Evaluation_Criteria_updated.pdf

PDF 152 KB Posted

Attached to
40 mm Single Shot and Multi Shot Launchers
Solicitation number
15BNAS18R0097
Issued by

About this file

Updated Evaluation Criteria

View the file

Other files

File Type Posted
Statment_of_Work01_05.pdf PDF
Question.pdf PDF
Combined_Synopsis_&_Solicitation_Notice.pdf PDF
Past_Performance_Questionnaire.doc DOC document
Submission_of_offers.pdf PDF
BOP_Physical_Address.pdf PDF
Business_Management_Questionnaire.doc DOC document
Evaluation_Criteria_12_12.pdf PDF
Statment_of_Work_12_12.pdf PDF
BANK_NOTIFICATION_LETTER.docx DOCX document
Schedule_Items.xlsx XLSX spreadsheet
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment III 15BNAS18R0097

Evaluation Criteria

National Acquisitions Section

The Bureau will evaluate each offer based on the best value, trade-off process as outlined in the Federal Acquisition

Regulations, part 15.101-1- Tradeoff Process. All evaluation factors and sub-factors other than price, when combined, are significantly more important than price. Evaluations will note the strengths, deficiencies, weaknesses (to include significant weaknesses) and risks of each proposal, in a summary format with supporting narrative

Definitions.

Strength is an aspect of the proposal that increases the likelihood of successful contract performance.

Deficiency is a material failure of a proposal to meet a

Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.

A weakness is a flaw in the proposal that increases the risk of unsuccessful contract performance. A “significant weakness” in the proposal is a flaw that appreciably increases the risk of unsuccessful contract performance.

A Risk is a potential to cause disruption of schedule, increased cost or degradation of performance.

NON-PRICED FACTORS:

Factor 1: Technical

Sub factor A- Written technical proposal. This written proposal shall contain the following: (DUE NO LATER THAN

PROPOSAL DUE DATE)

I. Technical specifications addressing all requirements in the statement of work (SOW) in the following sections:

a. Section 3 Technical Requirements

b. Section 4 Deliverables and Delivery

Schedule.

II. Manufacturer’s warranty certificate

III. Oral presentation

Sub factor B- The offeror shall hand delivered the following items on the day of the

Oral Presentation/demonstration:

1. One (1) single shot launcher

2. One (1) multi shot launcher

3. Two (2)rounds of each of the following less than lethal munitions:

I. (40mm) Foam rubber multiple baton round

II. (40mm) 60 caliber stinger 5 inch

III. (40mm) Smoke projectile (saf-smoke)

IV. (40mm) CS Speedheat projectile (short range)

V. (40mm) CS Speedheat projectile (long range)

VI. (40mm) any other specialty impact munition for close range use (ie 5ft)

All required items listed in the sub factor B, must clearly meet specifications in accordance with the SOW except the less than lethal munitions.

Sub factor B evaluation shall consist of oral presentation and demonstration.

The Oral presentation and demonstration shall be limited to the offerors whose volume one (1) and sub factor A considered within the competitive range.

Oral presentation shall be delivered using Microsoft

PowerPoint addressing items listed in the evaluation criteria. (DUE NO LATER THAN PROPOSAL DUE DATE)

Demonstration- The offerors shall conduct live fire demonstration using single shot launcher and multi shot launcher.

Oral Presentation and Demonstration

The Contracting Officer (CO) will notify Offerors of the date, and time they are scheduled to give the oral presentation and demonstration. Offerors will be provided advance notice of the date and time they are scheduled to present. The CO will determine the order in which offerors are scheduled. Requests to reschedule will be at the discretion of the CO.

The CO will maintain a record of the oral presentation and demonstration to document what the Government relied upon in making the source selection decision. The method and level of detail of the record will be video recording, government notes, and copies of offeror demonstration slides.

When oral presentation and demonstration includes information that the parties intend to include in the contract as material terms or conditions, the information shall be put in writing. Any changes to the offerors original proposal shall be done in writing.

Oral presentation shall be prepared and delivered using Microsoft PowerPoint at the appointed time and location. Offerors have discretion on the format, organization, and conduct of their presentation with the exceptions that no video clips may be embedded in the presentation.

Delivery

Offeror’s oral presentation is limited to two (2) hours.

Offeror’s demonstration is limited to one (1) hour.

Bureau does not intend to ask any questions during the

Offeror’s prepared portion of its oral presentation and demonstration. However, the Government may request clarification of any points addressed which are unclear. Any such interchange between the offeror and the Government will be for clarification only and will not constitute discussions within the meaning of FAR

15.306(a). The time required for clarifications will not be counted against the offeror's time limit. Only

Offeror’s three (3) Key Personnel are authorized to attend the oral presentation/demonstration. At the discretion of the Offeror.

It is the Offeror’s responsibility to present all material within the allotted time and only those materials presented during the allotted time for the oral presentation will be considered in the evaluation. Offeror’s must discuss each slide in its presentation in sufficient detail and allow sufficient time for SEB members to fully comprehend the slide’s relationship and relevance to the Offeror’s proposal.

