This document is Amendment 0004 to Federal Bureau of Prisons Request for Quotation 15BBNF26Q00000048 for the Upgrade of Health Services Elevator at FCI Englewood. The amendment, issued on 04/01/2026 by Contracting Officer Lucas Bonner, incorporates additional contractor questions and answers clarifications to the solicitation. The offer deadline has been extended to 5/8/2026, with all previous terms and conditions remaining unchanged and in full force and effect.

The Questions and Answers address 14 contractor inquiries regarding project specifications and requirements. Key clarifications include: a geared machine is required (gearless machines not acceptable); emergency video communications are not required as security cameras will be installed; wind-up safeties must be replaced with new emergency brakes; contractor bids must include 12 months of manufacturer's warranty; storage space will be provided for a 48"-60" job box on the mid-level floor and/or rooftop mechanical room; this is a turnkey project including all work to complete the Statement of Work and elevator modernization; the original elevator dates to 1938; any items not specifically identified for retention must be replaced with new components; existing elevator emergency power connection from backup generators will remain; fire alarm upgrades/replacements will be addressed in a separate scope of work; and as-built drawings/one-line diagrams are not available. The amendment does not specify pricing terms, set-asides, or award information.

View the file

Other files for this federal contract opportunity

Other files attached to FCI Englewood - Upgrade Health Services Elevator, newest first.
File Type Posted
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0002 Attachement - Questions and Answers.pdf PDF
Amendment 0001.pdf PDF
Amendment 0001 - Attachment 4 Photos.pdf PDF
Amendment 0001 - Attachment 3 Photos.pdf PDF
Amendment 0001 - Attachment 1 Photos.pdf PDF
Amendment 0001 - Attachment 2 Photos.pdf PDF
1 - Criminal History Check Form.pdf PDF
15BBNF26Q00000048.pdf PDF
1 - Instructions to Offerors.pdf PDF
Wage Determination.pdf PDF
Bid Bond.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15BBNF26Q00000048/0004 Page 1 of 1

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 1

2. AMENDMENT/MODIFICATION NUMBER

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

15BNASCODE

Federal Bureau of Prisons National Acquisitions Section 320 First Street NW Suite 5005 Washington, DC 20534

6. ISSUED BY CODE7. ADMINISTERED BY (If other than Item 6)

9A. AMENDMENT OF SOLICITATION NUMBER

15BBNF26Q00000048

CODE FACILITY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, country, state and ZIP Code) (X)

X 9B. DATED (SEE ITEM 11)

04/01/2026

10A. MODIFICATION OF CONTRACT/ORDER

NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X XThe above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning ____copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 0004 is hereby issued to incorporate additional contractor questions/answers.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Lucas Bonner Contracting Officer

(Signature of person authorized to sign)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

By (Signature of Contracting Officer)

16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

Request for Quotation 15BBNF26Q00000048 Upgrade Health Services Elevator – FCI Englewood Questions and Answers

Question 1:

The specification calls for a new geared machine. Would a new gearless machine be acceptable if more cost effective?

BOP Response: Clarification or Change Clarification: Gearless machine will not be accepted.

Question 2:

Since this is under federal jurisdiction will 2022 code be required including the 24/7 Emergency Video Communication in the car operating panel?

Clarification: Institutional elevators will not include Emergency video communications as there will be security cameras in the elevator. Per section B subsection 2.1 part b and section B subsection 2.6 part f, contractor required to provide video capability for entrapment assessment.

Question 3:

The elevator currently has wind-up safeties, and it is recommended to replace these. The specification does not include new safeties.

Should new safeties be included in the specification or an add alternate? Or should we retain the existing safeties as currently stated on the specification?

Clarification: Section B subsection 2.2 part O covers emergency brakes. Any items not specifically identified as to “Retain, reuse, or refurbish” shall be replaced with new.

Question 4:

Should pricing include 12 months of warranty maintenance?

Clarification: Contractor bids shall include a 12 month manufacturer’s warranty for completed work.

Question 5:

Please clarify where on site storage will be located for materials?

Location from the hoistway will affect the installation duration.

Clarification: Storage space for a 48” to 60” job box will be available on the mid-level floor near the elevator and/or in the rooftop mechanical room. Please note, rooftop mechanical room has limited access. Tool control and storage will be discussed in further detail during pre-construction meeting.

Question 6:

Existing hall stations are surface mount. Will surface mount be acceptable for the new hall stations?

Clarification: Section B subsection 2.8 covers Hall Controls.

Question 7:

Is this a turnkey project? In other words, is the elevator contractor carrying the required ‘work by others’? (Fire safety and electrical). If that’s the case, it will be impossible to provide an accurate bid by 4/24/2026. Can the bid date be extended by to 5/15/2026?

BOP Response: Clarification or Change Clarification: This is to be a turnkey project to include all work to complete the SOW and a complete elevator modernization. The solicitation has been extended, offers are due on 5/8/2026.

Question 8:

What year was this elevator installed?

BOP Response: Clarification or Change Clarification: Original building construction was 1938, and elevator is assumed to be original.

Question 9:

Will the elevator machine, governor, rope gripper, fixtures, and roller guides be retained? These are items that are normally replaced on the full modernization, along with traveling cable & hoistway wiring. It’s extremely unusual to retain all of these items.

Clarification: Any items not specifically identified as to “Retain, reuse, or refurbish” shall be replaced with new.

Question 10:

Is the existing elevator currently connected to an emergency power source/ATS, and is that connection intended to be reused?

Clarification: Yes, the existing elevator is connected to emergency power from backup generators located in out outside powerhouse.

Yes, that connection will remain.

Question 11:

Is the contractor expected to provide new routing, conduit, or connections between the elevator system and the ATS if not currently in place?

Clarification: Not Applicable

Question 12:

Please confirm whether the existing fire alarm system is compatible with the new elevator controller requirements, or if upgrades/replacement are anticipated under this project or by others.

Clarification: Upgrades/Replacements are expected and will be addressed in a separate scope of work.

Question 13:

If fire alarm upgrades are required, should this be included in the contractor’s scope or will it be handled separately?

Clarification: Upgrades/Replacements are expected and will be addressed in a separate scope of work.

Question 14:

Are as-built drawings or one-line diagrams available for the existing electrical and fire alarm systems?

Clarification: Drawings/one-line diagrams are not available.