Questions and Answers 1 - Solicitation 15BRRC24R00000004 Dallas TX.pdf
PDF 243 KB Posted
- Solicitation number
- 15BRRC24R00000004
About this file
This document contains questions and answers regarding Solicitation 15BRRC24R00000004 for Day Reporting Center Services in Dallas County, Texas. The solicitation seeks proposals to provide services including case management, electronic monitoring, drug testing, and employment assistance for male and female federal offenders. Proposers must address staffing levels and coverage for at least 12 hours daily Monday through Friday and 8 hours on weekends, with a minimum of two staff on site during operating hours. The Bureau of Prisons requires completion of individual program plans within four days and monthly in-person checks of offenders' homes and places of employment. Video conferencing is allowed for family orientations. Responses to the solicitation are due by February 1, 2024.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 | P a g e
Solicitation 15BRRC24R00000004 – Dallas, TX Question(s) and Answer(s) #1
1. Question: Is the Subcontracting plan missing?
Answer: Yes, the Subcontracting plan was missing, and an amendment was completed to add it.
2. Question: Similar to how BOP Residential Reentry Center (RRC) contracts are considered minor use or major use, and the requirements are different for each, would the Bureau consider similar flexibility given the small size of this Day Reporting Center (DRC)? The cost of meeting the requirements in the RFP could lead to a fixed daily rate in the several hundreds of dollars as the requirements involve 12-15 full-time staff in order to meet the Bureau’s requirements.
Answer: The SOW requirement stands as is.
3. RFP References: G.2 Payment Schedule: “In consideration of the Contractor’s satisfactory performance of services called for under this contract, the Government shall make payment to the Contractor at the fixed daily rates identified in the schedule.”
Question: Given the extremely small size of the contract, would the Bureau consider a monthly flat fee for the maximum population? The cost to operate the program is essentially the same whether the Bureau utilizes 40% or 100% of the slots, which leads to an extremely high per diem if the Contractor can only rely on being paid for 40% of the slots. Also, this is a new program with no utilization history which is a further reason that a Contractor can only assume that it will receive revenue for 40% of the contract given that is the level of utilization guaranteed by the Bureau.
Alternatively, would the Bureau consider utilizing a tiered pricing structure where the first tier would represent a fixed fee that covers the contractors’ operating expenses for the minimum percentage of placements. Additional tiers would be priced at a fixed daily rate to recoup incremental costs for the next percentages of placements, resulting in lower fixed daily rates as the number of placements increases.
A flat monthly fee or a tiered pricing structure would result in the lowest cost per placement to the BOP while ensuring that contractors can operate a financially sustainable program. This may also increase competition as it would ensure that risk is shared between the contractor and the BOP, resulting in the best value for the BOP.
Answer: No flat fee or tiered pricing structure at this time. Minimum guarantees will be met.
4. SOW Reference: Chapter 2 – Personnel, 4. Staffing Pattern (page 13): The contractor will staff the premises with a minimum of two positions during identified site hours. These two positions may not be covered by key staff personnel.
Question: This seems to be more than is necessary for a DRC of this size. Would the Bureau consider revising this section to allow key staff to be utilized to cover this requirement, which would substantially reduce the number of required staff?
2 | P a g e
Answer: The SOW requirement stands as is.
5. SOW Reference: Chapter 2 – Personnel, 2. Staff Coverage (page 11): The contractor will have paid, trained staff, dressed and alert, on the premises, to provide coverage, Mondays through Fridays, a minimum of twelve (12) hours each day; and Saturdays and Sundays, a minimum of eight (8) hours each day.
Chapter 2 – Personnel, 4. Staffing Pattern (page 13): The contractor will staff the premises with a minimum of two positions during identified site hours. These two positions may not be covered by key staff personnel.
Question: Would the BOP reduce the required hours of operation to a minimum of eight (8) hours each day Monday through Friday; four (4) hours on Saturday, and closing the facility on Sunday? This change allows the number of required non-key personnel staffed during identified site hours to be more efficiently utilized and doesn’t negatively impact accountability as GPS tracking will be used to track/verify a participant’s whereabouts.
Answer: The requirement will stay as outlined in the SOW.
6. SOW Reference: Chapter 2 – Personnel, 3. Position Requirements, Electronic Monitoring Specialist (page 12): A minimum of one EMS is required to be on duty at all times.
