Amd_1_Exhibit_5_Asbestos_Abatement_-_Taholah _Queets_ _Chemawa_Close_Out_Report.pdf
PDF 19 MB Posted
- Solicitation number
- 16-102-SOL-00001
About this file
Amd 1 Exhibit 5 Asbestos Abatement - Taholah Queets Chemawa Close Out Report
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I
, I
I I I I I I I J
I J
I
,j
PUBLIC HEALTH SERVICES
CLINICS AT TAHOLAH AND QUEEtS, WA;
SJ(LEM, OR
ASBESTOS ABATEMENT PROJECT
CLOSEOUT REPORT
PBS
lHV'''O .. Mot",,,L
PBS Project No. 4626.00 PHS Project No. PDHA003C6/PD1WN007C9
January 1992
SUMMARY
Project Summary Certificate of Substantial Completion Post Abatement Drawings Photo Documentation
PROJECT COMMUNICA TlON Submittal Checklist Worksite Checklists Field Observation Reports Transmittals
AIR MONITORING
Air Sample Lab Reports Sampling Descriptions
CONTRACTOR SUBMITTALS
Worker Training and Certification Asbestos Disposal Forms DEQ Notification
\)~ (o~j
~ \ 0 r--l ~t{c..q P1) \'\~ cD~e.(P
V\3S ~62--fJl~~ \S (b .6. * \ Co)
PBS
ENVIRONMENTAL
PROJECT SUMMARY
During the period from January 2 through January 19, 1992, removal of asbestos containing materials was performed at three Indian Health Clinics; Chemawa Clinic in Salem, Oregon, and the Queets and Taholah Clinics in Washington. The abatement work was performed by Certified Asbestos Abaters of Auburn, WA. Air monitoring and on site project management was provided by PBS Environmental Inc., of Portland, OR.
CHEMAWA CLINIC
Removal of asbestos-containing hard fittings from fiberglass insulated pipes and pipe insulation from inside radiators was performed at this clinic from January 2 to January 9, 1992. The insulation was removed using negative air glovebags. Workers wore protective coveralls and half-face negative pressure respirators during insulation removal.
Asbestos waste was double-bagged and labelled for proper disposal.
Pre-abatement air samples were taken throughout the Clinic before removal. Fiber concentrations ranged from below the analytical limit of detection to 0.001 flcc. Samples collected inside the various work areas during removal ranged from below the limit of detection to 0.04 f/cc. Although fiber concentrations exceeded 0.01 on several occasions, all samples remained below the OSHA action level of 0.1 f/cc .
Hard fittings suspected to contain asbestos remain above plaster or gypsum ceilings and behind wall cavities. Those which could be seen are identified in the post abatement drawing for Chemawa Clinic. During the project, PBS collected several bulk samples of the hard fittings. The sample results revealed that the non-friable substance beneath the mudded fittings contained asbestos, and in its current condition poses no significant health risk. Since it is difficult to identify which fittings contain the asbestos material , PBS recommends that it be assumed that all remaining fittings contain asbestos and proper precautions be taken if these areas are to be impacted.
TAHOLAH CLINIC
From January 10 to January 12, 1992 asbestos-containing materials were removed from the Taholah Health Clinic in Taholah, WA. Materials removed included hard-fittings on fiberglass insulated runs in the crawlspace, mechanical room and attic, and contaminated soil from the crawlspace. All asbestos materials were double-bagged and properly labelled for disposal.
11 20SW. :-'lurnson
ENVIRONMENTAL
MANAGEMENT AND
CONS ULTI NG
Portland . Oregon 9720 3 503/248·193() ')03 24H·0213 H.\
During the removal workers wore half-face negative pressure respirators and protective coveralls. Pipe insulation was removed using negative pressure glovebags. A personal decontamination chamber was constructed adjacent to the crawlspace entry. The chamber consisted of two airlocks and a shower for decontamination.
Pre-abatement samples were collected in each area and ranged from below the limit of detection to 0.002 f/cc. During removal airbome fiber concentrations ranged from below the limit of detection to 0.245 f/cc. Final air clearance samples collected in each area were below 0.005 flcc, as required by the specifications.
Asbestos-containing pipe insulation may still exist behind wall cavities. Flooring throughout the clinic is also suspected to contain asbestos. When impacting these area proper precautions should be used.
QUEETS CLINIC
From January 13 to January 19, 1992 asbestos-containing pipe fittings, flooring materials and cement asbestos board was removed from the Queets Clinic in Queets, WA.
During the removal of each material, workers wore protective coveralls and negative pressure half-mask respirators. The pipe fittings were removed using negative pressure glovebags. The flooring materials were removed under full isolation. Workers used a personal decontamination chamber for entry and exit into the work areas. Asbestos waste was double-bagged and properly labelled for disposal.
Pre-abatement samples were collected and ranged from 0.002 flcc to 0.012 f/cc. During the removal airborne fiber concentrations ranged from below the limit of detection to 0.139 f/cc. Final air clearance samples collected in each area were below 0.005 flcc, as required by the specifications.
Remaining asbestos-containing materials are noted in the post abatement drawing included with this report. The materials include flooring beneath stationary cabinets and pipe insulation above the basement suspended ceiling and inside wall cavities. Proper precautions should be taken if impact of these materials is anticipated.
CERTIFICATE OF
SUBSTANTIAL
COMPLETION
Distribution to :
OWNER
CONTRACTOR
FIELD
OTHER
PROJECT:
(name, address)
Health Centers at Taholah & Queets, WA; Salem, OR
III rn Certified Asbestos Abaters o o
CONSULTANT: PBS Environmental, Inc.
CONSULTANT'S PROJECT #: 4626.00
TO (Owner) :
DATE OF
ISSUANCE:
Public Health Service Office of Engineering Services 2201 Sixth Avenue
MIS RX-24
Seattle, WA 98121
23 January 1992
CONTRACTOR:
CONTRACT FOR:
CONTRACT DATE:
PROJECT OR DESIGNATED PORTION SHALL INCLUDE:
Asbestos Abatement in the Three Clinics as described in the PBS Specifications dated 30 July 1991
Certified Asbestos Abaters
Asbestos Abatement in Three Clinics
29 November 1989
The Work performed under this Contract has been reviewed and found to be substantially complete. The Date of Substantial Completion of the Project or portion thereof deSignated above is hereby established as 19 January 1992.
DEFINITION OF DATE OF SUBSTANTIAL COMPLETION
The Date of Substantial Completion of the Work or designated portion thereof is the Date certified by the Consultant when asbestos abatement is sufficiently complete, in accordance with the Contract Documents, and the following safety criteria are met:
a) The Contractor has removed asbestos-containing materials from each of the three clinics in substantial conformance with the intent of the specifications set forth by PBS, dated July 1991, and associated addenda.
b) Airborne fiber concentrations collected for clearance purposes were below the Environmental Protection Agency's (EPA) recommended clearance criterion of 0.01 flcc per cubic centimeter of air (flcc) based on Phase Contrast Microscopy (PCM) National Institute of Occupational Safety and Health (NIOSH) 7400 Method of Analysis of air samples.
c) Remaining asbestos-containing materials include:
CHEMEWA:
1) Pipe insulation above hard ceilings and embedded in walls .
2) Suspect floor coverings.
3) Pipe insulation inside radiator by Administration area.
TAHOLAH :
1) Suspect pipe insulation embedded in walls .
2) Suspect floor coverings.
QUEETS:
1) Floor coverings beneath stationary cabinets .
2) Pipe insulation above concelaed spline ceiling in basement and embedded in walls.
PBS Environmental, Inc.
CONSULTANT DATE
i:lwpI4626\sub·comp
LEGEND
fZJ
HARD FITTINGS ON flBERGlASS WHICH ARE VISIBLE SUT INACCESSIBLE DUE TO OBSTRUCTlON BY PLASTER
CEIUNGS, WALLS, PIPES OR HVAC SYSTEM.
PLASTER CEIUNG
NOTE
1. ONLY V1SIBLE FITTlNGS ARE SHOWN. AOOITIONAL
FITTINGS MAY EXIST BEHINO WALLS. THESE AREAS,
WITH POTENTIAL ASBESTOS-CONTAINING MAl'ERIALS.
SHOULD BE INVESTICAl[O &. NOTED PRIOR TO
DISTURBANCE.
-) ~ rr:: ty-,=
'-err
--- (3) l-'A.<.:O FI7TING:S, IN PLAGe
TYPICAL SAMPLE RESULTS
LAB
RESULT
1-57. CHRYSOTILE
MATERIAL
SAMFlLEO
HARO fiTTINGS ON fiBERGLASS
WESTERN OREGON (CHEM AWA) HEALTH CLINIC
NORTH
~ ~.L?3~~" PLANS o 5 15:30 60 .. : I 360
4626.01 462601 -4
1220 SY< ~R/IISON
POIUl..AND. Cflt<;ON
9no~
~03/2~~lQ3~ z « ....J
CL
f- Z w w u ::2 u 5 w _ 0:
f- z w « ::J Vl
CD u F « « -'
(j) « w 0 '" I w f- I U
(j) U ::J
W CD
CD ::>
(j) "-f- (j)
CL
UPDATED
22JAN92
13JUNE91
SEcnON 02074
LEGEND:
o
NOTE
APPROX. NUMBER &. LOCATION OF HARO
FlTTINGS ON FIBERGLASS.
