SUMMARY
CONTRACTOR COST PROPOSAL TEMPLATE
| PROJECT NAME: VOCATIONAL TRADES EXPANSION |
| RAMEY JOB CORPS CENTER |
| DATE: |
| PREPARED BY: |
| DIVISION AND DESIGN SUMMARY | LABOR | MATERIALS/SUB | EQUIPMENT | TOTAL | |
| Division 2 - Demolition | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 3 - Concrete | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 4 - Masonry | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 5 - Metals | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 6 - Woods and Plastics | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 7 - Thermal and Moisture Protection | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 8 - Doors and windows | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 9 - Finishes | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 10 - Specialties | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 11 - Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 12 - Furnishings | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 13 - Special Construction | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 14 - Conveying Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 21 - Fire Suppression | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 22 - Plumbing | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 23 - Mechanical | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 26 - Electrical | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 28- Electronic Safety and Security | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 31 - Excavation | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 32 - Exterior Improvements | $0.00 | $0.00 | $0.00 | $0.00 | |
| Division 33 - Utilities | $0.00 | $0.00 | $0.00 | $0.00 | |
| Design (For Design/Build Projects) | $0.00 | $0.00 | N/A | $0.00 | |
| General Conditions | $0.00 | $0.00 | $0.00 | $0.00 | |
| SUBTOTALS | $0.00 | $0.00 | $0.00 | $0.00 | |
| Contractor Overhead | $0.00 | 0.00% | |||
| SUBTOTAL WITH OVERHEAD | $0.00 | ||||
| Contractor Profit | $0.00 | 0.00% | |||
| SUBTOTAL WITH O&P | $0.00 | ||||
| Bonds/Insurance | 0.00 | 0.00% | |||
| TOTAL | $0.00 | ||||
| INSTRUCTIONS TO BIDDER | |||||
| 1. Only complete cells shaded in yellow. All other cells are automatically calculated. | |||||
| 2. Add tasks to "CSI DIVISION" Tab and applicable units, rates, and quantifies. If a CSI Section is N/A, leave blank. | |||||
| 3. If this is a Design-Build project, add applicable rates, hours, and materials costs to "DESIGN" Tab. | |||||
| 4. Add applicable units, rates, and quantifies in the "GENERAL CONDITIONS" Tab. | |||||
| 5. Add applicalbe Overhead, Profit, and Bonds/Insurance Percentages in the "SUMMARY" Tab. |
Version 0, 4/18/18
CSI DIVISION
CSI DIVISION
| LABOR | MATERIALS/SUBCONTRACTOR | EQUIPMENT | |||||||||
| ITEM | RATE | HOURS | TOTAL | UNIT | QTY | UNIT RATE | TOTAL | RATE | DURATION | TOTAL | ITEM TOTAL |
| Division 2 - Demolition | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| [List Tasks Under Each Division Heading] | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | |
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 3 - Concrete | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $2.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 4 - Masonry | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 5 - Metals | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 6 - Woods and Plastics | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 7 - Thermal and Moisture Protection | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 8 - Doors and windows | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 9 - Finishes | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 10 - Specialties | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 11 - Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 12 - Furnishings | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 13 - Special Construction | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 14 - Conveying Equipment | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 21 - Fire Suppression | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 22 - Plumbing | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 23 - Mechanical | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 26 - Electrical | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 28- Electronic Safety and Security | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 31 - Excavation | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 32 - Exterior Improvements | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Division 33 - Utilities | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| SUBTOTAL CSI DIVISIONS | $0.00 | $0.00 | $0.00 | $0.00 |