Question: With an understanding that staffing a minimum of one Electronic Monitoring Specialist be on duty at all times would require a contractor’s staffing of the Electronic Monitoring Specialist position to account for relief, coverage of lunch breaks, call outs, etc. It should be noted that complying with this requirement would require up to six or seven full-time equivalents of Electronic Monitoring Specialist, this level of staffing is disproportionately high when factoring a minimum participant count of 24 placements. Also, if the EMS is an hourly position, the contractor would need to pay the hourly rate plus an overtime premium, when applicable.
Would the BOP allow Contractors during non-operating hours to cover this responsibility with staff that may not be 100% dedicated to this contract, such as a monitoring call center or a key staff dedicated to this contract that is not an EMS?
Answer: The SOW requirement stands as is. It is the contractor’s decision how to structure the pay and staffing on the EMS position.
7. SOW References: Chapter 11-Security & Accountability, 1. Offender Accountability (page 63): Additionally, accountability procedures must provide for active, live monitoring of GPS alerts and include a GPS review for each offender with documentation once every 8 hours at a minimum.
Question: If the vendor has an electronic monitoring records database with an automated feature that dates, timestamps, and documents alerts/events in chronological order for an offender, will that suffice for “documentation once every 8 hours at a minimum”, or will the DRC staff still be
3 | P a g e required to physically/manually conduct a review and documentation entry once every 8 hours at minimum?
Answer: The DRC SOW requirement is for DRC staff to review and document every 8 hours.
Automatic system alerts are not sufficient.
8. SOW References: Chapter 3 – Facility, (page 27): gender bathrooms must be identified on the floor plans. Chapter 3 – Facility, 4. Plant Requirements, C) Space (page 29): A specified bathroom area to conduct urinalysis will be identified. Chapter 3 – Facility, 4. Plant Requirements, D) Lavatory (page 29): A DRC will have a minimum of two operable toilets and two wash basins.
Questions: What is the minimum number of gender bathrooms required for a DRC? Within the gender bathrooms, what is the minimum number of toilets required for each? May one of the bathrooms be utilized for urinalysis and also utilized as one of the required gender bathrooms?
Answer: A minimum of two bathrooms are required, with at least one toilet in each bathroom. It is acceptable for one of the two bathrooms to be specified as the UA bathroom to meet all requirements.
9. SOW Reference: Chapter 10 - Programs, Individual Program Plan (page 53). Within four calendar days of the offender’s arrival at the DRC, Case Managers, in consultation with the EPS, will complete the IPP, using Attachment F or subsequent versions.
Question: Would the BOP allow this task to be completed within ten (10) business days to align with the RRC SOW, or at a minimum four (4) operating business days, to ensure Case Managers can complete this task without being required to work on weekends or during federal holidays?
Answer: No, the SOW requirement stands as is.
10. SOW References: Chapter 10- Programs, 2. Individual Orientation, (page 55): The offender’s family members/significant others living at the home confinement location should ordinarily attend an orientation meeting at the DRC, to describe the purpose, accountability, and expectations of the offender. However, if the family/significant others cannot attend the initial orientation meeting at the DRC upon offender arrival, the family/significant other orientation can take place during the site visit conducted by contractor staff.
Question: Would the BOP please clarify if program staff will be permitted to conduct video conferencing sessions with an offender’s family members/significant others in order to provide an orientation meeting, describe the purpose, accountability and expectations of the offender.
Offering this alternative method of communication, it will allow for more flexibility with any family members/significant others scheduling needs.
Answer: Yes, program staff will be permitted to conduct video conferencing sessions for the situations indicated in the question.
4 | P a g e
11. SOW References: Chapter 10 – Programs, 3. Employment, B) Employment Approval and Verification, 2. Monthly Check (page 58): Thereafter, at least monthly, the offender's employment supervisor will be contacted by phone or site visits to substantiate attendance and discuss any concerns which may have arisen.
Chapter 11 – Security & Accountability, 4. On-site Accountability (page 64): As all offender accountability is monitored by GPS, DRC staff will visit the offender’s home and place of employment at least once every 30 days.
Question: Would the BOP please clarify that DRC staff may conduct monthly employment checks with the participant’s supervisor by phone in lieu of an in-person visit to substantiate attendance, as outlined in Chapter 10?
Answer: No, the intent is for in-person visits with the individual at the locations of the home and place of employment every 30 days. Employment checks with the employer/supervisor is separate.
12. Question: Would the BOP confirm if FAR 52.219-9 and 52.219-9 Alt II apply to this solicitation? It should be noted that FAR 52.219-9 is referenced in K.1 and G.5 of the solicitation, but not included in Section I - Contract Clauses.
Answer: FAR 52.219-9 and 52.219-9 Alt. II does not apply to this solicitation.