ASBESTOS-CONTAINING SHEET FLOOR
COIlERING &. MASTIC (UNDER COUNTERS)
CONCEALED SPLINE CEILING 'MTl-! AS8 ESTOS
CONTAINING PIPE FITTINGS ABOVE
1. ONLY V1SIBLE FITTINGS ARE SHO'NN. ADDiTIONAL FITllNGS MAY EXIST BEHIND WAllS. THESE AREAS, 'MTH POTENnAL ASBESTOS-CONTAINING MATERIALS.
SHOULD 8E IN VESnGATED & NOTED PRI OR TO orS1URBANCE.
o IFURNA~1
QUEETS HEALTH CLINIC
NORTH
~ ~~:,~~ENT PLAN
TYPICAL SA~PlE RESULTS
LA,
RESULT
4070 CHRYSO TILE
15% CHRYSQTJlE
&. 27. AMOSITE
"'ATERI.o.L
","PL£D
SHEET FLOOR COVERING
HARD FITTINGS ON FIBERGLASS
o 2 <I- 8 16
I '" I 96
4626.01 462601-1
1220 SIr 1l0000SOli PCflTl.NID. ORtCOH
Q7205
~/He-IU9 z « ....J 0..
f Z W w ::> u w 5 f- U 0:
~ d iJ::
Vl -'
U1 .... " o w w W I f- ::J (/) 0 ~ W -' m CD U1 ir f- U1 o 0..
UPDATED
22JAN92
13JUNE91
OF 4
SECTION
LEGEND:
NOTE
CABINETS 'MTH SUSPECT FLOOR n LE
LQCA TED BENEA TH
1. ONLY VISIBLE FtTnNGS ARE SHOWN . ADDITIONAL FlTllNGS MAY EXIST 8EHIND WAllS. THESE AREAS, I'I1TH POT(NllAL ASSESTOS-CONTAINING MATERIALS, SHOULD BE INVESTIGA ltD & NOTED PRIOR TO OISTlJRBANCE.
QUEETS HEALTH CLINIC
NORTH
~ ~~ I~_o_FLOOR PLAN
TYPICAL SAMPLE RESUL 15
LAB
RESUlT
MAl!RIAL S"I-IPlft)
17. CHRYSOTll E FLOOR TILE
T o 2 ~ 8 16 I ;;; I 96
46 26.01 462601 -2
1220 $W 1I0RFUSON
POll~O. ~CO>I
97205
~)/2:"-I'J9 z 0..
r- Z w W u :2 5 W u '" r- Z w
<{ '" CO ::J I
U r
..J r '" fJ) W W
0 W I r- :::> u
VJ 0 ::J
W CD
CO :::>
VJ
CL.
r-
VJ
0..
UPDATED
22JAN92
13JUNE91
SECTION
CLIENT : PUBLIC HEALTH SERVICE
A:
C:
ASBESTOS-CONTAINING HARDFIT
TINGS ON FIBERGLASS PIPE
RUNS; PRIOR TO REMOVAL
CAA WORKER GLOVEBAGGING PIPE
INSULATION INSIDE RADIATOR
BUILDING: CHEMEWA CLINIC
B:
D:
PHOTO DOCUMENTATION
ASBESTOS-CONTAINING PIPE IN
SULATION INSIDE RADIATOR
UNITS; PRIOR TO REMODEL
FITTI NGS ABOVE CEILING FOL
LOWING REMOVAL
SECTION TWO PAGE 3 . 1
CLIENT: PUBLIC HEALTH SERVICE
C:
EXTERIOR ELEVATION
CAA WORKER GLOVEBAGGING AS
BESTOS CONTAINING PIPE FIT
TINGS INSIDE CRAWLSPACE
BUILDING: TAHOLAH CLINIC
B :
D:
PHOTO DOCUMENTATION
PERSONAL DECONTAMINATION
CHAMBER OUTSIDE CRAWLSPACE
ENTRANCE
FITT INGS INSIDE CRAWLSPACE
FOLLWING REMOVAL
SECTION TWO PAGE 3.2
CLIENT: PUBLIC HEALTH SERVICE
C:
EXTERIOR ELEVATION
, d
CAA WORKER REMOVING ASBESTOS
CONTAINING FLOOR TILE; FIRST
FLOOR OF CLINIC
BUILDING: QUEETS CLINIC
B:
B:
PHOTO DOCUMENTATION
PERSONAL DECONTAMINATION
CHAMBER OUTSIDE CLINIC
ENTRANCE
CAA WOKERS REMOVING MASTIC
AND UNDERLAYMENT; FIRST FLOOR
OF CLINIC
SECTION TWO PAGE 3.3
I '
CLIENT: PUBLIC HEALTH SERVICE
A:
C:
FIRST FLOOR OF CLINIC FOLLOW
ING FLOOR TILE & UNDERLAYMENT
REMOVAL
BASEMENT FLOOR FOLLOWING RE
MOVAL OF FLOOR COVERING
BUILDING: QUEETS CLINIC
B:
D:
PHOTO DOCUMENTATION
ASBESTOS-CONTAINING SHEET
FLOOR COVERING IN BASEMENT
PRIOR TO REMOVAL
ASBESTOS-CONTAINING WASTE
DOUBLE-BAGGED & LABELLED FOR
DISPOSAL
SECTION TWO PAGE 3.4
SUBMITTAL CHECKLIST
This form is for Th e cxelusil'c lise of PBS Ellvironmcllrni.
Coordillafe (his lis! WillI the Asbestos Abmement Specifications, and inc/ude submittals thal are unique to the project.
Sp~ClfJCJ110n
Reference Brief Description
02075 1.04 Worker Certificat ion
02075 1.04 DEQ , MSD Notifica tIOn - 10 Days Prior \0 Sta rl ing Work
02075 £.04 Transpona tion/Disposal Approval from MSD, el al.
Project Name: Three Clinics
PHS
Project No.: 4626. 00 Da te: 1/ 1/92
Included & Included & No t Accepta ble Not A:xeplable Included
~ 0 0
GJ 0 0
~ 0 0
02075 £.04 Contractor's Work Plan ( wi II correct Taholah )~ 0 0 02075 l.N Emergency Control and Clean-up Plan !Xl 0 0 02075 1.04 Respirtllor Program [ill 0 0 O~075 1.04 Air Monitoring Program 0 0 0 i5 1.04 Manufacturer Certification of Equipment ~ 0 0 020:5 1.04 Medical Exam Program [2£J 0 0 OZ075 1.04 Product lnformal ion on Contractor-Requested Changes 0 0 0 02075 1.0. Asbestos Liabili ty Insu rance Policy 0 0 0 020i5 1.04 Superviso(s Resume and E>:perience ~ 0 0
0 0 0 0 0 0 0 0 0
0207 .5 1.0-1 :\.')bcs\()s Disp(l~(!J Form (Job Completion) !Xl 0 0 02075 I (), P(l~Toll Rcpons (Job Completion) 0 0 0 020i5 J.(!..j W(.r~:sJle Entry Logbook (Weekly or Job Compklion) [2£J 0 0 (120:5 I.U-I Equipml!nt 10);5 (Job Completion) 0 0 ~
Prin t Na me , Tille and Firm
Dave Keck, Field Technician
1/27/92
Signature Date
3/91 t:\wpflles\ronns\~ubc:hcck.lst
~'ot
RequIred bJ Q
[19
IKJ
VISUAL INSPECTION CHECKLIST
(USE fOR VJSUAl INSPECTION, PR[ - (NCAPSUtATIOH 6: FINAL INSP(Ci ION)
Contra ct o r: Certified Asbestos Abaters Proiect Name: Three Clinics
P BS S i leO b s e rver: _-"O",a"-v"--,=e~K,-,e",c,,,k,,---______ _ Proiect Number: 4626.00
Proie ct Manager: Tulla Stocker Abatement Area: Chemawa Clinic
Ow n ere 0 ni a ci: __ M=acot:..:t=---"'Ocei"x:co=n _ _ _ _____ _ Atlac h ed Reporl No.: ______ ---p;---,;-...,-_
DAM
Air Mo ni!. Pe rso nn e l en Site: PBS , Keck Do l e: 1/9/92 Tim e: _ __ 0 PM
Contractor On Site Personnel Foreman: Gary Parks Olher Personnel o n Sile: _ _____ _ ______ __ _
Number of Workers: 3 Page of
Type of InspeC! ion: 0 Visual Inspec!ion, 0 Pre Encapsulation, 119 Fina l Inspection, 0 Olher
REMOVAL COMPLETE:
( DU'l't &: Sul k AC)'( Removed)
0 Decks
0 Beams e; Pipes 0 Edges of f loors
INSIDE WORK AREA:
o Fixiures cleaned o Crilical barriers wiped clean o Conduii cleaned o Owner's equipment cleaned o Wa ll s free of ACM streaks
EOUIPMENT:
o Scaffo lds & la dde rs wiped c lean [J Framew o rk wiped c lea n o Neg al ive ai r uni t f iJi ers clean o Nego live oir unit gri lls & wheels free of AC I.1 residue .
