XLSX spreadsheet | |
| Amendment_0001-Ramey_Vocational_Trades_Expansion.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT TITLE: DESIGN BUILD – VOCATIONAL TRADES EXPANSION at the RAMEY JOB CORPS
CENTER, AGUADILLA, PUERTO RICO
The work involves services for the design and construction of two new buildings to accommodate the expansion of the existing Electrical trade and incorporation of a new Advanced Solar trade, and the rehabilitation of existing facilities to accommodate the expansion of the existing Carpentry trade. The expansion will total approximately 6,000 gross square feet and the rehabilitation will total approximately 2,400 gross square feet. The work includes, but is not limited to, miscellaneous site improvements in the form of general landscaping, roads, parking, drainage, connection to all utility lines and site/security lighting.
Ramey Job Corps Center 760 Belt Road
Aguadilla, PR 00603
- This requirement has been set-aside for a competitive HUBZone
- The estimated Construction Cost is between $1,000,000 and $2,000,000
- Please Reference Section C for the Statement of Work.
- Contractor shall submit one copy of the proposal via email to ramso.bryan@dol.gov by the solicitation due date. Paper copy submittals are not required for this solicitation. Include the solicitation number in the subject line of the email. Original bid bonds must be received by the proposal due date or the proposal will be considered nonresponsive. Bid bonds shall be sent to the address in Block 7 to the attention of Bryan Ramso.
- Please see Section L for further offeror instructions.
X
1. SOLICITATION NO. 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
A. NAME B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If "YES," indicate within how many calendar days after award in Item 12B.)
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 4-85) STANDARD FORM 1442
Prescribed by GSA YFAR (48 CFR) 52.236-1(d) NSN 7540-01-155-3212
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL: Bryan Ramso, Contract Specialist (202) 693-3618
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____10______ calendar days and complete it within ___520___ calendar days after receiving award, notice to proceed. This performance period is X mandatory, negotiable. (See _____________________________.)
YES NO
A. Sealed offers in original and __One (1)__copies to perform the work required are due at the place specified in Item 8 by _2:00 PM Eastern Time (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference
D. Offers providing less than ___120 ______ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NOTICE: SET-ASIDE for HUBZone Competitive
1630DC-18-R-00030
10-23-2018 1 of 141
U.S. Department of Labor, ETA/OCM SEE SECTION L Division of Job Corps Procurement 200 Constitution Avenue, NW Room N-4643 Washington DC 20210
52.211-10
X Ten (10) Days
12/11/2017 mailto:ramso.bryan@dol.gov
See Block 7
14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO.
16. REMITTANCE ADDRESS
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within 90 calendar days after the date offers are due.
AMOUNTS CLIN 0001 …………………………………………………………………………….….$ _______________
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20B. SIGNATURE 20C. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation, is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work, requisitions identified award consummates the contract. which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER
TO SIGN
30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA
BY
OFFER
AWARD
STANDARD FORM 1442(REV. 4-85)BACK
(Include ZIP Code) (Include area code)
(Include only if different than Item 14)
(Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
(Type or print)
(4 copies unless otherwise specified)
(Type or print) MARIA J. PIZARRO, CPCM CFCM Contracting Officer
Division of Job Corps Procurement
(Type or print)
(Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror)
(To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
ETA
U.S. Department of Labor ETA Payment Office 200 Constitution Avenue NW, Suite N-4702 Washington, DC 20210
1630DC-18-R-00030
Table of Contents
PART I - THE SCHEDULE ............................................................................................................................... A-1
SECTION A - SOLICITATION/CONTRACT FORM .................................................................................... A-1
SF 1442 SOLICITATION, OFFER, AND AWARDNOTICE: Total SET-ASIDE (Construction, Alteration, or Repair) ................................................................................................................................... A-1
SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS .................................................................. B-1
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK ......................................... C-1
[For this Solicitation, there are NO clauses in this Section] .................................................................................. C-1
SECTION D - PACKAGING AND MARKING ............................................................................................... D-1
SECTION E - INSPECTION AND ACCEPTANCE ....................................................................................... E-1
E.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE .................................. E-1 E.2 INSPECTION AND ACCEPTANCE ............................................................................................................ E-1
SECTION F - DELIVERIES OR PERFORMANCE ....................................................................................... F-1
F.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE ................................... F-1
F.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
ALTERNATE I (APR 1984) ........................................................................................................................ F-1 F.3 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEPT 2000) .................................................. F-1 F.4 PERIOD OF PERFORMANCE ..................................................................................................................... F-2 F.5 PLACE OF PERFORMANCE ........................................................................................................................ F-2
