Project Manual Summary: Harris Health System BT Nuclear Medicine Renovation

This Project Manual prepared by Page Southerland Page, Inc. (now Stantec) on behalf of Harris Health System outlines the specifications and general requirements for a nuclear medicine department renovation at Ben Taub Hospital in Houston, Texas. The project involves interior renovation, imaging equipment replacement, and cosmetic upgrades to an existing nuclear medicine department within an operational hospital facility. The scope of work is defined under a single prime construction manager contract with an issue date of March 12, 2026. The project requires coordination with Owner's existing operations, including 72-hour advance notice for activities affecting hospital operations, maintenance of existing exits and walkways, and potential partial occupancy before substantial completion. The manual establishes comprehensive specifications across multiple divisions covering structural steel, hollow metal doors and frames, architectural hardware, flooring systems, finishes, mechanical systems, and electrical infrastructure, with particular emphasis on fire-rated assemblies, sound-rated partitions, and specialized medical equipment support systems. The project involves coordination with Owner-furnished fixtures, Owner's not-in-contract information technology systems, and separate contractors for testing laboratory services and specialty installations.

The manual specifies a construction manager delivery method with emphasis on quality assurance through independent testing agencies for specialized work including structural steel inspection, concrete testing, HVAC commissioning, and fire-rated assembly verification. Project closeout requirements include substantial completion certification with punch list resolution within 30 days, final completion procedures, operation and maintenance data submission, and demonstration and training of Owner's personnel. The contract includes provisions for temporary facilities, waste management and recycling, protection of existing conditions, and coordination with the building's fire-suppression, plumbing, mechanical, and electrical systems. Specific performance requirements address fire-resistance ratings, sound transmission control, accessibility standards, and seismic design criteria. The estimated project budget is $4,000,000, with the project located at 1504 Taub Loop, Houston, Texas 77030, under the authority of Harris Health System with the project manager identified as DeMarques Potter.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page/ Architect/Engineer:

TEL 713 871 8484 Page, now Stantec FAX 713 871 8440 1100 Louisiana, Suite One

Houston, Texas 77002 pagethink.com

Project Manual

Harris Health System BT Nuclear Medicine Gamma Camera & SPECT/CT

1504 Taub Loop Houston, Texas 77030

ISSUE FOR CONSTRUCTION

March 12, 2026 Page Project No. 422089.03

Page/ Architect/Engineer:

TEL 713 871 8484 Page, now Stantec FAX 713 871 8440 1100 Louisiana, Suite One

Houston, Texas 77002 pagethink.com

Professional Seals

Harris Health System BT Nuclear Medicine Gamma Camera & SPECT/CT

ISSUE FOR CONSTRUCTION

March 12, 2026 Page Project No. 422089.03

Architect Structural Engineer

Plumb/Mech Electrical Engineer Engineer

R

S

AX

ETFET

AT

S

O

DER NIG

E

R F

O R 89839

E E

MICHAEL J. WALSH

NELAOI

S

N

ETS I

G

S E

P

ONAL SEALS

67193

THOMAS A. FRANKLIN

R

E G I

XTE

O

STE

SAAT

S

E R E

NI

R E

D

LANO

S

E S

F O R

P

I

F TE

G

NE

AL SEALS

Harris Health System BT Nuclear Medicine Gamma Camera & SPECT/CT Page Project No. 422089.03

ISSUE FOR CONSTRUCTION

March 12, 2026

TABLE OF CONTENTS

000110 - 1

DOCUMENT 000110 - TABLE OF CONTENTS

Section Section Title

INTRODUCTORY INFORMATION

000101 Cover Page 000107 Professional Seals 000110 Table of Contents

DIVISION 01 - GENERAL REQUIREMENTS

011000 Summary 012500 Substitution Procedures 012600 Contract Modification Procedures 012900 Payment Procedures 013100 Project Management and Coordination 013200 Construction Progress Documentation 013300 Submittal Procedures 013516 Alteration Project Procedures 014000 Quality Requirements 014200 References 014523 Testing and Inspecting Services 015000 Temporary Facilities and Controls 016000 Product Requirements 017300 Execution 017419 Construction Waste Management and Disposal 017700 Closeout Procedures 017823 Operation and Maintenance Data 017839 Project Record Documents 017900 Demonstration and Training 019100 General Commissioning Requirements

DIVISION 02 - EXISTING CONDITIONS

024119 Selective Demolition

DIVISION 03 - CONCRETE

035416 Hydraulic Cement Underlayment

DIVISION 05 - METALS

051200 Structural Steel Framing 054523 Healthcare Metal Supports

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

061000 Rough Carpentry 064116 Plastic Laminate-Faced Architectural Cabinets

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

078413 Penetration Firestopping 079200 Joint Sealants

DIVISION 08 - OPENINGS

081113 Hollow Metal Doors and Frames 081416 Flush Wood Doors 083113 Access Doors and Frames

Page Project No. 422089.03

ISSUE FOR CONSTRUCTION

March 12, 2026

TABLE OF CONTENTS

000110 - 2

083313 Coiling Counter Door 085659 Aluminum Service Windows 087100 Door Hardware 088000 Glazing

DIVISION 09 - FINISHES

090561 Common Work Results for Flooring Preparation 092216 Non-Structural Metal Framing 092900 Gypsum Board 093000 Tiling 095113 Acoustical Panel Ceilings 096513 Resilient Base and Accessories 096516 Resilient Sheet Flooring 096519 Resilient Tile Flooring 099000 Painting and Coating