DESIGN (DB ONLY)
DESIGN (DESIGN-BUILD PROJECTS ONLY)
| LABOR HOURS | ||||||||||
| Design (for Design/Build Projects) | RATE | SITE VISITS | 15% or 30% | 50% or 60% | 100% | CA SERVICES | SUBMITTAL REVIEW | CLOSEOUT DOCS | TOTAL HOURS | TOTAL |
| Architect | $0.00 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 |
| Project Manager | $0.00 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 |
| Civil Engineer | $0.00 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 |
| Structural Engineer | $7.00 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 |
| Mechanical Engineer | $0.00 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 |
| Electrical Enginer | $0.00 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 |
| SUBTOTAL HOURS | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 |
| MATERIALS/SUBCONTRACTORS | ||||||||||
| Design (for Design/Build Projects) | RATE | SITE VISITS | 15% or 30% | 50% or 60% | 100% | CA SERVICES | SUBMITTAL REVIEW | CLOSEOUT DOCS | TOTAL HOURS | TOTAL |
| [LIST ITEMS] | $0.00 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 |
| $0.00 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | |
| $0.00 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | |
| $0.00 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | |
| $0.00 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | |
| $0.00 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | |
| SUBTOTAL MATERIALS/SUB | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 |
SUBTOTAL DESIGN $0.00
GENERAL CONDITIONS
GENERAL CONDITIONS
| ITEM DESCRIPTION | QTY | UNITS | MATERIAL/SUB | LABOR | EQUIPMENT | TOTAL | |||
| UNIT COST | COST | UNIT COST | COST | UNIT COST | COST | ||||
| SALARIES | |||||||||
| Project Manager (Labor) | 0.0 | Hours | $ - 0 | $ - 0 | $ - 0 | ||||
| Project Scheduler (Labor) | 0.0 | Hours | $ - 0 | $ - 0 | $ - 0 | ||||
| Quality Control Manager (Labor) | 0.0 | Hours | $ - 0 | $ - 0 | $ - 0 | ||||
| Superintendent (Labor) | 0.0 | Hours | $ - 0 | $ - 0 | $ - 0 | ||||
| SALARIES SUBTOTAL | 0.0 | Hours | $ - 0 | $ - 0 | |||||
| VEHICLES | |||||||||
| Project Superintendent Vehicle | 0.0 | Days | $ - 0 | $ - 0 | $ - 0 | ||||
| QCM Vehicle | 0.0 | Days | $ - 0 | $ - 0 | $ - 0 | ||||
| VEHICLES SUBTOTAL | $ - 0 | $ - 0 | |||||||
| PER DIEM | |||||||||
| Project Manager Per Diem | 0.0 | Days | $ - 0 | $ - 0 | $ - 0 | ||||
| Project Superintendent Per Diem | 0.0 | Days | $ - 0 | $ - 0 | $ - 0 | ||||
| QCM Per Diem | 0.0 | Days | $ - 0 | $ - 0 | $ - 0 | ||||
| PER DIEM SUBTOTAL | $ - 0 | $ - 0 | |||||||
| LODGING | |||||||||
| Project Manager Lodging | 0.0 | Days | $ - 0 | $ - 0 | $ - 0 | ||||
| Project Superintendent Lodging | 0.0 | Days | $ - 0 | $ - 0 | $ - 0 | ||||
| QCM Lodging | 0.0 | Days | $ - 0 | $ - 0 | $ - 0 | ||||
| LODGING SUBTOTAL | $ - 0 | $ - 0 | |||||||
| CELL PHONE | |||||||||
| Project Manager Cell Phone | 0.0 | Days | $ - 0 | $ - 0 | $ - 0 | ||||
| Project Scheduler Cell Phone | 0.0 | Days | $ - 0 | $ - 0 | $ - 0 | ||||
| Project Superintendent Cell Phone | 0.0 | Days | $ - 0 | $ - 0 | $ - 0 | ||||
| QCM Cell Phone | 0.0 | Days | $ - 0 | $ - 0 | $ - 0 | ||||
| CELL PHONE SUBTOTAL | $ - 0 | $ - 0 | |||||||
| OTHER | |||||||||
| Rental Equipment | 0.0 | LS | $ - 0 | $ - 0 | $ - 0 | ||||
| Field Office Printer/Copier | 0.0 | Months | $ - 0 | $ - 0 | $ - 0 | ||||
| As-builts | 0.0 | LS | $ - 0 | $ - 0 | $ - 0 | ||||
| Temp fencing | 0.0 | Feet | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Field Office Supplies | 0.0 | Months | $ - 0 | $ - 0 | $ - 0 | ||||
| Safety Material | 0.0 | Months | $ - 0 | $ - 0 | $ - 0 | ||||
| Temp Lighting | 0.0 | Days | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Office Trailer | 0.0 | Months | $ - 0 | $ - 0 | $ - 0 | ||||
| Office Trailer Setup | 0.0 | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Sanitary Faciltiies | 0.0 | Months | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Soils and concrete inspection | 0.0 | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Tools | 0.0 | Weeks | $ - 0 | $ - 0 | $ - 0 | ||||
| Construction Waste Disposal | 0.0 | Weeks | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Final Cleaning | 0.0 | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| OTHER SUBTOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| GENERAL CONDITIONS SUBTOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 |