SECTION G - CONTRACT ADMINISTRATION DATA .............................................................................. G-1
G.1 PRE-CONSTRUCTION CONFERENCE ..................................................................................................... G-1 G.2 PERIODIC PROJECT MEETINGS .............................................................................................................. G-1 G.3 SUBCONTRACTS ........................................................................................................................................ G-1 G.4 SHOP DRAWINGS ....................................................................................................................................... G-1 G.5 OPERATIONS, STORAGE AREAS AND SECURITY .............................................................................. G-2 G.6 PROJECT SAFETY ....................................................................................................................................... G-3 G.7 DISPOSAL OF REFUSE ............................................................................................................................... G-3 G.8 SCHEDULE OF PROGRESS ........................................................................................................................ G-3 G.9 PAYMENTS TO CONTRACTOR ................................................................................................................ G-4 G.10 METHOD OF PAYMENT .......................................................................................................................... G-4 G.11 FURNISHING INFORMATION AND RECORDS .................................................................................... G-4 G.12 WORKERS’ COMPENSATION LAWS .................................................................................................... G-5 G.13 REQUIRED INSURANCE .......................................................................................................................... G-5 G.14 EQUITABLE ADJUSTMENTS .................................................................................................................. G-6 G.15 WEATHER DELAYS (EXCUSABLE DELAY) ........................................................................................ G-8 G.16 TEST RESULTS .......................................................................................................................................... G-8 G.17 SUBSTANTIAL COMPLETION ................................................................................................................ G-8 G.18 CONTRACT CLOSEOUT .......................................................................................................................... G-9 G.19 PRECEDENCE OF PLANS, SPECIFICATIONS, AND CLAUSES ......................................................... G-9
G.20 INVOICE PREPARATION AND SUBMISSION .................................................................................... G-10
SECTION H - SPECIAL CONTRACT REQUIREMENTS ........................................................................... H-1
H.1 COMMENCEMENT OF WORK .................................................................................................................. H-1 H.2 SUBCONTRACTING RESPONSIBILITIES ............................................................................................... H-1 H.3 ENVIRONMENTAL COMPLIANCE .......................................................................................................... H-1 H.4 INSTALLATION RULES AND REGULATIONS ...................................................................................... H-1 H.5 SPECIAL UTILITY PROVISION ................................................................................................................ H-1 H.6 DESIGNATION OF GOVERNMENT INSPECTOR ................................................................................... H-1 H.7 ACCOUNTING AND AUDITING SERVICES ........................................................................................... H-1 H.8 SUBMISSION OF CORRESPONDENCE .................................................................................................... H-2 H.9 OTHER CONTRACTORS ............................................................................................................................ H-2 H.10 DISPOSITION OF MATERIAL ................................................................................................................. H-2 H.11 HAZARDOUS OCCUPATION ORDERS .................................................................................................. H-2 H.12 DATA COLLECTION FOR THE DEPARTMENT OF LABOR ............................................................... H-2 H.13 RIGHTS AND OBLIGATIONS .................................................................................................................. H-3 H.14 INITIATION OF LIQUIDATED DAMAGES ............................................................................................ H-3 H.15 MODIFICATIONS AND CHANGE ORDERS .......................................................................................... H-3 H.16 PERMITS ..................................................................................................................................................... H-4 H.17 OVERTIME WORK .................................................................................................................................... H-4
PART II - CONTRACT CLAUSES ................................................................................................................... I-1
SECTION I - CONTRACT CLAUSES ............................................................................................................ I-1
I.1 NOTICE LISTING CONTRACT CLAUSES INCORPORATED BY REFERENCE .....................................I-1 I.2 INFORMATION REGARDING RESPONSIBILTY OF MATTERS (FEB 2012) ..........................................I-4
I.3 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRCT
AWARDS (OCT 2016) ..................................................................................................................................I-5 I.4 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013) ...........I-7
I.5 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS
ACT (DEC 2010) (DEVIATION) ..................................................................................................................I-8 I.6 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015) ..................................................I-10
I.7 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND
CONSTRUCTION CONTRACTS (SEPT 2013) ........................................................................................I-12
I.8 52.223-3 HAZARDOUS MATERIAL IDENTIFICAITON AND MATERIAL
SAFETY DATA (JAN 1997) .......................................................................................................................I-12 I.9 52.225-9 BUY AMERICAN - CONSTRUCTION MATERIALS (MAY 2014) .........................................I-13
I.10 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT - CONSTRUCTION
MATERIALS (MAY 2014) ........................................................................................................................I-16 I.11 52.227-4 PATENT INDEMNITY—CONSTRUCTION CONTRACTS (DEC 2007) ALT I (DEC 2007).I-17 I.12 52.228-15 PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (OCT 2010) ....................I-17 I.13 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2017) ...........................I-18 I.14 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997) ........................I-23 I.15 52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994) .................................................................I-24 I.16 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) ..................................................I-25
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS .................................... J-1
SECTION J - LIST OF ATTACHMENTS ........................................................................................................ J-1
J.1 WAGE DETERMINATION ............................................................................................................................ J-1 J.1 JCH 814 ............................................................................................................................................................ J-1
SECTION K – REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF
OFFERORS OR RESPONDENTS ........................................................................................................... K-1
K.1 NOTICE LISTING SOLICITATION PROVISIONS INCORPORATED BY REFERENCE ..................... K-1 K.2 52.203-2 CERTIFICATE OF INDEPENDENT PRICE DETERMINATION (APR 1985) ......................... K-1 K.3 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2012) ................................. K-2 K.4 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (APR 2010) ......................... K-4 K.5 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (APR 2012) ........................................ K-5 K.6 52.219-22 SMALL DISADVANTAGED BUSINESS STATUS (OCT 1999) ............................................. K-8 K.7 SIGNATURE BLOCK ................................................................................................................................ K-10
SECTION L – INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR
RESPONDENTS ........................................................................................................................................ L-1
L.1 NOTICE LISTING SOLICITATION PROVISIONS INCORPORATED BY REFERENCE ...................... L-1
L.2 52.215-20 REQUIREMENTS FORCERTIFIED COSTOR PRICING DATA AND DATA
OTHER THAN CERTIFIED COST OR PRICING DATA (OCT 2010) ................................................ L-1 L.3 52.216-1 TYPE OF CONTRACT (APR 1984) ............................................................................................. L-2
L.4 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) ................................................. L-2 L.5 52.233-2 SERVICE OF PROTEST (SEP 2006) ............................................................................................. L-3 L.6 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE 1 (FEB 1995) .............................. L-4 L.7 52.236-28 PREPARATION OF PROPOSALS—CONSTRUCTION (OCT 1997) ...................................... L-4 L.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) .................... L-4 L.9 52.252-3 ALTERATIONS IN SOLICITATIONS (APR1984) ....................................................................... L-4 L.10 GENERAL PROPOSAL PREPARATION INSTRUCTIONS ................................................................... L-4
SECTION M – EVALUATION FACTORS FOR AWARD ........................................................................... M-1
1630DC-18-R-00030 Section B Supplies or Services and Price/Costs
B-1
PART I - THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS
PRICE/COST SCHEDULE
CLIN SUPPLIES/
SERVICES
QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 LS --------- $
Firm Fixed Price
The Contractor shall provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform the Design and Construction Services for the Design/Build – Vocational Trades Expansion at the Ramey Job Corps Center.
TOTAL **$
**Enter amount on Page 2 of SF 1442, Block 17.
B.2 DELIVERABLE - RELEASABLE COPIES - FREEDOM OF INFORMATION ACT
The Freedom of Information Act (FOIA) permits withholding information under several exemptions, including Exemption 4 which protects "trade secrets and commercial or financial information obtained from a person [that is] privileged or confidential," 5 U.S.C. 552(b) (4). Within five business days of contract award, the contractor shall provide a statement that the contract is available for full disclosure under the FOIA or provide a scanned PDF of the redacted copy of the contract identifying the specific potions the contractor believes are covered by the particular exemption requested. Any redactions must be fully supported under the FOIA. In the event the Government notifies the contractor that it does not agree with a proposed redaction, the contractor shall have five business days to submit additional information to support the requested redaction. For subcontracts, within 5 business days of the contractor's award of any subcontract over $500,000 the contractor shall provide the Government a scanned PDF copy of the subcontract with a statement that the copy is either available for full disclosure, or identifying the specific portions believed to be covered by the particular exemption requested.
