Pre Bid RFIs.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Building 5 Module Entrances Construction Services Federal contract opportunity
- Solicitation number
- 15F06724R0000141
About this file
This document is a set of Pre-Bid Requests for Information (RFIs) related to a federal contract opportunity for the construction of Building 5 module entrances at the FBI's CJIS Division facility in Clarksburg, WV.
The key details include: the current providers for security systems, fire alarm, HVAC controls, and intercom at the facility; the badging process and associated lead time; the ability for contractors to work on site before receiving a badge; the location of the dumpster and any on-site storage/staging area; clarification on the coordination required with the government and other contractors; and confirmation that OSHA 30 certifications meet the safety requirements. Proposals for this solicitation are due by 10:00 a.m. ET on June 12, 2024, and any late proposals will not be considered. The contracting agency is the Department of Justice Federal Bureau of Investigation Headquarters Division.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SECTION L Instructions Conditions and Notices to Offerors - Module Entrance - 060624.pdf | ||
| 15F06724R0000141_Mod 2.pdf | ||
| SECTION L Instructions Conditions and Notices to Offerors - Module Entrance.pdf | ||
| SECTION L Instructions Conditions and Notices to Offerors - Module Entrance -.pdf | ||
| Question Template.xlsx | XLSX spreadsheet | |
| 15F06724R0000141_Mod_1.pdf | ||
| Section B.pdf | ||
| Section C .pdf | ||
| SECTION G - CONTRACT ADMINISTRATION DATA - Module Entrances .pdf | ||
| SECTION L Instructions Conditions and Notices to Offerors - Module Entrance - .pdf | ||
| SECTION E - INSPECTION AND ACCEPTANCE - Module Entrance.pdf | ||
| SECTION F - DELIVERIES OR PERFORMANCE - module entrance.pdf | ||
| Wage Determination.pdf | ||
| SECTION H - SPECIAL CONTRACT REQUIREMENTS - module entrance.pdf | ||
| Attachment H-Pricing Template.xlsx | XLSX spreadsheet | |
| SECTION M - EVALUATION CRITERIA - Module Entrance - .pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| RFP #15F06724R000141 Attachment E - Questions | |||||
| Page Number | Solicitation Section | Paragraph Section | Service Area | Question | Response |
| N/A | N/A | N/A | N/A | Who is the current security systems provider (card readers, cameras, door sensors, etc.) at this facility? | The FBI will provide and install the badge readers, cameras, door sensors, etc. |
| Who is the current Fire Alarm System provider for this facility? | Please reference "24_0328 - B5 Mod Entrances - 100pc BOD" | ||||
| Who is the current HVAC (Building Automation Controls) controls provider for this facility? | Siemans | ||||
| Who is the current intercom system provider for this facility? | Not applicable to this project. | ||||
| What is the badging process at this facility? | Once an individual is processed and approved through the LAR (Limited Access Request) process, they may be eligible to receive a bidge. To receive a badge the contractor must be on site 2-3 days a week for at least three consecutvie weeks. To receive a badge, the contractor must schedule a badging appointment with the FBI. We can schedule two individuals for an appointment, every 30 minutes. Scheduling is dependent on the staffing and availability at the Visitos Center. | ||||
| N/A | N/A | N/A | N/A | *Is there cost associated with the badging process, if so what is it? | No |
| *What is the lead time to receive badging to this facility? | Once LAR paperwork and fingerprints are submitted, the LAR process can take up to 10 business days. After approval a badging appointment would then have to be scheduled with the FBI. Scheduling is dependent on the staffing and availability at the Visitos Center. | ||||
| *Are there any avenues for personnel to work before receiving the badge after applying for it (i.e. daily check in or visitor's pass)? | All contractor's working on or off site on the project, must complete an LAR and be approved before performing work. They are not required to have a badge, but the FBI would need 48hr notice before they are on site to add them to an access list. Anyone planning to be on site 2-3 days a week for at least three consecutvie weeks should request a badge. | ||||
| What is the average time to access the job site daily for contractors? | If the FBI is given at least 48hr notice of the individuals need to be on site, the individual should have minor delays at the gate. The only delays would be for vehicle searches and to ensure they are on the access list. If they are badged, the only delay is a vehicle search. | ||||
| At the walk thru it was mentioned that a list of current vendors and contractors who are or have been working at the facility could possibly be made available. Can this be provided? | We cannot publish the entire list of cleared vendors. If there is a vendor you would like us to verify their clearance status, we can. | ||||
| At the walk thru it was mentioned that photos could be provided and there were areas that photos were requested. Can the requested photos from the site visit be provided? | For security purposes, pictures can not be posted on SAM; however, will be provided upon request to the Contracting Officer | ||||
| N/A | N/A | N/A | N/A | For bidding purposes where would the dumpster be located for this project? | Location can be discussed and coordinated. The best location would probably be in the back of the parking lot. |
| For bidding purposes would a storage / staging / laydown area be provided on site? | Yes | ||||
| Spec 01 10 00 1.6 states “Coordinate the work of this contract with work performed by the Government.” Please clarify what work is to be performed by the government. What is the extent of coordination needed? | This is a general statement. All work is to be coordinated with Government. We are constantly working on projects and maintenance throughout our facility. Our facility is occupied and must remain open throughout the project. Other than the items specifically identified in the drawings, this blanket statement covers anything else that may need to be coordinated to ensure our facility can remain open and occupied throughout the project. | ||||
| Spec 01 10 00 1.7 states “Coordinate the work of this contract with work performed under Owner’s separate contracts.” Please clarify what work is to be performed under other contracts. What is the extent of coordination needed? | This is a general statement. All work is to be coordinated with Government or other Government contractors, as neccessary. We are constantly working on projects and maintenance throughout our facility. Our facility is occupied and must remain open throughout the project. Other than the items specifically identified in the drawings, this blanket statement covers anything else that may need to be coordinated to ensure our facility can remain open and occupied throughout the project. | ||||
| Spec 01 31 00 1.6 states “Weekly BIM Coordination meetings are required. Contractor shall provide Clash Detection.” Is BIM required for this project? Are weekly BIM Coordination meetings required? What Clash detection is required? | Please disregard the BIM requirements of Spec 013100 1.6. | ||||
| Spec 01 40 00 1.6 states “Project quality-control manager may not also serve as Project superintendent.” Please confirm that quality control manager is not permitted to serve as project superintendent. If this is the case, does the quality control manager need to always be on site? | For this particular question, please follow the language in the RFP, which states "The primary duties and responsibilities of the QC Manager are to manage and implement the QC program on this contract. The QC Manager can also be designated as the safety competent person or site safety and health officer (SSHO) as defined by EM 385-1-1, or the Project Superintendent." | ||||
| Spec 01 40 00 1.6e states “The safety engineer shall have no other duties.” Please confirm that the safety engineer cannot serve as project superintendent. If this is the case, does the safety engineer need to always be on site? | The Safety Engineer as defined in Spec 01 40 00 1.6 cannot serve as the project superintendent, but does not be on site. The superintendent can serve as the on-site safety competent person or site safety and health officer. | ||||
| This project is scheduled to bid on June 19th which is a federal holiday. Can an extension to the following day be provided so it does not fall on a federal holiday? | Yes | ||||
| Section L - Instructions, Conditions, and Notices to Offerors requires personel to "be familiar with the requirements of Em 385-1-1 and have experience in the areas of hazard identification, safety compliance, and sustainability." We typically see OSHA 30 required for projects like this. Are OSHA 30 certifications sufficient to meet this requirement? | Yes. OSHA 30 certifications are sufficient. |