DIVISION 10 - SPECIALTIES

102123 Cubicle Curtains and Track 102600 Wall Protection 102800 Toilet Accessories 104413 Fire Protection Cabinets 104416 Fire Extinguishers 105113 Metal Lockers

DIVISION 11 - EQUIPMENT

117300 Medical Equipment

DIVISION 12 - FURNISHINGS

122413 Roller Window Shades 123661 Simulated Stone Countertops

DIVISION 13 – SPECIAL CONSTRUCTION

134905 Radiation Protection

Physician's Report

DIVISION 21 - FIRE SUPPRESSION

210000 Basic Fire Protection Requirements 210523 General Valves for Fire Suppression Piping 210529 Fire Protection Hangers and Supports 210553 Fire Protection Piping and Equipment Identification 211000 Fire Suppression Systems

DIVISION 22 - PLUMBING

220500 Common Work Results for Plumbing 220517 Sleeves and Sleeve Seals for Plumbing Piping 220523 General Valves for Plumbing Piping 220529 Hangers and Supports for Plumbing Piping and Equipment 220553 Identification for Plumbing Piping and Equipment 220716 Plumbing Equipment Insulation 220719 Plumbing Piping Insulation 221116 Domestic Water Piping 221316 Sanitary Waste and Vent Piping 221319 Sanitary Waste Piping Specialties 224213 Commercial Water Closets

Page Project No. 422089.03

ISSUE FOR CONSTRUCTION

March 12, 2026

TABLE OF CONTENTS

000110 - 3

224216 Commercial Lavatories 224217 Commercial Sinks

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

230513 Common Motor Requirements for HVAC Equipment 230593 Testing, Adjusting, And Balancing for HVAC 230713 HVAC Insulation 230800 Commissioning of HVAC 233113 Metal Ducts 233300 Air Duct Accessories 233346 Flexible Ducts 233416 Centrifugal HVAC Fans 233600 Air Terminal Units 233713 Air Diffusers 233714 Registers and Grilles

DIVISION 26 - ELECTRICAL

260500 Common Work Results for Electrical 260519 Low Voltage Electrical Power Conductors and Cables

260519.13 Metal Clad Cable

260529 Hangers and Supports for Electrical Systems 260533 Raceways and Boxes 260553 Identification for Electrical Systems

260573.13 Short-Circuit Studies

260573.19 Arc-Flash Hazard Analysis

260923 Lighting Control Devices 262726 Wiring Devices 262816 Enclosed Switches and Circuit Breakers 265100 Interior Lighting

DIVISION 27 - COMMUNICATIONS

Harris Health - Division 27 Communications Specifications

DIVISION 32 – EXTERIOR IMPROVEMENTS

323119 Decorative Metal Fences and Gates

END OF TABLE OF CONTENTS

Page Project No. 422089.03

ISSUE FOR CONSTRUCTION

March 12, 2026

SUMMARY

011000 - 1

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Project information.

2. Work covered by the Contract Documents.

3. Type of the Contract.

4. Work under other contracts.

5. Access to site.

6. Coordination with occupants.

7. Specification formats and conventions.

B. Related Sections include the following:

1. Division 01 Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

1.2 PROJECT INFORMATION

A. Project Identification: Harris Health BT Nuclear Medicine Gamma Camera & SPECT/CT.

1. Page Project No. 422089.03

2. Project Location: 1504 Taub Loop, Houston, Texas 77030

B. Owner: Harris Health, 4800 Fournace Place, Bellaire, Texas 77401

1. Owner's Representative: DeMarques Potter, Project Manager - Harris Heath System, 4800 Fournace Place, Bellaire, Texas 77401, cell: (254) 541-9746.

C. Architect: Page Southerland Page, Inc (Page), 1100 Louisiana, Suite One, Houston, Texas, 77002, telephone: (713) 871-8444.

D. Web-Based Project Software: Project software administered by the Architect will be used for purposes of managing communication and documents during the construction stage.

1. See Section 013100 "Project Management and Coordination" for requirements for using web-based Project software.

1.3 WORK COVERED BY DOCUMENTS

A. The Work of Project is defined by the Contract Documents and generally consists of the following:

1. Project Description: Interior renovation, imaging equipment replacement, and cosmetic upgrades to a nuclear medicine department in an existing hospital.

B. Type of Contract:

1. Project will be constructed under a single prime contract: Construction Manager.

Page Project No. 422089.03

ISSUE FOR CONSTRUCTION

March 12, 2026

SUMMARY

011000 - 2

1.4 WORK UNDER OTHER CONTRACTS

A. General: Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract. Coordinate the Work of this Contract with work performed under separate contracts.