~ 80se of co lumns o Floor is dry o Hand i oo ls removed f rom work area
.J Ledges 00 Waste removed 0 Ho rizonta l surfaces DECONTAMINATION UNIT: N / A o Air locks clean o Wasle re m oved o Floor dry o Shower clean o Wa !ls free of AC),i o Equ ipment clean & removed
Co ndil ion of Regulated Work Area appears: :g Salisfoclary o Unsa1isfaciory
FIELD OBSERVATION NOTES: I nclud~: 1) Work Proclice:s, 2) De leys, 3) !!eml Discussed w/Controclor, 4) Scope Che nges , 5) Project Concerns
Contractor removed 476 asbestos-containipg hard fittings from fiberglass insulated pipes using negat i ve air glavebags . vlorkers wore 1/2 mask negative pressure respirators and protective coveralls.
_ _ Ap~raximat_e~ __ ~~2~,:rd !ittings were in con~::,:~~or ~ s __ :.c;~~~ _ ? f~o:~L ____ . __ _
304 fittings were removed in addition to this.
NOTE: ANY DEFICIENCIES MUST BE CORRECTED BEFORE CLEARANCE MAY BE STARTED
The individual signing has visually inspected this area and found that the above information is complete and accurate.
Name: ~D~a~'~'ee~Kue~c~k ______________________________ __ Authorized Signature:
cc : Cont ra cl or Tille : Field Technician
VICU $ T
:u :
(US( FOR VISUAL INS P[CTION, PR(-(NCAPSULATION /( fiNAL IHSP(CTlOH)
Contractor: certified Asbestos Abaters
PBS Site Observer: Dave Keck ----------------------- Pro i e c t Man age r: _____ 'I\l_l_la_ S-'-t_o_c_k_e_r ______ _
Nome: Three Clinics
Proiee! Number: 4626.00
Abatement Area: Taholah Clinic
Own e rCa ntact: ___ Ma_t_t_D_i_x_o_n ________ _ Attached Report
Dote: 1/12/92 No. : ------------r;--;-;-.-----
DAM
Air Man it. Per so n n e IOn Sit e: -=Pc:BccSC!,-cK=-e=-c=-k-'---__ __ Time: ___ _ o PM
Contractor On Site Personnel Foreman: Bob Gurtler other Personnel on Site: _______________ _
Number of Workers: 3 Page 1 of
Typ e of Inspection: 0 Visual In spection, 0 Pre-Encapsu lation, 129 Final inspeciion, 0 Other
REMOVAL COMPLETE:
(Dust & Sulk ACM Removed)
0 Decks 0 Beams 12! Pipes 0 Edges of f loors
INSIDE WORK AREA:
o Fixiures cleaned o Crilica ) barriers wiped clean o Conduit c leaned o Owner's equipment cleaned o Walls free of ACM streaks
EQUIPMENT:
o Scaffo ld s & ladders wiped c lean o Framework wipe d clean o Negative air unir filters clean o Negative air unit gri ll s & wheels free of ACM residue.
'] Base of columns o Floor is dry ~ Hond iools removed from work area .] Ledges t:§ Wasle removed 0 Horizontal surfaces DECONT AMINA TION UNIT:
o Air locks clean [2g Was1e removed ~ Floor dry 0" Shower clean f1 Walls free of ACM ~ Equ ipm ent clean & removed
Condition of Regulated Work Area appears: ~ Sofisloctory o Unsa1isfaciory
FIELD OBSERVATION NOTES: Include: 1) Work ProcHces, 2) Delays , 3) l1em s Discussed w/Conlrocior, 4) Scope Changes, 5) Projecl Concerns contractor removed a total of 190 hard fittings from the crawlspace, mechanical rCX)m and attic areas and 75 sq. ft. of debris from the crawlspace. Of the 190 fittings removed, 40 were beyond the scope of work. A personal decontamination chamber was used as entry and exit access for the crawlspace. Workers wore
1/2 mask respirators and protective coveralls.
NOTE: ANY DEFICIENCIES MUST BE CORRECTED BEFORE CLEARANCE MAYBE STARTED
The individual information is signing has visually inspected this area and found that the above complete and accurate . Q
VICU$T
· ua
(USC rOil VlSU,I,L INSP(CTION, PRt-(NCAPSUlATIDH tc fiNAL I!'iSPECTivH)
Controctor : Certified Asbestos Abaters Proiect No me : __ 'Ih_ r _e_e_C_l _i_n_ic_s _ _ ____ _
PBS Sit e 0 b s e rver: _ Da'-'--v_e'----K_ec.::..::.k"'-________ _ Pro iect Number:
Pro i ect Man ag e r: __ Tll_ l_l_a_ S_t _=_ k_e_r ______ _ Abatement Area: Queets Clinic
Own e rCa n t act : ___ Mc:.a--=t--=t-=c0:::i:..:x:::on=, _P:..:H::S=--____ _ Attached Report No .: --------n,.. .... -
/ / 0 AM
Air Man i t. P e rs ann e IOn Sit e: __ P_BS---','---K_e_c_k ___ _ Date: 1 19 92 Time : ___ 0 PM
Contractor On Site Personnel Foreman: Bob Gurtler Other Personnel on Site: ________________ _
Number of Workers: 3 Page 1 of
Type of Inspection: 0 Visu a l Inspection . 0 Pre - Enca psula tion. e:l Fina l Inspec tion . 0 Othe r
REMOVAL COMPLETE:
(Dust &. Bulk ACI.! Remov ed )
0 Decks
0 Beams ill Pipes
&il Edges of floors
INSIDE WORK AREA:
o Fix tures cleaned ~ Critical barriers wiped clean o Conduit cleaned
EQUIPMENT:
o Scoffolds & lad d ers wiped clean o Framework wiped c lean [}l Nega tive oir unit fi lters clean ~ Negative air unit grills & wh eels free o f ACM residue.
'J Bose of columns
!Sa Owner's equipment cleaned ~ Walls free of AC M stre aks
~ Floor is dry ~ Hand 100ls removed from work area ;a Ledges 0" Waste removed llJ Horizontal surfaces DECONTAMINATION UNIT:
~ Was1e removed III Floor d ry Ki Air locks cl ea n
XI Shower cleo n ~ Walls free of ACM [2g Equipment c lean & removed
Cond itio n of Re g u lated Work Area appears: rn: Solisfocfory o Unso1isfact ory
FiELD OBSERVATION NOTES: In clude; 1) Work Proc1ice s , 2) Deloys, 3) li ems Oi :>cus:> ed w/Coniroctor, 4) Scope ChanglS , 5) Proje ct Concerns
The follolving materials were removed : 1,070 sf floor tile /mastic ( 620 beyond contractor
90 hard fittings scope of work)
20 sf cement asbestos board
380 sf sheet floor covering & mastic
All flooring was removed under full isolation and hard fittings were removed using negati ve pressure glovebags . Workers wore 1/2 mask negative pressure res pirators and protective coveralls. Clearance results collected in each area revealed fiber concentrations less than 0.005 f/cc .
NOTE: ANY DEFICIENCIES MUST BE CORRECTED BEFORE CLEARANCE MAY BE STARTED
The individual i nformation is s igning has visually inspected thi s area and found that the a b ove complete and accurate . n cc: Co~tractor
Authori zed Signature: /3)o.u{ tLk'Ck.;0 Tit l e: __ Fi_· e_l_d_ Te_ c_h_n_i_c_i_a_n ______ _
ViCU ST
Dave Keck Name: __________________________________________ __
PBS 2.2
r.ill
ENVIRONMENTAL
BU ILDING
CONSULTANTS
FIELD OBSERVATION REPORT
Contractor
I PBS Site Obsen'er (s) (~.J2~ t£-ct--IHO --- ;2..2---3 () Project No.L/6 '2-[; . 0 I Date ! - 3- 9 J-
! L( 3, 0 - /51..(0
Conrractor on Site Personnel : (7 (i() -vrGO Proiect h1ana2"er
Workers
Yes
(!J~ No
Foreman (jjs No
How Many?
Air Monitoring Personnel on Site '(rt-0 ~ 213>
Items Discusse<l with Contractor
Report No. /) L.- z....- Time am / pm
/ od Weather CrlJZ.,2..C{}.; -r Temoerarure F
Summary Projw StatuS Cf4r4 !r)B~ 'S-tr:te IU(~/!r2-r1T1 G1-1, i3?r.A.1h'-1f ( d'1. 0J r.!r:::/::c, i'rJ (h/it,tAt'lf(1/
/ V [: /, Other Personnel on Site
1 __________________________________ __
Scope Chan ges
I Pro'ect Concerns/O onunities
Jo (<R r3Jt~'-wtj ( oC;r, / 6/ lV-u~
(...(/-4» {J .-Cy
The individual signing certi fies thal the above information is correCl and accurate.
8;89
Authorized Siplature Date
PBS 2.2 - --
L.LD
ENVIRONMENTAL
BUILDING
CONSULTANTS
ON.: ,
FIELD OBSERVATION REPORT
Contraclor on Site ?ersonnel: ~l/[;C - ('Z-fXJ, 1"500 -/730 Page
Pro'eCl Manaeer Yes No Foreman No
Workers Ye No BowMan?
