About this file

This document contains questions and answers regarding a solicitation for a warehouse camera system upgrade. The solicitation is being conducted by the Department of Justice Federal Bureau of Investigation Headquarters Division under number 15F06723Q00000469. The warehouse has a suspended ceiling in the office area and no existing cable trays or wiring that can be utilized. A UPS with 6 hours of power duration is required. Equipment substitutions are allowed if equivalent to the brand specified. Plenum wire is acceptable. After hours contractor access is not available at no cost. Exterior cameras will be approximately 15 feet high. No incumbent vendor has been servicing the existing system. There are no requirements for the readers or system to be FICAM or cybersecurity compliant.

View the file

Other files for this federal contract opportunity

Other files attached to Warehouse Camera System Upgrade, newest first.
File Type Posted
SOW-Updated 9.21.23-Security-System-Upgrade.pdf PDF
RFQ-Updated 9.21.23-Security-System-Upgrade.pdf PDF
Warehouse-Security-System-Upgrade-Q-n-A-Part-3.pdf PDF
Warehouse-Security-System-Upgrad-Q-n-A-Part-2.pdf PDF
Warehouse-Security-System-Upgrade-Q-n-A.pdf PDF
Updated-SOW-Security-System-Upgrade.pdf PDF
RFQ-Warehouse_Security_Upgrade.pdf PDF
SOW-Security-System-Upgrade.pdf PDF
RFQ-Warehouse_Security_Upgrade.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A for Warehouse Security Systems Upgrade Solicitation Number: 15F06723Q00000469

1. Are Ceilings Suspended? Or Hard Lid?

Warehouse open, office area suspended ceiling.

2. Is there existing Cable Trays for wiring above ceilings?

No

3. Can Existing Wiring be utilized?

4. Is a “UPS” required? If so, What Time/Power Duration is required?

6 hours

5. Are “Or Equal” Equipment substitutions allowed?

Yes, the RFQ is Brand Name or Equal

6. Is “Plenum Wire” acceptable?

Yes

7. Is “After Hours Access” for said work, available to contractor at no additional cost to the Gov’t?

8. What is the height of Exterior Cameras? (If any)

About 15 ft at most

9. Please provide/post other “Q & A” requests.

Posted

10. Please provide a list of equipment to be installed.

Posted

Q&A for Warehouse Security Systems Upgrade Solicitation Number: 15F06723Q00000469

11. Is there an incumbent vendor who has been servicing the existing system?

12. If so, what is the most current contract number and amount?

N/A

13. Is there any requirement for the readers to be FICAM-compliant?

14. Are there any requirements for the system to be cyber-secure?