B. All or portions of the following work may be performed by separate contractors:

1. Owner's Testing Laboratory Services (Quality Control).

2. Owner's Fixtures, Furnishings and Equipment.

3. Owner's Not-In-Contract Information Technology.

4. Other work designated NIC (Not in Contract).

1.5 ACCESS TO SITE

A. General: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section.

B. Use of Site: Limit use of Project site to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Driveways, Walkways and Entrances: Keep driveways parking garage, loading areas, and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or for storage of materials.

a. Schedule deliveries to minimize use of driveways and entrances by construction operations.

b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

C. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations.

D. Condition of Existing Grounds: Maintain portions of existing grounds, landscaping, and hardscaping affected by construction operations throughout construction period. Repair damage caused by construction operations.

1.6 COORDINATION WITH OCCUPANTS

A. Full Owner Occupancy: Owner will occupy adjacent site and building during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's day-to-day operations.

Maintain existing exits unless otherwise indicated.

1. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Owner and approval of authorities having jurisdiction.

2. Notify Owner not less than 72 hours in advance of activities that will affect Owner's operations.

Page Project No. 422089.03

ISSUE FOR CONSTRUCTION

March 12, 2026

SUMMARY

011000 - 3

B. Owner Occupancy of Completed Areas of Construction: Owner reserves the right to occupy and to place and install equipment in completed areas of building, before Substantial Completion, provided such occupancy does not interfere with completion of the Work. Such placement of equipment and partial occupancy shall not constitute acceptance of the total Work.

1. Architect will prepare a Certificate of Substantial Completion for each specific portion of the Work to be occupied before Owner occupancy.

2. Obtain a Certificate of Occupancy from authorities having jurisdiction before Owner occupancy.

3. Before partial Owner occupancy, mechanical and electrical systems shall be fully operational, and required tests and inspections shall be successfully completed. On occupancy, Owner will operate and maintain mechanical and electrical systems serving occupied portions of building.

4. On occupancy, Owner will assume responsibility for maintenance and custodial service for occupied portions of building.

1.7 SPECIFICATION FORMATS AND CONVENTIONS

A. Specification Format: The Specifications are organized into Divisions and Sections using the 50-division format and CSI/CSC's "MasterFormat 2010” numbering system.

1. Section Identification: The Specifications use Section numbers and titles to help cross-referencing in the Contract Documents. Sections in the Project Manual are in numeric sequence; however, the sequence is incomplete because all available Section numbers are not used. Consult the table of contents at the beginning of the Project Manual to determine numbers and names of Sections in the Contract Documents.

2. Division 01: Sections in Division 01 govern the execution of the Work of all Sections in the Specifications.

B. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.

These conventions are as follows:

1. Abbreviated Language: Language used in the Specifications and other Contract Documents is abbreviated. Words and meanings shall be interpreted as appropriate.

Words implied, but not stated, shall be inferred as the sense requires. Singular words shall be interpreted as plural, and plural words shall be interpreted as singular where applicable as the context of the Contract Documents indicates.

2. Imperative mood and streamlined language are generally used in the Specifications.

Requirements expressed in the imperative mood are to be performed by Contractor.

Occasionally, the indicative or subjunctive mood may be used in the Section Text for clarity to describe responsibilities that must be fulfilled indirectly by Contractor or by others when so noted.

a. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION

Page Project No. 422089.03

ISSUE FOR CONSTRUCTION

March 12, 2026

SUBSTITUTION PROCEDURES

012500 - 1

SECTION 012500 - SUBSTITUTION PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for substitutions.

B. Related Requirements:

1. Section 016000 "Product Requirements" for requirements for submitting comparable product submittals for products by listed manufacturers.

1.2 DEFINITIONS

A. Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents and proposed by Contractor.

1. Substitutions for Cause: Changes proposed by Contractor that are required due to changed Project conditions, such as unavailability of product, regulatory changes, or unavailability of required warranty terms.

2. Substitutions for Convenience: Changes proposed by Contractor or Owner that are not required in order to meet other Project requirements but may offer advantage to Contractor or Owner.

1.3 ACTION SUBMITTALS

A. Substitution Requests: Submit a request for each substitution. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles.

1. Substitution Request Form: Use copy of form provided at end of this Section.

2. Documentation: Show compliance with requirements for substitutions and the following, as applicable:

a. Statement indicating why specified product or fabrication or installation method cannot be provided, if applicable.

b. Coordination of information, including a list of changes or revisions needed to other parts of the Work and to construction performed by Owner and separate contractors that will be necessary to accommodate proposed substitution.

c. Detailed comparison of significant qualities of proposed substitutions with those of the Work specified. Include annotated copy of applicable Specification Section.

Significant qualities may include attributes, such as performance, weight, size, durability, visual effect, sustainable design characteristics, warranties, and specific features and requirements indicated. Indicate deviations, if any, from the Work specified.

d. Product Data, including drawings and descriptions of products and fabrication and installation procedures.

e. Samples, where applicable or requested.

f. Certificates and qualification data, where applicable or requested.

g. List of similar installations for completed projects, with project names and addresses as well as names and addresses of architects and owners.

h. Material test reports from a qualified testing agency, indicating and interpreting test results for compliance with requirements indicated.