Redactions should be limited to those protections provided under the FOIA. Following the procedures above, the Government has the right to notify the contractor of any disagreement with proposed redaction or exemption requests.
1630DC-18-R-00030 Section C Description/Specifications
C-1
DESIGN-BUILD SCOPE OF WORK
FOR
VOCATIONAL TRADES EXPANSION
AT THE
RAMEY JOB CORPS CENTER
AGUADILLA, PUERTO RICO
U.S. DEPARTMENT OF LABOR
PROJECT NO. 3996
June 2018 DESIGN-BUILD SOW
C-2
TABLE OF CONTENTS
I. GENERAL .......................................................................................................................... C-4 II. SPECIFIC REQUIREMENTS/INSTRUCTIONS .............................................................. C-4
A. LEGALLY MANDATED STANDARDS ..................................................................... C-4
1. Code of Federal Regulations ..................................................................................... C-4
2. National and State Building Codes ........................................................................... C-5
3. Permits and Licenses................................................................................................. C-5
B. JOB CORPS GUIDELINES ........................................................................................... C-5
1. JCH-814: Planning, Design, and Construction Administration Guidelines ............ C-5
C. OTHER STANDARDS.................................................................................................. C-6
1. Life Cycle Cost (LCC) Analyses .............................................................................. C-6
2. Sustainable Design and Building Requirements ....................................................... C-6
3. Energy Conservation ................................................................................................. C-7
4. Environmentally Preferable Products ....................................................................... C-8
5. Asbetos-Containing Materials, Lead Based Paint and PCBs .................................... C-8
6. Environmental Assessments ..................................................................................... C-9
7. Commissioning ......................................................................................................... C-9
8. Existing Facility Investigative Survey .................................................................... C-10
D. SPECIFIC INSTRUCTIONS ........................................................................................ C-10
1. Center Operation ..................................................................................................... C-10
2. Contractor Responsibilites ...................................................................................... C-10
3. Submittal Requirements .......................................................................................... C-11
4. Submittals for Review............................................................................................. C-12
5. Web Based Project Management System ............................................................... C-13
6. Building Design ...................................................................................................... C-14
7. Site Visits – Construction Observation – Construction Progress Meetings ........... C-14
8. As-Built Drawings .................................................................................................. C-14
9. Contract Document Reproduction .......................................................................... C-15
10. Availability of Existing Documents........................................................................ C-15
11. Inegrated Design Process ........................................................................................ C-15
12. Verification of Construction Sustainability Measures ............................................ C-16
III. USE OF THE SITE ........................................................................................................... C-16 IV. EXTENT OF WORK ........................................................................................................ C-16
A. SITE IMPROVEMENTS AND UTILITIES ................................................................ C-16
1. Design Objectives ................................................................................................... C-16
2. Site Improvements .................................................................................................. C-16
3. Site Utilities ............................................................................................................ C-17
B. GENERAL BULDINGS DESIGN REQUIREMENTS ............................................... C-18
1. General Requirements ............................................................................................. C-18
2. Demolition .............................................................................................................. C-18
3. Architectural ........................................................................................................... C-19
C-3
4. Specific Provisions to all Architectural Work ........................................................ C-20
5. Structural ................................................................................................................. C-25
6. Mechanical/Plumbing ............................................................................................. C-26
7. Electrical ................................................................................................................. C-26
8. Radon ...................................................................................................................... C-29
