Amendment_0001-Earle_C_Clementsew_Haven.pdf
PDF 334 KB Posted
- Solicitation number
- 1630DC-18-R-00016
About this file
Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EC_Clements_Pool_Rebuild_bid_template.xlsx | XLSX spreadsheet | |
| E_C_Clements_Pool_Bldg_Project_-_Solicitation_No._1630DC-18-R-00017_R1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1630DC-18-R-00016
X
X
5. PROJECT NO.
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NO.
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers X
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning ____1_____ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR AC- KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 10-83)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. NOTE: The proposal due date has been extended to 2:00 PM EDT, June 6, 2018.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(No., street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(If applicable)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
(X)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
0001 5/22/2018 3908
ETA OCM JOB CORPS bramso
U.S. Department of Labor ETA/OCM/Division of Job Corps Procurement 200 Constitution Avenue, NW Room N-4643 Washington DC 20210
5/2/2018
N/A
Project Title: Design/Build – Rebuild Swimming Pool Building 1512-A at the Earle C. Clements Job Corps Center Located in Morganfield, Kentucky
a. The purpose of this Amendment is as follows:
1) Incorporate the change in the SOW.
2) Replace the original schedule in the SOW with the attached one, dated May 22, 2018.
3) Attachment 1 - Recommended bid template.
4) Attachment 2 - Pre-Bid Attendance Sheet, dated May 9, 2018
Maria J. Pizarro, CPCM CFCM Branch Chief, Contracting Officer
Division of Job Corps Procurement/ A/E & Construction Eastern Branch
CHANGE IN SCOPE OF WORK
1. The existing ceiling was not as specified in the original scope of work. It should be a rust resistant suspended ceiling grid, with moisture resistant panels of a type specifically designed for swimming pool atmospheres.
1630DC-18-R-00016 Section C Revised May 22, 2018 Description/Specifications
C-20
VII. PROJECT SCHEDULE
ACTIVITY DESCRIPTION CALENDAR DAYS
Demolition 21
Submit Design Development Documents (30% Submittal) 14
DOL Review 14
Construction Documents and Coordination Drawings (100% Submittal) 60
DOL Review 21
Final Documents 30
Construction 180
Total Design & Construction 340
Final Completion / Project Closeout 30
Total Period of Performance 370
ATTACHMENT 1
Attachment 2
| Amendment 0001-Earle C Clementsew Haven |
| CHANGE IN SCOPE OF WORK |
| Revised Schedule for E C Clements Pool Bldg Project - Solicitation No. 1630DC-18-R-00017 |
| VII. PROJECT SCHEDULE |
| Bid Template |
| Prebid Sign In Sheet |
File details come from the government source that posted it.