Section J Documents, Exhibits, and Other Attachments Table of Contents
| Attachment Number |
| Attachment Title |
| J-1602000-01 |
| Definitions and Acronyms |
| J-1602000-02 |
| References and Technical Documents |
| J-1602000-03 |
| Contractor Provided Electrical Generation Plant Equipment and Distribution Systems Description and Inventory |
| J-1602000-04 |
| Electrical Power System Line Diagram |
| J-1602000-05 |
| Generator Inventory (Non-Contractor Provided) |
Attachment J-1602000-01 Definitions and Acronyms
| Equipment, Collateral |
| Encompasses built-in and large substantially affixed equipment/property that is normally acquired and installed as part of a facility project. |
| Equipment, Installed |
| Encompasses building-type equipment, built-in equipment, and large, substantially affixed equipment/property, and is normally acquired and installed as part of a facility project. Installed equipment is normally required to make a facility useful and operable. Removing such equipment would impair the usefulness, safety, or environment of the facility or the facility restoration work required after its removal, is substantial. |
| Equipment, Personal Property |
| Personal property equipment includes all equipment other than collateral equipment. Such equipment, when acquired and used in a facility or a test apparatus, can be severed and removed after erection or installation without substantial loss of value or damage thereto or to the premises where installed. |
| Facilities Life Cycle |
| A facilities life cycle is divided into four stages, requirements (planning and design), acquisition (construction and acceptance), stewardship (operations, maintenance and repair), and disposal. |
| Facilities Maintenance Management |
| The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of facilities maintenance operations to support the CNO/NAVFAC facilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.” |
| High Voltage Transmission |
| Transmission of electrical loads greater than 69 kilovolts (KV). |
| Integrated Maintenance Plan |
| IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness. |
| Life-Cycle Costs |
| A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life. |
| Low Voltage Distribution |
| Distribution of electrical loads less than or equal to 600 volts (V). |
| Medium Voltage Distribution |
| Distribution of electrical loads ranging from greater than 600 V up to and including 69 KV. |
| Repair |
| Repair is the restoration of facilities or equipment to such a condition that it may be effectively utilized for its designated purposes by overhaul, reconstruction, or replacement of constituent parts or materials which have deteriorated by action of the elements or usage, and which have not been corrected through maintenance. This term also applies to replacement of the entire unit or system if beyond economical repair. The intent of repair is to have the equipment at normal working condition. |
| Replacement |
| Replacement, as a distinct work element, is confined to a program of planned replacement of a facility or its components. It may be further limited to major components such as air conditioning compressors, furnaces or hot water heaters. Replacement is performed when the equipment has reached the end of its useful life; when it no longer can perform due to degradation of its internal components and repair is no longer cost effective. Included under the replacement would be the major rebuilding of any component, since rebuilding also restores performance. |
| SCADA |
| A version of telemetry commonly used in wide-area industrial applications, such as electrical power generation and distribution and water distribution, which includes supervisory control of remote stations as well as data acquisition from those stations over a bidirectional communications link. |
| AC |
| Alternating Current (electricity) |
| ANSI |
| American National Standards Institute |
| ASHRAE |
| American Society of Heating, Refrigerating and Air-Conditioning Engineers |
| ASME |
| American Society of Mechanical Engineers |
| BPVC |
| Boiler and Pressure Vessel Code |
| IMP |
| Integrated Maintenance Program |
| NEC |
| National Electrical Code |
| NFPA |
| National Fire Protection Association |
| SCADA |
| Supervisory Control and Data Acquisition |
| SRM |
| Sustainment, Restoration and Modernization |
| UFC |
| Unified Facilities Criteria |
| UPV |
| Unfired Pressure Vessel |
Attachment J-1602000-02 References and Technical Documents
| MO-209 |
| Engineering Criteria |
| UFC 3-430-02FA |
| Central Steam Boiler Plants |
| UFC 3-430-07 |
| Operations and Maintenance: Inspection and Certification of Boilers and Unfired Pressure Vessels |
| UFC 3-430-08N |
| Central Heating Plants |
| UFC 3-501-01 |
| Electrical Engineering |
| UFC 3-550-01 |
| Exterior Electrical Power Distribution |
| UFC 3-560-01 |
| Electrical Safety. O&M |
| NAVFAC P-307 |
| Management of Weight Handling Equipment |
Department of the Army.
| AR 420-49 |
| Heating, Energy Selection and Fuel Storage, Distribution, |
and Dispensing Systems
| TM 5-811-6 |
| Electric Power Plant Design |
| TM 5-815-1 |
| Air Pollution Control Systems Boilers and Incinerators |
Non-Government Publications.
American Association of State Highway and Transportation Officials, (AASHTO)
444 North Capital Street, N.W., Suite 249, Washington, DC 20001
American Boiler Manufacturers Association (ABMA)
950 N. Glebe Road, Suite 160, Arlington, VA 22203
American Concrete Institute (ACI)
P.O. Box 19150, Redford Station, Detroit, MI 48219-0150
American Gear Manufacturers Association (AGMA)
1500 King Street, Suite 201, Alexandria, VA 22314
American National Standards Institute, Inc. (ANSI)
11 West 42nd Street, New York, NY 10036
American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE)
Publication Dept. 1791 Tullie Circle, N.E., Atlanta, GA 30329
ASHRAE (1991) Handbook, HVAC Applications
ASHRAE (1992) Handbook, HVAC Systems and Equipment
ASHRAE (1993) Handbook, Fundamentals
ASHRAE (1990) Handbook, Refrigeration Systems and Applications
ATTACHMENT J-1602000-03
CURRENT ELECTRICAL POWER GENERATION PLANT AND TRANSMISSION AND DISTRIBUTION SYSTEM DESCRIPTION AND INVENTORY
· The existing power generation system consists of four fuel fed generators with a capacity of 1000 kva for a total of 4000 kva. Fuel is supplied from two above ground fuel tanks.
· A synchro panel is connected to the generators for power distribution to the facilities by means of seven panels located around the facilities.
· The fuel generation is confined though a chain link fence equipped with two vehicle access gates and one pedestrian gate.
· Electrical cables from the generators to the seven distribution panels are buried. Cables are surface installed from distribution panel #5 to the secured area.
ATTACHMENT J-1602000-04
SINGLE LINE DIAGRAM AND FACILITIES SERVED BY POWER GENERATION PLANT
ATTACHMENT J-1602000-05
Non-Contractor Provided Generator Inventory
| Location |
| Generator Type |
| Model |
| Quantity |
| Remarks |
| Oman - Tidmar Island |
| Caterpillar Diesel 200kVA |
| Genset 400/230V, 50 Hz |
| 3 |
| Host Nation Operated |