9. Warranties ............................................................................................................... C-30
C. FUNCTIONAL BUILDING DESIGN REQUIREMENTS ......................................... C-30
1. General .................................................................................................................... C-30
2. Programmatic Requirements ................................................................................... C-31
V. CONSTRUCTION REQUIREMENTS/SPECIFIC INSTRUCTIONS .............................. C-31 A. SPECIFIC INSTRUCTIONS........................................................................................ C-31
1. Quality Requirements ............................................................................................. C-31
2. Temporary Facilities and Controls.......................................................................... C-32
3. Adherence to Scope of Work .................................................................................. C-33
4. Incidental Cutting and Patching .............................................................................. C-33
5. Coordination of Work ............................................................................................. C-34
VI. SKETCHES ....................................................................................................................... C-35 A. LOCATION MAP ........................................................................................................ C-35 B. VICINITY MAP ........................................................................................................... C-35 C. SITE PLAN ................................................................................................................... C-36 D. CENTER SATELLITE CAMPUS SITE PLAN .......................................................... C-37 E. CONCEPTUAL FLOOR PLANS: BUILDING 702 .................................................... C-38 F. CONCEPTUAL FLOOR PLANS: BUILDING 702A ................................................. C-39
G. CONCEPTUAL FLOOR PLANS: ELECTRICAL & ADVANCED SOLAR ............ C-40
TRADES
H. CONCEPTUAL FLOOR PLANS: CAPRENTRY TRADE ........................................ C-41 I. CONCEPTUAL CROSS SECTIONS .......................................................................... C-42 J. ROOM DATA SHEET EXAMPLE ............................................................................. C-43
VII. PROJECT SCHEDULE .................................................................................................... C-44 ATTACHMENT 1 CONTRACTOR QUICK REFERENCE CHECKLIST ........................... C-45
ATTACHMENT 2 QUALITY CONTROL, TESTING, AND INSPECTION SERVICES .... C-52
REQUIREMENTS
ATTACHMENT 3 ENVIRONMENTAL ASSESSMENT REQUIREMENTS ...................... C-64
C-4
DESIGN-BUILD SCOPE OF WORK
VOCATIONAL TRADES EXPANSION
AT THE
RAMEY JOB CORPS CENTER
I. GENERAL
The work involves services for the design and construction of two new buildings to accommodate the expansion of the existing Electrical trade and incorporation of a new Advanced Solar trade, and the rehabilitation of existing facilities to accommodate the expansion of the existing Carpentry trade at the Ramey Job Corps Center. The expansion will total approximately 6,000 gross square feet and the rehabilitation will total approximately 2,400 gross square feet. The work includes, but is not limited to, miscellaneous site improvements in the form of general landscaping, roads, parking, drainage, connection to all utility lines and site/security lighting. The extent of work is described in Parts IV & V of this Scope of Work (SOW).
The design will comply with identified and targeted standards established by the Leadership in Energy and Environmental Design (LEED) rating system; however, no LEED Certification is required.
“Contractor Quick Reference Checklist,” Attachment 1, is a required form that identifies a simplified but not all inclusive list of issues that the Contractor needs to address as due diligence items during the design phase.
The JCH-814 paragraphs shown provide an initial design reference; however, reference to other sources may be required to fully address the issue.
“Quality Control, Testing, and Inspection Services Requirements”, Attachment 2, outlines the minimum quality control, testing, and inspection procedures and practices which are required to ensure the completed construction meets or exceeds both the contract requirements and the Government-accepted contractor design..
II. DESIGN REQUIREMENTS/ SPECIFIC INSTRUCTIONS
A. LEGALLY MANDATED STANDARDS
The Contractor shall conform to:
1. Code of Federal Regulations
a) Safety and Health………………………………………..OSHA CFR Part 1926.62
b) Historic Preservation …………………………………..…….…….36 CFR Part 800
c) Disability/Accessibility …….…….…………………………….….28 CFR Part 36
The design must be in strict conformance with the Architectural Barriers Act Accessibility Standard (ABAAS) of 2007 from the General Services Administration. The Contractor shall conduct a thorough research of these guidelines and, without exception, comply to the fullest extent, including those guidelines pertaining to the visually and hearing impaired.
C-5
No deviations from these guidelines are allowed. However, if the Contractor, at any Design Review Submittal, demonstrates that the compliance requirements would be technically infeasible or that compliance will cause an undue burden as defined by the guidelines, the Contractor is obligated to notify the Contracting Officer, in writing, for a final decision on such requirements.
(These standards can be printed from the website at http://www.access.gpo.gov/nara/cfr/cfr-table-search.html).
d) Life Safety Code……………...…………………………………………NFPA-101
The Contractor’s responsibility for safety related requirements extends to all impacted areas and access ways affected by the work.