Items Observed 'Work Praclices & Procedures
Delays (Causes) llems Discussed wilh ContraclDr
Scope Changes
/ of
Pro ieCl Concerns/OpPoflunities a~~t-t,)I.af5 ~/'f-t~1--J2d lUI 83.> ~ slY!- l-J--f, Sft1.vL df (c tJ/YI- j1.2i 4 l<£ let IV(' i i V "'-"-''--'''--;/I--.l...-"<=--:::.=-=--.!='-'''--...!::.:=----
) P ' /~,-~ 111e individual signing certi fies lhol lhe above informalion is nnt.,or Type, Name and Title CCJ lY',LY/7'" carreel and accurate. L5f \1 :J( . /::.·CC ...... (C- / 1 / / t kpv-' cV /£Ir--- / -tj-1lV Authorized Signalure Dale
8/59
PBS 22 - -
rllJ
ENVIRONMENTAL
BUILDING
CONSULTANTS
FIELD OBSERVATION REPORT
Contractor
Project Manacer Yes ~ Foreman ~ No c=::::=- or-
How Many? 3 = Workers d'G7 No Summary Project Status t< r:r(;
~ (1'2f/I (£#L 'r'tl2..
Air Monitorifl2 Personnel on Site />;fvV t Other Personnel on Site I /~kJ U:5S//Vr' ;r;
Items Discussed with Contractor (dt~;::; tvf.,ee ~;jl.$J io s ~v Cet.<--;rJl~ --tVt--!---f !/VLt! ;P4lZr?- tilt"'? ~;:J.£ t{.0e." /1 /;";5'1&:r,;.-v- (t!/tlu./~, Scope Changes q l .JL-~'" f j/c:L/_ 11 ~At( -Jj I~r/,I ' / Proiect Concems/Opportunioes //1 I'r r0J 1,.1 1-1 n{/-i!1r-- f1P-v-f. ~r'" ?cS( ,· ,Ul y')~, S--:'~'
(J/!= L·,viltl? r'rJ'YuI,j;A '~ IA<-J i/J to-F/( If&~e.. aw'A iz(~1-t-4~ d ft~ C(?J~iYC.
r ' V ~
The individ ual signing certifies thal the above information is Print or T ' e Narn 'd Till, ~...£~J6t:(/ correct and accurate, ' -;1 l ' - ~ c.~
Y(' ~ < t-I ;;e:;;..- (- <)-9''2.--
Authorized Signature Date
8/89
PBS ~ .2
Indicate Category and Continue Discussion
PBS
ENVIRONMEN1,\L
BUILDING
COr,SUL1ANTS
NO
Proicct No. i? 'J-& Report No. () 1::··5-
Page Z. of 1-
The individual signing certifies that the above information is correct and accurale.
Print or Type Name and Title, 0-t~t1 +
Authorized Signature Da~
BUILDING
CONSULTANTS
FIELD OBSERVATION REPORT
COntraclor CA-it Project Name C f/etlA At.".fi-
PBS Site Observer (s) Otto - 0 ').0 0 Project No.
Rcport No. Q~ - 0.---'.T"'im.:.::ec......... __ -'!:am"-!..../ p",m"-.
Contractor on Site Pmonnel! 7 00 - () ( () 0 Page / of
Weather f}.i'~(/ u;c..c,:'; Temperature {(...(/ F Project ManaQer Yes (:"0 ) = Workers !':o
Foreman @ How Many? ~
No
Summary Project Status ;I ((:::;; 2qv.."_~~( r/v t)t2-t- ,~ e/1 1> ct",d ]); f/r..'r.4:'1' !k'{!c:.S '
Air MonitorinQ Personnel on Sile '(;;:rmd!...-- A ~ (&i Other person~el on Site CI-#')z.rh-v If I 5.::j;f'l U£/?7'l P~5/"<Jh;
Items Obsen'cd (Work Practices & Procedures
Delays (Causes)
(! ,f--r.JC {-c--c
~~~ ~CC8- ('/('
Scope ChanQes pas 2.2 ill)
ENVIRONMENTAL
BUILDING
CONSULTANTS ,..,.
FIELD OBSERVATION REPORT
Contractor Proi.,,,t Name
PBS Site Observer (5) 1xiv-<-~ 1&>'3 D -(1 (S- ;l.occ> -()2 .. f() -r: ~~'L ('e,'/b--
. LJt7-? ,U( Proje.ct No, I I:' Date
I ( /',//-7 RCpDn No. L.J r-- _ Time am/pm
Contractor on Site ?ersonnel: /700-0r Ou ( ______________________ ~P~a~ge~ ________ ~o~f !
Project Manager Yes No Foreman 62 No Weather Temperarure F
Workers No How Many?
Delavs (Causes)
I Items Discussed wilhContractor '1"'- s'4cic,t:-5. ," ;'~1/, , ' ;0...-.,/ 'A /",_,} ~ 5 c/ c:/J :::,,"->' ,/ j (Yl--- 1-1. '-'r'~ #..f-::;(22r.£,-tk~/ h 0 J}..,e 1:"5 (l/l-:4 - CC h~ I'::. ,£}:>-
~[,j'.-(~ te .. / '--Ie c....,a .. n-:..8:-(/J..e7:;c / .. 1~ i vJ7'.,..",,-"&\ :"'{!" U.~ I N"/''£'£ ('17:V:!fC:; , I / P./
-Scope Changes
Project Concerns/Opportuni ties Irfl'~/ &-C""'-f1.Jl U i(i,Jc?t...<..r2F2£lc/ ;-Lrr:r;;
D(;"V-- 7io::"/v!..LL /fV ;CJ.C:J2q,Uc.J ;"'t·~",- i':;J,~'C !(~j C:!//iv i
The individual signing certifies that the above information is correct and accurate.
I 8/89
(C/~ H(,-- ·~J I'JY
S+,f1 ~'S.sh-) >~e-1;
5W /, , Date
Contractor rlX)
ENVIRONMENTAL
BUILDING
CONSUl1ANTS
I~.
FIELD OBSERVATION REPORT
C;4 f Project Name
PBS Site Observer (s) ,~i)-e ktcL 1''6 QV - 07(70 Proiect No. L(&~0 , (J I DateO /- 0 S - 'i z.
'I.. /_ Lt'
Report No. !dl"- - -:) Time am/ pm
BUILDING
CONSULTANTS
NC.
PBS 1.2
FIELD REPORT: ADDITIONAL PAGE c7
("Jlv / /V Project Name ('L :1AJU"v / Lf/! c/"; I C
Project No. ,-(We., (7! Repon No. D /C 'ti
Page z--of 2...--
C&.-z~ jAfl.<-- ~ ,
- -Je' ;'11 ' ~~) ftif C/- '1/ Lf~,/6t0C , ,) tc j{f.zl· '( ;',Jj., 'C/h- -ruj-&£~Z- 111!1r
~ r:-"?e,:; ( :EC"(,/ '--f{1 ~ (.J-<;;a li.tt.;::;r 1<.£ # 0 //,;/; Sz<'>-3dd /I{'~,,-- ~ff ~~ ,/"cy'rv4i.fl·YUIi'/
.' 5,:r (l~ t/ C/l /1-tt~ /-z ·Le-€.- j.&Si~ ..Jh.'l.c&~'tIAP f/~ !-ti - ) ik c.c./ F-/~x'- , ~d> )~/~'&.,d~:T
: . - C c' cJ,J >, ,?- - /7, ) , 1 • - I «.L..tJ - . ~ d~ ."; (, . ~i.-[ l:J. ( / ''-7-.,< '> <....;-.. /'1 i ';, ) N 1/,1 ( --.: I - -·c·"..I: {oJ
-It:.-" (.<>0t.t- ' ~.:..vi - (>ft<-F!d.tL ' d>t(.all/~);lvJ.ur /7/t {.oJ' (-:;1cls;
,J}-,;;-O - C7,....,z {/~:i;c ~W'_+'1.,.L./J ;1;:1-0 aU-.....-<- !0.h(,cC/J ;:~-i, t2"-,,j d- {",,-V?~t- (;'V C'A£C 5,12.a:J;J' cJ-330 - (;. /Jr,?f's (.f:11:/j, e;
i-J 14-( ( kv1Jy UI1./t 01 'F If ,"'~ '1--- )(')/«. .-: '-tf ~'if.z. ;C.e /~~ f,'l~h' '
{. #(.--t-tJ/ ;?'o (2e ~4!.. . /fFP0 (;tJ iU C;4(;'c ~v.
I () / -'l; - "/2---
Authorized Si.:nature Date
I PB S 2.2
Contrac tor rll)
ENVIRONMENTAL
BUJ:.DING
COI'SUl TANTS
NO.
FIELD OBSERVATION REPORT
C ,., A- {' I;;, , ';f ?/J(( __ I 'e ~ Project Name (~ , '--k" ( ,rv1
PBS Site Observer (s) Project No, I..f&)-~ Dale (~ 1- 1 V
Repan No, Dj?-0 Time am fpm
ComraClOr on Site Personnel: .{Y (100 / 0 yOO Page ( of
Proiect Manarer Yes @ Foreman @ No Weather ---Je~ F
@ ?-<o How Many? ~ Summary Project SLatus Ur r <;;v..aJI ~~ tV-
___ _ _ _____ ~- &1,--;'1-(1'6 dr-fC; ~ b~ fdlr~ f1'tf,;Ujf
~ e.... t1::..--(/,{./ Other Personnel on Site 1$ ~Vb--;Z;= (2r?f}1<l4/
'Workers
Air Monitoring Personnel on Site r3r0'-fl- Authorized SlgnalUre Dale l..LJJ
ENVIRONMENTAL
BUILDING
CONSULTANTS
FIELD OBSERVATION REPORT
Contractor CAp· " - ' "V - (P/E} , Project Name : ·c/"R<- H
PBS Site Observer (s)
Report No_ Time
ContraciOr on Site Personnel: Pa~e
Project ]l.flmager Yes I~-~) Foreman Yes Weather Temperature
Workers Yes 11'0) How Manv? Summary Project Status am/pm of
F
Air Monitoring Personnel on Site Other Personnel on Site ;Z <{;e ;! f..et-: Foe Cr(+S
Items Discussed with Cor.tractm
Scope Chan~es
Proiect Concerns/Opportunities
The individual signi ng certifies that the above information is correct and accurate.