Page Project No. 422089.03

ISSUE FOR CONSTRUCTION

March 12, 2026

SUBSTITUTION PROCEDURES

012500 - 2

i. Research reports evidencing compliance with building code in effect for Project, from ICC-ES.

j. Detailed comparison of Contractor's construction schedule using proposed substitutions with products specified for the Work, including effect on the overall Contract Time. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating date of receipt of purchase order, lack of availability, or delays in delivery.

k. Cost information, including a proposal of change, if any, in the Contract Sum.

l. Contractor's certification that proposed substitution complies with requirements in the Contract Documents, except as indicated in substitution request, is compatible with related materials and is appropriate for applications indicated.

m. Contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.

3. Architect's Action: If necessary, Architect will request additional information or documentation for evaluation within seven days of receipt of a request for substitution.

Architect will notify Contractor of acceptance or rejection of proposed substitution within 15 days of receipt of request, or seven days of receipt of additional information or documentation, whichever is later.

a. Forms of Acceptance: Change Order, Construction Change Directive, or Architect's

Supplemental Instructions for minor changes in the Work.

b. Use product specified if Architect does not issue a decision on use of a proposed substitution within time allocated.

1.4 QUALITY ASSURANCE

A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage a qualified testing agency to perform compatibility tests recommended by manufacturers.

1.5 PROCEDURES

A. Coordination: Revise or adjust affected work as necessary to integrate work of the approved substitutions.

1.6 SUBSTITUTIONS

A. Substitutions for Cause: Submit requests for substitution immediately on discovery of need for change, but not later than 15 days prior to time required for preparation and review of related submittals.

1. Conditions: Architect will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, Architect will return requests without action, except to record noncompliance with these requirements:

a. Requested substitution is consistent with the Contract Documents and will produce indicated results.

b. Substitution request is fully documented and properly submitted.

c. Requested substitution will not adversely affect Contractor's construction schedule.

d. Requested substitution has received necessary approvals of authorities having jurisdiction.

e. Requested substitution is compatible with other portions of the Work.

f. Requested substitution has been coordinated with other portions of the Work.

Page Project No. 422089.03

ISSUE FOR CONSTRUCTION

March 12, 2026

SUBSTITUTION PROCEDURES

012500 - 3

g. Requested substitution provides specified warranty.

h. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.

B. Substitutions for Convenience: Architect will consider requests for substitution if received within 60 days after the Notice to Proceed. Requests received after that time may be considered or rejected at discretion of Architect.

1. Conditions: Architect will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, Architect will return requests without action, except to record noncompliance with these requirements:

a. Requested substitution offers Owner a substantial advantage in cost, time, energy conservation, or other considerations, after deducting additional responsibilities Owner must assume. Owner's additional responsibilities may include compensation to Architect for redesign and evaluation services, increased cost of other construction by Owner, and similar considerations.

b. Requested substitution does not require extensive revisions to the Contract Documents.

c. Requested substitution is consistent with the Contract Documents and will produce indicated results.

d. Substitution request is fully documented and properly submitted.

e. Requested substitution will not adversely affect Contractor's construction schedule.

f. Requested substitution has received necessary approvals of authorities having jurisdiction.

g. Requested substitution is compatible with other portions of the Work.

h. Requested substitution has been coordinated with other portions of the Work.

i. Requested substitution provides specified warranty.

j. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.

PART 2 - PRODUCTS (Not Used)

Page | 1

SUBSTITUTION REQUEST SUBSTITUTION REQUEST NO.

PROJECT ARCHITECT’S PROJECT NO.

CHECK APPROPRIATE BOX

□ SUBSTITUTION PRIOR TO BID OPENING (Minimum of 5 working days prior to receipt of bids per Instructions To Bidders)

□ SUBSTITUTION FOLLOWING AWARD (Maximum of 20 working days from Notice To Proceed per Section 016000)

FROM BIDDER/CONTRACTOR (Print Company Name)

TO ARCHITECT/ENGINEER (Print Company name)

Bidder/contractor hereby requests acceptance of the following product or systems as a substitution in accordance with the provisions of the Contract Documents:

SPECIFICATION TITLE DESCRIPTION

SECTION NO. ARTICLE/PARAGRAPH □ Point-by-point comparison attached – REQUIRED BY A/E

Reason for not providing specified item:

QUALITY COMPARISON

SPECIFIED PRODUCT PROPOSED SUBSTITUTION

MANUFACTURER

NAME, BRAND

CATALOG/MODEL NO.

VENDOR/DISTRIBUTOR

MANUFACTURING LOCATION

WARRANTY

DOCUMENTED YEARS PROPOSED PRODUCT HAS BEEN MANUFACTURED

□ New Product □ 2 - 5 years old □ 5 - 10 years old □ More than 10 years old

SUPPORTING DATA ATTACHED

□ Drawings □ Product Data □ Samples □ Tests □ Reports □ Other

Differences between proposed substitution and specified product:

Proposed substitution affects other parts of Work: □ No □ Yes, explain:

Substitution requires dimensional revision or redesign of structure or A/E work: □ No □ Yes, explain:

Savings to Owner for accepting substitution: _________________________________________________($______________)

Proposed substitution changes Contract Time: □ No □ Yes [Add] [Deduct] ____________________days

Page | 2

PREVIOUS INSTALLATIONS OF PROPOSED PRODUCT (Provide three, minimum)

PROJECT ARCHITECT/ENGINEER PHONE NO.

