Amendment_0001-Ramey_Vocational_Trades_Expansion.pdf
PDF 1 MB Posted
- Solicitation number
- 1630DC-18-R-00030
About this file
Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Cost_Proposal_Template.xlsx | XLSX spreadsheet | |
| Ramey_Trades_Expansion_Project_-_Solicitation_No._DOL-ETA-18-R-00030.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1630DC-18-R-00030
X
X
5. PROJECT NO.
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NO.
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers X
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning ____1_____ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR AC- KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 10-83)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(No., street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(If applicable)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
(X)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 5
0001 11/20/2018 3996
ETA OCM JOB CORPS bramso
U.S. Department of Labor ETA/OCM/Division of Job Corps Procurement 200 Constitution Avenue, NW Room N-4643 Washington DC 20210
10/23/2018
N/A
Project Title: Design/Build – Vocational Trades Expansion at the Ramey Job Corps Center Located in Aguadilla, Puerto Rico
a. The purpose of this Amendment is as follows:
1) INCORPRATE the attached questions and answers into the solicitation.
2) Attachment 1 - Recommended bid template.
3) Attachment 2 - Pre-Bid Attendance Sheet, dated November 7, 2018
Maria J. Pizarro, CPCM CFCM Branch Chief, Contracting Officer
Division of Job Corps Procurement/ A/E & Construction Eastern Branch
AMENDMENT 0001 Page 2 of 5
QUESTIONS AND ANSWERS
VOCATIONS TRADES EXPANSION
RAMEY JOB CORPS CENTER
SOLICITATION 1630DC-18-R-00030
1. We are requesting an additional time for questions and a new date for the bid in order to provide a better price for the benefit of the owner.
Answer: No extensions are being granted for this project.
2. Apply City Construction Taxes?
Answer: Contact the municipal government regarding the construction tax along with any other applicable taxes.
3. Who is the responsible to pay power, Water and other infrastructures? Connection and contributions fee?
Answer: Refer to Section V Paragraph 2 a (C-32) “The contractor is responsible for all costs associated with the installation and removal of temporary utility services,…”.
4. Please identify power connection points.
Answer: Connection points will be identified during the pre-construction conference.
5. Please identify sanitary sewer connection point.
Answer: Connection points will be identified during the pre-construction conference.
6. Please identify potable water connection point.
Answer: Connection points will be identified during the pre-construction conference.
7. The Contractor should have some special qualifications for a competitive HUBZone set-aside Contract?
Answer: The successful offeror shall be registered as a HUBZone Certified Business via the System for Award Management (SAM) internet site at https://www.sam.gov/portal/SAM/##11 at time of award or provide a copy of the Small Business Administration (SBA) acceptance letter upon request.
8. What are the requirements for the company that grants the Payment & Performance Bond?
Answer: Please consult your insurance agent for Payment and Performance Bond requirements.
The percentages for coverage on the bonds is 100% each of the contract amount.
9. What are the requirements for the Bid Bond?
https://www.sam.gov/portal/SAM/
AMENDMENT 0001 Page 3 of 5
Answer: Please consult your insurance agent for the Bid Bond requirements. The percentage is 20% of your offer.
10. Subcontractors must comply with any requirement or prequalification?
Answer: They must be able to perform the portion of the work that they bid on.
11. It is or not necessary to notify about the use of subcontractor at the beginning of the project, during or at any time?
Answer: The requirement is at the beginning of the contract.
12. In addition to the provisions of JCH-814, to which other sources of references of designs refers (page C-4)?
Answer: Reference Section II Paragraph C.2.
13. Each member of the design group must be licensed and be a member of their respective professional associations?
Answer: Please reference Section II A 3.
14. In addition of construction plans, it is necessary to submit structural, electric or mechanical design calculations to the Contracting Officer?
Answer: Please reference Section II Paragraph D.3.
15. It is necessary that the Department of Education approve the design or only send copies for their knowledge and file?
Answer: All design submittals must be transmitted to the Contracting Officer.
16. Does the LCC Analysis should be made by a licensed professional? (page C-6)
Answer: Recommendations must be made by the designer of record.
17. In our proposal the costs of the field investigation for asbestos and lead will be included, it is necessary to include some allowance for the case that it is necessary to carry out some remediation for asbestos and/or lead?
Answer: Contractor should include the cost for asbestos and lead investigation and testing only.