8/89
, I rID
ENVIRONMENTAL
BUILDING
CONSULTANTS
FIELD OBSERVATION REPORT
. r-:-( /. /1/
Project Name ( f1 (.f-.(J , f1- L// ' J1/ I c.
PBS Site Observer (s) /1,,}4/UG f'LJ~ o£ <(S -lrY~ I,;) ('> -- Project No. '{ (;- 2&7 ~~~~ ____ ~~-L~ ____ ~
(YCo ,-' Report No. D/<. -/
Contractor on Site Personnel: 0'7 fi) - (DOD · I ;-if-D - ( {CO. -------,------=---t~~-----.Q!.
j - /
No Foreman@ No Wn~ea"-"th~e"-r ",Yt-"--.:. b.:c' ~-/-' V+It.L/,,""-fP-,.:c':...· ~,=· --,,'=',--' -!-~:.!.2~~~ __ ----.!:.
I - I I I.
Workers ~ d'L---c Summary Project Status A ff/c f{ F;:: (;, 4-u/,Cti fr-"Av (c;"r-h:Y t.50 ~ {~-I(ja /
Air Monitoring Personnel on Site Other Personnel on Site ~,J we
Delays (Causes)
Scope Changes we;:Ji"c ~~b~-tlv"~I+'fr~. . 16dR/lwpA, C[f~-:/IJ f!<-eSfTEtl A <; P-K-L r(j1!j/'-?>~j Of f\J:{i:,d:\1 ~L C-d c.v-t hAC, ~ AltJ fi.1bti f" 71Pt' (t ~(' . u . I /' oft"" I, ( 1 The individual signing c'ertifies thatthJabove information is PhO[ or TeN e and TItle . UJv-S't __ ' _'_' ___ _ correct and accurate. j)-:{\ , ,'J.. J ( -t-r - II-i I
ENVIRONMENTAL
BUILDING
CONSULTANTS
NC.
FIELD REPORT: ADDITIONAL PAGE .
,--;- /1_ ( fl// .
Project Name / I <-rt' ,:4 '-C f /1: I C
~Ic - ( Project No. ~ Repon No. 'f 0 2--?
dicate Category and Continue Discussion Page z..-of
G,x J;.. .-?- (C;5(J~ J~ "L i <; (,(t-J!;:.1f.- CFt-c..Cf<?J.
/,6--C;'-&-v-d (i /-vvJ1 .$Y'.LGZ.
IILI ~t 'It", Y-~;' ,~ J.<!1e ~.I'-..
l , /).. P--'v--- ±- ( 2;;' IfFF .. {..o-(J,,dof,6.~
(S
The individual signing certifies that the above information is correct and accurate.
1 . .. -c ' / (I'T. -" ' 1 // .1. 11/ ' I - .~t-'S~. {'-' V ''-"1 x7~ ({ iCJ i""V01/1 ! I r·
I-!l · n Authorized Signature Dale
ENVIRONMENTAL
BUILDING
CONSULTANTS
FIELD OBSERVATION REPORT
..--:-( .;. l~. /..:-Projeci Name _ I (-11. I '
PBSSileObservcr(s) Cnll. to leEel (l7! -)- ,.-::,1..('-; Projeci No."-; {j. (.' Dale i - !1.. - '/~ , I!..,' '-1 5 - i<i) [iV Repor[ No, D L 1/ Time am / pm
, .' I - 11 /"I! -, Contractor on Sile Personnel: L ·,<c 1 L: - / -:;.,t (I, ' (c.- -', -'re:»"' Page of ,/
Projeci Manager ({is) No Foreman 60 No Weailler () U...t;'..(/(ff Temperalure F
Workers @ No How Many? '-( C..; , J~ Summ Pro 'eel Stalus ~ :::I iSf!:'v-v- it! 3 _ ________ --;-__ ---,-,,---;_- ,J((C (llkvC ~1Ju. (q i-f (k /l~"';Cj" $) q ue ;?u: L Oiller Personnel on Si l: II f r C j0{/J c I Air MonilOrin Personnel on Sile
\PAv I i lemsObserved VorkPractices & Procedures c'Llc - ).- "u,ti'·,~::.S' / '1Ah /k:JZ .
-!-rJ ~{,;"V'tJ !1.;I2cJ-;?;.2... (,I V.Jlt~,C-;:! ·h-{-f' J , /t~J'1,.i:J '. 'L~2- ~..., Li~ dQ{f~"I.;l{-j~";{;'L/- I n:f,:cv- old! /> 7(.( ~'ik:~.t.,( '~ I (,/ /y,-{-I:.AL ?: (l~.y{{ '<;, ~c/~'..<.d Tv f
~;{t'~:V(,j-.:_ '~---t /'.}' I/~ /-(/I-,e. :.~.~~L p-ehA-,c(v.cJ,i / -II-til (;'CI')C:' -i;.(~,i6(.
I . '. J1 " '/ . ,', / . /' Z "/J ( I c; .- . . - ",U A / .- If j e-i..L · ... ') ·IL . ..) ~- i!"'0 1,-v-f';~ <,.'1.1 }"i{¢~~C. )7/:'u7 • ()(~- ~~ fff?e- c?l?~v{..d'
Dela"s (Causes) (j T-S () - OeY IJ-,' , Tf!\ n fTi ) 02tLL <;1, I! ){{,rt,-" ! Iv tJ P; c
I {0:1::/:' t!J{ ' // S/;v...C/ ~fj.('~1! i ~V / ,u';'?.0" /q4:/ 6-1--- I S:l:-~ .& ..... / t.//lf-Z } ~ /' I J I
(].' {L- '-,s, J1...;1~j' . C)(.;H-- f~c C2:t;£j ;J '1/-~tL k~:!.!,t.1:"e/·
I Ilems Discussed with Contractor d~ Qv..--fht1! j.,;;/A '(-v-- 11-cl-v.. [,(
Cc-'-LAe. c; , ~~~~~~~~~~-+.tPy~~~~~_J r,-ua~c-~~~~~~~~~~!~-1)1~
Projeci Concerns/Opportunities
The individual signing certifies Ihal the above informalion is concc( and accura le.
8/,9
Prim or Tvpe Name and Tille ~:)tflC, (
Authorized Signalure Dale
):~ . \ P-B'~· '
ENV,RONMEi'HAL
BUILDING
CONSULlANTS
PBS :2.2
FIELD REPORT: ADDITIONAL PAGE
.--r!~ II J i
Projcct N3J11C ( ~ 1 ~ \
/ I -~ ,.
Projcct No. Lf L.~ .>-{;- Repan No . 0 I:.' . z.
Page J- of ;2-.
/ &;]')- - } CC£,':11/?/{. (l /£~ft-ft.'vU ;1-11... ~ fc:'-0?cJ' R-e0{~;/ -!--o l:5 , 6'u-v.Ju.v , C/ r -:!- t3 l'>lfd/e ft~j i>r1? ((..;£u/i: v-) i).eC,.6'~ (#i,J 1I:s16 r~dJ '
I (,;; 50 - a~1A ~¥-{ icc;'. (?f4.fh, t,)! {0'U.J( y,T'[,,;
The individual signing certifies wa1 the above information is correct and accurate.
Aut..~orizcd Signature Dale
Pili
ENVIRONMENTAL
BUILDING
CONSULTANTS
><0.