LOCATION DATE INSTALLED OWNER PHONE NO.

PROJECT ARCHITECT/ENGINEER PHONE NO.

LOCATION DATE INSTALLED OWNER PHONE NO.

PROJECT ARCHITECT/ENGINEER PHONE NO.

LOCATION DATE INSTALLED OWNER PHONE NO.

STATEMENT OF CONFORMANCE

The Undersigned certifies:

Proposed substitution has been fully investigated and determined to be equal or superior in all respects to specified product.

Same warranty will be furnished for proposed substitution as for specified product.

Same maintenance service and source of replacement parts, as applicable, is available.

Proposed substitution will have no adverse effect on other trades and will not affect or delay progress schedule.

Cost data as stated above is complete. Claims for additional costs related to accepted substitution which may subsequently become apparent are to be waived.

Proposed substitution does not affect dimensions and functional clearances.

Payment will be made for changes to building design, including A/E design, detailing, and construction costs caused by the substitution.

Coordination, installation, and changes in the Work as necessary for accepted substitution will be complete in all respects.

SUBMITTED BY DATE

SIGNATURE FIRM

ADDITIONAL COMMENTS

□ Contractor □ Subcontractor □ Supplier □ Manufacturer □ A/E □ Other ___________________

REVIEW AND ACTION (For A/E Use only)

□ Substitution is not accepted.

□ Substitution is accepted.

□ Substitution is accepted with the following comments:

□ Resubmit substitution request with the following additional information:

REVIEWED BY DATE

SIGNATURE FIRM

Page Project No. 422089.03

ISSUE FOR CONSTRUCTION

March 12, 2026

CONTRACT MODIFICATION PROCEDURES

012600 - 1

SECTION 012600 - CONTRACT MODIFICATION PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for handling and processing Contract modifications.

B. Related Requirements:

1. Section 012500 "Substitution Procedures" for administrative procedures for handling requests for substitutions made after the Contract award.

1.2 MINOR CHANGES IN THE WORK

A. Architect will issue supplemental instructions authorizing minor changes in the Work, not involving adjustment to the Contract Sum or the Contract Time, on AIA Document G710.

1.3 PROPOSAL REQUESTS

A. Owner-Initiated Proposal Requests: Architect will issue a detailed description of proposed changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If necessary, the description will include supplemental or revised Drawings and Specifications.

1. Work Change Proposal Requests issued by Architect are for information only. Do not consider them instructions either to stop work in progress or to execute the proposed change.

2. Within time specified in Proposal Request or 20 days after receipt of Proposal Request, when not otherwise specified, submit a quotation estimating cost adjustments to the Contract Sum and the Contract Time necessary to execute the change.

a. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.

b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.

c. Include costs of labor and supervision directly attributable to the change.

d. Include an updated Contractor's construction schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.

e. Quotation Form: Use forms acceptable to Architect.

B. Contractor-Initiated Proposals: If latent or changed conditions require modifications to the Contract, Contractor may initiate a claim by submitting a request for a change to Architect.

1. Include a statement outlining reasons for the change and the effect of the change on the Work. Provide a complete description of the proposed change. Indicate the effect of the proposed change on the Contract Sum and the Contract Time.

2. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.

Page Project No. 422089.03

ISSUE FOR CONSTRUCTION

March 12, 2026

CONTRACT MODIFICATION PROCEDURES

012600 - 2

3. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.

4. Include costs of labor and supervision directly attributable to the change.

5. Include an updated Contractor's construction schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.

6. Comply with requirements in Section 012500 "Substitution Procedures" if the proposed change requires substitution of one product or system for product or system specified.

7. Proposal Request Form: Use AIA Document G709 or form acceptable to Architect.

1.4 ADMINISTRATIVE CHANGE ORDERS

A. Allowance Adjustment: See Section 012100 "Allowances" for administrative procedures for preparation of Change Order Proposal for adjusting the Contract Sum to reflect actual costs of allowances.

B. Unit-Price Adjustment: See Section 012200 "Unit Prices" for administrative procedures for preparation of Change Order Proposal for adjusting the Contract Sum to reflect measured scope of unit-price work.

1.5 CHANGE ORDER PROCEDURES

A. On Owner's approval of a Work Change Proposal Request, Architect will issue a Change Order for signatures of Owner and Contractor on AIA Document G701.

1.6 CONSTRUCTION CHANGE DIRECTIVE

A. Construction Change Directive: Architect may issue a Construction Change Directive on AIA Document G714. Construction Change Directive instructs Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order.

1. Construction Change Directive contains a complete description of change in the Work. It also designates method to be followed to determine change in the Contract Sum or the Contract Time.

B. Documentation: Maintain detailed records on a time and material basis of work required by the Construction Change Directive.

1. After completion of change, submit an itemized account and supporting data necessary to substantiate cost and time adjustments to the Contract.

PART 2 - PRODUCTS (Not Used)

Page Project No. 422089.03

ISSUE FOR CONSTRUCTION

March 12, 2026

PAYMENT PROCEDURES

012900 - 1

SECTION 012900 - PAYMENT PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements necessary to prepare and process Applications for Payment.