18. The Commissioning Agent will be from a local engineering company or it is necessary to be a Building Commissioning Association member? (page C-9)
AMENDMENT 0001 Page 4 of 5
Answer: The Commissioning agent must be familiar with Commissioning Associations handbook and can be from an independent company or the contractor’s design firm, but not a member of the design team”.
19. The Investigative Survey can be done by a design team member or it should be by an independent company?
Answer: Design team members must gave the capabilities to perform specific investigations i.e.
Geotechnical, Surveying, etc.
20. It will be necessary to provide security outside working hours and weekends?
Answer: It will be for the construction area only and at the company’s discretion.
21. It is necessary to provide external office facilities, or it can be using the existing facilities like the gym?
Answer: Reference Section V Paragraph A.2 for temporary services.
22. The Onboard Presentation require some multimedia presentation by an electronic media or just with construction plans printouts is enough?
Answer: Presenters should have a multimedia presentation available (preferably PowerPoint).
23. The videoconference workshops will be done from Job Corps facilities or it can be from other facilities like designer office?
Answer: The location of the videoconferencing for the 30% and 60% workshops can be perform from a location of the designer’s discretion.
24. The submittals, shop drawings and product data sheet must be submitted all at the beginning or it can be submitted during the construction process?
Answer: Contractor shall provide submittals, shop drawings and product data sheets using the issued For-Construction Documents.
25. The electromagnetic induction equipment and the penetration radar will be used at the contractor discretion or by the Construction Officer criteria?
Answer: The electromagnetic induction equipment and the penetration radar equipment is a requirement of the contract.
26. The contract include payment and contributions to the Governmental Agencies like PREPA and PRASA?
Answer: No
AMENDMENT 0001 Page 5 of 5
27. Each new building will be measured by an independent accountant for potable water and electric power services or each new structure will be connected to existing services? (page C18)
Answer: No new independent buildings are being constructed on this project, only additions to existing structures. These additions will be metered from the existing metering system.
28. Does the General Control Manager can be a member of the design team or should be from an independent company? (page C-55)
Answer: Page C-55 refers to the “Quality Control Manager” who can be a member of the design build contractor’s team.
DIVISION AND DESIGN SUMMARY LABOR MATERIALS/SUB EQUIPMENT TOTAL
Division 2 - Demolition $0.00 $0.00 $0.00 $0.00 Division 3 - Concrete $0.00 $0.00 $0.00 $0.00 Division 4 - Masonry $0.00 $0.00 $0.00 $0.00 Division 5 - Metals $0.00 $0.00 $0.00 $0.00 Division 6 - Woods and Plastics $0.00 $0.00 $0.00 $0.00 Division 7 - Thermal and Moisture Protection $0.00 $0.00 $0.00 $0.00 Division 8 - Doors and windows $0.00 $0.00 $0.00 $0.00 Division 9 - Finishes $0.00 $0.00 $0.00 $0.00 Division 10 - Specialties $0.00 $0.00 $0.00 $0.00 Division 11 - Equipment $0.00 $0.00 $0.00 $0.00 Division 12 - Furnishings $0.00 $0.00 $0.00 $0.00 Division 13 - Special Construction $0.00 $0.00 $0.00 $0.00 Division 14 - Conveying Equipment $0.00 $0.00 $0.00 $0.00 Division 21 - Fire Suppression $0.00 $0.00 $0.00 $0.00 Division 22 - Plumbing $0.00 $0.00 $0.00 $0.00 Division 23 - Mechanical $0.00 $0.00 $0.00 $0.00 Division 26 - Electrical $0.00 $0.00 $0.00 $0.00 Division 28- Electronic Safety and Security $0.00 $0.00 $0.00 $0.00 Division 31 - Excavation $0.00 $0.00 $0.00 $0.00 Division 32 - Exterior Improvements $0.00 $0.00 $0.00 $0.00 Division 33 - Utilities $0.00 $0.00 $0.00 $0.00 Design (For Design/Build Projects) $0.00 $0.00 N/A $0.00 General Conditions $0.00 $0.00 $0.00 $0.00