FIELD OBSERVATION REPORT
ContraclOr cAf.. PrOjeC I N~e C&~ts
PBS Sile Observer (s)
COnlTaClOr on Sile Personnel: 01)00 - {( &-<J
Projecl No. l/6 z- t Repon No. ble - (
Dale
Time
Page ( Project Manar:er Yes No Fvreman @ No Temperature
Workers ad No How Many? Summary Projecl SUIiUS T?et
Air Moni loM2 Personnel on Sile ksztv~· {{i;d/ Other Personnel on Sile
I items Observed \lork Practices & Proc.edures am/pm of
F
I r ( 21LlKL~'=-I~9-fJ1~~...2......-.ill~--.idLClf±:~~~~:;;L~~~~-..!2..::...!B~
~~r ~~~f~~~==~~~~~~~=-~~---
, Delays (c auses/'(/\? - fA-,'I iA e-e --b O&+ftjJ LiZt 'b,d 3u/)p1US (~I r t'jht<;.M s'fo/ W#f: r£-I.u-~ r0.IINtWit 7eb? ?¥fe. (,4'[)f'J1U~'
Jlems DiSC USSed wilh Con II3C lo,o'f'~,o ~VfAk1.tv1d -fo (. I/X/(/A-tMt5 --(t..iI etM ~(i.f.,41. (tv' 1 ' ~({lCf4t~~ ~ III {,It ~
Scope Changes (95 ~ ?!;;,.R.. CrttA.v~'j?4f{~ 1(,.de- ~,?lT /wlici/;
l/.41' t ~'c r ~ AI r; dP,.;J&/ tfS v.Jf(L (~d SF: /IIUte-
The individual sign ing certifies lh,l Loe above informalion is Print ~e anQ. Ti~ ~ r correct l:lnd accurate. f(;1~ hi4VL'-d f£$-- (- (3-1'2- Authorized Signa lure Dale
8;89
BUILDING
CONSULTANTS
ltV:, PBS 2.2
FIELD OBSERVATION REPORT
Contractor
PBS Site Observer ($) ~ {it,/; 0700 I
I Contractor on Si te Personnel: 01 trO Pro 'ect Mana~er e No Foreman No
I Workers t( I.,J/" No How Man ? vv/i't-
I Air" Monitoring Personnel on Si te ~ ted--
01f)O Items Discussed with Contractor
Scope Changes
Project No.tfrz -zrb Date ( - [Cf.--tfZ-- Report No. Of? -1--- Time am / pm
Pa~e ( of 2-- -w-ea-~-~--O-v-~---~--~-r~----~Te~m~w-r-at-~~e----~F
Summary Project Status ~ l' ?~. ff ff ();
O~er Personnel on Site
Au~orized Signature
ENVIRONMENTAL
BUILDING
CONSULTANTS
ON(;
Project Name
Project No. tf(p ~ ReponNo.
~1=dicFate~C=al=eg~o0~' ~~d~C~on=tin~ue~===-________________________ ~Pa=ge~~~o~f _ty __ iF
The indi\'idual signing certifies that the above infonnation is correct and accurate.
I PBS 2.2
rID
ENVIRONMENTAL
BUILDING
CONSULTANTS
FIELD OBSERVATION REPORT
Contractor
PBS Site Observer (5) Pro ject No, Date
1 7 ." / } : ........... ReponNo, O? Time
, '/C'O~ ,,-. ~ , ' ,~ (i " '- (/ " j Contractor on SHe Personnel :O (' ' c ,,- , ') v -
Page
Foreman No Weather Temperature
Summary Project Status
Air Monitoring Per:onnel on Site ~IZ- kcL Other Personnel on Sile
Jtems Observed York Practices & Procedures) (}7C"'-r..· - CAfl /) '5Gv111.if /[-1.tST ji-r!G
Project Concems/Opportun i ties
The individual signi ng certifies th3tlhe above information is correct and accUJate.
Print or
Authorized Signature Date am/pm of t
F
I I
PBS: :2
PBS
ENVIRONMEr-JTAL
BUILDING
CONSULTANTS
FIELD REPORT: ADDITIONAL PAGE
The individual signing cenifies that the above information is corrCCl and accurate.
B/89
Print or T Name and Ttle
Authorized Signature
Repor! :\0.
Page Z-- of 1_
Dut.e
ENVIRONMENTAL
BUILDING
CONSULTANTS
NO.
I FIELD REPORT: ADDITIONAL PAGE
Project Name [1 [{j!.(.X- c, Project No. ci 0'.) /; Repon :-<0.
[jndicate Category and Continue Discussion Page ;:"/Of :/ ( I ot)~· ,-U>v-2/ /~ ct-\ l I /7-(;0 - l<.- '-t-t::&;."r}, .;.<..(:(v..c 5;/fu· U i ')'1. 't'
1/ ' j , 15:],9 . .
/;'J S2£ct'C.L- rI '-h~ U~r#-!::- /Pc;&'- IS k O;;~(.k'. c:
-f7:-r- c-t, {/I /t.K,i,~tk C ~-J -
/(P<;o- J 0 50
. The indh'idual signing cenifies that the above infonnation is correct and accurate, Authorized Signarure
. / -(("92
PBS 2.1
BUILDING
CONSULTANTS
INC.
FIELD OBSERVATION REPORT
Contractor CA-;4 Project Name Q&..pfi &kr'c
PBS Site Observer (5)
Contractor on Site Personnel:
, Project Manager Yes & I Workers cr;i? No
I Air MonilOring Personnel on Site
Delays (Causes)
Project Concerns/O pponunities
Foreman @ No
How Many? ~
Tne individual signing certifies that the above information is correct and accurate, 8/89
Project No. <'{6 Z-tp Date (-(7 - 1V
ReponNo. Time am/pm
Page ( of
Weather Duet-OOI//2ktc,J Temperature F
Summary Project SUllUS tfe.M4wcA.. (~/1A.tu.-t Sf(; ~¥ ttf/njJ f(()t1? t/t1{!UrJ-t3"ir (;rvt:;(v.l(
7 7) r
Other Personnel on Sire
Authorized Signature Dare
I PBS 2.2
BUILDING
CONSULTANTS
FIELD OBSERVATION REPORT
~a n~ 4/,~
Contractor ( tr'" I Project Name ,---(U-ffLf'S 0/( vv-
PBS Sile Observer (s) "0-4ue t< J D C6G-O 10 30 I
IZt.{<) (b 3;0 ( cls= d-;r3S· , ) I
Repor! No. Time am / pm
I Cono-actor on Sile Personnel: Qq(JO -(go () Page ( of 2..-
Project Manager Yes @2 Foreman Yes No Weather olJR-t.{/J1S 1 < Temperalure F
I Workers @ No How Many? <( Summary Project Status VB; M-/e- I f Su hs ~ _ ____ ----.-_ _ ~~_ flw..f)~ ;-1#( § e~ (?6HJU4
Air Monitoring Personnel on Sile ~e..- ~ p~S I
AU.e A~1-i, ~ ~ e.g
'C -f . fr-.d~ IA/AIC- ;?e51/~tL'f-M-5
Delays (Causes)
The individual signing certifies lhal rhe abo\'e information is correct and accurate.
8/89
Other Personnel on Si le
Authorized Signature fa b- ~e).
. ~ t.<.s?M-e..
t ~~ (W ,f/z...
~ ~0 fiCA-<, Dare
ENVIRONMENTAL
BUILDING
CONSULTANTS
NC.
The individual signing certifies that the above information is correct and accurate.
8/89
Projcct No. L( r; U Repon No.
Page Z-- of ~
TO Cd~ A-1+;\/ '
PBS
ENVIRONMENTAL
BUILDING
CONSULTANTS ,,"
.) J i)//IC' -r !aj t){)·) '-- I ... , I __
~ " 9c/"·" (("'/:(l I ,~ ":;o
RE : (c ifF21:' C~1~/;
I .
/fV
0 BULK
n DUST
0 AIR
Amount
Amount
Amount
-7~,;/ - Y. :;./ • _ . 1 J z:o~.
0 CALL WITH RESULTS
0 CALL WITH RESULTS
0 CALL WITH RESULTS ----
o TRANSMITIAL 0 LAB ANALYSIS REQUEST 3'"MEMO o TELCON 0 CONFERENCE D
PROJECT 7i1 ;''''F~ C!' >jtC< { ;HI-c (-1 at t £:!( r;
JOB NO.
FROM
WITH
TURNAROUND METHOD
.'7 -, . . , 0 2 HOUR 0 PLM - Dispersion Staining
0 24 HOUR 0 PCM
0 REGULAR 0 0 TEM 0
SPEC!AUSTS IN AS8ESTOS ABAiEMENT PROGRAtI.S 122:) sw t.1Om~SON PO:lTI.AND. O~,:;ON 972:)5 5~3/2'B· 1 939
AIR SAMPLING PROCESS
Air samples are taken to determine representative fiber levels in the air, as an index to the potential asbestos content of the air. This is done to insure the safety of the abatement workers, other personnel in the building, and to decide if the building is safe for public use after asbestos removal.
The sampler is a pump and filter arrangement through which the air is pulled. The fibers in the air are then deposited on the filter where they can be subsequently analyzed under a microscope.
EQUIPMENT
High volume air sampling pumps are a.c. - powered and used when large volumes of relatively clean air need to be sampled. These pumps typically operate at flow rates of about 10 liters per minute. Low volume pumps are battery operated and are primarily used for personal monitoring. They operate at
1.0 to 2.5 liters per minute flow rates.
PERSONAL EXPOSURE MONITORING
According to the OSHA code, an employer must perform monitoring to determine the exposure level for each employee, or at least the exposure for each type of task on the abatement project. Breathing zone air samples are collected to represent full shift exposure. This could be one sample or a series of samples representing a period of 6 to 7 hours or more.
AREA MONITORING
Ambient air samples are collected outside of the work area to detect possible elevated fiber levels as a result of abatement, and to document that the project did not contaminate the space. "Clearance" samples are a type of ambient air sample , and are taken prior to removing plastic isolation to confirm that the space is safe to reoccupy without respiratory protection. The EPA recommended clearance level is 0.01 f/cc.
QUALITY CONTROL PROCEDURES
Air sampling pumps are calibrated before and after use to determine accurate flow rates. Microscopes are also frequently adjusted for proper operation. All equipment undergoes routine maintenance to insure optimal functioning.
PBS analysts have completed air sampling training courses and participate in an internal quality control program as well as interlaboratory and national sample exchange programs. This variety of quality control practices insures the highest possible proficiency.
"Blanks" are unused filter cassettes that are periodically analyzed to determine the level of background fibers on the filters. All samples undergo chain-of-custody documentation. Records are kept of equipment calibration and maintenance.