2. National and State Building Codes
The Contractor shall conform to all applicable construction codes, ordinances, and regulations including the national building code used in the local area, laws and local ordinances. The most recent version of the International Building Code (IBC) will be used for all seismic related design, and the version will be coordinated with the local jurisdiction on the version for the non-seismic design. Deviations and interpretations will be subject to the approval of the Contracting Officer. The most recent versions of the IBC and the International Existing Building Code (IEBC) will be used for wind provisions as follows (hyperlinked documents):
a) Wind Provisions in the 2015 International Building Code® (February 2017)
b) Wind Provisions in the 2015 International Existing Building Code® (February 2017)
3. Permits and Licenses
The Ramey Job Corps Center is a leased facility, whose Lessor is the Commonwealth of Puerto Rico Education Department.
The Contractor shall research, and be responsible for obtaining and paying for, all regulatory, permitting and licensing requirements required to perform this work in Aguadilla, Puerto Rico and in accordance with JCH-814, Section 1.7. No drawings or specifications will be submitted for building permits unless express notification in writing is received from the Contracting Officer (CO).
Drawings and calculations shall be stamped by a licensed Professional Engineer.
Coordinate all appropriate permits with the Lessor, the local Department of Natural Resources and Energy, and the local permitting office (Administración de Reglamentos y Permisos ARPE).
B. JOB CORPS GUIDELINES
1. JCH-814: Planning, Design, and Construction Administration Guidelines for Architects and
Engineers.
http://www.access.gpo.gov/nara/cfr/cfr-table-search.html https://www.fema.gov/media-library/assets/documents/129665 https://www.fema.gov/media-library/assets/documents/129663
C-6
Job Corps publication JCH-814, September 2013 "Planning, Design, and Construction Administration Guidelines for Architects and Engineers," including Amendment 1 dated September 2015, is a companion document to this scope of work. This reference will from this point forward be referenced as “JCH-814.” The JCH-814 can be found at http://www.solicitationattachments.com/jch814. It presents the A/E Contractor additional design criteria not specifically stated in the scope of work.
Where conflicts occur between the requirements of the contract and JCH-814, the requirements of the contract will take precedence.
C. OTHER STANDARDS
1. Life Cycle Cost (LCC) Analyses
LCC will be utilized as the basis for recommendations in making the selections of energy sources, systems and equipment, and building materials. However, the design must be consistent and in accordance with the extent of the Scope of Work and the budget. At the 15% Schematic submittal, the LCC analyses for the mechanical systems and fuel will be submitted with recommendations for review, and will be approved and revised as necessary as equipment is selected and specified. The LCC analyses will be run on NIST's BLCC and Discount software programs. On request, the Department of Labor will furnish this software to the Contractor free of charge. The BLCC program will be run on the OMB A-94 guidelines, using the discount factor from the latest edition of OMB Circular No. A-94 under “Real Interest Rates.”
(The BLCC software is also available on the Federal Energy Management Program website at http://www1.eere.energy.gov/femp/information/download_blcc.html under the heading “BLCC 5.3(latest version)” for a Windows version).
2. Sustainable Design and Building Requirements
The project will use design methodologies, materials, systems and components that minimize negative environmental impacts, increase energy efficiency and make use of renewable energy technologies. Within budget constraints it will embody best current sustainable design and building practices. The project team is to propose the highest possible implementation of these strategies for consideration by the Department of Labor, the Regional DOL office, and the Job Corps Center.
GUIDING PRINCIPLES: Pursuant to Executive Order (EO) 13693, new buildings and renovations will incorporate the Guiding Principles (GP) to the extent practical and that are lifecycle cost-effective. To comply with the EO, refer to the tab titled "Compliance Summary Checklist” in Attachment 2, Job Corps High Performance and Sustainable Buildings New Buildings Compliance Tool. The compliance tool may be downloaded from http://www.solicitationattachments.com/hpsb/hpsb.xlsx. The Contractor shall use the Compliance Forms and instructions included in the Tool as a guide for implementing the Guiding Principles. The Summary Checklist provides a quick list of the Guiding Principles and the actions required to achieve them. As Guiding Principles are met, marking the corresponding checkbox on the Compliance Forms will populate a total percentage of Guiding Principles achieved. The Compliance Forms also provide a space for notes or to list supporting documents. In the event that a Guiding Principle cannot be met, http://www.solicitationattachments.com/jch814 http://www.solicitationattachments.com/hpsb/hpsb.xlsx
C-7 the Compliance Forms also provide an opportunity to explain why. The Summary Checklist provides a quick view to easily review compliance overtime.