SUBTOTALS $0.00 $0.00 $0.00 $0.00
$0.00 0.00% $0.00 $0.00 0.00% $0.00
0.00 0.00%
$0.00
INSTRUCTIONS TO BIDDER
2. Add tasks to "CSI DIVISION" Tab and applicable units, rates, and quantifies. If a CSI Section is N/A, leave blank.
3. If this is a Design-Build project, add applicable rates, hours, and materials costs to "DESIGN" Tab.
4. Add applicable units, rates, and quantifies in the "GENERAL CONDITIONS" Tab.
5. Add applicalbe Overhead, Profit, and Bonds/Insurance Percentages in the "SUMMARY" Tab.
Version 0, 4/18/18
CONTRACTOR COST PROPOSAL TEMPLATE
PREPARED BY:
SUBTOTAL WITH OVERHEAD
Contractor Profit
SUBTOTAL WITH O&P
1. Only complete cells shaded in yellow. All other cells are automatically calculated.
Bonds/Insurance
TOTAL
DATE:
PROJECT NAME: VOCATIONAL TRADES EXPANSION
RAMEY JOB CORPS CENTER
Contractor Overhead
ATTACHMENT 1
CSI DIVISION
ITEM RATE HOURS TOTAL UNIT QTY UNIT RATE TOTAL RATE DURATION TOTAL ITEM TOTAL
Division 2 - Demolition $0.00 $0.00 $0.00 $0.00 [List Tasks Under Each Division Heading] $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00
$0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00
Division 3 - Concrete $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $2.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00
Division 4 - Masonry $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00
Division 5 - Metals $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00
Division 6 - Woods and Plastics $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00
Division 7 - Thermal and Moisture Protection $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00
Division 8 - Doors and windows $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00
Division 9 - Finishes $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00
Division 10 - Specialties $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00
Division 11 - Equipment $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00
Division 12 - Furnishings $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00
Division 13 - Special Construction $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00
Division 14 - Conveying Equipment $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00
Division 21 - Fire Suppression $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00
Division 22 - Plumbing $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00
Division 23 - Mechanical $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00
Division 26 - Electrical $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00
Division 28- Electronic Safety and Security $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00
Division 31 - Excavation $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00
Division 32 - Exterior Improvements $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00
Division 33 - Utilities $0.00 $0.00 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 0 $0.00 $0.00 $0.00 0 $0.00 $0.00
SUBTOTAL CSI DIVISIONS $0.00 $0.00 $0.00 $0.00
LABOR MATERIALS/SUBCONTRACTOR EQUIPMENT
DESIGN (DESIGN-BUILD PROJECTS ONLY)
Design (for Design/Build Projects) RATE
SITE
VISITS
15% or
30% 50% or
60% 100%
CA
SERVICES
SUBMITTAL
REVIEW
CLOSEOUT
DOCS
TOTAL
HOURS TOTAL
Architect $0.00 0 0 0 0 0 0 0 0 $0.00 Project Manager $0.00 0 0 0 0 0 0 0 0 $0.00 Civil Engineer $0.00 0 0 0 0 0 0 0 0 $0.00 Structural Engineer $7.00 0 0 0 0 0 0 0 0 $0.00 Mechanical Engineer $0.00 0 0 0 0 0 0 0 0 $0.00 Electrical Enginer $0.00 0 0 0 0 0 0 0 0 $0.00
