Warehouse-Security-System-Upgrade-Q-n-A.pdf
PDF 142 KB Posted
- Attached to
- Warehouse Camera System Upgrade Federal contract opportunity
- Solicitation number
- 15F06723Q00000469
About this file
This document contains questions and answers regarding Solicitation Number 15F06723Q00000469 for upgrading the security camera system at a Department of Justice Federal Bureau of Investigation warehouse. The solicitation seeks proposals to replace aging security equipment including installing new interior and exterior cameras, field racks, decoder monitors, and ambush monitors. Drawings will not be provided but vendors are encouraged to attend a site visit. Existing airphone and underground conduits require replacement. The statement of work has been updated to include replacing camera 400 in the interior mantrap loading area. Recorded video is required to be retained for 30 days. Wage determinations are not necessary. An ideal transition period for removing the old system and installing the new is 30 days, and work may be done simultaneously. Drop ceilings above the work areas are in good condition.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SOW-Updated 9.21.23-Security-System-Upgrade.pdf | ||
| RFQ-Updated 9.21.23-Security-System-Upgrade.pdf | ||
| Warehouse Camera System Upgrad Q-n-A Part-4.pdf | ||
| Warehouse-Security-System-Upgrade-Q-n-A-Part-3.pdf | ||
| Warehouse-Security-System-Upgrad-Q-n-A-Part-2.pdf | ||
| Updated-SOW-Security-System-Upgrade.pdf | ||
| RFQ-Warehouse_Security_Upgrade.pdf | ||
| SOW-Security-System-Upgrade.pdf | ||
| RFQ-Warehouse_Security_Upgrade.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A for Warehouse Security Systems Upgrade
Solicitation Number: 15F06723Q00000469
1. Will there be an opportunity to receive First and Second Floor drawings?
No, drawing shall not be posted on SAM.gov. Vendors are encouraged to attend a site visit.
2. Will 120VAC outlets be supplied at the Field Racks, Decoder Monitors, and Ambush Monitors locations?
Yes
3. Is the existing Airphone Intercom underground conduit free of obstructions and in serviceable condition?
No. The underground conduits for Gate-1 and the Pedestrian Gate were compromised with moisture and not in ideal serviceable condition.
Gate-2 (main delivery gate), we were unable to locate the underground conduit supplying the Aiphone system, but a PVC line near the structure of the building “may” be a feed from the sprinkler room leading to the COMSEC room feeds to the system.
4. The Interior Mantrap Loading Area 400 camera is not on the attached SOW. Is it expected to be replaced?
Yes, the SOW has been updated to reflect this change.
5. What is the requirement for the length of time you like to retain recorded video?
30 Days
6. Will Wage Determine Rates be Required?
No
Q&A for Warehouse Security Systems Upgrade
Solicitation Number: 15F06723Q00000469
7. Transition period - What does the transition period look like for installation of the new system and removal of the old system?
Ideally 30 days
8. Is the new equipment to be installed first then remove the old equipment? Can this be done simultaneously?
It can be done simultaneously.
9. What are the conditions above the drop ceilings?
The drop ceilings are in good condition.