To the extent required by this Scope of Work, the Contractor’s design team shall incorporate the requirements of the Guiding Principles into the design and verify implementation. Upon project completion, each team member will fill out and sign the compliance form for each assigned category and provide the exhibits required per the Job Corps High Performance and Sustainable Buildings New Buildings Compliance Tool. Each compliance form is provided on a separate tab in the compliance tool. The team member/professional is to fill out the "Confirmation" section of each form and provide exhibits as noted in "Required Exhibits."
In the event that special circumstances exist that prevent compliance with one of Guiding Principles categories, the appropriate team member may use the "Compliance Notes" field to describe why the project could not achieve compliance. This field may also be used to describe any unique or alternative compliance method, if previously approved by DOL. Provide copies of emails or letters from DOL that approve any decisions for non-compliance with a Guiding Principle category.
There will be at least one sustainable design Accredited Professional (AP) as an integral and active member of the design team.
The project will also meet required energy use and sustainability goals as described below and as noted in the JCH-814.
The Contractor shall engage in an integrated design process as defined in the JCH-814.
The Contractor shall verify construction phase sustainability measures as detailed in the JCH-814 and as noted on the respective Compliance Forms. The specifications will include requirements to provide any necessary documentation.
3. Energy Conservation
All new work is to be designed in accordance with energy conservation opportunities and applicable federal directives. In response to energy conservation concerns, all proposed construction must conform to ASHRAE 90.1-2013 for all buildings except low rise residential buildings. Low rise residential buildings, three stories or fewer above grade, will conform to the International Energy Conservation Code IECC 2012. The ASHRAE 90.1 -2013 standards or IECC 2009 for low rise residential buildings will be used as a baseline for energy comparisons.
It is the Department of Labor’s policy to purchase energy and water consuming products which are in the upper 25% of energy and water efficiency whenever practicable and cost effective. All work must be designed to meet or exceed the requirements of the Energy Policy Act of 2005 (or latest version), which includes Sections 103, 104, 109, 131, 553; Executive Order 13693; and all other applicable federal, state, and local codes and directives. New equipment will be Energy Star or FEMP designated products where applicable.
C-8
Building annual energy consumption calculations, methods and presentation will conform to nationally recognized standards such as found in ASHRAE Handbooks. A calculation summary statement of the estimated annual energy consumption, expressed in BTU/GSF/YR will be submitted with the 30%, 60% and final review submittals. Building energy will include lighting, all HVAC energy including heating, cooling, and ventilating loads, fans and pump motors energy, and domestic hot water supply energy.
The Contractor shall submit an energy analysis per ASHRAE 90.1-2010 Appendix G showing that the design reduces energy consumption by at least 30% for the new construction and 20% for the rehabilitation work compared to the baseline building. This analysis will be provided with the 30% design submission and will be revised as necessary with succeeding submittals.
The Contractor shall evaluate options for the use of energy and water conservation measures in building design and shall include a description of recommended options in the DESIGN NARRATIVE (see JCH-814 for narrative requirements).
4. Environmentally Preferable Products
The Contractor shall evaluate options for the use of environmentally preferable products and environmentally preferable building design and shall include a description of recommended options in the DESIGN NARRATIVE (see JCH-814 for narrative requirements).
5. Asbestos-Containing Materials, Lead-Based Paint and PCBs
The Contractor shall conduct a field investigation to identify ACM and lead-based paint affected by the rehabilitation activities. The field investigation will include destructive testing as required to identify and quantify the presence of ACM and lead-based paint. Where a field investigation is required to be performed in an occupied building, the Contractor shall coordinate with DOL and the Center Operator to determine the appropriate after-hours schedule for conducting of the investigation.
It is not intended that the ACM previously identified will be retested. However, suspect ACM not previously identified should be sampled to determine asbestos-content.
The Contractor shall conduct a field investigation for PCB fluorescent light ballasts for light fixtures impacted by this project only. The consultant shall not sample dielectric fluid from ballasts but shall rely on labeling to determine PCB status. Unlabeled ballasts will be assumed to be PCB-containing.
Note leaking PCB ballasts for special removal and disposal per 40 CFR 761.
An asbestos survey of the Center’s buildings was conducted in December 2003. The results of the survey and subsequent lab tests confirm no presence of asbestos-containing materials (ACM) in the Auditorium Building 702. However, since this project entails areas beyond the Auditorium, there is no available data about ACM presence in the remainder of the Building 702 complex. For Contractor’s information only, a copy of the report can be downloaded from http://www.solicitationattachments.com/ramey/acm_survey.pdf. If asbestos is encountered, the Contractor shall notify the Contracting Officer before proceeding, so that direction can be provided.