SUBTOTAL HOURS 0 0 0 0 0 0 0 0 $0.00
Design (for Design/Build Projects) RATE
SITE
VISITS
15% or
30% 50% or
60% 100%
CA
SERVICES
SUBMITTAL
REVIEW
CLOSEOUT
DOCS
TOTAL
HOURS TOTAL
[LIST ITEMS] $0.00 0 0 0 0 0 0 0 0 $0.00
$0.00 0 0 0 0 0 0 0 0 $0.00 $0.00 0 0 0 0 0 0 0 0 $0.00 $0.00 0 0 0 0 0 0 0 0 $0.00 $0.00 0 0 0 0 0 0 0 0 $0.00 $0.00 0 0 0 0 0 0 0 0 $0.00
SUBTOTAL MATERIALS/SUB 0 0 0 0 0 0 0 0 $0.00
$0.00SUBTOTAL DESIGN
MATERIALS/SUBCONTRACTORS
LABOR HOURS
GENERAL CONDITIONS
UNIT COST COST UNIT COST COST UNIT COST COST
Project Manager (Labor) 0.0 Hours -$ -$ -$ Project Scheduler (Labor) 0.0 Hours -$ -$ -$ Quality Control Manager (Labor) 0.0 Hours -$ -$ -$ Superintendent (Labor) 0.0 Hours -$ -$ -$
SALARIES SUBTOTAL 0.0 Hours -$ -$
Project Superintendent Vehicle 0.0 Days -$ -$ -$ QCM Vehicle 0.0 Days -$ -$ -$
VEHICLES SUBTOTAL -$ -$
Project Manager Per Diem 0.0 Days -$ -$ -$ Project Superintendent Per Diem 0.0 Days -$ -$ -$ QCM Per Diem 0.0 Days -$ -$ -$
PER DIEM SUBTOTAL -$ -$
Project Manager Lodging 0.0 Days -$ -$ -$ Project Superintendent Lodging 0.0 Days -$ -$ -$ QCM Lodging 0.0 Days -$ -$ -$
LODGING SUBTOTAL -$ -$
Project Manager Cell Phone 0.0 Days -$ -$ -$ Project Scheduler Cell Phone 0.0 Days -$ -$ -$ Project Superintendent Cell Phone 0.0 Days -$ -$ -$ QCM Cell Phone 0.0 Days -$ -$ -$
CELL PHONE SUBTOTAL -$ -$
Rental Equipment 0.0 LS -$ -$ -$ Field Office Printer/Copier 0.0 Months -$ -$ -$ As-builts 0.0 LS -$ -$ -$ Temp fencing 0.0 Feet -$ -$ -$ -$ -$ -$ -$ Field Office Supplies 0.0 Months -$ -$ -$ Safety Material 0.0 Months -$ -$ -$ Temp Lighting 0.0 Days -$ -$ -$ -$ -$ -$ -$ Office Trailer 0.0 Months -$ -$ -$ Office Trailer Setup 0.0 LS -$ -$ -$ -$ -$ Sanitary Faciltiies 0.0 Months -$ -$ -$ -$ -$ Soils and concrete inspection 0.0 LS -$ -$ -$ -$ -$ Tools 0.0 Weeks -$ -$ -$ Construction Waste Disposal 0.0 Weeks -$ -$ -$ -$ -$ -$ -$ Final Cleaning 0.0 LS -$ -$ -$ -$ -$ -$ -$
OTHER SUBTOTAL -$ -$ -$ -$
PER DIEM
LODGING
CELL PHONE
OTHER
GENERAL CONDITIONS SUBTOTAL
SALARIES
VEHICLES
TOTALITEM DESCRIPTION QTY UNITS MATERIAL/SUB LABOR EQUIPMENT
NAME
COMPANY I
ORGANIZATION
RAMEY JOB CORPS CENTER ATTACHMENT 2
Project 3996-Vocational Trades Expansion Preproposal Conference and Walkthrough November 7, 2018, 10:00 am
SIGN-IN SHEET
JOB TITLE PHONE E-MAIL
Bryan Ramso DOL Contract Specialist (202) 693-3618 ramso.bryan@dol.gov
Hosvep (Joe) Erchenian DOL Project Manager (703) 516-2238 erchenian.hosvep.t@dol.gov I
PRIME
/SUB
JI.)/, ,. fJ�z Our,,c./1 (r.,vi/,,c. c/4,5- 7,c- [r.:_,, Mt..r1t--J_ 1 _., _ _
,/f::"l/J,,c�� n)o/ k¥, -M_ �VI o/et2-� /# /, 'V /"§ t IA-£¥'.,, • ✓1/-Vb"-L� ,v--.�u 'l.<'?"'' ... T7.
JifJ lict?t�/1/Ai _ �/YI �? fi??/4-rk e-�, _ .. _. __ .
� -Y · y\tr-{_ CJg,,f,,, ��.,-- �""-';:) ll C' ..J-;.r:1&k>l11 ! I ----
_j '-'��� &µ�fI--DA°"fE=b fY0t11u� �;1IMtk'-- Co1tso f, ti ft.le J
..5, 10- _Ge-i..,.,1,J��te._J.. -, �e G Fbve }- Co.--.s" !,· Jo-- -h. cf ·::l;d( -::C,EJ2...5fi ,t.€..... t==-0 12..C 1:- \f - +> /l)�nt}M � _, fqcit.. fl2__=e....r_c_-e_ __ -l
�. �101CC2
\.-\\� �� £,uo ; ...,e1::,-rt;tJ c.,, f_M
7.:37- 36.6-3Ye>
....._I_-=--., 78'-�3-9'.J.-�
/co'fV')
�:rl
--� �M 1J!> · o_ojli \al@\ o beLtil6JYf-
| Amendment 0001-Ramey Vocational Trades Expansion |
| Amendment 0001-Ramey Vocational Trades Expansion |
| Bid RFIs Ramey Trades Project - ADW |
| Cost Proposal Template |
| SUMMARY |
| CSI DIVISION |
| DESIGN (DB ONLY) |
| GENERAL CONDITIONS |
Ramey Prebid Attendance Sheet 11-7-18
File details come from the government source that posted it.