Boiler Inspection Form.pdf
PDF 222 KB Posted
- Attached to
- National Boiler Inspection Services Federal contract opportunity
- Solicitation number
- 15BNAS21Q00000032
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Chapter 11 boiler inspection.pdf | ||
| Business Quotation Information.pdf | ||
| SOW-National Boiler Inspection Contract-7-8-21.pdf | ||
| 15BNAS21Q00000032.pdf | ||
| Cover Letter Solicitation.pdf | ||
| Evaluation Criteria.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUREAU OF PRISONS
BOILER INSPECTION
REPORT
TYPE OF INSPECTION:
A INTERNAL AND EXTERNAL
B INTERNAL AND EXTERNAL WITH HYDROSTATIC TEST
C EXTERNAL WHILE OPERATIONAL
D EXTERNAL INSPECTION WITH HYDROSTATIC TEST
E INTERNAL AND EXTERNAL OF OTHER PRESSURE
VESSEL
DATE OF INSPECTION
INSPECTION NUMBER
CONTRACT NUMBER
SECTION I - IDENTIFICATION
INSTITUTION Type of Service(Steam Heat/Dom HW/Heat loop) BUILDING
BOILER TYPE (Fire Tube/Water Tube) MODEL BOILER # (Per BOP ITMS System) MANUFACTURER’S RATING (HP)
MANUFACTURED BY YEAR BUILT YEAR INSTALLED FUEL
DESIGN WORKING PRESSURE PRESSURE ALLOWED SAFETY VALVE SETTING PRESSURE OBSERVED
STEAM HYDROSTATIC Lbs.
SECTION II - STATEMENT FROM OPERATOR
REPAIRS MADE SINCE PREVIOUS INSPECTION
SECTION III - INTERNAL INSPECTION (Types A, B & E only)
DESCRIBE INSPECTION FULLY (State location of any scale, grease oil or other deposits; any corrosion, pitting, grooving, cracks or de-laminations; any evidence of overheating, such as bulging, or warping; any broken or loose rivets or stays, etc.)
SECTION IV - EXTERNAL INSPECTION
CONDITION OF SEAMS, TUBE ENDS, PIPE CONNECTIONS, ETC. (Describe fully and state the location of any corrosion, leakage, erosion, evidence of overheating, soot or other destructive accumulations, etc.)
Sample of Potential Required Report
SECTION V - INSPECTION OF SAFETY DEVICES
SAFETY
VALVES
SIZE (No. & diameter)
SET AT (Lbs)
CONDITION AND HOW TESTED
PRESSURE GAGE
STATE CORRECTION, IF MADE. STATE REASON, IF NOT TESTED.
OTHER
APPLIANCES
WATER COLUMNS, GAGE GLASSES, GAGE COCKS, BLOW OFF AND VALVE OR COCKS, FEED PIPE., ETC.
REGULATORS
AND CONTROLS
FEED WATER, DAMPER, COMBUSTION, ETC.
SECTION VI - STATEMENT OF INSPECTOR
WAS BOILER PREPARED FOR THROUGH EXAMINATION? (If not, explain why in Section VII,)
YES
NO
WAS BOILER ENTERED FOR INSPECTION? (If not, explain why in Section VII,)
YES
NO
SECTION VII - REMARKS AND RECOMMENDATIONS OF INSPECTOR
LIST DEFICIENCIES TO BE CORRECTED AND REPAIRS TO BE MADE. (Use supplemental sheet, if necessary)
TYPED NAME AND TITLE OF INSPECTOR
SIGNATURE OF INSPECTOR
SECTION VIII - ACTION TAKEN ON RECOMMENDATIONS
TYPED NAME AND TITLE OF CONTRACT ADMINISTRATOR
SIGNATURE OF CONTRACT ADMINISTRATOR