B. Related Requirements:

1. Section 012600 "Contract Modification Procedures" for administrative procedures for handling changes to the Contract.

2. Section 013200 "Construction Progress Documentation" for administrative requirements governing the preparation and submittal of the Contractor's construction schedule.

1.2 SCHEDULE OF VALUES

A. Coordination: Coordinate preparation of the schedule of values with preparation of Contractor's construction schedule.

1. Coordinate line items in the schedule of values with items required to be indicated as separate activities in Contractor's construction schedule.

2. Submit the schedule of values to Architect at earliest possible date, but no later than seven days before the date scheduled for submittal of initial Applications for Payment.

3. Subschedules for Separate Elements of Work: Where the Contractor's construction schedule defines separate elements of the Work, provide subschedules showing values coordinated with each element.

B. Format and Content: Use Project Manual table of contents as a guide to establish line items for the schedule of values. Provide at least one line item for each Specification Section.

1. Identification: Include the following Project identification on the schedule of values:

a. Project name and location.

b. Name of Architect.

c. Architect's Project number.

d. Contractor's name and address.

e. Date of submittal.

2. Arrange schedule of values consistent with format of AIA Document G703.

3. Arrange the schedule of values in tabular form, with separate columns to indicate the following for each item listed:

a. Related Specification Section or Division.

b. Description of the Work.

c. Name of subcontractor.

d. Name of manufacturer or fabricator.

e. Name of supplier.

f. Change Orders (numbers) that affect value.

g. Dollar value of the following, as a percentage of the Contract Sum to nearest one-hundredth percent, adjusted to total 100 percent. Round dollar amounts to whole dollars, with total equal to Contract Sum.

1) Labor.

2) Materials.

3) Equipment.

Page Project No. 422089.03

ISSUE FOR CONSTRUCTION

March 12, 2026

PAYMENT PROCEDURES

012900 - 2

4. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Applications for Payment and progress reports. Provide multiple line items for principal subcontract amounts in excess of five percent of the Contract Sum.

5. Provide a separate line item in the schedule of values for each part of the Work where Applications for Payment may include materials or equipment purchased or fabricated and stored, but not yet installed.

a. Differentiate between items stored on-site and items stored off-site. Include requirements for insurance and bonded warehousing, if required.

6. Allowances: Provide a separate line item in the schedule of values for each allowance.

7. For each item of work in the schedule of values, provide a separate line item for initial cost of materials, for amount of each subsequent stage of completion, and for total installed value.

8. Overhead Costs: Show cost of temporary facilities and other major cost items that are not direct cost of actual work-in-place either as separate line items or distributed as general overhead expense, at Contractor’s option.

9. Schedule of Values Revisions: Revise the schedule of values when Change Orders or Construction Change Directives result in a change in the Contract Sum. Include at least one separate line item for each Change Order and Construction Change Directive.

1.3 APPLICATIONS FOR PAYMENT

A. Each Application for Payment following the initial Application for Payment shall be consistent with previous applications and payments as certified by Architect and paid for by Owner.

1. The initial Application for Payment, the Application for Payment at time of Substantial Completion, and the final Application for Payment involve additional requirements.

B. Payment Application Times: The period of construction work covered by each Application for Payment is the period indicated in the Agreement between Owner and Contractor.

1. Submit draft copy of Application for Payment seven days prior to due date for review by Architect.

C. Application for Payment Forms: Use AIA Document G702 and AIA Document G703 as form for Applications for Payment.

D. Application Preparation: Complete every entry on form. Notarize and execute by a person authorized to sign legal documents on behalf of Contractor. Architect will return incomplete applications without action.

1. Entries shall match data on the schedule of values and Contractor's construction schedule. Use updated schedules if revisions were made.

2. Include amounts for work completed following previous Application for Payment, whether or not payment has been received. Include only amounts for work completed at time of Application for Payment.

3. Include amounts of Change Orders and Construction Change Directives issued before last day of construction period covered by application.

E. Stored Materials: Include in Application for Payment amounts applied for materials or equipment purchased or fabricated and stored off-site.

1. Provide certificate of insurance, evidence of transfer of title to Owner, and consent of surety to payment for stored materials.

Page Project No. 422089.03

ISSUE FOR CONSTRUCTION

March 12, 2026

PAYMENT PROCEDURES

012900 - 3

2. Provide supporting documentation that verifies amount requested, such as paid invoices.

Match amount requested with amounts indicated on documentation; do not include overhead and profit on stored materials.

3. Provide summary documentation for stored materials indicating the following:

a. Value of materials previously stored and remaining stored as of date of previous

Applications for Payment.

b. Value of previously stored materials put in place after date of previous Application for Payment and on or before date of current Application for Payment.

c. Value of materials stored since date of previous Application for Payment and remaining stored as of date of current Application for Payment.

F. Transmittal: Submit three signed and notarized original copies of each Application for Payment to Architect by a method ensuring receipt within 24 hours. One copy shall include waivers of lien and similar attachments if required.

1. Transmit each copy with a transmittal form listing attachments and recording appropriate information about application.

