SF-30_15F06718R0000099_Amendment_4.pdf
PDF 298 KB Posted
- Attached to
- Job Ordering Contract Federal contract opportunity
- Solicitation number
- 15F06718R0000099
About this file
This document contains an amendment to a job order contract solicitation and related questions and answers. The solicitation is for job order contracting services to support construction, alteration, and repair projects at Federal Bureau of Investigation facilities located in Washington D.C., Quantico, Virginia, West Virginia, and Pocatello, Idaho. This is a 100% small business set-aside with a NAICS code of 236220 and size standard of $36.5 million. The contract is an indefinite delivery, indefinite quantity firm-fixed price arrangement for multi-trade maintenance, repair, alteration, and minor new construction projects ranging from $2,000 to $750,000. Pricing will be determined by applying RS Means unit pricing adjusted for location factors and the contractor's coefficient. The period of performance is one base year plus four one-year options.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question Page Number Solicitation Section Paragraph Section Service Area Question Government Response
Pgs. 1 & 2 of
Section B.2 Services &
Pricing
B.2.1 Pricing All
I have contacted the Gordian Support Group and specifically XXXX regarding the CPC Catalog to review and how to apply the wage revisions but to date, have not received the requested information. Please provide some direction on how these wage increases/changes are to apply annually and if available, receive a copy of the CPC Catalog.
The offeror must access JOC Federal to gain access to the Construction Procurement Catalog.
Attachment A in the solicitation – the Big Note – is also included in JOC Federal; the Big Note defines what labor is included in the published unit price, and what items should be considered in developing a coefficient. Published Unit
Prices, including the labor component, are different for each location. Each option year the published unit prices, including the labor component, will be updated in the CPC to escalate the prices.
Pg 3 of 114 Section B.3
B.3.2 Davis Bacon
Wage Rates
All The first is the applying of annual revised Davis Bacon
Wage Rate increases. Each of the four CLIN locations for 2018 have had multiple increases throughout this past year. The DC and Northern Va. Locations both have had nine (9) wage increases; West Va. Has had eight (8) increases; and Pocatello Id, five (5) increases for FY 2018. It is not clear how we would incorporate these annual wage changes within the coefficient parameters.
Wage rates are calculated as explained in the
Gordian Groups Big Note page 1. The wage rates developed by the Gordian Group are not based on just the Davis Bacon wage determinations but are developed by an average of prevailing wages and other factors based on location. The labor rates used in the Construction Procurement
Catalog are at least equal to and typically higher than Davis Bacon wage determinations, and are burdened as described in the Big Note. The successful contractor is responsible for ensuring they are utilizing the most current version of the
JOC Advanced Federal software by the Gordian
Group throughout the life of the contract.
11 51 H H.7.3 All
It is understood that the Contractor is required to provide their own cleared Escorts. Should the
Contractor assume that all FBI JOC projects require
Escorts? If yes, should the Escort cost to be captured in the JOC Coefficient? If not, should the Escort cost be excluded from the coefficient and captured as a non-prepriced line item within the individual project proposal?
Please reference revised Solicitation Section page 3 and Scetion C pages 22 regarding Security
Escorts.
RFP # 15F06718R0000099 Government Responses
Amendment # 2
Question 14
Answer to question 14 Introduces a new requirement for the Project Manager that he/she holds a PMP
Certification from the Project Management Institute.
Initially the requirement only read “some project management training with completion certification”.
Most often, a Licensed Engineer (PE) is considered superior training to PMP, and most Project Manager positions require one or the other. Can this answer be rephrased to Licensed PE or PMP certified?
Both Project Management Professional and
Licensed Professional Engineer would be considered, however, individuals with certifications, such as, Project Management
Institute would receive greater preference in conjunction with relevant prior work experience.
Please reference Section C pages 20 and 21-22 for added language