Facility Survey Questions.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Operation of the Sacramento Job Corps Center
- Solicitation number
- 1605JW-24-R-00005
About this file
The provided document is an internal facility survey that identifies various facility issues and concerns at the Sacramento Job Corps Center, along with the resolutions and improvements that have been made or are in progress. The survey covers topics such as fire safety, exit signage, appliance disconnects, and deterioration of HVAC systems, roofs, and other building components. The document also mentions the use of a facility management software, School Dude, and its recent upgrade to Asset Essentials. Lastly, the document references a related federal contract opportunity for the operation of the Sacramento Job Corps Center, which includes requirements for academic, career technical, and career development training, as well as outreach and admissions services, with a planned on-board strength of 414 students.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 3.pdf | ||
| Amendment 3.pdf | ||
| Amendment 3.pdf | ||
| Amendment 3.pdf | ||
| J-1 (Revised Price Detail Template 5-13-2024).xlsx | XLSX spreadsheet | |
| J-19 (Sublease with County of San Joaquin).pdf | ||
| J-12 (Utilities for Oct. 2019 - Present).pdf | ||
| Clarification Requests and Government Responses.xlsx | XLSX spreadsheet | |
| J-1 (Revised Price Detail Template).xlsx | XLSX spreadsheet | |
| J-31 (Revised Statement of Equivalent Rates for Federal Hires).xlsx | XLSX spreadsheet | |
| Amendment 2.pdf | ||
| J-19 (Lease Agreement for Childcare Center).pdf | ||
| Amendment 1.pdf | ||
| Amendment 1.pdf | ||
| Sacramento Solicitation with Updated Attachments (04-10-2024).pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Life Safety Facility Issues | |
| Concerns | Resolutions |
| Infirmary Building 500A HVAC room lacks fire rated enclosure. | This has been completed by contractor TS7Smart in February 2024. |
| Education Building 200, Career Transition. Services Building 600A, Security Vocation |
Building 730, and Career Preparation Building 930 exit signage is inadequate. Signs ordered and received, (awaiting installation). All of these signs are in process of ordering signs from vender.
| Medical Building 500B Appliance disconnect not provided. | Completed early in 2023. |
| Operations and Maintenace (O&M) | |
| The Center does use School Dude, an internet-based program for facility maintenance. | The center has upgraded the former CMMS (School Dude) program, to Asset Essentials, which is a global CMMS system. |
| Major Improvements in Progress | |
| Dining Hall is deteriorated. | B1b request has been submitted, approved , and a vendor has been selected. |
| Structurally compromised floor in Center Building 3/4. | The floor has been repaired and finished by a contractor |
| Deteriorated/ leaking roofs on buildings 3/4, 12, 100, 700, and 730. | All roofs have been temporarily repaired and there were no roof leaks evident from th last few storms we've had. ESC has suggested that this may become a national project. |
Deteriorated HVAC and Hood systems in buildings 210, 600A, and 931. Buildings 500A and 500C roof gutters have been redirected from the roofs to storm drain areas which prevent ponding and flooding inside of the buildings. Building 200 roof gutters and ground gutters (west side of 200) have been kept clear of debris and will drain in normal rain storms.
File details come from the government source that posted it. Updated .