G. Initial Application for Payment: Administrative actions and submittals that must precede or coincide with submittal of first Application for Payment include the following:

1. List of subcontractors.

2. Schedule of values.

3. Contractor's construction schedule (preliminary if not final).

4. Submittal schedule (preliminary if not final).

5. Copies of building permits, authorizations, and licenses from authorities having jurisdiction for performance of the Work.

6. Initial progress report.

7. Report of preconstruction conference.

8. Certificates of insurance and insurance policies.

9. Performance and payment bonds.

10. Data needed to acquire Owner's insurance.

H. Application for Payment at Substantial Completion: After Architect issues the Certificate of Substantial Completion, submit an Application for Payment showing 100 percent completion for portion of the Work claimed as substantially complete.

1. Include documentation supporting claim that the Work is substantially complete and a statement showing an accounting of changes to the Contract Sum.

2. This application shall reflect Certificate(s) of Partial Substantial Completion issued previously for Owner occupancy of designated portions of the Work.

I. Final Payment Application: After completing Project closeout requirements, submit final Application for Payment with releases and supporting documentation not previously submitted and accepted, including, but not limited, to the following:

1. Evidence of completion of Project closeout requirements " see Section 017700 “Closeout Procedures.”

2. Insurance certificates for products and completed operations where required and proof that taxes, fees, and similar obligations were paid.

3. Updated final statement, accounting for final changes to the Contract Sum.

4. AIA Document G706 " Affidavit of Payment of Debts & Claims.

5. AIA Document G706A " Contractor’s Affidavit of Release of Liens.

6. AIA Document G707 " Consent of Surety to Final Payment.

7. Evidence that claims have been settled.

Page Project No. 422089.03

ISSUE FOR CONSTRUCTION

March 12, 2026

PAYMENT PROCEDURES

012900 - 4

8. Final meter readings for utilities, a measured record of stored fuel, and similar data as of date of Substantial Completion or when Owner took possession of and assumed responsibility for corresponding elements of the Work.

9. Final liquidated damages settlement statement.

PART 2 - PRODUCTS (Not Used)

Page Project No. 422089.03

ISSUE FOR CONSTRUCTION

March 12, 2026

PROJECT MANAGEMENT AND COORDINATION

013100 - 1

SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. General coordination procedures.

2. Coordination drawings.

3. RFIs.

4. Digital project management procedures.

5. Project meetings.

B. Related Requirements:

1. Section 013200 "Construction Progress Documentation" for preparing and submitting Contractor's construction schedule.

2. Section 017300 "Execution" for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.

3. Section 017700 "Closeout Procedures" for coordinating closeout of the Contract.

1.2 DEFINITIONS

A. BIM: Building Information Modeling.

B. RFI: Request for Information. Request from Owner, Architect, or Contractor seeking information required by or clarifications of the Contract Documents.

1.3 INFORMATIONAL SUBMITTALS

A. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design.

Include the following information in tabular form:

1. Name, address, telephone number, and email address of entity performing subcontract or supplying products.

2. Number and title of related Specification Section(s) covered by subcontract.

3. Drawing number and detail references, as appropriate, covered by subcontract.

B. Key Personnel Names: Within 15 days of starting construction operations, submit a list of key personnel assignments, including superintendent and other personnel in attendance at Project site. Identify individuals and their duties and responsibilities; list addresses and cellular telephone numbers and e-mail addresses. Provide names, addresses, and telephone numbers of individuals assigned as alternates in the absence of individuals assigned to Project.

1. Post copies of list in project meeting room, in temporary field office,and by each temporary telephone. Keep list current at all times.

Page Project No. 422089.03

ISSUE FOR CONSTRUCTION

March 12, 2026

PROJECT MANAGEMENT AND COORDINATION

013100 - 2

1.4 GENERAL COORDINATION PROCEDURES

A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations included in different Sections that depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.

1. Prepare similar memoranda for Owner and separate contractors if coordination of their Work is required.

C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's construction schedule.

2. Preparation of the schedule of values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Preinstallation conferences.

7. Project closeout activities.

8. Startup and adjustment of systems.

D. Conservation: Coordinate construction activities to ensure that operations are carried out with consideration given to conservation of energy, water, and materials. Coordinate use of temporary utilities to minimize waste.

1.5 COORDINATION DRAWINGS

A. Coordination Drawings, General: Prepare coordination drawings according to requirements in individual Sections, and additionally where installation is not completely indicated on Shop Drawings, where limited space availability necessitates coordination, or if coordination is required to facilitate integration of products and materials fabricated or installed by more than one entity.

1. Content: Project-specific information, drawn accurately to a scale large enough to indicate and resolve conflicts. Do not base coordination drawings on standard printed data. Include the following information, as applicable:

a. Use applicable Drawings as a basis for preparation of coordination drawings. Prepare sections, elevations, and details as needed to describe relationship of various systems and components.

b. Coordinate the addition of trade-specific information to coordination drawings in a sequence that best provides for coordination of the information and resolution of conflicts between installed components before submitting for review.