E;-. \ ·I RO:\\IE:-\TAL
;"ll,.~ :'GB1E:\T '-\:\D
COSSL'LTI:.<G
')03248·j039 W3 14fL(l2~31A\.
ENVIRONMENTAL, INC_
S . W. MORRISON STREET, SUITE 600
PORTLAND, OREGON 97205
(503) 248-1939
AIR SAMPLE ASBESTOS ANALYSIS
Cli ent: Public Health Service 2201 Sixth Ave. M/S RX 24 Seattle, WA 98121
Project: Chemawa Clinic
DATE, LOCATION
CLIENT ID/
PBS LAB ID
WORKER NAME, MINUTES
A4 62 6.01-0001
A4626.01-0002
A4626.01-0003
A4626.01-000 4
A4626 . 01-0005
A4 626.01-000 6
A4626. 01-0007
A4626.01-0008
A4626 .01-0009
A4 626.01-0010
~A~C~T~I~V~I~T~YL,_E~T~C~. _______ SAMPLED
1/02/92 - Blank
1/02/92 - Blank
1/02/92 - Pre-abatement
Offi ce ball/lobby
1 /02/92 - Pre -abatement
Lab/pharmacy doorway
1 /02/92 - Pre- abatement
Exam roolllS hall, r ecord s tation
1/02/92 - Pre- abatement
Infi rmary I nea r ent.rance t o r oom 4
1/03/92 - Pre - abatement
Admini stration wi ng lounge, near hal l entranca
A: . 003 B: . 002 c: . 001
1/0 3/92 - Persona l sample
Don Turner , negalr g lovebag hardf!tt ing pipe insul ation
A: .034 B: .019 c: . 0 1
1/03/92 - Excursion
Don Turner I negair glovebag hardfltting pipe i nsul at ion
1/03/92 - Glove bag area
Infirmary room 4 ent rance negair glvbg hardftng pi pe ins
A: .013 B: . 007 c: .00 1
AVE. FLOW
RATE (LPM)
10.2 LPM
10 LPM
10 LPM
10 LPM
10.1 LPM
1. 77 LPM
1. 77 LPM
10 LPM
Report Date:
Date Received:
Client Project 1D:
PBS Project No.:
Page No.:
AIR FIBERS/
VOLUME(L) FIELDS
.5/100
1/100
1938 L 4/100
1850 L 3/100
1900 L 2/100
1850 L 2/100
1869 L 5.5/100
195 L 5.5/100
53 L 3/100
1450 L 13/100
NOTE: For explanation of abbreviations - see last page
(Continued on next page)
1/23/92 1/09/92 N/A 4626 . 0 1
FIBERS
PER cc (f/cc)
.5 fibers
1 fiber
BLD
BLD
BLD
BLD
.001 f/cc
.Oll f/ce
BLD
.004 f/ee
AIR SAMPLE ASBESTOS ANALYSIS
Client: Public Health Service 2201 Sixth Ave. M/S RX 24 Seattle, WA 98121
Project: Chemawa Clinic
CLIENT 10/
PBS LAB 10
DATE, LOCATION
WORKER NAME,
ACTIVITY. ETC.
MINUTES
SAMPLED
A4626.01-0011
A4626.01-0012
A4626.01-0013
A4626.01-0014
A4626.01-0015
A4626.01-0016
A4626.01-0017
A4626.01-0018
A4626.01-0019
1/04/92 - Personal sample
Linda Lindberg, negair glovbag hardflttlng pipe insulation
A: .03B B: .021 C; .005
1/04/92 - Personal sample
Linda Lindberg, negair glovbag hardfltting pipe insulation
1/04/92 - Personal sample
Linda Lindberg, negair glovbag hardfltting pipe insulation
A: .038 B: .021 c: .006
1/04/92 - Excursion
Linda Lindberg, negalr glovbag hardfltting pipe insulation
1/04/92 - Glove bag area
Infirmary roam 4 entrance negair glvbg, hrdftng pipe ins
A: .013 B: .007 c: .001
1/04/92 - Glove bag area
Kitchen, negair glovebag, hardfitting pipe insulation
A: .009 B: .005 c: .001
1/05/92 - Personal sample
Don Turner I infirmary, negair glOVebag, hardtittng pipe ins.
A: .069 B: .038 c: .003
1/05/92 - Personal sample
Don Turner, Id tehen/new wing, nega1r glvbag, hrdf1tting p.1.
A: .091 ll: .05 c: .008
1/05/92 - Glove bag area
Kitchen, negair glovebag, hard fitting pipe insulation
A: .006 ll: .003 C: <.001
AVE. FLOW
RATE (LPM)
2 . 03 LPM
2.02 LPM
2.03 LPM
2.03 LPM
10 LPM
9.83 LPM
2.03 LPM
2.12 LPM
5.49 LPM
Report Date:
Date Received:
Client Project 10:
PBS Project No.:
Page No.:
AIR FIBERS/
VOLUME(L) FIELDS
376 L 10.5/100
162 L 5/100
335 L 9.5/100
61 L 3/100
1700 L 13.5/100
1622 L 9.5/100
568 L 26/100
254 L 16/100
2553 L 13/100
NOTE: For explanation of abbreviations - see last page
(Continued on next page)
1/23/92 1/09/92 N/A 4626.01
FIBERS
PER ee (f/ee)
.012 flee
BLD
.012 flee
BLD
.004 f/cc
.003 f/cc
.022 flcc
.029 flcc
.002 f/cc
2201 Sixth Ave. M/S RX 24 Seattle, WA 98121
Project: Chemawa Clinic
CLIENT 10/
PBS LAB ID
DATE, LOCATION
WORKER NAME,
ACTIVITY, ETC.
MINDTES
SAMPLED
A4626.01-0020
A4626.01-0021
A4626.01-0022
A4626.01-0023
A4626.01-0024
A4626.01-0025
A4626.01-0026
A4626.01-0027
A4626.01-0028
1/05/92 - Glove bag area
Field health reception area negalr glvbg, hrdftng pipe ins
A: .005 B: . 003 c: <.001
1/06/92 - Blank
1/06/92 - Blank
1/06/92 - Personal sample
Linda Lindberg, Dental Clinic;
negair glovebag, hardflttings
A: .047 II: .026 c: .003
1/06/92 - Personal sample
Linda Lindberg, lab, negair glovebag, hardfltting removal
A: .063 B: .035 c: . 006
1/06/92 - Glove bag area
Lab, during negair glovebagi hardfltting removal
A: .013 B: .007 C: .001
1/06/92 - Glove bag area
Infirmary room 4, during negair glovebag, hardflttlngs
A: .003 II: . 002 C: .001
1/06/92 - Glove bag area
Dental Clinic, during negair glovsbag, hardflttings
A: .019 B: .01 C: <.001
1/06/92 - Inside work area
Dental Clinic, post bag breech negair glovebag, hardfittings
A: .006 B: .003 c: .001
AIR SAMPLE ASBESTOS ANALYSIS
AVE. FLOW
RATE (LPM)
5.71 LPM
2.19 LPM
2.31 LPM
10.1 LPM
10 LPM
10 LPM
13.4 LPM
Report Date:
Date Received:
Client Project ID:
PBS Project No.:
Page No.:
AIR FIBERS/
VOLUME(L) FIELDS
2570 L 9.5/100
1/23/92 1/09/92 N/A 4626.01
FIBERS
PER cc (f/cc)
.002 f/cc
2/100 2 fibers
1.5/100 1.5 fibers
504 L 17.5/100 .015 f/cc
243 L 12/100 .02 f/cc
1212 L 13/100 .004 f/cc
1200 L 5.5/100 .001 f/cc
1600 L 21/100 .006 f/cc
1246 L 6/100 .002 flcc
NOTE: For explanation of abbreviations - see last page
(Continued on next page)
2201 Sixth Ave. M/S RX 24 Seattle, WA 98121
Project: Chemawa Clinic
CLIENT IDI
PBS LAB ID
DATE, LOCATION
WORKER NAME,
ACTIVITY, ETC.
MINUTES
SAMPLED
A4626.01-0029
A4626.01-0030
A4626.01-0031
A4626.01-0032
A4626.01-0033
A4626.01-0034
A4626.01-0035
A4626.01-0036
1/07/92 - Personal sample
Don TUrner, exam room station;
negair glovebag, hard fittings
A: .116 E: .064 C: .002
1/07/92 - Excursion
Don Turner, staff dressing rms nagair glovebag , hardflttings
A; .156 13: .087 c: .021
1/07/92 - Personal sample
Don Turner, staff dressing rms negair glovebag, hard fittings
A: .038 E: .021 C: .006
1/07/92 - Glove bag area
Exam room record station;
neg air glovebag, hardflttings
A: .006 B: .003 c: <.001
1/07/92 - Glove bag area
Directors office, nagair glovebag, hardfittings
A: .003 E; .002 c: <.001
1/08/92 - Glove bag area
Pharmacy, nsgair glovebag , hard fltt ings
A: .006 B: .003 C; . 001
1/08/92 - Glove bag area
Adminstratlon, negair glovebag, hardfi~~lngs
A: .009 B: .005 C: <.001
1/08/92 - Glove bag area
Lobby hall, negair glovebag, hardfit~ings
A: . 003 B: .002 C: <.001
AVE. FLOW
RATE (LPM)
2.32 LPM
2.29 LPM
2.3 LPM
9.56 LPM
9.6 LPM
9.7 LPM
9.33 LPM
9.24 LPM
Report Date:
Date Received:
Client Project ID:
PBS Project No.:
Page No.:
AIR FIBERS/
VOLUME(L) FIELDS
603 L 48/100
69 L 91100
265 L 8.5/100
1606 L 8/100
2064 L 6/100
1261 L 7/100
2053 L 14/100
2569 L 6.5/100
NOTE: For explanation of abbreviations - see last page
(Continued on next page)
1/23/92 1/09/92 N/A 4626.01
FIBERS
PER ec (f/cc)
.037 f/ee
.05 f/ce
.012 f/ec
.002 flee
.001 flee
.002 f/ee
.003 f/ce
.001 f/ee
Seattle, WA 98121
Project: Chernawa Clinic
CLIENT ID/
PBS LAB ID
DATE, LOCATION
WORKER NAME,
ACTIVITY, ETC.