It is not intended that all identified asbestos be removed. Asbestos containing materials will only be removed as necessary to complete the rehabilitation work.
C-9
If directed, friable ACM will be abated prior to building demolition. Non-friable ACM will be abated prior to building demolition only as necessary to comply with the EPA National Emissions Standard for Hazardous Air Pollutants (NESHAP) (40 CFR 61 Subpart M), and applicable State and Local regulations.
All asbestos abatement will be done by licensed, trained asbestos workers, supervisors, and contractors. An asbestos abatement work plan will be prepared by a licensed, trained asbestos project designer for submittal. Asbestos abatement work plan will include the list and location of materials to be abated, methods of abatement, containment setup and location, decontamination procedures, respiratory protection, all worker licenses, training certifications and medical certifications, and disposal plan including transportation and final disposal location. All asbestos work will be done in accordance with applicable federal, state, and local regulations. The Contractor shall provide the services of an independent industrial hygienist or environmental consultant to conduct on-site project monitoring and air monitoring services during asbestos abatement, including laboratory services as needed. The consultant shall conduct on-site project monitoring and air-monitoring services during asbestos abatement including laboratory services as needed. The aforementioned monitoring and services will comprise the following:
a) Baseline air sampling (prior to abatement) with Phase Contrast Microscopy (PCM) laboratory analyses.
b) In-progress air monitoring and sampling with PCM laboratory analyses.
c) Final visual clearance inspections and final clearance air sampling using aggressive air sampling techniques. Sampling will be conducted in compliance with all applicable Federal, State, and Local requirements.
d) Submit a final abatement report certifying that asbestos abatement work has been completed in accordance with all applicable Federal, State, and Local regulations.
Note: The Contractor will pay for all costs for additional sampling and analyses resulting from improper execution of the asbestos removal or final clean up.
6. Environmental Assessment
The Contractor shall perform an Environmental Assessment study based on the requirements set out in Attachment 3 herein.
7. Commissioning
(a) The buildings will be commissioned by an experienced Commissioning Agent (CxA).
Commissioning standards will be per the Building Commissioning Association’s Building Commissioning Handbook, Second Edition. Building Commissioning will be as indicated on the Building Commissioning Compliance Form. The CxA may be from an independent firm hired by the Contractor or a member of the contractors ‘design team firm, but not a member of the design team itself. In addition, the CxA shall:
C-10
(b) Provide 30% and 60% design phase reviews and comment of selected mechanical systems. These reviews are to be included in the design submissions.
(c) Participate in the 15%, 30% and 60% design phase Integrated Design workshop.
(d) Provide training and orientation of commissioned systems to the appointed maintenance and operations staff. The CxA shall provide a video of this training.
(e) Provide a systems operating manual for the facility maintenance staff with the information needed to understand and optimally operate the commissioned systems.
8. Existing Facility Investigative Survey
(a) For the rehabilitation work to be performed on the existing areas of Building 702, the
Contractor shall perform an investigative survey to determine if there are hidden conditions or elements which will impact the proposed design. Demolition may be required to expose suspected unknown elements.
(b) The survey will determine if multiple ceilings exist or if there are multiple layers of floor covering.
(c) The survey will determine the extent of any hidden structural elements. The design and spacing of hidden structural elements will be investigated.
(d) The survey will locate any hidden mechanical or electrical components, the presence of which would impact the proposed design.
(e) Any openings in the exposed finishes created to perform the investigative survey will be sealed and restored in all areas where there are occupants. Any opening hidden by the exposed finish¸ such as a drop-in ceiling, need only be sealed.
(f) Care must be taken to avoid disruption of suspected or known ACM.
D. SPECIFIC INSTRUCTIONS
1. Center Operation
The Center will remain in operation throughout the construction phase. The Contractor shall, as part of this contract, coordinate with DOL’s Engineering Support Contractor (ESC) and develop a set of construction documents that will minimize disruption of Center operations during construction.
2. Contractor Responsibilities
C-11
The Contractor’s design will meet the programmatic requirements as outlined in this Scope of Work and in the JCH-814.
Although this Scope of Work may identify specific elements of construction, it is the…