Page Project No. 422089.03

ISSUE FOR CONSTRUCTION

March 12, 2026

PROJECT MANAGEMENT AND COORDINATION

013100 - 3

c. Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems.

d. Indicate space requirements for routine maintenance and for anticipated replacement of components during the life of the installation.

e. Show location and size of access doors required for access to concealed dampers, valves, and other controls.

f. Indicate required installation sequences.

g. Indicate dimensions shown on Drawings. Specifically note dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements. Provide alternative sketches to Architect indicating proposed resolution of such conflicts. Minor dimension changes and difficult installations will not be considered changes to the Contract.

B. Coordination Drawing Organization: Organize coordination drawings as follows:

1. Floor Plans and Reflected Ceiling Plans: Show architectural and structural elements, and mechanical, plumbing, fire-protection, fire-alarm, and electrical Work. Show locations of visible ceiling-mounted devices relative to acoustical ceiling grid. Supplement plan drawings with section drawings where required to adequately represent the Work.

2. Plenum Space: Indicate subframing for support of ceiling and wall systems, mechanical and electrical equipment, and related Work. Locate components within plenums to accommodate layout of light fixtures and other components indicated on Drawings. Indicate areas of conflict between light fixtures and other components.

3. Mechanical Rooms: Provide coordination drawings for mechanical rooms showing plans and elevations of mechanical, plumbing, fire-protection, fire-alarm, and electrical equipment.

4. Structural Penetrations: Indicate penetrations and openings required for all disciplines.

5. Mechanical and Plumbing Work: Show the following:

a. Sizes and bottom elevations of ductwork, piping, and conduit runs, including insulation, bracing, flanges, and support systems.

b. Dimensions of major components, such as dampers, valves, diffusers, access doors, cleanouts and electrical distribution equipment.

c. Fire-rated enclosures around ductwork.

6. Electrical Work: Show the following:

a. Runs of vertical and horizontal conduit 1-1/4 inchesin diameter and larger.

b. Light fixture, exit light, emergency battery pack, smoke detector, and other fire-alarm locations.

c. Panel board, switch board, switchgear, transformer, busway, generator, and motor-control center locations.

d. Location of pull boxes and junction boxes, dimensioned from column center lines.

7. Review: Architect will review coordination drawings to confirm that in general the Work is being coordinated, but not for the details of the coordination, which are Contractor's responsibility. If Architect determines that coordination drawings are not being prepared in sufficient scope or detail, or are otherwise deficient, Architect will so inform Contractor, who shall make suitable modifications and resubmit.

8. Coordination Drawing Prints: Prepare coordination drawing prints according to requirements in Section 013300 "Submittal Procedures."

C. Coordination Digital Data Files: Prepare coordination digital data files according to the following requirements:

1. File Preparation Format: Contractor’s option.

2. File Submittal Format: Submit or post coordination drawing files using PDF format.

Page Project No. 422089.03

ISSUE FOR CONSTRUCTION

March 12, 2026

PROJECT MANAGEMENT AND COORDINATION

013100 - 4

1.6 REQUEST FOR INFORMATION (RFI)

A. General: Immediately on discovery of the need for additional information, clarification, or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified.

1. Architect will return without response those RFIs submitted to Architect by other entities controlled by Contractor.

2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.

B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

1. Project name.

2. Project number.

3. Date.

4. Name of Contractor.

5. Name of Architect.

6. RFI number, numbered sequentially.

7. RFI subject.

8. Specification Section number and title and related paragraphs, as appropriate.

9. Drawing number and detail references, as appropriate.

10. Field dimensions and conditions, as appropriate.

11. Contractor's suggested resolution. If Contractor's suggested resolution impacts the Contract

Time or the Contract Sum, Contractor shall state impact in the RFI.

12. Contractor's signature.

13. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop

Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.

C. RFI Forms: AIA Document G716 or software-generated form with substantially the same content, acceptable to Architect.

1. Attachments shall be electronic files in PDF format.

D. Architect's Action: Architect will review each RFI, determine action required, and respond. Allow 3-5 working days for Architect's response for each RFI. RFIs received by Architect after 1:00 p.m. will be considered as received the following working day.

1. The following Contractor-generated RFIs will be returned without action:

a. Requests for approval of submittals.

b. Requests for approval of substitutions.

c. Requests for approval of Contractor's means and methods.

d. Requests for coordination information already indicated in the Contract Documents.

e. Requests for adjustments in the Contract Time or the Contract Sum.

f. Requests for interpretation of Architect's actions on submittals.

g. Incomplete RFIs or inaccurately prepared RFIs.

2. Architect's action may include a request for additional information, in which case Architect's time for response will date from time of receipt by Architect of additional information.

3. Architect's action on RFIs that may result in a change to the Contract Time or the Contract Sum may be eligible for Contractor to submit Change Proposal according to Section 012600 "Contract Modification Procedures."

Page Project No. 422089.03

ISSUE FOR CONSTRUCTION

March 12, 2026

PROJECT MANAGEMENT AND COORDINATION

013100 - 5

a. If Contractor believes the RFI response warrants change in the Contract Time or the Contract Sum, notify Architect in writing within 10 days of receipt of the RFI response.

E. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number. Submit log weekly. Use software log that is part of web-based Project software. Include the following:

1. Project name.

2. Name and address of Contractor.

3. Name and address of Architect.

4. RFI number including RFIs that were returned without action…