MINUTES
SAMPLED
A4626.01-0037
A4626.01-0038
A4626.01-0039
A4626.01-0040
A4626.01-0041
A4626.01-0042
A4626.01-0043
A4626.01-0044
A4626.01-0045
A4626 . 01-0046
1 /0 8/92 - Excursion
Linda Lindberg, records storage
1/oe/92 - Personal sample
Linda Lindberg, adminln1stratn negatr glovebag, hardfittings
A: .041 13: .023 c: .003
1/0 8 /92 - Excursion
Linda Lindberg, medical recrde negatr glovebag, hardfittings
1/06/92 - Personal sample
Linda Lindberg , negair glovebag, hardfi ttings
A: .059 13: .033 c: .008
1 /08/92 - Personal sample
Gary Parks, various rIDS; pipe wrap removal, from radiators
1/09/92 - Blank
1 /09/92 - Blank
1/09/92 - Personal sample
Gary Parks , various rIDS; neg air glvbg, radiator hardfitngs
A: .019 B: .01 C: ,003
1/09/92 - Personal sample
Don Turner, various rIDS; neg air glvbg, radiator hardfitnga
A: .031 B: .017 c: .003
1/09/92 - Excursion
Don Turner, various rIDS; neg air glvbg, radiator hardfitngs
A: .125 B: .07 c: .035
AIR SAMPLE ASBESTOS ANALYSIS
AVE. FLOW
RATE (LPM)
o LPM
2.28 LPM
2.39 LPM
2.4 LPM
2.48 LPM
2.49 LPM
2.42 LPM
2.44 LPM
Report Date:
Date Received:
Client Project 10:
PBS Project No.:
Page No.:
AIR FIBERS/
VOLUME(L) FIELDS
1/23/92 1/09/92 N/A 4626.01
FIBERS
PER cc (f/cc) o L PUMP KALFlJIICTION
481 L 15/100 .013 f/cc
72L 5/100 BI.D
192 L 9.5/100 .019 f/cc
144 L 3/100 BI.D
1.5/100 1.5 fibers
1/100 1 fiber
660 L 9.5/100 .006 f/cc
593 L 13/100 .01 f/cc
49 L 5.5/100 .04 f/cc
2201 Sixth Ave. M/S RX 24 Seattle, WA 98121
Project: Chemawa Clinic
DATE, LOCATION
CLIENT ID /
PBS LAB ID
WORKER NAME , MINUTES
ACTIVITY, ETC . SAMPLED
A4626.01- 0047 1/09/ 92 - Pers onal s ample 225 Don Turner I final clean, hardflttings throughout bldg .
A: .038 B: . 021 c: . 00 3
A4 626.01-0 048 1/0 9/ 92 - Glove bag a rea 130 Administrati on , negair glovebag, radi ator f i ttings
A4626 . 01-0049 1/09/92 - Glove bag area 220 Ne gair glovebag , r adiator fittings
A: .003 B: ,002 c: < . 001
AVE. FLOW
RATE (LPM)
2 . 46 LPM
10 LPM
10 LPM
Time Weighted Avera ge
A4626.01 - 0011 A4626.01-0012 A4626.01-0013 A4626 . 01-0014
A462 6 .01-00 17 A4626 . 01-0018
A4626.01-0023 A4626 . 01-0024
A4626 . 01-0029 A4626 . 01- 0030 A4626 . 01 - 0031
A4626.01-0038 A4626.01-0039
A4626.01-0045 A4626.01 - 0046
1/04/92 - Pers onal sample
Linda Lindberg
1/05/92 - Pe rsonal s ample
Don Turner
1/06 /92 - Personal sample
Linda Lindberg
1/ 07/92 - Pers onal sampl e
Don Turner
1/08/92 - Pers onal sample
Linda Lindberg
1/ 09 / 92 - Pe r s onal s ample
Don T Wler
Report Date:
Date Received:
Client Pro ject I D:
PBS Project No .:
Page No.:
AIR FIBERS/
VOLUME(L) FIELDS
554 L 15/100
1300 L 5/100
2200 L 7/100
1/2 3/92 1/09/92 N/A 4626 . 01
FIBERS
PER cc (f/cc)
.012 f / cc
BLD
. 001 f / cc
. 012 f /cc
. 02 f / ce
.012 f / cc
. 026 f /cc
. 007 f / c c
. 011 f lcc
FILTER AREA (Square millimeters) 385 FIELD AREA (Square millimeters) 0.00785
INTERLABORATORY Relative Standard Deviation 0.45 INTRALABORATORY Relative Standard Deviation 0 . 45
Seattle, WA 98121
Project: Chemawa Clinic
REVIEWED BY
,, :1Jfll1 . I?.JiUjp 4 / • 2-3 ·51 d-..
Approved Signatory Date
Name /
AIR SAMPLE ASBESTOS ANALYSIS
Report Date:
Date Received:
Client Project ID:
PBS Project No . :
Page No.:
L: Litera of air LPM: Litera per minute
1/23/92 1/09/92 N/A 4626.01
A: Interlaboratory 95% Upper Confidence Limit B: Intralaboratory 95% Upper Confidence Limit C: Limit of detection BLD: Below the limit of detection
ENVIRONMENTAL, INC_
S.W. MORRISON STREET, SUITE 600
PORTLAND, OREGON 97205
(503) 248-1939
AIR SAMPLE ASBESTOS ANALYSIS
Client: Public Health Service 2201 Sixth Ave. M/S RX 24 Seattle, WA 98121
Project: Taholah Clinic
CLIENT ID/
PBS LAB ID
DATE, LOCATION
WORKER NAME,
ACTIVITY, ETC.
MINUTES
SAMPLED
A4626.02-0001
A4626.02-0002
A4626.02-0003
A4626.02-0004
A4626.02-0005
A4626.02-0006
A4626.02-0007
A4626.02-000B
A4626.02-0009
A4626.02-0010
1/11/92 - Blank
1/11/92 - Blank
1/11/92 - Pre-abatement
Mechanical room
1/11/92 - Pre-abatement cra~lspace near mechanical roam access
1/11/92 - Pre-abatement
Attic, east acceas
1 /11/92 - Pre-abatement
Main floor hall l near x-ray & pharmacy
A: .006 11: .003 c: .001
1/11/92 - Personal sample
Bob Gunther, negair glovebag, hardfittings
1/11/92 - Personal sample
Bob Gunther, neg4ir glovebag, hardtlttings
1/11/92 - Personal sample
Jag Bradley, crawlspace, neg4ir glovebag, hardfittings
A: .332 B: .184 c: .014
1/11/92 - Outside work area
Ball near x-ray , pharmacy, negair glovebag
A: .028 B: .016 c: .002
1BO
lOB
AVE. FLOW
RATE (LPM)
10 LPM
10.1 LPM
10 LPM
10 LPM
2.02 LPM
2.01 LPM
1.1B LPM
5.91 LPM
Report Date:
Date Received:
Client Project 1D:
PBS Project No.:
Page No.:
AIR FIBERS/
VOLUME(L) FIELDS
1/23/92 1/12/92 N/A 4626.02
FIBERS
PER cc (f/cc)
1.5/100 1.5 fibers
1/100 1 fiber
1700 L 4.5/100 BLD
1757 L 4/100 BLD
1BOO L 3/100 BLD
1550 L 7/100 .002 f/cc
61 L 3/100 BLD
1Bl L 4/100 BLD
127 L 29/100 .106 f/cc
B57 L 1B/100 .009 f/cc
2201 Sixth Ave. M/S RX 24 Seattle, WA 98121
Project: Taholah Clinic
CLIENT ID/
PBS LAB ID
DATE, LOCATION
WORKER NAME,
ACTIVITY, ETC.
MINUTES
SAMPLED
A4626.02-0011
A4626.02-0012
A4626.02-0013
A4626.02-0014
A4626.02-0015
A4626.02-0016
A4626.02-0017
A4626.02-0018
1/11/92 - Outside work area
Ball near main entrance crawlspace, negair glovebag
A: .019 13: .01 c: .002
1/12/92 - Personal sample
George Murfltt, crawlspacei nega1r glovebag, hardfittings
A: .106 13 : .059 c: .018
1/12/92 - Personal sample
George Murfitt, crawlspace;
negair glovebag, bardfittings
A: .131 13: .073 c: .025
1/12/92 - Excursion
George Murfitt,…