16_FAT_Combined.pdf

PDF 448 KB Posted

Attached to
F-15 FMS Ejection Seat Mode Selector
Solicitation number
FA8213-26-Q-3000
Issued by

About this file

This appears to be an Adobe PDF portfolio landing page with an instructional message recommending users open the document using Acrobat X or Adobe Reader X (or later versions). The page features the Adobe PDF logo, a red and white document graphic, and a "Get Adobe Reader Now!" button. The document does not contain substantive contract, solicitation, or procurement information.

View the file

Other files

File Type Posted
12_CDRLs_FD2020-25-50051.pdf PDF
2_REPSHIP.pdf PDF
17_Section_L_CADPAD.pdf PDF
18_Bid_sets_25-50051.pdf PDF
17_AFMC Form 158_TEMP-4732920 (FD2020-25-50051).pdf PDF
1_Air_Munitions_Specifications_FD2020-25-50051.pdf PDF
6_SPI_combined.pdf PDF
5_Packaging_SOW.pdf PDF
FA8213-26-Q-3000 NEW.pdf PDF
10_ID_Combined.pdf PDF
3_ADC_SOW.pdf PDF
Section M CADPAD.pdf PDF
9_JFQR_Combined.pdf PDF
11_EDL_Combined.pdf PDF
4_CADPAD_Item_Marking_Instruction_Ver_1.6.pdf PDF
7_807s_combined.pdf PDF
15_Statement_of_Objectives.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

FIRST ARTICLE REQUIREMENTS 1. DATE

24 OCT 2024(AFMCI 23-110, AFMCDAFI 20-102, and FAR, Subpart 9.3) (additional instructions on page 3)

2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER

17610 / 50905-3

4. NSN

1377003493943ES

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS 6 UNIT(S) OF LOT / ITEM 1

AND WILL BE: PART OF PRODUCTION QUANTITY X IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

X WILL WILL NOT SERVE AS A MANUFACTURING STANDARD

7. LONG LEAD TIME ITEMS

REQUIRED X NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST / INSPECTION REQUIREMENTS

A. X CONTRACTOR TESTING

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are

IAW Government approved contractor remanufacture procedures and ATP

B. The detailed technical requirements for First Article approval tests are contained in

IAW Government approved contractor remanufacture procedures based on Boeing (McDonnell Douglas) specification PS 68-710080.

(Cite Spec and Para number)

C. X TEST PLAN REQUIRED

(3) Number of days for government approval / disapproval days.

(1) DD Form 1423 ELIN

(2) Delivery due calendar days from date of contract.

D. Contractor's notification to ACO and

AFLCMC/EBHJ

(Requesting Activity) of test time and location due 10 days prior to start of testing.

E. X TEST REPORT REQUIRED

(3) Forwarded to

6044 Dogwood Ave

Hill AFB, UT 84056

(4) Government written notice of approval / disapproval due

(2) Due days after receipt of contractor's report.15 calendar days from date contract.

AFMC IMT 260, 20230316, V-5,

Version 2Generated by PRPS using Jasper Reports on 24 Oct 2024

PREVIOUS EDITION IS OBSOLETE

Prescribed by: AFMCI23-110

05 JUN 2020(AFMCI 23-110, AFMCDAFI 20-102, and FAR, Subpart 9.3) (additional instructions on page 3)

F. FIRST ARTICLE DELIVERY

(1) Due within 120 calendar days from date contract.

(2) Notify 10 calendar days prior to shipment.

(3) Delivered to government at

(Set Forth Consignee and Address)

(4) Government written notice of approval / disapproval within 15 days after receipt of first article package.

G. Estimated cost of government testing / inspection evaluation.

$9,000.0000

10. DISPOSITION OF FIRST ARTICLES

Approved First Articles will be forwarded to

X 6 (insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor

X will be retained by Contractor pending disposition instructions from the contractor.

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

Disapproved First Articles will be retained by

On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

Other Disposition:

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, Air Force.

b. Offerors currently in production of the same or similar article for a Government, DoD, Air Force contract and who have received First Article approval under the existing contract.

c. Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d. X Provided not more than 48 months have elapsed since completion of the contract.

e. First Article testing will not be waived.

f. See Remarks in block 12 below.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

12. REMARKS

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING

(Name, Organization, Phone)

Tidwell, Quinn R

AFLCMC / EB H J

801-777-4136

777-4136

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

TEST (Name, Organization, Phone)

06331 / 826213-01

1377014374075ES

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must

IAW Government approved contractor remanufacture procedures based on Boeing (McDonnell Douglas) specification PS 68-710080.

Version 3Generated by PRPS using Jasper Reports on 24 Oct 2024

(4) Government written notice of approval / disapproval within 15 days after receipt of first article package.

X 6 (insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles

X will be retained by contractor

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded

On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD,

b. Offerors currently in production of the same or similar article for a Government, DoD, Air Force contract and who have received First Article

c. Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, Air Force, provided articles

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE

AFLCMC / EB H J

93455 / 6139100

1377014799295ES

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must

IAW Government approved contractor remanufacture procedures based on Boeing (McDonnell Douglas) specification PS 68-710080.

(4) Government written notice of approval / disapproval within 15 days after receipt of first article package.

X 6 (insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles

X will be retained by Contractor

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded

On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD,

b. Offerors currently in production of the same or similar article for a Government, DoD, Air Force contract and who have received First Article

c. Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, Air Force, provided articles

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE

AFLCMC / EBHJ

File details come from the government source that posted it. Updated .