The types of information shall be presented and evaluated in the oral presentation.

The 40 mm single and multi-shot launchers will be evaluated on the following criteria:

Caliber: 40MM

Operation: Fully mechanical, no electronic controls.

Loading: Shall have a top or ambidextrous breach loading ability.

Breach Release: Breach release shall be ambidextrous.

Trigger: Double action only trigger.

Hammer: Hammer shall be internal or external.

Sights: Shall have (white or visibly colored) front post sight and notch or ring rear sights. Sights shall be constructed of steel or hardened aluminum, be an independent matched set, and attached to the device via 1913 Picatinny rail.

Barrel: Device shall be equipped with a corrosive resistant and rifled barrel. Operating Temperature:

Shall be able to fully operate in temperatures ranging from -40 F to 140 F.

Ruggedized: Shall be resistant to environmental factors such as rain, salt water, dust, sand, and snow.

Munitions Compatibility: Shall be able to launch full array of non-lethal munitions with various lengths, ranging from 2.85 inches to 5.0 inches.

Appearance: Shall be monochromatic in color (to include the barrel, frame, grip, and buttstock) and be either black or dark tan. Markings shall be limited to serial number, manufacturer information, country of origin, model, caliber, and import information (if applicable), and safety or breech opening identifiers.

All markings shall be consistent in size and font. The device shall not be marked with inconsistent graphics.

Sling: Shall be equipped with at least one single-point sling attachment. At least one sling attachment point must be able to be accessed from the right and left side of the device.

The launcher’s total weight shall not exceed 11-13 lbs. The total length of the weapon shall not exceed

34 inches with stock open o1r fixed stock.

Buttstock: Shall be equipped with a foldable or collapsible buttstock, constructed of aluminum or durable polymer material. The stock shall be equipped with non-slip checkering, stippling, or grooves on the furthest rearward vertical surface.

Pistol grip: Shall be constructed of rubber or plastic and have non-slip checkering or stippling textured grip. The pistol grip shall be the same color as the device.

Accessory Vertical Grip: The vertical grip shall be textured with non-slip checkering, stippling, or grooves.

The barrel shall be capable of firing a minimum of

5000 rounds without significant wear.

The weapon system must have a gauge kit available to use for preventative maintenance checks and services.

Demonstration-The offeror shall conduct live fire demonstration on the single shot launcher and multi-shot launcher using the less than lethal rounds stated in sub factor b.

The trigger should be able to be pulled again on a round that does not discharge.

If the weapon cylinder is not aligned with the barrel the weapon should not be able to be fired.

The weapon should be capable of being manually advanced to a specific round then the trigger can be pulled when multiple types of ammunition are being carried.

The launchers shall maintain full and uninterrupted operability throughout test firings of all Bureau’s operational less lethal munitions. The device must operate, without device failure, for a minimum of 6 firings of each of the following munitions.

I. (40mm) Foam rubber multiple baton round

II. (40mm) 60 caliber stinger 5 inch

III. (40mm) Smoke projectile (saf-smoke)

IV. (40mm) CS Speedheat projectile (short range)

V. (40mm) CS Speedheat projectile (long range)

VI. (40mm) any other specialty impact munition for close range use (ie 5ft)

Factor 2: Past Performance

Recent and relevant past performance will be evaluated on its performance under existing and prior contracts for similar services, with an emphasis on the similarity of the Offeror’s experience to the Request for Proposal (RFP). The purpose of

Past Performance is to allow the government to review the

Offerors recent and historical probability of meeting the solicitation requirements. It is the Offeror’s responsibility to provide the questionnaire to the contractors to complete and return to the offeror for submittal along with their proposal.

A Offeror’s past performance information shall include three

(3)of the contractor’s most recent contracts occurring during the past five years that are similar and relevant in nature to the services required in the Statement of Work. Contracts listed may include those entered into with the Federal Government, agencies of state and local government, and commercial entities.

Offerors shall address any instances of past performance problems in the referenced contracts and explain how these problems were resolved. The Government may consider efforts performed by the offeror for agencies of the federal, state, or local governments and commercial customers as potentially relevant to the Past Performance evaluation.

Offerors should not provide general information on their performance on the identified contracts. General performance information MUST be obtained from the references on the Past

Performance Questionnaire and submitted along with the contractor’s proposal. Offeror’s without a record of relevant company past performance or for whom information on Past

Performance is not available will not be evaluated favorably or unfavorably on Past Performance. References other than those identified by the offeror may be contacted. Information utilized may be obtained from the references listed in the proposal, other customers known to the Government or of whom it becomes aware, and any others who may have useful and relevant information (i.e. Past Performance Information Retrieval System

(PPIRS), System for Award Management (SAM), Federal Awardee

Performance & Integrity Information System (FAPIIS), and internet).

Factor 3: Price

Price is defined as the offerors’s price proposal. The CO will evaluate price independently. Pursuant to FAR 17.203(b), the

Government’s evaluation of offers shall be inclusive of options.

Price proposal in Schedule of Items (Attachment I) will be evaluated on the base period and options periods in total.

File details come from the government source that posted it.